CN103278055B - Roof-cutting pressure relief method in hard-roof deep-hole pre-splitting blasting - Google Patents

Roof-cutting pressure relief method in hard-roof deep-hole pre-splitting blasting Download PDF

Info

Publication number
CN103278055B
CN103278055B CN201310216309.XA CN201310216309A CN103278055B CN 103278055 B CN103278055 B CN 103278055B CN 201310216309 A CN201310216309 A CN 201310216309A CN 103278055 B CN103278055 B CN 103278055B
Authority
CN
China
Prior art keywords
hole
roof
seam
blast hole
blast
Prior art date
Application number
CN201310216309.XA
Other languages
Chinese (zh)
Other versions
CN103278055A (en
Inventor
张宏伟
朱志洁
陈蓥
霍丙杰
兰天伟
Original Assignee
辽宁工程技术大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 辽宁工程技术大学 filed Critical 辽宁工程技术大学
Priority to CN201310216309.XA priority Critical patent/CN103278055B/en
Publication of CN103278055A publication Critical patent/CN103278055A/en
Application granted granted Critical
Publication of CN103278055B publication Critical patent/CN103278055B/en

Links

Abstract

The invention relates to a roof-cutting pressure relief method in hard-roof deep-hole pre-splitting blasting, belongs to the technical field of blasting pressure relief, relates to a method of controlling coal pillar stress concentration and intense gob-side entry strata behaviors caused by suspension of gob hard roofs in thick seams and super high seams, and solves such problems of coal pillar stress concentration and intense gob-side entry strata behaviors caused by suspension of gob hard roofs in thick seams and super high seams. The method is effective and widely applicable and includes the steps of firstly, reserving a roof-cutting roadway in coal pillars along a seam roof before working face extraction in case of the seam being the super high seam; if the seam is the thick seam, directly using a mining roadway as a roof-cutting roadway; secondly, if the seam is the super high seam, longitudinally reserving blast holes in the roof strata above the roof-cutting roadway; and thirdly, loading explosives, sealing the holes and allowing for roof-cutting blasting.

Description

A kind of tight roof Deephole pre-splitting blasting cuts top pressure relief method

Technical field

The invention belongs to Relieving Shot field, relate to a kind of high seam and super high seam goaf tight roof to hang and push up the stress of coal pillar caused and to concentrate and gob side entry ore deposit pressure manifests strong prevention and controls, particularly relate to a kind of tight roof Deephole pre-splitting blasting and cut top pressure relief method.

Background technology

In high seam and super high seam exploitation, when particularly top board is multi-layered thickness larger competent bed, along with working face is pushed ahead, it is outstanding and do not collapse with coal column to be that the strong point forms the cantilever beam of certain length, supports overlying rock.Along with working face periodic weighting, this layer of top board tilts to goaf at a certain angle, the spoil of inbreak is difficult to be full of goaf, side direction concentrated stress increases, coal column edge coal body destroys, concentrated stress shifts to deep, causes the strong ore deposit pressures such as the sinking of contiguous working face extraction back, pucking, anchor pole (rope) fracture to manifest, easily brings out rock blast hazard time serious.For addressing this problem, with the method for passive increasing width of chain pillar and strengthening supporting, adopt ensures that roadway surrounding rock is stablized more, and these methods fail to solve this problem from basic, and waste coal resources.

Summary of the invention

For prior art Problems existing, the invention provides a kind of tight roof Deephole pre-splitting blasting and cut top pressure relief method, this method solve high seam and super high seam goaf tight roof to hang and push up the stress of coal pillar caused and to concentrate and gob side entry ore deposit pressure manifests the problems such as strong, successful, has practicality widely.

To achieve these goals, the present invention adopts following technical scheme: a kind of tight roof Deephole pre-splitting blasting cuts top pressure relief method, comprises the steps:

Step one: arrange and cut tunnel, top

If coal seam thickness is greater than 8m, be super high seam, before working face extraction, arrange along roof in coal column and cut tunnel, top, and be 7m ~ 9m with the horizontal separation of stope drift active workings;

If coal seam thickness is 3.5m ~ 8m, be high seam, then direct using described stope drift active workings as cut top tunnel;

Step 2: arrange blast hole

If coal seam is super high seam, cut top tunnel above roof strata in be vertically arranged with several tilt blast hole; If coal seam is high seam, in the coal seam of cutting above tunnel, top and roof strata, be vertically arranged with several blast holes tilted;

Blast hole and roof angle are 30 ° ~ 80 °, and be 3 ~ 5 times of coal seam thickness to the vertical range of cutting top back at the bottom of blast hole hole, blast hole diameter is 60mm ~ 90mm;

Step 3: powder charge sealing of hole and cut top explosion

Powder charge in blast hole also by stemming sealing of hole, is implemented to cut top explosion; Loaded length is 0.6 ~ 0.75 times of blast hole hole depth, and stemming filling length is 0.25 ~ 0.4 times of blast hole hole depth.

Described blast hole is arranged on to be cut above tunnel, top and in the roof strata helped near the stope drift active workings tunnel adjacent with coal column.

Described blast hole is arranged in same plane.

Distance between described adjacent blast hole is 3m ~ 5m.

Centre position between described adjacent blast hole is provided with control hole in parallel, and the diameter of control hole is 80mm ~ 100mm; Control hole hole depth is all identical with blast hole hole depth, and after setting up control hole, the distance between described adjacent blast hole is 8m ~ 10m; Described control hole does not need charge explosion, controls the direction of explosion energy effect on the one hand, improves the utilization rate of explosion energy, improve the effect of explosion; Serve the effect of compensation space on the other hand, what the coal body after explosion was destroyed relatively evenly by compacting again, can not produce the phenomenon of a larger compression ring after eliminating deep hole standing shot.

Beneficial effect of the present invention:

The present invention carries out presplit blasting to tight roof and cuts top, destroys the integrality of tight roof.Along with the propelling of working face, tight roof is along the crack fracture that presplit blasting produces, and destroy the cantilever beam structure of working face side direction top board, thus stress of coal pillar is reduced, plastic failure area reduces, and improves stability of coal pillar; The surrouding rock stress in contiguous working face extraction tunnel reduces, and roadway deformation and destructiveness be corresponding reduction also, decreases tunnel and overhauls number of times.Present invention, avoiding and hang top due to tight roof large area and cause stress of coal pillar to be concentrated and the impulsion pressure disaster of bringing out.Successful of the present invention, has practicality widely.

Accompanying drawing explanation

Fig. 1 is for adopting super high seam coal petrography section structure schematic diagram of the present invention;

Fig. 2 is the A-A sectional view of Fig. 1;

Fig. 3 is the B-B sectional view of Fig. 2;

Fig. 4 is for adopting high seam coal petrography section structure schematic diagram of the present invention;

Fig. 5 is the C-C sectional view of Fig. 4;

Fig. 6 is the D-D sectional view of Fig. 5;

Wherein, 1-stope drift active workings, 2-cut tunnel, top, 3-coal column, 4-blast hole, 5-control hole, 6-working face, 7--coal seam, 8--roof strata;

α--blast hole (control hole) and roof angle, distance between W-adjacent blast hole, to the vertical range of cutting top back at the bottom of H--blast hole (control hole) hole, M--coal seam thickness, D1--blast hole diameter, D2--control hole diameter, L--blast hole (control hole) hole depth, S--cuts the horizontal separation between tunnel, top and stope drift active workings.

Detailed description of the invention

Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.

Embodiment one:

As shown in FIG. 1 to 3, the present embodiment coal seam thickness M is 10m, specifically comprises the following steps:

Step one: arrange and cut tunnel 2, top

Described coal seam 7 is super high seam 7, therefore before working face 6 back production, in coal column 3, cuts tunnel 2, top along coal seam 7 top board driving, and the horizontal separation S cut between tunnel, top and stope drift active workings is 7m;

Step 2: arrange blast hole 4 and control hole 5

Whole piece cuts the blast hole 4 and the control hole 5 that longitudinally arrange inclination in the roof strata 8 above tunnel 2, top, and control hole 5 is arranged on the centre position between adjacent blast hole 4; Blast hole 4 and control hole 5 aperture push ups tunnel 2 and helps near the tunnel of working face 6 apart from being 1.5m with cutting, stope drift active workings 1 are arranged in the tunnel side place perpendicular of coal column 3 at the bottom of hole, blast hole 4 and control hole 5 be arranged in parallel in same plane, blast hole (control hole) and roof angle α are 45 °, distance W between adjacent blast hole is 10m, at the bottom of blast hole (control hole) hole to cut top back vertical range H be 50m, blast hole diameter D1 is 85mm, control hole diameter D2 is 90mm, and blast hole (control hole) hole depth L is 70m;

Step 3: powder charge sealing of hole and cut top explosion

Adopt continuous coupled mode to carry out powder charge to blast hole 4, loaded length is 49m, and adopt stemming to carry out sealing of hole, stemming is made up of water stemming material and yellow mud, and sealed borehole length is 21m.Adopt double detonator, two primacord to ignite, explosion explosive used is three grades of emulsion explosive for coal mine, explosive specification 70mm × 500mm, implements to cut top bursting work.

Embodiment two:

As shown in Fig. 4 ~ Fig. 5, the present embodiment coal seam thickness M is 5m, specifically comprises the following steps:

Step one: arrange and cut tunnel 2, top

Described coal seam 7 is high seam 7, using described stope drift active workings 1 as cutting tunnel 2, top;

Step 2: arrange blast hole 4 and control hole 5

Whole piece is cut in coal seam 7 above tunnel 2, top and roof strata 8 and is vertically arranged with blast hole 4 and the control hole 5 of inclination, and control hole 5 is arranged on the centre position between adjacent blast hole 4; Blast hole 4 and control hole 5 with cut that to push up the distance helped in tunnel, tunnel 2 be 1.5m near coal column 3, blast hole 4 and control hole 5 be arranged in parallel in same perpendicular, blast hole (control hole) and roof angle α are 45 °, distance W between adjacent blast hole is 10m, at the bottom of blast hole (control hole) hole to cut top back vertical range H be 25m, blast hole diameter D1 is 85mm, and control hole diameter D2 is 90mm, and blast hole (control hole) hole depth L is 35m;

Step 3: powder charge sealing of hole and cut top explosion

Adopt continuous coupled mode to carry out powder charge to blast hole 4, loaded length is 24m, and adopt stemming to carry out sealing of hole, stemming is made up of water stemming material and yellow mud, and sealed borehole length is 11m.Adopt double detonator, two primacord to ignite, explosion explosive used is three grades of emulsion explosive for coal mine, explosive specification 70mm × 500mm, implements to cut top bursting work.

Claims (4)

1. tight roof Deephole pre-splitting blasting cuts a top pressure relief method, it is characterized in that comprising the steps:
Step one: arrange and cut tunnel, top
If coal seam thickness is greater than 8m, be super high seam, before working face extraction, arrange along roof in coal column and cut tunnel, top, and be 7m ~ 9m with the horizontal separation of stope drift active workings;
If coal seam thickness is 3.5m ~ 8m, be high seam, then direct using described stope drift active workings as cut top tunnel;
Step 2: arrange blast hole
If coal seam is super high seam, cut top tunnel above roof strata in be vertically arranged with several tilt blast hole; If coal seam is high seam, in the coal seam of cutting above tunnel, top and roof strata, be vertically arranged with several blast holes tilted; Described blast hole is arranged in the roof strata helped near the stope drift active workings tunnel adjacent with coal column;
Blast hole and roof angle are 30 ° ~ 80 °, and be 3 ~ 5 times of coal seam thickness to the vertical range of cutting top back at the bottom of blast hole hole, blast hole diameter is 60mm ~ 90mm;
Step 3: powder charge sealing of hole and cut top explosion
Powder charge in blast hole also by stemming sealing of hole, is implemented to cut top explosion; Loaded length is 0.6 ~ 0.75 times of blast hole hole depth, and stemming filling length is 0.25 ~ 0.4 times of blast hole hole depth.
2. tight roof Deephole pre-splitting blasting according to claim 1 cuts top pressure relief method, it is characterized in that described blast hole is arranged in same plane.
3. tight roof Deephole pre-splitting blasting according to claim 1 cuts top pressure relief method, it is characterized in that the distance between described adjacent blast hole is 3m ~ 5m.
4. tight roof Deephole pre-splitting blasting according to claim 1 cuts top pressure relief method, it is characterized in that the centre position between described adjacent blast hole is provided with control hole in parallel, and the diameter of control hole is 80mm ~ 100mm; Control hole hole depth is all identical with blast hole hole depth, and after setting up control hole, the distance between described adjacent blast hole is 8m ~ 10m.
CN201310216309.XA 2013-05-31 2013-05-31 Roof-cutting pressure relief method in hard-roof deep-hole pre-splitting blasting CN103278055B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310216309.XA CN103278055B (en) 2013-05-31 2013-05-31 Roof-cutting pressure relief method in hard-roof deep-hole pre-splitting blasting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310216309.XA CN103278055B (en) 2013-05-31 2013-05-31 Roof-cutting pressure relief method in hard-roof deep-hole pre-splitting blasting

Publications (2)

Publication Number Publication Date
CN103278055A CN103278055A (en) 2013-09-04
CN103278055B true CN103278055B (en) 2015-02-25

Family

ID=49060645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310216309.XA CN103278055B (en) 2013-05-31 2013-05-31 Roof-cutting pressure relief method in hard-roof deep-hole pre-splitting blasting

Country Status (1)

Country Link
CN (1) CN103278055B (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103557006B (en) * 2013-11-21 2015-10-28 兖矿集团有限公司 Tunnel reasonable Arrangement method under large area tight roof
CN103615286B (en) * 2013-12-06 2017-07-18 中国矿业大学(北京) Working face open-off cut top pressure relief method
CN103940568B (en) * 2014-04-11 2016-08-17 中国矿业大学 A kind of method detecting tight roof relieving shot effect
CN104100266B (en) * 2014-08-04 2016-08-24 山东科技大学 The method of preventing and treating gob side entry bump
CN104462659B (en) * 2014-11-13 2018-07-31 辽宁工程技术大学 A kind of hard overlying strata grandidierite pressure shows analysis method
CN104481537A (en) * 2014-11-18 2015-04-01 山西潞安环保能源开发股份有限公司 Gas phase fracturing roof weakening treatment and safety caving method
CN104790954A (en) * 2015-03-27 2015-07-22 黑龙江科技大学 Roadside packing gob-side entry retaining top-cutting explosion pressure relief method
CN105569659B (en) * 2015-12-25 2018-10-16 中国矿业大学 A kind of tunnel hydraulic slotted liner technique directional blasting cuts top pressure relief method
CN105606002B (en) * 2016-01-12 2017-03-15 中国矿业大学 Reduce the disrumpent feelings layering presplit blasting method for causing calamity risk of colliery hard-and-thick strata
CN106643355B (en) * 2017-01-19 2019-07-09 中国矿业大学(北京) A kind of overhead caving method of the huge thick tight roof of deep coalmine
CN106884660A (en) * 2017-04-28 2017-06-23 中国矿业大学 A kind of method that protection pillar base angle presplit blasting release controls roadway deformation
CN107313777A (en) * 2017-05-09 2017-11-03 天地科技股份有限公司 The main return channel hydraulic fracturing pressure relief method of fully-mechanized mining working and device
CN107152279A (en) * 2017-06-06 2017-09-12 天地科技股份有限公司 Wangeviry stope top plate hydraulic fracturing method for weakening and device
CN107387085B (en) * 2017-09-26 2019-03-22 河南理工大学 A kind of tight roof and the porous control explosion softening method in coal seam
CN108548460B (en) * 2018-05-21 2020-01-07 北京科技大学 Method for preventing rock burst by coupling and pressure relief of blast hole and large-diameter drill hole
CN109162712B (en) * 2018-08-30 2020-06-05 北京矿冶科技集团有限公司 Method for controlling uneven settlement of overlying surrounding rock in caving goaf
CN109209495B (en) * 2018-09-13 2020-08-04 天地科技股份有限公司 Roof cutting and pressure relief protection method on stoping surface of fully mechanized coal mining face
CN109630171A (en) * 2018-11-01 2019-04-16 山西潞安环保能源开发股份有限公司常村煤矿 A method of along top tunnel along backplane relieving roadway floor lift control

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1055036A (en) * 1990-12-28 1991-10-02 煤炭科学研究总院抚顺分院 Deep hole control pressure relief blasting protrusion-dispelling technology, technology and equipment
CN100494112C (en) * 2007-08-17 2009-06-03 淮南矿业(集团)有限责任公司 Side filling material of road retained for next sublevel
CN102778182B (en) * 2012-07-26 2014-03-26 山东科技大学 Beside-roadway topping pressure relief method of roadway driving along gob of small coal pillar influenced by dynamic pressure

Also Published As

Publication number Publication date
CN103278055A (en) 2013-09-04

Similar Documents

Publication Publication Date Title
CN1260461C (en) Continuous mining method of stepped sectional extruding and ore caving followed by filling
Huang et al. Cavability control by hydraulic fracturing for top coal caving in hard thick coal seams
US4018293A (en) Method and apparatus for controlled fracturing of subterranean formations
CN102220866B (en) Pressure relief and consolidation synergizing prevention and control method for rock burst in deep coal drift
CN101105129B (en) Mining environment reconstructed continuous mining afterwards filling mining method
CN103615250B (en) The full Open stope mining afterwards filling of itemize studding works in coordination with mining codes
CN101338674B (en) Non-pillar sublevel caving mining method for direct loading for ore
CN103821558B (en) Coal mine gob filling mining and gob side entry retaining filling process
CN102493806B (en) Mechanized continuous mining method for wall-type gentle-inclined thin ore body
CN104453904B (en) Kerve-free sublevel filling mining method
Han et al. Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining
CN102536239B (en) Long-wall working face coal pillar-free mining method
CN104806244A (en) Filling mining method for slant middle-thick ore body
CN108894787B (en) Leave the pressure break release method of ore pillar stress concentration in Overburden gob area
CN104989405B (en) Mining steeply dipping coal seam bump orients prevention and controls
CN102678120B (en) Method for releasing pressure and removing danger of rock burst
CN106499395B (en) The quick-fried power of shallow bore hole rock drilling-scraper cooperates with haulage Sublevel room mining
CN103590831A (en) Novel mining method of gently-inclined thin and medium thickness ore bodies
CN102778182B (en) Beside-roadway topping pressure relief method of roadway driving along gob of small coal pillar influenced by dynamic pressure
CN105626071B (en) A kind of Theory of Mining of Gentle Dip Thin Ore-body Hexi Gold Mine of Zhaoyuan, Shandong Province
CN101509395B (en) The roof caving and tunnel protecting method
CN102518436B (en) Method for controlling tectonic rock burst in coal mine tunneling
CN101644156B (en) Method for weakening coal-rock mass by hydraulic blasting and fracturing
CN106368701B (en) The method and device in lane is stayed using hydraulic fracturing release control stope drift active workings
CN103924956A (en) Advanced pre-splitting method for lump coal mining

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150225