CN202064839U - Four-drill column double headframe for land drilling machine - Google Patents

Four-drill column double headframe for land drilling machine Download PDF

Info

Publication number
CN202064839U
CN202064839U CN201120120397XU CN201120120397U CN202064839U CN 202064839 U CN202064839 U CN 202064839U CN 201120120397X U CN201120120397X U CN 201120120397XU CN 201120120397 U CN201120120397 U CN 201120120397U CN 202064839 U CN202064839 U CN 202064839U
Authority
CN
China
Prior art keywords
main
auxiliary
fixed
hoists
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201120120397XU
Other languages
Chinese (zh)
Inventor
石林
韩兴
方太安
丁铁恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING KEMBL PETROLEUM TECHNOLOGY DEVELOPMENT Co Ltd
China National Petroleum Corp
CNPC Engineering Technology R&D Co Ltd
Original Assignee
BEIJING KEMBL PETROLEUM TECHNOLOGY DEVELOPMENT Co Ltd
China National Petroleum Corp
CNPC Drilling Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING KEMBL PETROLEUM TECHNOLOGY DEVELOPMENT Co Ltd, China National Petroleum Corp, CNPC Drilling Research Institute Co Ltd filed Critical BEIJING KEMBL PETROLEUM TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201120120397XU priority Critical patent/CN202064839U/en
Application granted granted Critical
Publication of CN202064839U publication Critical patent/CN202064839U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

A four-drill column double headframe for a land drilling machine is applied to oil field well drilling. A main hoisting steel wire rope is wound on a main crown block and a main hoisting traveling block; a main hoisting large hook and a top driving device are fixed to the lower part of the main hoisting traveling block; the top driving device is arranged on a top driving slide rail; a main rotating disc is fixed onto a drilling platform; a main rotating disc is arranged opposite to the lower end of the top driving slide rail; a main winch is fixed onto the drilling platform; the driving end of the main hoisting steel wire rope is wound on the rotary drum of the main winch; a drill rod operating board is fixed on a headframe main body; an auxiliary hoisting steel wire rope is wound on an auxiliary crown block and an auxiliary hoisting traveling block; an auxiliary hoisting large hook is fixed at the lower part of the auxiliary hoisting steel wire rope; and the driving end of the auxiliary hoisting steel wire rope is wound on the rotary drum of an auxiliary hoist. The four-drill column double headframe has the effect that an auxiliary hoisting system can fulfill single rod connection operation and single rod disassembling operation during drilling operation, so as to save drilling time, and effectively improve drilling efficiency.

Description

Land rig four drill string duplex derricks
Technical field
The utility model relates to the petroleum drilling technology field, and particularly a kind of drilling derrick is a kind of land rig four drill string duplex derricks.Improve land deep-well, ultradeep well and special deep drilling rig drilling efficiency, save drilling time, reduce the derrick of lock of tool drilling.
Background technology
At present, in deep-well, ultradeep well and special deep drilling operation,, make drilling efficiency reduce and the drilling cost increase along with the increase of drilling depth.Have only a cover Hoisting System on the Drilling derrick, a cover Hoisting System promptly will be used for drillng operation, is used to again make up a joint wait less important work, can not the while operation, and the drilling efficiency of existing motor-pumped well frame system is low.
The utility model content
The purpose of this utility model is: a kind of land rig four drill string duplex derricks are provided, improve land deep-well, ultradeep well drill drilling efficient, in drillng operation, can make up a joint and wait less important work, the saving drilling time.Overcome the deficiency of less important works such as existing drilling derrick can not make up a joint in drillng operation, reduce lock of tool drilling.
The technical solution adopted in the utility model is: land rig four drill string duplex derricks, mainly drive slide rail, the main tourist bus that hoists, main hoist hook, top-drive device, drilling rod operating desk, main winch, main turntable by overhead traveling crane, derrick main body, main hoist rope, top, auxiliary hoist rope, two-layer platform, the auxiliary tourist bus that hoists, the auxiliary hook that hoists, auxiliary winch, auxiliary turntable and offshore boring island are formed, upper vertical at offshore boring island is fixed with the derrick main body, at the middle part of derrick main body two-layer platform is arranged; Be fixed with overhead traveling crane (overhead traveling crane is a fixed pulley) at the top of derrick main body, it is characterized in that: described overhead traveling crane comprises main overhead traveling crane and assistant crown block;
On described main overhead traveling crane and the main tourist bus that hoists, be wound with main hoist rope, be fixed with the main hook that hoists in the bottom of the main tourist bus that hoists, be hung with top-drive device in the bottom of the main hook that hoists, and top-drive device drives on the slide rail on the top; Be fixed with main turntable on offshore boring island, main turntable is relative with the lower end that slide rail is driven on the top; Be fixed with main winch on offshore boring island, the driving end of main hoist rope is wrapped on the cylinder of main winch; On the derrick main body, be fixed with the drilling rod operating desk;
On described assistant crown block and the auxiliary tourist bus that hoists, be wound with auxiliary hoist rope, be fixed with the auxiliary hook that hoists in the bottom of auxiliary hoist rope, on offshore boring island, be fixed with auxiliary turntable, be fixed with auxiliary winch on offshore boring island, the driving end of auxiliary hoist rope is wrapped on the cylinder of auxiliary winch.
Between the front end of offshore boring island and ground, the drilling rod slideway is arranged; Between offshore boring island dual-side and ground, ladder is arranged.
When guaranteeing that main and auxiliary hoisting system is worked simultaneously, do not disturb mutually, be formed centrally dislocation in before and after the main and auxiliary hoisting system.The center to center distance that is described main overhead traveling crane and described assistant crown block is between 1000~2000mm.
Suitably widen the derrick width, two cover hoisting systems are installed so that leave enough spaces; For satisfying the demand of four drill string drilling wells, the more common derrick height of derrick height design.
The beneficial effects of the utility model: the utility model land rig four drill string duplex derricks, the hoisting system of the parallel assembling of main and auxiliary two covers, main hoisting system is used for drilling, setting of casing, creeps into drillng operations such as sending brill, and auxiliary hoisting system is used to make up a joint into less important works such as four drill strings (drill string that is formed by connecting by four drilling rods).Main hoisting system is equipped with top-drive device, connects four drill string drilling wells, saves to make up a joint the activity duration, improves drilling efficiency.When drillng operation, the co-ordination that can walk abreast of main and auxiliary hoisting system can reduce the number of times of drilling effectively, has reduced the occurrence probability of lock of tool drilling in the drilling process.
Description of drawings
Fig. 1 is the utility model land rig four drill string duplex derrick geometry schematic diagrames.
Fig. 2 is the left view of Fig. 1.
Among the figure, 1-overhead traveling crane, 2-derrick main body, 3-master's hoist rope, slide rail is driven on 4-top, 5-master's tourist bus that hoists, 6-master's hook that hoists, 7-top-drive device, 8-drilling rod operating desk, the 9-main winch, the 10-main turntable, 11-assists hoist rope, the 12-two-layer platform, the auxiliary tourist bus that hoists of 13-, the auxiliary hook that hoists of 14-, 15-four drill strings, the 16-drilling rod, 17-auxiliary winch, 18-auxiliary turntable, 19-ladder, the 20-base, 21-drilling rod slideway, 22-drill rod rack, 23-rat hole.
The specific embodiment
Embodiment 1: with a land rig four drill string duplex derricks is example, and the utility model is described in further detail.
Consult Fig. 1.The utility model land rig four drill string duplex derricks, mainly drive slide rail 4, the main tourist bus 5 that hoists, main hoist hook 6, top-drive device 7, drilling rod operating desk 8, main winch 9, main turntable 10 by overhead traveling crane 1, derrick main body 2, main hoist rope 3, top, auxiliary hoist rope 11, two-layer platform 12, the auxiliary tourist bus 13 that hoists, the auxiliary hook 14 that hoists, auxiliary winch 17, auxiliary turntable 18 and offshore boring island 20 are formed.Upper vertical at offshore boring island 20 is fixed with derrick main body 2, at the middle part of derrick main body 2 two-layer platform 12 is arranged, and two-layer platform 12 can move up and down; Be fixed with overhead traveling crane 1 at the top of derrick main body 2.Described overhead traveling crane 1 comprises main overhead traveling crane and assistant crown block.
On main overhead traveling crane and the main tourist bus 5 that hoists, be wound with main hoist rope 3, be fixed with the master hook 6 that hoists in the bottom of the main tourist bus 5 that hoists, be hung with a top-drive device 7 in the bottom of the main hook 6 that hoists, and top-drive device 7 drives on the slide rail 4 on the top.Be fixed with a main turntable 10 on offshore boring island 20, main turntable 10 is relative with the lower end that slide rail 4 is driven on the top; Be fixed with a main winch 9 on offshore boring island 20, the driving end of main hoist rope 3 is wrapped on the cylinder of main winch 9; The fixed end of main hoist rope 3 is fixed on the offshore boring island 20.Horizontal fixed has a drilling rod operating desk 8 on the derrick main body 2.
On described assistant crown block and the auxiliary tourist bus 13 that hoists, be wound with auxiliary hoist rope 11, be fixed with an auxiliary hook 14 that hoists in the bottom of auxiliary hoist rope 11, on offshore boring island 21, be fixed with an auxiliary turntable 18, be fixed with an auxiliary winch 17 on offshore boring island 21, auxiliary winch 17 and main winch 9 are arranged side by side.The driving end of auxiliary hoist rope 11 is wrapped on the cylinder of auxiliary winch 17.The fixed end of auxiliary hoist rope 11 is fixed on the offshore boring island 20.
Between the front center of offshore boring island 20 and ground, a drilling rod slideway 21 is arranged.Between offshore boring island 20 dual-sides and ground, ladder 19 is arranged.The center to center distance of main overhead traveling crane and described assistant crown block is 1200mm.
The auxiliary hook 14 that hoists is sling drilling rod 16 from drill rod rack 22, drilling rod 16 winches on the offshore boring island 20 by 21 in drilling rod slideway, the auxiliary hook 14 that hoists promotes drilling rod 16 and is emitted on the drilling rod operating desk 8, the auxiliary hook 14 that hoists, is transferred drilling rod 16 and is entered rat hole 23 to auxiliary turntable 18 from drilling rod 16 of drilling rod operating desk 8 liftings.Make drilling rod 16 box cuplings a little more than auxiliary turntable 18 cards, slips is placed on the auxiliary turntable 18, transfer drilling rod 16 drilling rod 16 is stuck on the auxiliary turntable 18; The auxiliary hook 14 that hoists to auxiliary turntable 18 centers, is transferred second drilling rod from second drilling rod 16 of drilling rod operating desk 8 liftings, and second drilling rod is connected with first drilling rod.By the auxiliary hook 14 that hoists the drill string that connects is promoted one section height, from auxiliary turntable 18, take out slips, drill string is transferred once more to rat hole 23, and the box cupling that makes second drilling rod is a little more than auxiliary turntable 18 cards, slips is placed on the auxiliary turntable 18, transfer drill string fully, it is stuck on the auxiliary turntable 18.Connect four drilling rods 15 and rise to, promptly finish one four drill string operation to two-layer platform 12 height.Use when being emitted on the two-layer platform 12 auxiliary hook 14 liftings that hoist of four drill strings, 15 usefulness that connect for drilling well.Simultaneously, drive slide rail 4, the main tourist bus 5 that hoists, the main hook 6 that hoists, top-drive device 7, main winch 9, main turntable 10 by overhead traveling crane 1, derrick main body 2, main hoist rope 3, top and constituted main hoisting system, mainly finish drilling, setting of casing, creep into drillng operation work such as sending brill.

Claims (3)

1. land rig four drill string duplex derricks, mainly by overhead traveling crane (1), derrick main body (2), main hoist rope (3), slide rail (4) is driven on the top, the main tourist bus (5) that hoists, the main hook (6) that hoists, top-drive device (7), drilling rod operating desk (8), main winch (9), main turntable (10), auxiliary hoist rope (11), two-layer platform (12), the auxiliary tourist bus (13) that hoists, the auxiliary hook (14) that hoists, auxiliary winch (17), auxiliary turntable (18) and offshore boring island (20) are formed, upper vertical at offshore boring island (20) is fixed with derrick main body (2), at the middle part of derrick main body (2) two-layer platform (12) is arranged; Top in derrick main body (2) is fixed with overhead traveling crane, it is characterized in that: described overhead traveling crane (1) comprises main overhead traveling crane and assistant crown block;
On described main overhead traveling crane and the main tourist bus (5) that hoists, be wound with main hoist rope (3), be fixed with the main hook (6) that hoists in the bottom of the main tourist bus (5) that hoists, bottom at the main hook (6) that hoists is hung with top-drive device (7), and top-drive device (7) drives on the slide rail (4) on the top; Be fixed with main turntable (10) on offshore boring island (20), main turntable (10) is relative with the lower end that slide rail (4) is driven on the top; Be fixed with main winch (9) on offshore boring island (20), the driving end of main hoist rope (3) is wrapped on the cylinder of main winch (9); On derrick main body (2), be fixed with drilling rod operating desk (8);
On described assistant crown block and the auxiliary tourist bus (13) that hoists, be wound with auxiliary hoist rope (11), be fixed with the auxiliary hook (14) that hoists in the bottom of auxiliary hoist rope (11), on offshore boring island (21), be fixed with auxiliary turntable (18), be fixed with auxiliary winch (17) on offshore boring island (21), the driving end of auxiliary hoist rope (11) is wrapped on the cylinder of auxiliary winch (17).
2. land rig four drill string duplex derricks according to claim 1 is characterized in that: between the front end of offshore boring island (20) and ground drilling rod slideway (21) is arranged; Ladder (19) is arranged between offshore boring island (20) dual-side and ground.
3. land rig four drill string duplex derricks according to claim 1, it is characterized in that: the center to center distance of described main overhead traveling crane and described assistant crown block is between 1000~2000mm.
CN201120120397XU 2011-04-22 2011-04-22 Four-drill column double headframe for land drilling machine Expired - Lifetime CN202064839U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120120397XU CN202064839U (en) 2011-04-22 2011-04-22 Four-drill column double headframe for land drilling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120120397XU CN202064839U (en) 2011-04-22 2011-04-22 Four-drill column double headframe for land drilling machine

Publications (1)

Publication Number Publication Date
CN202064839U true CN202064839U (en) 2011-12-07

Family

ID=45058707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120120397XU Expired - Lifetime CN202064839U (en) 2011-04-22 2011-04-22 Four-drill column double headframe for land drilling machine

Country Status (1)

Country Link
CN (1) CN202064839U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075103A (en) * 2013-01-30 2013-05-01 山东中天泰和实业有限公司 Self-walking shale gas drilling machine
CN104213855A (en) * 2013-06-05 2014-12-17 中国石油天然气集团公司 Four-stand column construction operating method for land drilling machine
CN106285518A (en) * 2016-08-30 2017-01-04 宝鸡石油机械有限责任公司 A kind of tubing string automatic processing device discharging little drilling tool four single upright column
CN110346217A (en) * 2019-06-28 2019-10-18 宝鸡石油机械有限责任公司 A kind of load testing method and experimental rig of ocean double-wellhead derrick
CN110792399A (en) * 2018-08-03 2020-02-14 国民油井华高有限公司 Hoisting system, robotic manipulator and method for handling tubulars on a drilling rig and tubular handling system and method
CN112196517A (en) * 2019-11-26 2021-01-08 中国科学院地质与地球物理研究所 Drilling calibration method, device, equipment and medium based on image recognition
CN114263441A (en) * 2021-12-27 2022-04-01 河北永明地质工程机械有限公司 Drill rod delivery device
US11834914B2 (en) 2020-02-10 2023-12-05 National Oilwell Varco, L.P. Quick coupling drill pipe connector
US11891864B2 (en) 2019-01-25 2024-02-06 National Oilwell Varco, L.P. Pipe handling arm
US11988059B2 (en) 2019-02-22 2024-05-21 National Oilwell Varco, L.P. Dual activity top drive

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075103A (en) * 2013-01-30 2013-05-01 山东中天泰和实业有限公司 Self-walking shale gas drilling machine
CN104213855A (en) * 2013-06-05 2014-12-17 中国石油天然气集团公司 Four-stand column construction operating method for land drilling machine
CN104213855B (en) * 2013-06-05 2016-08-10 中国石油天然气集团公司 A kind of land rig 4 single upright column constructing operation method
CN106285518A (en) * 2016-08-30 2017-01-04 宝鸡石油机械有限责任公司 A kind of tubing string automatic processing device discharging little drilling tool four single upright column
CN110792399A (en) * 2018-08-03 2020-02-14 国民油井华高有限公司 Hoisting system, robotic manipulator and method for handling tubulars on a drilling rig and tubular handling system and method
US11891864B2 (en) 2019-01-25 2024-02-06 National Oilwell Varco, L.P. Pipe handling arm
US11988059B2 (en) 2019-02-22 2024-05-21 National Oilwell Varco, L.P. Dual activity top drive
CN110346217A (en) * 2019-06-28 2019-10-18 宝鸡石油机械有限责任公司 A kind of load testing method and experimental rig of ocean double-wellhead derrick
CN112196517A (en) * 2019-11-26 2021-01-08 中国科学院地质与地球物理研究所 Drilling calibration method, device, equipment and medium based on image recognition
US11494931B2 (en) 2019-11-26 2022-11-08 Institute Of Geology And Geophysics, Chinese Academy Of Sciences Drilling calibration method, apparatus, device and medium based on image recognition
CN112196517B (en) * 2019-11-26 2021-05-04 中国科学院地质与地球物理研究所 Drilling calibration method, device, equipment and medium based on image recognition
US11834914B2 (en) 2020-02-10 2023-12-05 National Oilwell Varco, L.P. Quick coupling drill pipe connector
CN114263441A (en) * 2021-12-27 2022-04-01 河北永明地质工程机械有限公司 Drill rod delivery device
CN114263441B (en) * 2021-12-27 2024-03-22 河北永明地质工程机械有限公司 Drill rod delivery device

Similar Documents

Publication Publication Date Title
CN202064839U (en) Four-drill column double headframe for land drilling machine
CN209653956U (en) All-hydraulic deep drilling rig
CN201221322Y (en) Novel petroleum well drilling hoisting system and headframe
CN202108420U (en) Land headframe for duplex rig
CN103359626B (en) A kind of Marine riser crane
CN203441467U (en) Automatic catwalk device for marine drilling platform
CN202064840U (en) Four-drill column drill derrick
CN101666208B (en) Gear rack lifting drilling machine
CN103434988B (en) A kind of loop wheel machine lift system and centering guide device
CN205918365U (en) Ocean reconnaissance ship hydraulic pressure plays to rise a type derrick drilling system
CN102071887A (en) Operating method of well drilling and repairing machine
CN202500502U (en) Telescopic type drilling machine derrick
CN201982029U (en) Working device of well-drilling and repairing rig
CN203296722U (en) Floating type gate marine riser crane for offshore drilling
CN201687395U (en) Gate-type derrick of coiled tubing drilling machine
CN102071889A (en) Operating device of well drilling and repairing machine
CN202578562U (en) Lifting device of drilling machine
CN201202410Y (en) Headframe telescoping mechanism
CN208235483U (en) It is a kind of for discard oil/gas well block and old platform removal extraordinary ocean platform
CN102425383A (en) Modular lifting device
CN210829101U (en) Mine derrick
CN204727540U (en) A kind of sledge seat jack up unit
CN203978336U (en) The continuous running and pulling device of a kind of rig
CN102561954A (en) Multifunctional derrick
CN203097764U (en) Injection head mounting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20111207

CX01 Expiry of patent term