CN109231098A - Tool part and its movement method for cutter suction dredger gantry Integral transporting - Google Patents

Tool part and its movement method for cutter suction dredger gantry Integral transporting Download PDF

Info

Publication number
CN109231098A
CN109231098A CN201811263910.3A CN201811263910A CN109231098A CN 109231098 A CN109231098 A CN 109231098A CN 201811263910 A CN201811263910 A CN 201811263910A CN 109231098 A CN109231098 A CN 109231098A
Authority
CN
China
Prior art keywords
gantry
column
attachment base
welded
tool part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811263910.3A
Other languages
Chinese (zh)
Other versions
CN109231098B (en
Inventor
陈新华
顾明
王健
王秋松
田云
罗靖
杨永坤
陶思宇
邢海华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ZHENHUA HEAVY INDUSTRY QIDONG MARINE ENGINEERING Co Ltd
Shanghai Zhenghua Heavy Industries Co Ltd
CCCC Tianjin Dredging Co Ltd
Original Assignee
SHANGHAI ZHENHUA HEAVY INDUSTRY QIDONG MARINE ENGINEERING Co Ltd
Shanghai Zhenghua Heavy Industries Co Ltd
CCCC Tianjin Dredging Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ZHENHUA HEAVY INDUSTRY QIDONG MARINE ENGINEERING Co Ltd, Shanghai Zhenghua Heavy Industries Co Ltd, CCCC Tianjin Dredging Co Ltd filed Critical SHANGHAI ZHENHUA HEAVY INDUSTRY QIDONG MARINE ENGINEERING Co Ltd
Priority to CN201811263910.3A priority Critical patent/CN109231098B/en
Publication of CN109231098A publication Critical patent/CN109231098A/en
Application granted granted Critical
Publication of CN109231098B publication Critical patent/CN109231098B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F19/00Hoisting, lifting, hauling or pushing, not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/60Rope, cable, or chain winding mechanisms; Capstans adapted for special purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/90Component parts, e.g. arrangement or adaptation of pumps
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The present invention discloses a kind of tool part for cutter suction dredger gantry Integral transporting and its gantry Integral transporting method.The present invention uses the interim trolley of 400T, with hoist engine mode of traction, by installation in gantry Integral transporting to hull tail portion fluting, thereby ensures that gantry internal unit can be installed in advance and the integral installation precision of gantry, raising production efficiency shorten construction period.Tool part for gantry Integral transporting includes supporting tool part and connecting tooling part.Supporting tool part includes column, vertical supports, horizontal support piece, skewed horizontal load part, deep bracket, support beam.Connecting tooling part includes attachment base top plate, attachment base bottom plate, attachment base inside longitudinal baffle, attachment base outside longitudinal baffle and attachment base lateral partitions.The attachment base bottom plate of connecting tooling part is connect by the bolt hole on bolt and attachment base bottom plate with trolley;The attachment base top plate of connecting tooling part is connect by welding manner with gantry supporting tool part.

Description

Tool part and its movement method for cutter suction dredger gantry Integral transporting
Technical field
The present invention relates to ocean dredging engineer equipment and large ship construction applications, relate more specifically to a kind of for twisting suction The tool part and its gantry movement method of formula dredger gantry Integral transporting.
Background technique
A kind of common dredging plant of the gantry as cutter suction dredger, setting is in the fluting of hull tail portion, after upper deck Portion or so respectively sets an electronic hoisting winch, and by gantry wave compensation system and pulley blocks lifting bridge rack, gantry turns around trunnion It is dynamic.Equipment includes: reamer and driving device on gantry;Submersible pump and driving device;Lifting pulley group;Traversing pulley;Gantry ear Axis locked instrument;Suction piping;Oil, water, electric drag chain;Tear reamer backstop apparatus open;Reamer dismantles device etc..
Gantry self structure weight is very big, in addition the equipment on gantry, and by taking day enormous legendary fish, which could change into a roc cutter suction dredger as an example, weight reaches To more than 1600 tons, the lifting equipment of general shipyard can not the so heavy weight equipment of handling,
If limited by shipyard elevating capacity, gantry can only be segmented when being segmented and dividing and be divided into multiple small points Section, then each subsection close up one by one, and equipment cannot be installed in advance on such gantry, influence construction period.
The installation accuracy requirement of gantry is very high, because topple over axis and the lower twisted point on portal structure must be accurate right after closing up Corresponding trunnion hole site on quasi- main hull structure, and the distance between gantry outside plate and ship hull plate are very small, if peace After installing trunnion and bearing, bridge trunnion only has more than ten millimeters away from the distance between main hull bearing, if being played Beijing South Maxpower Technology Co. Ltd by shipyard The limitation of power is divided into multiple subsections then can only be segmented gantry when being segmented and dividing, and each subsection closes up one by one, closes Weldering of reburning after holding together, which can deform, also influences whether installation accuracy.
Therefore need a kind of new movement technical solution by the whole accurately movement of gantry to dredging in quarter fluting.
Summary of the invention
The object of the present invention is to provide a kind of tool part for cutter suction dredger gantry Integral transporting and its gantry are whole Body movement method.The present invention is opened gantry Integral transporting to hull tail portion with hoist engine mode of traction using the interim trolley of 400T Installation in slot thereby ensures that gantry internal unit is installed in advance and gantry integral installation precision, raising production efficiency shorten Construction period.
To achieve the goals above, the invention adopts the following technical scheme:
According to an aspect of the present invention, a kind of tool part for cutter suction dredger gantry Integral transporting is provided, it should Tool part includes supporting tool part and connecting tooling part.
Supporting tool part is used to support the gantry, including multiple columns, multiple vertical supports, multiple cross-braces Part, multiple skewed horizontal load parts, multiple deep brackets, support beam.Wherein: each column is welded on the branch by deep bracket It supports on crossbeam;The multiple column includes the first to the 5th column, and the height of each column successively falls progressively to form the gradient, should The gradient is corresponding with the gantry bottom line style gradient;Pass through vertical supports and skewed horizontal load between first column and the second column Part is welded to connect;It is welded to connect between second column and third column by vertical supports;Third column and the 4th It is welded to connect between column by skewed horizontal load part;It is welded between 4th column and the 5th column by vertical supports Connection;It is welded to connect between first column by horizontal support piece and skewed horizontal load part.
Connecting tooling part is for connecting and fastening the supporting tool part and trolley, including attachment base top plate, attachment base bottom Longitudinal baffle, attachment base outside longitudinal baffle and attachment base lateral partitions inside plate, attachment base.Wherein: the attachment base top Plate and attachment base bottom plate pass through weldering by longitudinal baffle, attachment base lateral partitions outside longitudinal baffle inside attachment base, attachment base Connect the connecting tooling part that is formed by connecting;Bolt hole is provided on the attachment base bottom plate;The connection of the connecting tooling part Seat bottom plate is connect by the bolt hole on bolt and attachment base bottom plate with trolley;The attachment base top plate of the connecting tooling part is logical Welding manner is crossed to connect with the gantry supporting tool part.
According to the present invention in the tool part for cutter suction dredger gantry Integral transporting of above-mentioned aspect, the first column Skewed horizontal load part and column between the second column is at 61 °;Skewed horizontal load between third column and the 4th column Part and column are at 108 °;Skewed horizontal load part and column between first column is at 43 °.
According to the present invention in the tool part for cutter suction dredger gantry Integral transporting of above-mentioned aspect, the second column Between be welded to connect by horizontal support piece and skewed horizontal load part;Pass through horizontal support piece and skewed horizontal load between third column Part is welded to connect;It is welded to connect between 4th column by horizontal support piece;Skewed horizontal load part between second column with Column is at 43 °;And skewed horizontal load part between third column and column are at 43 °.
According to the present invention in the tool part for cutter suction dredger gantry Integral transporting of above-mentioned aspect, first, third, 5th column is 630 × 25 round tube of Φ;The second, the 4th column is 508 × 13 round tube of Φ;Vertical supports and cross-brace Part is 219 × 8 round tube of Φ;Skewed horizontal load part between first column and the second column is 325 × 8 round tube of Φ;Third pair Skewed horizontal load part between column and the 4th column is 219 × 8 round tube of Φ.
According to the present invention in the tool part for cutter suction dredger gantry Integral transporting of above-mentioned aspect, support construction is adopted The steel material for being 235MPa with yield strength;Portal structure uses yield strength for the steel material of 255MPa.
According to the present invention in the tool part for cutter suction dredger gantry Integral transporting of above-mentioned aspect, gantry supporting element Port and starboard is symmetrical.
According to the present invention in the tool part for cutter suction dredger gantry Integral transporting of above-mentioned aspect, gantry length is 46m, width 8m, highly between 8-11m, weight is 1408 tons.
According to the present invention in the tool part for cutter suction dredger gantry Integral transporting of above-mentioned aspect, gantry and support The total weight of tool part is 1600 tons.
According to another aspect of the present invention, the method that a kind of pair of cutter suction dredger gantry carries out Integral transporting is provided, Method includes the following steps:
S1: the tool part that cutter suction dredger gantry carries out Integral transporting is prepared comprising supporting tool part and connection Tool part;
Supporting tool part is used to support the gantry, including multiple columns, multiple vertical supports, multiple cross-braces Part, multiple skewed horizontal load parts, multiple deep brackets, support beam.Wherein: each column is welded on the branch by deep bracket It supports on crossbeam;The multiple column includes the first to the 5th column, and the height of each column successively falls progressively to form the gradient, should The gradient is corresponding with the gantry bottom line style gradient;Pass through vertical supports and skewed horizontal load between first column and the second column Part is welded to connect;It is welded to connect between second column and third column by vertical supports;Third column and the 4th It is welded to connect between column by skewed horizontal load part;It is welded between 4th column and the 5th column by vertical supports Connection;It is welded to connect between first column by horizontal support piece and skewed horizontal load part.
Connecting tooling part is for connecting and fastening the supporting tool part and trolley, including attachment base top plate, attachment base bottom Longitudinal baffle, attachment base outside longitudinal baffle and attachment base lateral partitions inside plate, attachment base.Wherein: the attachment base top Plate and attachment base bottom plate pass through weldering by longitudinal baffle, attachment base lateral partitions outside longitudinal baffle inside attachment base, attachment base Connect the connecting tooling part that is formed by connecting;Bolt hole is provided on the attachment base bottom plate;The connection of the connecting tooling part Seat bottom plate is connect by the bolt hole on bolt and attachment base bottom plate with trolley;The attachment base top plate of the connecting tooling part is logical Welding manner is crossed to connect with the gantry supporting tool part;
S2: tool part, track, gantry to be installed are transported to dock, and clears up shift paths;
S3: executing scribing line, laying and trapped orbit in shift paths, levels up the upper table for making track by carrying out to track Face is in same level;
S4: being placed on dock bottom for hoist engine, counterweight pressing block, will draw total root lifting lug and is welded on main hull;
S5: trolley is placed, trolley motor is removed and is placed into gantry support construction;
S6: installation shackle, coaster wear haulage cable and insurance side wirerope;
S7: examination top operation is carried out to gantry before movement operation, to check in gantry movement whether portal structure is caused to destroy Or tool part unstability;
S8: trolley jacks up, and places safety block, starts to slide;
S9: by the tractive force of hoist engine, support construction and gantry on trolley and trolley is made to be slid onto main hull Gantry installation site;
S10: in gantry installation site, removing trolley safety block, to gantry execute up and down, left and right finely tune, until gantry pacify It is attached to position.
In the method for carrying out Integral transporting to cutter suction dredger gantry according to a further aspect of the invention, step S3 packet It includes: being crossed and surveyed height, rail linearity degree and trolley plate thickness using laser Lycra, the flatness of track is in ± 5mm, rail The diagonal error in road is 2.95m in ± 10mm, track length 70.00m, spacing of the every track away from center line.
In the method for carrying out Integral transporting to cutter suction dredger gantry according to a further aspect of the invention, step S4 packet It includes: 2 hoist engines being set, in 2 hoist engines of insurance side setting in traction side, traction side hoist engine is welded with insurance side hoist engine It connects on the steel plate for being placed with counterweight pressing block, steel plate is placed in dock bottom;Wherein: total root lifting lug will be drawn and be welded on main hull On, traction lifting lug is welded on gantry, and insure total root lifting lug and is welded on the steel plate for being placed with counterweight pressing block, insurance lifting lug welding In gantry support construction.
In the method for carrying out Integral transporting to cutter suction dredger gantry according to a further aspect of the invention, traction side elevator Machine and insurance side hoist engine are 12t hoist engine, and traction side hoist engine and the counterweight pressing block weight for insuring side hoist engine are more than or equal to 50 tons;The counterweight pressing block weight for insuring total root lifting lug is more than or equal to 150 tons.
In the method for carrying out Integral transporting to cutter suction dredger gantry according to a further aspect of the invention, institute in step S5 The trolley stated is 400t trolley.
In the method for carrying out Integral transporting to cutter suction dredger gantry according to a further aspect of the invention, institute in step S6 The traction side wirerope and insurance side wirerope stated are 28 wirerope of Φ, and traction side length of steel rope is greater than 400m, insures side steel wire Rope length is greater than 650m.
In the method for carrying out Integral transporting to cutter suction dredger gantry according to a further aspect of the invention, step S9 packet Include: gantry skidding distance in orbit is 30.75m.
In the method for carrying out Integral transporting to cutter suction dredger gantry according to a further aspect of the invention, in step S10, The final installed position of gantry slotted to main hull stern, the fine tuning up and down and left and right fine tuning of the gantry are within 20mm.
Tool part and its gantry Integral transporting method for cutter suction dredger gantry Integral transporting of the invention can Cooperate trolley that will weigh 1600 tons of gantry Integral transporting to cutter suction dredger main hull tail portion by hoist engine mode of traction Installation in fluting thereby ensures that gantry internal unit is installed in advance and gantry integral installation precision, raising production efficiency contract Short construction period.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon.
Fig. 1 is the schematic diagram of cutter suction dredger gantry Integral transporting technical solution according to the present invention, wherein (a) is bridge Before frame movement;(b) among movement;1 (c) is after the completion of gantry movement;
Fig. 2 is the portal structure figure according to the present invention for the movement of cutter suction dredger gantry;
Fig. 3 shows the support beam figure of the support construction according to the present invention for gantry Integral transporting;
Fig. 4-7 is the connection relationship between column and cross-brace and skewed horizontal load in support construction at different height Figure;
Fig. 8 is the finite element model figure I of gantry Integral transporting support construction intensive analysis according to the present invention;
Fig. 9 is the finite element model figure II of gantry Integral transporting support construction intensive analysis according to the present invention;
Figure 10 is according to the present invention for connecting the schematic diagram of the simultaneously connecting tooling part of fastening support tool part and trolley, (a) one section of the centre shown between connecting tooling part and gantry supporting element is not welded, and the attachment base in connecting tooling part (b) is shown Top plate, attachment base bottom plate, attachment base inside longitudinal baffle, attachment base outside longitudinal baffle and attachment base lateral partitions;(c) It shows and is provided with bolt hole on connecting tooling part;
Figure 11 is the general arrangement of cutter suction dredger gantry Integral transporting according to the present invention;
Figure 12 is the layout drawing of track laying;
Figure 13 is the layout drawing of hoist engine and lifting lug;
Figure 14 is trolley scheme of installation.
Figure 15 shows traction lifting lug and the traction always installation site with lifting lug on gantry and hull.
Figure 16 shows trolley scheme of installation, and gantry supporting element is mounted on trolley, and support gantry is mounted on gantry supporting element On.
Figure 17 shows trolley motor and is installed on gantry supporting element.
Figure 18 is hoist engine setting figure.
In attached drawing: 2-1 is column;2-2 is vertical supports;2-3 is skewed horizontal load part;2-4 is horizontal support piece;2-5 For deep bracket;2-6 is support beam;
10-1 is top plate;10-2 is internal longitudinal baffle;10-3 is lateral partitions;10-4 is external longitudinal baffle;10-5 For bottom plate;
11-1 is clump weight;11-2 is steel plate;11-3 is to insure total root lifting lug;11-4 is to draw total root lifting lug to be welded on master At hull 37# rib position;11-5 is tetra- coasters of 80t;11-6 is 85t shackle;11-7 is the total root lifting lug of 80t;11-8 is dock bottom; 11-9 is hoist engine;11-10 is insurance steel cable;11-11 is hull;11-12 is haulage cable;
18-1 is pine;18-2 is steel plate;18-3 is hoist engine;18-4 is counterweight;18-5 is snap-gauge.
Specific embodiment
Technical solution of the present invention is specifically described below in conjunction with Figure of description.
Describe detailed features and advantage of the invention in detail in a specific embodiment below, content is enough to make any Skilled in the art realises that technology contents of the invention and implementing accordingly, and according to specification disclosed by this specification, power Benefit requires and attached drawing, skilled person readily understands that the relevant purpose of the present invention and advantage.
Cutter suction dredger according to the present invention includes main hull, piling bar trolley, gantry and superstructure living area. The setting of piling bar trolley is equipped with fluting in main hull fore body, main hull fore body.At work, the piling bar trolley of stem is to sea for dredger Piling bar is stretched out at bottom (river bed), thus fixed hull.Gantry is integrally inserted into the fluting of main hull stern.Portal structure can be around connection Axis is rotated relative to main hull.Reamer head is arranged in gantry end, is dredged by the rotation of reamer head.
Gantry according to the present invention is provided with two twisted points up and down, therefore depth of dredging is up to 35 meters.Close up after molding Gantry length be 46 meters, about 8 meters of width, height about 8-11 between, weight is about 1408 tons.
Gantry total weight reaches more than 1600 tons (including the equipment on self structure weight and gantry).General shipyard, which rises, to be reseted It is standby can not the so heavy weight equipment of handling.
The present invention is using a kind of new movement technical solution by the master of the whole accurately movement of gantry to cutter suction dredger In hull stern fluting.
Fig. 1 (a) -1 (c) shows the schematic diagram of cutter suction dredger gantry Integral transporting technical solution according to the present invention.
Gantry movement scheme according to the present invention is being propped up gantry setting using Special support tool part and connecting tooling part Support tool part, supporting tool part be mounted at the top of trolley by connecting tooling part, by the traction of hoist engine make trolley and It is moved to the installation site of cutter suction dredger main hull stern fluting along dock inner orbit by the gantry of supports support thereon.
In order to implement the overall movement of weight up to 1600 tons of gantries, the present invention designs and has made gantry Integral transporting Two Special tooling pieces, i.e. (1) supporting tool part and (2) connecting tooling part, the former is used to support gantry, and the latter is for connecting simultaneously Fastening support tool part and trolley.
Fig. 2 shows the side views of the support construction according to the present invention for gantry Integral transporting.
Fig. 3 shows the support beam of the support construction according to the present invention for gantry Integral transporting.
Fig. 4-7 is the sectional view in support construction at different columns.
An embodiment according to the present invention, supporting tool part include multiple columns 1, multiple support bases, multiple vertical supports 2, multiple horizontal support pieces 4, multiple skewed horizontal load parts 3, multiple deep brackets 5, support beam 6.
Each column is welded in the support beam by deep bracket;Column includes the first to the 5th column, often The height of one column successively falls progressively to form the gradient, and the gradient is corresponding with the gantry bottom line style gradient;First column and second It is welded to connect between column by vertical supports and skewed horizontal load part;By vertical between second column and third column It is welded to connect to supporting element;It is welded to connect between third column and the 4th column by skewed horizontal load part;4th column It is welded to connect between the 5th column by vertical supports.Pass through horizontal support piece and skewed horizontal load between first column Part is welded to connect.Each support base is arranged on each column by welding.
Another embodiment according to the present invention, between the second column, between third column by horizontal support piece and Skewed horizontal load part is welded to connect;It is welded to connect between 4th column by horizontal support piece.
An embodiment according to the present invention, skewed horizontal load part and column between the first column and the second column at 61°;Skewed horizontal load part and column between third column and the 4th column is at 108 °;Oblique branch between first column Support member and column are at 43 °.
According to another embodiment of the present invention, pass through horizontal support piece between the second column, between third column It is welded to connect with skewed horizontal load part.Oblique branch between skewed horizontal load part between second column and column, third column Support member and column are at 43 °.
According to still another embodiment of the invention, in supporting tool part first, third, the 5th column be Φ 630 × 25Q235 round tube;The second, the 4th column is 508 × 13Q235 of Φ round tube;Vertical supports and horizontal support piece be Φ 219 × 8Q235 round tube;Skewed horizontal load part between first column and the second column is 325 × 8Q235 of Φ round tube;Third column Skewed horizontal load part between the 4th column is 219 × 8Q235 of Φ round tube.
The material of supporting tool part is Q235 material.
Fig. 8 is the finite element model figure I of gantry Integral transporting support construction intensive analysis according to the present invention.
Fig. 9 is the finite element model figure II of gantry Integral transporting support construction intensive analysis according to the present invention.
According to the finite element model of Fig. 8 and support construction shown in Fig. 9, by finite element method (fem) analysis, branch of the invention The structure type for supportting tool part is secured, and organizational form is simple.
When with 6 trolley support gantry transhipments, bearing capacity is respectively 294/216/ below the position of the cross section A13/A7/A2 355 tons.
Figure 10 shows according to the present invention for connecting the signal of the simultaneously connecting tooling part of fastening support tool part and trolley Figure.
An embodiment according to the present invention, connecting tooling part includes attachment base top plate, attachment base bottom plate, vertical inside attachment base Longitudinal baffle and attachment base lateral partitions outside to partition, attachment base.
Attachment base top plate and attachment base bottom plate pass through longitudinal baffle, attachment base outside longitudinal baffle, connection inside attachment base Seat lateral partitions are by being made of welded connection.Bolt hole is provided on attachment base bottom plate.
The attachment base bottom plate of connecting tooling part is connect by the bolt hole on bolt and attachment base bottom plate with trolley.Connection The attachment base top plate of tool part is connect by welding manner with gantry supporting tool part.
Figure 11 shows the general arrangement of cutter suction dredger gantry Integral transporting according to the present invention.
Gantry integral shift scheme according to the present invention is coupled interim trolley with hoist engine mode of traction, by gantry It is installed in Integral transporting in orbit to main hull stern fluting, is achieved in gantry internal unit and installs and guarantee in advance Gantry integral installation precision improves production efficiency, shortens construction period.
According to parameters such as gantry weight, sizes, certain amount trolley is set below gantry support construction.Traction side setting 2 2 hoist engines are arranged in platform hoist engine, insurance side, and hoist engine is fixed on harbour using steel plate press-fitting double recipe formula, draws total root and hang Ear is welded on dredger main hull, is insured total root lifting lug and is welded on the steel plate of press-fitting weight.When displacement, 2 elevator machine travels, 2 hoist engine insurances, it is desirable that lowest speed, synchronous, crawl operates when reaching installation site fastly.
As shown in figure 11,6 400t trolleys are arranged in an embodiment according to the present invention below gantry support construction, 2 hoist engines are arranged in traction side, and 2 hoist engines are arranged in insurance side.4 hoist engines are fixed in such a way that steel plate is press-fitted pouring weight In on harbour, the clump weight weight of every hoist engine is more than or equal to 50 tons.Traction is always welded on dredger main hull with lifting lug On 37# rib position, insurance is always welded on the steel plate of press-fitting pouring weight with lifting lug, and clump weight weight is more than or equal to 150 tons.Gantry is practical Translocation distance is 30.75 meters.Up and down amount trimmed and left and right amount trimmed of the gantry in the final position installation of main hull stern fluting Within 20mm.
The specific movement process for carrying out movement using gantry movement technical solution of the present invention is as follows:
Step 1: in tooling, track, equipment conveying to dock, and clear up shift paths.
Step 2: scribing line, is laid with track, track is fixed, and due to dock bottom injustice, and trolley force request is stringenter, is needed By rail levelling, upper surface need to be in same level.
Step 3: hoist engine is put in place, total root lifting lug is welded, counterweight pressing block is in place.
Step 4: placing 400t trolley, the dismounting of trolley motor is placed into gantry support construction.
Step 5: installing shackle, coaster, wearing traction and insurance side wirerope.
Step 6: needing to carry out gantry examination top operation before movement, to check whether cause portal structure broken in gantry movement Bad or tooling unstability.
Step 7: 400t trolley jacks up, and safety block is placed, starts to slide.
Step 8: sliding is in place.
Step 9: front and back is finely tuned, trolley removes safety block and finely tunes up and down, until installing successfully.
Track laying
It is laid with track in dock, track uses H316, and 70 meters of track overall length, track width 600mm.Orbit centre line-spacing Minimum spacing from two sides docking block is not less than 40mm.
In order to reduce the resistance generated when gantry traction movement, the flatness to track, gap are needed in track laying It is controlled with difference in height.
Track is set to be guaranteed at same level.The flatness of track reaches in ± 5mm.The diagonal error of track ± 10mm。
Height is crossed and surveyed using laser Lycra, and rail linearity degree and trolley plate thickness are met the requirements.
Figure 12 shows track laying schematic diagram.
The placement of hoist engine and total root lifting lug
Figure 13 shows the layout drawing of hoist engine and lifting lug, and 1 is hoist engine in figure, and 2 always hang for insurance with lifting lug, 3 for traction Ear, 4 be traction always with lifting lug.
4 hoist engines are welded on the steel plate for being placed with clump weight, and clump weight weight is more than or equal to 50 tons.
Traction lifting lug is welded on gantry;Total root lifting lug is drawn to be welded on the position of hull 37# rib position.
Insurance lifting lug is welded in gantry support construction, is insured total root lifting lug and is welded on the steel plate for being placed with clump weight, Clump weight weight is more than or equal to 150 tons.
The installation of 400 tons of trolleys
Figure 14 shows trolley scheme of installation.
6 400t trolleys are arranged in preferred embodiment according to the present invention below gantry support construction.2 components of trolley point Designated position is not slid onto from 2 tracks.Trolley 1 and 2 is located at the position A13 of gantry support construction, and trolley 3 and 4 is located at bridge At the position A7 of frame support structure, trolley 5 and 6 is located at the position A2 of gantry support construction.
In order to avoid the interference of motor and the gantry support of trolley, motor is disassembled from trolley and is placed into gantry On Support Position and increase with the hydraulic oil pipe for meeting length requirement.
Trolley slides onto designated position from the tail portion of track.Connect trolley and gantry support construction by trolley connector It connects.Trolley is linked together by the attachment base bottom plate of bolt and trolley connector.The attachment base top plate of trolley connector passes through Welding welds together with gantry support construction.
Gantry integral shift
Figure 11 shows the general arrangement of cutter suction dredger gantry Integral transporting according to the present invention.
When gantry Integral transporting, drawn using 2 12t hoist engines and 2 12t hoist engine insurances.
Wirerope wears coaster, and coaster is connected to traction lifting lug, insurance lifting lug, traction always with lifting lug and insurance always with lifting lug On.
According to the distance between the gantry bottom surface of in-site measurement and track upper surface, trolley attachment base and connecting plate are installed, 400t trolley lifts 168mm simultaneously, has padded safety block and has prepared to shift later.
When displacement, by the traction of 2 rack winches and 2 insurance hoist engines, keep gantry whole with lowest speed along track Body displacement.Crawl operation is carried out when reaching installation site fastly.
It can be by the whole accurately movement of gantry to quarter of dredging using Novel bridge frame movement technical solution of the invention In fluting, guarantee that gantry internal unit is installed in advance and gantry integral installation precision, raising production efficiency shorten construction week Phase
Although this technology is led finally it is pointed out that the present invention is described with reference to current specific embodiment Those of ordinary skill in domain it should be appreciated that more than embodiment be intended merely to illustrate the present invention, and be not used as to this The restriction of invention can also make various equivalent change or replacement without departing from the inventive concept of the premise, therefore, as long as Claims of the present invention range will all be fallen in the variation of above-described embodiment, modification in spirit of the invention It is interior.

Claims (16)

1. a kind of tool part for cutter suction dredger gantry Integral transporting, which is characterized in that the tool part includes support Tool part and connecting tooling part,
The supporting tool part is used to support the gantry, including multiple columns, multiple vertical supports, multiple cross-braces Part, multiple skewed horizontal load parts, multiple deep brackets, support beam, in which:
Each column is welded in the support beam by deep bracket;
The multiple column includes the first to the 5th column, and the height of each column successively falls progressively to form the gradient, the gradient It is corresponding with the gantry bottom line style gradient;
It is welded to connect between first column and the second column by vertical supports and skewed horizontal load part;
It is welded to connect between second column and third column by vertical supports;
It is welded to connect between third column and the 4th column by skewed horizontal load part;
It is welded to connect between 4th column and the 5th column by vertical supports;
It is welded to connect between first column by horizontal support piece and skewed horizontal load part;
The connecting tooling part is for connecting and fastening the supporting tool part and trolley, including attachment base top plate, attachment base bottom Longitudinal baffle, attachment base outside longitudinal baffle and attachment base lateral partitions inside plate, attachment base;Wherein:
The attachment base top plate and attachment base bottom plate pass through longitudinal baffle, attachment base outside longitudinal baffle, connection inside attachment base Seat lateral partitions pass through the connecting tooling part that is made of welded connection;Bolt hole is provided on the attachment base bottom plate;
The attachment base bottom plate of the connecting tooling part is connect by the bolt hole on bolt and attachment base bottom plate with trolley;
The attachment base top plate of the connecting tooling part is connect by welding manner with the gantry supporting tool part.
2. being used for the tool part of cutter suction dredger gantry Integral transporting as described in claim 1, which is characterized in that
Skewed horizontal load part and column between first column and the second column is at 61 °;
Skewed horizontal load part and column between third column and the 4th column is at 108 °;
Skewed horizontal load part and column between first column is at 43 °.
3. being used for the tool part of cutter suction dredger gantry Integral transporting as described in claim 1, which is characterized in that
It is welded to connect between second column by horizontal support piece and skewed horizontal load part;
It is welded to connect between third column by horizontal support piece and skewed horizontal load part
It is welded to connect between 4th column by horizontal support piece;
Skewed horizontal load part and column between second column is at 43 °;And
Skewed horizontal load part and column between third column is at 43 °.
4. being used for the tool part of cutter suction dredger gantry Integral transporting as described in claim 1, which is characterized in that
The first, third, the 5th column are 630 × 25 round tube of Φ;
The second, the 4th column is 508 × 13 round tube of Φ;
Vertical supports and horizontal support piece are 219 × 8 round tube of Φ;
Skewed horizontal load part between first column and the second column is 325 × 8 round tube of Φ;
Skewed horizontal load part between third column and the 4th column is 219 × 8 round tube of Φ.
5. being used for the tool part of cutter suction dredger gantry Integral transporting as described in claim 1, which is characterized in that
Support construction uses yield strength for the steel material of 235MPa;
Portal structure uses yield strength for the steel material of 255MPa.
6. being used for the tool part of cutter suction dredger gantry Integral transporting as described in claim 1, which is characterized in that the bridge Frame supporting element port and starboard is symmetrical.
7. being used for the tool part of cutter suction dredger gantry Integral transporting as described in claim 1, which is characterized in that
The gantry length is 46m, width 8m, and highly between 8-11m, weight is 1408 tons.
8. being used for the tool part of cutter suction dredger gantry Integral transporting as described in claim 1, which is characterized in that
The total weight of the gantry and supporting tool part is 1600 tons.
9. the method that a kind of pair of cutter suction dredger gantry carries out Integral transporting, which is characterized in that the method includes following steps It is rapid:
S1: the tool part that cutter suction dredger gantry carries out Integral transporting, including supporting tool part and connecting tooling part are prepared;
The supporting tool part is used to support the gantry, including multiple columns, multiple vertical supports, multiple cross-braces Part, multiple skewed horizontal load parts, multiple deep brackets, support beam, in which:
Each column is welded in the support beam by deep bracket;
The multiple column includes the first to the 5th column, and the height of each column successively falls progressively to form the gradient, the gradient It is corresponding with the gantry bottom line style gradient;
It is welded to connect between first column and the second column by vertical supports and skewed horizontal load part;
It is welded to connect between second column and third column by vertical supports;
It is welded to connect between third column and the 4th column by skewed horizontal load part;
It is welded to connect between 4th column and the 5th column by vertical supports;
It is welded to connect between first column by horizontal support piece and skewed horizontal load part;
The connecting tooling part is for connecting and fastening the supporting tool part and trolley, including attachment base top plate, attachment base bottom Longitudinal baffle, attachment base outside longitudinal baffle and attachment base lateral partitions inside plate, attachment base;Wherein:
The attachment base top plate and attachment base bottom plate pass through longitudinal baffle, attachment base outside longitudinal baffle, connection inside attachment base Seat lateral partitions pass through the connecting tooling part that is made of welded connection;Bolt hole is provided on the attachment base bottom plate;
The attachment base bottom plate of the connecting tooling part is connect by the bolt hole on bolt and attachment base bottom plate with trolley;
The attachment base top plate of the connecting tooling part is connect by welding manner with the gantry supporting tool part;(S3: pass through spiral shell The attachment base bottom plate of connecting tooling part is connect by the bolt hole on bolt and attachment base bottom plate with trolley;It will be even by welding manner The attachment base top plate for connecing tool part is connect with supporting tool part)
S2: tool part, track, gantry to be installed are transported to dock, and clears up shift paths;
S3: executing scribing line, laying and trapped orbit in shift paths, by level up at the upper surface for making track to track In same level;
S4: being placed on dock bottom for hoist engine, counterweight pressing block, will draw total root lifting lug and is welded on main hull;
S5: trolley is placed, trolley motor is removed and is placed into gantry support construction;
S6: installation shackle, coaster wear haulage cable and insurance side wirerope;
S7: carrying out examination top operation to gantry before movement operation, to check whether cause portal structure destruction or work in gantry movement Piece installing unstability;
S8: trolley jacks up, and places safety block, starts to slide;
S9: by the tractive force of hoist engine, support construction and gantry on trolley and trolley is made to be slid onto the gantry of main hull Installation site;
S10: in gantry installation site, removing trolley safety block, to gantry execute up and down, left and right finely tune, until gantry is installed to Position.
10. the method for carrying out Integral transporting to cutter suction dredger gantry as claimed in claim 9, which is characterized in that step S3 includes:
Height, rail linearity degree and trolley plate thickness are crossed and surveyed using laser Lycra,
The flatness of track in ± 5mm,
The diagonal error of track in ± 10mm,
Track length 70.00m,
Spacing of the every track away from center line is 2.95m.
11. the method for carrying out Integral transporting to cutter suction dredger gantry as claimed in claim 9, which is characterized in that step S4 includes:
2 hoist engines are set, in 2 hoist engines of insurance side setting in traction side, traction side hoist engine and insurance side hoist engine are equal It is welded on the steel plate for being placed with counterweight pressing block, steel plate is placed in dock bottom;Wherein:
Total root lifting lug will be drawn to be welded on main hull, traction lifting lug is welded on gantry, is insured total root lifting lug and is welded on placement Have on the steel plate of counterweight pressing block, insurance lifting lug is welded in gantry support construction.
12. the method for carrying out Integral transporting to cutter suction dredger gantry as claimed in claim 9, which is characterized in that
Traction side hoist engine and insurance side hoist engine are 12t hoist engine,
The counterweight pressing block weight of traction side hoist engine and insurance side hoist engine is more than or equal to 50 tons;
The counterweight pressing block weight for insuring total root lifting lug is more than or equal to 150 tons.
13. the method for carrying out Integral transporting to cutter suction dredger gantry as claimed in claim 9, which is characterized in that step Trolley described in S5 is 400t trolley.
14. the method for carrying out Integral transporting to cutter suction dredger gantry as claimed in claim 9, which is characterized in that step Traction side wirerope described in S6 and insurance side wirerope are 28 wirerope of Φ, and traction side length of steel rope is greater than 400m, insurance Side length of steel rope is greater than 650m.
15. the method for carrying out Integral transporting to cutter suction dredger gantry as claimed in claim 9, which is characterized in that step S9 includes:
Gantry skidding distance in orbit is 30.75m.
16. the method for carrying out Integral transporting to cutter suction dredger gantry as claimed in claim 9, which is characterized in that step In S10,
The final installed position of gantry slotted to main hull stern, the fine tuning up and down of the gantry and left and right fine tuning 20mm it It is interior.
CN201811263910.3A 2018-10-29 2018-10-29 Tool piece for integral moving of cutter suction dredger bridge frame and moving method thereof Active CN109231098B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811263910.3A CN109231098B (en) 2018-10-29 2018-10-29 Tool piece for integral moving of cutter suction dredger bridge frame and moving method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811263910.3A CN109231098B (en) 2018-10-29 2018-10-29 Tool piece for integral moving of cutter suction dredger bridge frame and moving method thereof

Publications (2)

Publication Number Publication Date
CN109231098A true CN109231098A (en) 2019-01-18
CN109231098B CN109231098B (en) 2023-07-25

Family

ID=65078626

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811263910.3A Active CN109231098B (en) 2018-10-29 2018-10-29 Tool piece for integral moving of cutter suction dredger bridge frame and moving method thereof

Country Status (1)

Country Link
CN (1) CN109231098B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07187070A (en) * 1993-12-27 1995-07-25 Mitsubishi Heavy Ind Ltd Lateral transfer device for ship's hull between parallel sloped building berths
WO2008059809A1 (en) * 2006-11-14 2008-05-22 Sumitomo Heavy Industries Engineering & Services Co., Ltd. Bridge crane
CN102295056A (en) * 2011-05-26 2011-12-28 天津新河船舶重工有限责任公司 New method for hoisting dredger steel pile and trolley
CN104528411A (en) * 2014-11-18 2015-04-22 惠生(南通)重工有限公司 Method for integrally shifting main body of ship loader
CN205602074U (en) * 2016-04-26 2016-09-28 山东港湾建设集团有限公司 Big line type boats and ships building berth launching gear
CN106181206A (en) * 2016-08-26 2016-12-07 厦门鑫创好钢结构有限公司 The auxiliary equipment that steel structure bridge manufactures can be used in
CN107042879A (en) * 2016-11-29 2017-08-15 舟山中远船务工程有限公司 A kind of oblique slipway launching draw-gear and method
CN107234415A (en) * 2017-08-01 2017-10-10 广船国际有限公司 A kind of hull transport frock and hull support method
CN107499968A (en) * 2017-09-11 2017-12-22 上海振华重工(集团)股份有限公司 A kind of unloading method of bridge crane in shallow draft quay
CN207715295U (en) * 2017-10-31 2018-08-10 北京万源工业有限公司 A kind of mounting tool of direct wind-driven generator group engine room cover
CN209583564U (en) * 2018-10-29 2019-11-05 上海振华重工(集团)股份有限公司 Tool part for cutter suction dredger gantry Integral transporting

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07187070A (en) * 1993-12-27 1995-07-25 Mitsubishi Heavy Ind Ltd Lateral transfer device for ship's hull between parallel sloped building berths
WO2008059809A1 (en) * 2006-11-14 2008-05-22 Sumitomo Heavy Industries Engineering & Services Co., Ltd. Bridge crane
CN102295056A (en) * 2011-05-26 2011-12-28 天津新河船舶重工有限责任公司 New method for hoisting dredger steel pile and trolley
CN104528411A (en) * 2014-11-18 2015-04-22 惠生(南通)重工有限公司 Method for integrally shifting main body of ship loader
CN205602074U (en) * 2016-04-26 2016-09-28 山东港湾建设集团有限公司 Big line type boats and ships building berth launching gear
CN106181206A (en) * 2016-08-26 2016-12-07 厦门鑫创好钢结构有限公司 The auxiliary equipment that steel structure bridge manufactures can be used in
CN107042879A (en) * 2016-11-29 2017-08-15 舟山中远船务工程有限公司 A kind of oblique slipway launching draw-gear and method
CN107234415A (en) * 2017-08-01 2017-10-10 广船国际有限公司 A kind of hull transport frock and hull support method
CN107499968A (en) * 2017-09-11 2017-12-22 上海振华重工(集团)股份有限公司 A kind of unloading method of bridge crane in shallow draft quay
CN207715295U (en) * 2017-10-31 2018-08-10 北京万源工业有限公司 A kind of mounting tool of direct wind-driven generator group engine room cover
CN209583564U (en) * 2018-10-29 2019-11-05 上海振华重工(集团)股份有限公司 Tool part for cutter suction dredger gantry Integral transporting

Also Published As

Publication number Publication date
CN109231098B (en) 2023-07-25

Similar Documents

Publication Publication Date Title
CN109231099A (en) Tool part and its movement method for cutter suction dredger gantry Integral transporting
CN104878733B (en) A kind of drilling platform leg segment folding technique
CN104386219B (en) The follow-up docking technique of jack-up unit shoe
CN202064839U (en) Four-drill column double headframe for land drilling machine
CN104787236B (en) Integral hoisting technology of upper layer building of ship
CN102596790A (en) Lightweight high-performance pipelayer
CN107600314B (en) Integral hoisting method is built in thin plate multilayer
CN102337736A (en) Installation process of upper module on offshore oil platform
CN106958253A (en) A kind of new type of deep-water combined steel plate pile cofferdam construction method
CN104406753B (en) The dynamic response test device of deep-sea slender standpipe under vertical forced oscillation
CN111039169A (en) Ship equipment module hoisting method
CN209583564U (en) Tool part for cutter suction dredger gantry Integral transporting
CN209522555U (en) Tool part for cutter suction dredger gantry Integral transporting
KR20190111972A (en) How to assemble the device placed in the body of water
CN105714829B (en) The constructing device and use its construction method that deep pit digging is built with underground station
CN204473090U (en) The detachable flipper panel assembly peculiar to vessel of external hanging type
CN109231098A (en) Tool part and its movement method for cutter suction dredger gantry Integral transporting
CN208307924U (en) A kind of automatic de-stacking conveying device of glass bottle
CN105041346B (en) The transportation resources of rectangular shield segment inside tunnel
CN103723624B (en) Hydraulic double-type crane and installation method
FI66815B (en) OVER ANGLE CONNECTION FOR OIL TRANSPORT OPERATING MOVEMENT
CN107399412B (en) The method of construction of MOPU
CN104483083B (en) The deep-sea slender standpipe dynamic response test device of simulated sea bottom pipeclay and shear flow
CN203007843U (en) Variable amplitude deck derrick crane
CN105317031B (en) A kind of ship lift main equipment room bridge main beam hanging method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant