CN109235421A CN201811203646.4A CN201811203646A CN109235421A CN 109235421 A CN109235421 A CN 109235421A CN 201811203646 A CN201811203646 A CN 201811203646A CN 109235421 A CN109235421 A CN 109235421A
Authority
CN
China
Prior art keywords
sheet pile
steel sheet
steel
purlin
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811203646.4A
Other languages
Chinese (zh)
Inventor
雷崇
孙波
李志敏
王金平
周兵
雷铎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201811203646.4A priority Critical patent/CN109235421A/en
Publication of CN109235421A publication Critical patent/CN109235421A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • E02D5/08Locking forms; Edge joints; Pile crossings; Branch pieces
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/14Sealing joints between adjacent sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of double steel sheet pile fabricated structures of the steel purlin for also serving as interim sidewalk, including double steel sheet pile (3), steel bar rod (1), steel purlin (4);Front-seat steel purlin (41), front-seat steel sheet pile (31), steel bar rod (1), heel row steel sheet pile (32) are fixedly connected each other, also, it is provided with concrete at the top of double steel sheet pile (3) and forms concrete slab (6);In the top outer of heel row steel sheet pile (32) every several interim sidewalk reinforcing bars (7) are distributed with, it is additionally provided with concrete and forms interim sidewalk (8) of constructing;The interim sidewalk reinforcing bar (7) is fixedly connected with the double steel sheet pile fabricated structure of steel purlin.Front and rear row steel sheet pile of the invention, interim sidewalk are closely linked together, so that front and rear row steel sheet pile and the common stress of interim sidewalk can greatly improve the lateral rigidity of double steel sheet pile.

Description

A kind of double steel sheet pile fabricated structure of steel purlin also serving as interim sidewalk
Technical field
The invention belongs to base pit engineering fields, and in particular to a kind of double steel sheet pile combination of steel purlin for also serving as interim sidewalk Formula structure is mainly used in the base pit engineerings such as building engineering, railway traffic engineering, port and pier.
Background technique
For steel sheet pile due to low cost, quick construction is convenient, has a wide range of applications in base pit engineering field.Steel at present Sheet pile supporting is divided into single steel sheet pile supporting and double steel sheet pile supporting, and conventional two-row steel sheet pile passes through pull rod for front-seat steel sheet pile It links together with heel row steel sheet pile, is able to bear bigger load, be suitable in deeper base pit engineering.Therefore double steel plate Stake has bigger market prospects.But conventional two-row steel sheet pile is connected using pull rod, can only be born pulling force, cannot be born to press Power, cause front and rear row cannot simultaneously stress, it is difficult to play the big advantage of double-row pile lateral rigidity.
Summary of the invention
For at least one of prior art the above defects or improvement requirements, the present invention provides one kind to also serve as temporarily just The double steel sheet pile fabricated structure of the steel purlin in road, front and rear row steel sheet pile, interim sidewalk are closely linked together, so that front and back Steel sheet pile and the common stress of interim sidewalk are arranged, the lateral rigidity of double steel sheet pile can be greatly improved.
To achieve the above object, according to one aspect of the present invention, it is double to provide a kind of steel purlin for also serving as interim sidewalk Arrange steel sheet pile fabricated structure, including double steel sheet pile, steel bar rod, steel purlin, it is characterised in that: double steel sheet pile includes base The front-seat steel sheet pile of interior direction and the heel row steel sheet pile of foundation pit lateral direction are cheated, in top outer, that is, foundation pit of front-seat steel sheet pile Interior direction is provided with front-seat steel purlin;
If being successively intervally distributed between front-seat steel sheet pile and the top of heel row steel sheet pile along double steel sheet pile longitudinal direction Dry steel bar rod;
Front-seat steel purlin, front-seat steel sheet pile, steel bar rod, heel row steel sheet pile are fixedly connected each other, also, double The top of steel sheet pile, gap, front-seat steel sheet pile between front-seat steel purlin and front-seat steel sheet pile and between heel row steel sheet pile are all provided with It is equipped with concrete and forms concrete slab, concrete slab package covers all steel bar rods;
In top outer, that is, foundation pit lateral direction of heel row steel sheet pile, successively it is spaced apart along double steel sheet pile longitudinal direction There are several interim sidewalk reinforcing bars, is additionally provided with concrete and forms interim sidewalk of constructing;
The interim sidewalk reinforcing bar is fixedly connected with the double steel sheet pile fabricated structure of steel purlin.
Preferably, the front-seat steel purlin is channel steel purlin.
Preferably, the both ends of the steel bar rod are equipped with the end of thread, and one end pass through protrusion the front-seat steel sheet pile and Front-seat steel purlin, the other end pass through the heel row steel sheet pile of recess and extend outward;The one of adjacent another steel bar rod The front-seat steel sheet pile, the other end across recess is held to pass through the heel row steel sheet pile of protrusion and extend outward.
Preferably, the both ends end of thread of the steel bar rod is equipped with nut, is used for the front-seat steel purlin, front-seat steel plate Stake, steel bar rod, heel row steel sheet pile are fastenedly connected each other.
Preferably, the interim sidewalk reinforcing bar is welded and fixed one by one with the steel bar rod for stretching out the heel row steel sheet pile.
Preferably, the front-seat steel purlin is I-steel purlin.
Preferably, the both ends of the steel bar rod are welded with the front-seat steel sheet pile and heel row steel sheet pile respectively.
Preferably, it is welded and fixed between the front-seat steel purlin and front-seat steel sheet pile.
Preferably, the interim sidewalk reinforcing bar is welded and fixed with the heel row steel sheet pile.
Preferably, several distribution steel are sequentially arranged at intervals with along double steel sheet pile longitudinal direction between the steel bar rod Muscle, the concrete slab package cover all distribution bars;
Several interim sidewalks point are sequentially arranged at intervals with along double steel sheet pile longitudinal direction between the interim sidewalk reinforcing bar Cloth reinforcing bar, the interim sidewalk package cover all interim sidewalk distribution bars.
Above-mentioned preferred feature can be combined with each other as long as they do not conflict with each other.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, have below beneficial to effect Fruit:
1, front and rear row steel sheet pile of the invention is by steel bar rod, nut, the connection of channel steel purlin, and by double steel sheet pile Then the reinforcement welding of pull rod and interim sidewalk is used front and rear row steel sheet pile, steel bar rod, interim sidewalk reinforcing bar, distribution bar The concreting armoured concrete slab certain at thickness.Make front and rear row steel sheet pile and the common stress of interim sidewalk in this way, it can To greatly improve the lateral rigidity of double steel sheet pile.
2, front and rear row steel sheet pile of the invention is welded with steel bar rod respectively, and by interim sidewalk reinforcing bar and heel row steel Sheet pile is also using being welded to connect, then by front and rear row steel sheet pile, steel bar rod, interim sidewalk reinforcing bar, distribution bar concrete It pours and builds up the certain armoured concrete slab of thickness.Make front and rear row steel sheet pile and the common stress of interim sidewalk in this way, it can be significantly Improve the lateral rigidity of double steel sheet pile.
3, the double steel sheet pile enclosure structure's practice of the combined type of combination temporary construction sidewalk proposed by the present invention, it will be interim Builder's road and front and rear row steel sheet pile are linked together by concrete slab so that front and rear row steel sheet pile and interim sidewalk jointly by Power forms space gantry type supporting structure system, can greatly improve the lateral rigidity of supporting construction.On the one hand it can reduce base On the other hand the suitable foundation depth of double steel sheet pile supporting construction can be improved in the deformation in hole.It is made so as to save engineering Valence saves the construction period, there is very strong economic results in society.
Detailed description of the invention
Fig. 1 is the double steel sheet pile structural plan figure of the embodiment of the present invention 1;
Fig. 2 is double steel plate pilework 1-1 sectional view schematic diagram in Fig. 1;
Fig. 3 is 1. Fig. 1 interior joint locates full-page proof;
Fig. 4 is the double steel sheet pile structural plan figure of the embodiment of the present invention 2;
Fig. 5 is double steel plate pilework 1-1 sectional view schematic diagram in Fig. 4.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below Not constituting a conflict with each other can be combined with each other.The present invention is described in more detail With reference to embodiment.
As shown in Figs. 1-5, the double steel sheet pile fabricated structure of the steel purlin for also serving as interim sidewalk of the invention, including it is double Steel sheet pile 3, steel bar rod 1, steel purlin 4.
Double steel sheet pile 3 includes the front-seat steel sheet pile 31 of foundation pit interior direction and the heel row steel sheet pile of foundation pit lateral direction 32, top outer, that is, foundation pit interior direction of front-seat steel sheet pile 31 is provided with front-seat steel purlin 41.Steel purlin 4 is including before more piece Arrange steel purlin 41.
It is successively spaced apart between front-seat steel sheet pile 31 and the top of heel row steel sheet pile 32 along double 3 longitudinal direction of steel sheet pile There are several steel bar rods 1.
Front-seat steel purlin 41, front-seat steel sheet pile 31, steel bar rod 1, heel row steel sheet pile 32 are fixedly connected each other, and And at the top of double steel sheet pile 3, the gap, front-seat steel sheet pile 31 between front-seat steel purlin 41 and front-seat steel sheet pile 31 are with after It arranges between steel sheet pile 32, has poured concrete and formed concrete slab 6, the package of concrete slab 6 covers all steel bar rods 1.
In top outer, that is, foundation pit lateral direction of heel row steel sheet pile 32, successively it is spaced along double 3 longitudinal direction of steel sheet pile Several interim sidewalk reinforcing bars 7 are distributed with, has also poured concrete and has formed interim sidewalk 8 of constructing.
The interim sidewalk reinforcing bar 7 is fixedly connected with the double steel sheet pile fabricated structure of steel purlin.
Several distribution bars 2, institute are sequentially arranged at intervals with along double 3 longitudinal direction of steel sheet pile between the steel bar rod 1 It states the package of concrete slab 6 and covers all distribution bars 2;Along double 3 longitudinal direction of steel sheet pile between the interim sidewalk reinforcing bar 7 Several interim sidewalk distribution bars 9 are sequentially arranged at intervals with, the interim package of sidewalk 8 covers all interim sidewalks and is distributed steel Muscle 9.
The double steel sheet pile 3 uses Larsen steel sheet pile.The concrete slab 6 is in ground elevation, with a thickness of 200- 300mm。
The double steel sheet pile of structure and steel purlin for steel purlin 4 connects combination, it is preferred to use following embodiment party Formula.
Embodiment 1:
As shown in Figure 1-3, the front row steel purlin 41 is channel steel purlin, slit opening is towards double steel sheet pile 3, or carries on the back To double steel sheet pile 3.
The both ends of the steel bar rod 1 are equipped with the end of thread, and one end passes through the front-seat steel sheet pile 31 and the front row of protrusion Steel purlin 41, the other end pass through the heel row steel sheet pile 32 of recess and extend outward;The one of adjacent another steel bar rod 1 The front-seat steel sheet pile 31, the other end across recess is held to pass through the heel row steel sheet pile 32 of protrusion and extend outward.
The both ends end of thread of the steel bar rod 1 is equipped with nut 5, is used for the front-seat steel purlin 41, front-seat steel sheet pile 31, steel bar rod 1, heel row steel sheet pile 32 are fastenedly connected each other.
The interim sidewalk reinforcing bar 7 is welded and fixed one by one with the steel bar rod 1 for stretching out the heel row steel sheet pile 32.
Front and rear row steel sheet pile of the invention is by steel bar rod, nut, the connection of channel steel purlin, and by the drawing of double steel sheet pile Then the reinforcement welding of bar and interim sidewalk is used front and rear row steel sheet pile, steel bar rod, interim sidewalk reinforcing bar, distribution bar mixed Solidifying soil, which pours, builds up the certain armoured concrete slab of thickness.Make front and rear row steel sheet pile and the common stress of interim sidewalk in this way, it can be with Greatly improve the lateral rigidity of double steel sheet pile.
Embodiment 2:
As illustrated in figures 4-5, the front-seat steel purlin 41 is I-steel purlin, and web is substantially horizontally disposed.
It is welded respectively with the front-seat steel sheet pile 31 and heel row steel sheet pile 32 at the both ends of the steel bar rod 1.
It is welded and fixed between the front row steel purlin 41 and front-seat steel sheet pile 31.
The interim sidewalk reinforcing bar 7 is welded and fixed with the heel row steel sheet pile 32.
Front and rear row steel sheet pile of the invention is welded with steel bar rod respectively, and by interim sidewalk reinforcing bar and heel row steel plate Stake also using being welded to connect, then pours front and rear row steel sheet pile, steel bar rod, interim sidewalk reinforcing bar, distribution bar with concrete Build up the certain armoured concrete slab of thickness.Make front and rear row steel sheet pile and the common stress of interim sidewalk in this way, can mention significantly The lateral rigidity of high double steel sheet pile.
Generally speaking, the double steel sheet pile enclosure structure's practice of the combined type of combination temporary construction sidewalk proposed by the present invention, Temporary construction sidewalk and front and rear row steel sheet pile are linked together by it by concrete slab, so that front and rear row steel sheet pile and interim sidewalk Common stress forms space gantry type supporting structure system, can greatly improve the lateral rigidity of supporting construction.It on the one hand can be with On the other hand the suitable foundation depth of double steel sheet pile supporting construction can be improved in the deformation for reducing foundation pit.So as to save Project cost saves the construction period, there is very strong economic results in society.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include Within protection scope of the present invention.

Claims (10)

1. a kind of double steel sheet pile fabricated structure of steel purlin for also serving as interim sidewalk, including double steel sheet pile (3), steel bar rod (1), steel purlin (4), it is characterised in that: double steel sheet pile (3) includes the front-seat steel sheet pile (31) and foundation pit of foundation pit interior direction The heel row steel sheet pile (32) of lateral direction is provided with front-seat steel in top outer, that is, foundation pit interior direction of front-seat steel sheet pile (31) Purlin (41);
It is successively spaced and divides along double steel sheet pile (3) longitudinal direction between front-seat steel sheet pile (31) and the top of heel row steel sheet pile (32) It is furnished with several steel bar rods (1);
Front-seat steel purlin (41), front-seat steel sheet pile (31), steel bar rod (1), heel row steel sheet pile (32) are fixedly connected each other, Gap, front-seat steel plate also, at the top of double steel sheet pile (3), between front-seat steel purlin (41) and front-seat steel sheet pile (31) Between stake (31) and heel row steel sheet pile (32), it is provided with concrete and forms concrete slab (6), concrete slab (6) package covering All steel bar rods (1);
In top outer, that is, foundation pit lateral direction of heel row steel sheet pile (32), along double steel sheet pile (3), longitudinal direction is successively spaced Several interim sidewalk reinforcing bars (7) are distributed with, is additionally provided with concrete and forms interim sidewalk (8) of constructing;
The interim sidewalk reinforcing bar (7) is fixedly connected with the double steel sheet pile fabricated structure of steel purlin.
2. the double steel sheet pile fabricated structure of the steel purlin for also serving as interim sidewalk as described in claim 1, it is characterised in that:
The front row steel purlin (41) is channel steel purlin.
3. the double steel sheet pile fabricated structure of the steel purlin for also serving as interim sidewalk as claimed in claim 2, it is characterised in that:
The both ends of the steel bar rod (1) are equipped with the end of thread, and one end passes through the front-seat steel sheet pile (31) and the front row of protrusion Steel purlin (41), the other end pass through the heel row steel sheet pile (32) of recess and extend outward;Adjacent another steel bar rod (1) one end passes through the front-seat steel sheet pile (31) of recess, the other end pass through protrusion the heel row steel sheet pile (32) and to Outside extends.
4. the double steel sheet pile fabricated structure of the steel purlin for also serving as interim sidewalk as claimed in claim 3, it is characterised in that:
The both ends end of thread of the steel bar rod (1) is equipped with nut (5), is used for the front-seat steel purlin (41), front-seat steel plate Stake (31), steel bar rod (1), heel row steel sheet pile (32) are fastenedly connected each other.
5. the double steel sheet pile fabricated structure of the steel purlin for also serving as interim sidewalk as claimed in claim 3, it is characterised in that:
The interim sidewalk reinforcing bar (7) is welded and fixed one by one with the steel bar rod (1) for stretching out the heel row steel sheet pile (32).
6. the double steel sheet pile fabricated structure of the steel purlin for also serving as interim sidewalk as described in claim 1, it is characterised in that:
The front row steel purlin (41) is I-steel purlin.
7. the double steel sheet pile fabricated structure of the steel purlin for also serving as interim sidewalk as claimed in claim 6, it is characterised in that:
It is welded respectively with the front-seat steel sheet pile (31) and heel row steel sheet pile (32) at the both ends of the steel bar rod (1).
8. the double steel sheet pile fabricated structure of the steel purlin for also serving as interim sidewalk as claimed in claim 7, it is characterised in that:
It is welded and fixed between the front row steel purlin (41) and front-seat steel sheet pile (31).
9. the double steel sheet pile fabricated structure of the steel purlin for also serving as interim sidewalk as claimed in claim 7, it is characterised in that:
The interim sidewalk reinforcing bar (7) is welded and fixed with the heel row steel sheet pile (32).
10. the double steel sheet pile fabricated structure of the steel purlin for also serving as interim sidewalk as described in claim 1, it is characterised in that:
Several distribution bars (2) are sequentially arranged at intervals with along double steel sheet pile (3) longitudinal direction between the steel bar rod (1), Concrete slab (6) package covers all distribution bars (2);
Several interim sidewalks are sequentially arranged at intervals with along double steel sheet pile (3) longitudinal direction between the interim sidewalk reinforcing bar (7) Distribution bar (9), interim sidewalk (8) package cover all interim sidewalk distribution bars (9).
CN201811203646.4A 2018-10-16 2018-10-16 A kind of double steel sheet pile fabricated structure of steel purlin also serving as interim sidewalk Pending CN109235421A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811203646.4A CN109235421A (en) 2018-10-16 2018-10-16 A kind of double steel sheet pile fabricated structure of steel purlin also serving as interim sidewalk

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811203646.4A CN109235421A (en) 2018-10-16 2018-10-16 A kind of double steel sheet pile fabricated structure of steel purlin also serving as interim sidewalk

Publications (1)

Publication Number Publication Date
CN109235421A true CN109235421A (en) 2019-01-18

Family

ID=65053654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811203646.4A Pending CN109235421A (en) 2018-10-16 2018-10-16 A kind of double steel sheet pile fabricated structure of steel purlin also serving as interim sidewalk

Country Status (1)

Country Link
CN (1) CN109235421A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914423A (en) * 2019-03-06 2019-06-21 上海市基础工程集团有限公司 Pattern foundation pit supporting structure processing method in number library Fang Yudi narrow space

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981879A (en) * 2014-06-03 2014-08-13 上海隧道工程股份有限公司 Cofferdam structure and construction method thereof
CN106284296A (en) * 2016-09-28 2017-01-04 南京工业大学 The supporting construction of a kind of double steel sheet pile and construction method thereof
CN206706772U (en) * 2017-03-02 2017-12-05 广州市城市规划勘测设计研究院 A kind of double steel sheet pile supporting construction
CN207919573U (en) * 2017-12-11 2018-09-28 中交第三航务工程勘察设计院有限公司 A kind of sheet-pile cofferdam structure suitable for soft soil foundation
CN108612081A (en) * 2018-05-18 2018-10-02 中铁二院昆明勘察设计研究院有限责任公司 A kind of combined type multilayer Larsen steel sheet pile combination supporting system and construction method
CN209162803U (en) * 2018-10-16 2019-07-26 中铁第四勘察设计院集团有限公司 A kind of double steel sheet pile fabricated structure of steel purlin also serving as interim sidewalk

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981879A (en) * 2014-06-03 2014-08-13 上海隧道工程股份有限公司 Cofferdam structure and construction method thereof
CN106284296A (en) * 2016-09-28 2017-01-04 南京工业大学 The supporting construction of a kind of double steel sheet pile and construction method thereof
CN206706772U (en) * 2017-03-02 2017-12-05 广州市城市规划勘测设计研究院 A kind of double steel sheet pile supporting construction
CN207919573U (en) * 2017-12-11 2018-09-28 中交第三航务工程勘察设计院有限公司 A kind of sheet-pile cofferdam structure suitable for soft soil foundation
CN108612081A (en) * 2018-05-18 2018-10-02 中铁二院昆明勘察设计研究院有限责任公司 A kind of combined type multilayer Larsen steel sheet pile combination supporting system and construction method
CN209162803U (en) * 2018-10-16 2019-07-26 中铁第四勘察设计院集团有限公司 A kind of double steel sheet pile fabricated structure of steel purlin also serving as interim sidewalk

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914423A (en) * 2019-03-06 2019-06-21 上海市基础工程集团有限公司 Pattern foundation pit supporting structure processing method in number library Fang Yudi narrow space
CN109914423B (en) * 2019-03-06 2021-03-26 上海市基础工程集团有限公司 Foundation pit support treatment method in narrow space of house and ground warehouse

Similar Documents

Publication Publication Date Title
CN106948548A (en) A kind of precast concrete frame beam structure
CN209162803U (en) A kind of double steel sheet pile fabricated structure of steel purlin also serving as interim sidewalk
CN109235421A (en) A kind of double steel sheet pile fabricated structure of steel purlin also serving as interim sidewalk
CN209162804U (en) A kind of double steel sheet pile fabricated structure of steel purlin
CN110195471A (en) The combination assembled frame joint of modularization steel-concrete
CN109235422A (en) A kind of double steel sheet pile fabricated structure of steel purlin
CN206396892U (en) Building block and building structure
KR20140069845A (en) Retaining wall using diagonal reinforcement member
CN110130934B (en) Construction method of urban tunnel branch junction with box-type top plate structure
CN102392417B (en) Dual-cantilever bearing support structure for large steel pipe and installation method
CN211113674U (en) Double-row column supporting structure of foundation pit
CN110359488A (en) A kind of fender member of assembled underground structure and its connecting structure with arch sheet
CN212670965U (en) Large-span floor hidden beam used in steel structure
CN104797762A (en) Building and construction method thereof
CN107700654A (en) Enhanced reinforced concrete frame node
CN208857812U (en) A kind of civil engineering built pile
CN210002583U (en) Connection structure of prefabricated shear wall vertical joints of prevention of seepage water
CN208981846U (en) A kind of movie theatre grandstand of precast stand slab and pillar composition
CN206189438U (en) Area separates ground of wet function
CN207079788U (en) A kind of floor quick structure for assembling
CN207498963U (en) A kind of support changing structure for use of hypogee
CN205688442U (en) A kind of precast concrete channel plate pile head bracing means
CN207027858U (en) A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape
CN105625257B (en) Ecological environment-friendly type bunding protecting wall and the H-type prestressed-concrete pile for the protecting wall
CN212958035U (en) Shaped rotatable fence structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication