CN109214099A - A kind of arch rib steel pipe location Calculation and construction method - Google Patents

A kind of arch rib steel pipe location Calculation and construction method Download PDF

Info

Publication number
CN109214099A
CN109214099A CN201811098199.0A CN201811098199A CN109214099A CN 109214099 A CN109214099 A CN 109214099A CN 201811098199 A CN201811098199 A CN 201811098199A CN 109214099 A CN109214099 A CN 109214099A
Authority
CN
China
Prior art keywords
arch rib
steel pipe
limit plate
construction
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811098199.0A
Other languages
Chinese (zh)
Other versions
CN109214099B (en
Inventor
戴小松
谢小飞
王少兵
秦磊
鲁帅
罗赞彪
王维
曹雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
China Construction Third Bureau Infrastructure Construction Investment Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
China Construction Third Bureau Infrastructure Construction Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd, China Construction Third Bureau Infrastructure Construction Investment Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201811098199.0A priority Critical patent/CN109214099B/en
Publication of CN109214099A publication Critical patent/CN109214099A/en
Application granted granted Critical
Publication of CN109214099B publication Critical patent/CN109214099B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Theoretical Computer Science (AREA)
  • Architecture (AREA)
  • Mathematical Optimization (AREA)
  • Mathematical Analysis (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Computational Mathematics (AREA)
  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of arch rib steel pipe location Calculation and construction methods, the seat calibration method and making software for calculating limit plate at each moulding bed are derived first, limit plate is made according to arch rib tilt angle, accurate adjustment limit Board position and welding and moulding bed, mark limit plate and arch rib steel pipe control point coordinates, single rib-lifting section is lifted according to control point position, the errorless rear next segment lifting construction of progress of single rib-lifting section positioning is checked, until completing arch rib installation.Using this location Calculation and construction method, conventional vertical is replaced with into vertical cross-section control in the oblique section of arch rib, compared to the difficulty that the control of former arch rib measuring point reduces measurement construction, the installation site of arch rib steel pipe can accurately be controlled by improving arch rib installation accuracy, substantially reduce the heavy-duty machineries such as loop wheel machine uses the time, the accurate adjustment construction operation for significantly reducing arch rib, reduces the security risk of construction, and accurately joining the two sections of a bridge, etc for arch rib and guaranteeing that design is linear plays a supportive role.

Description

A kind of arch rib steel pipe location Calculation and construction method
Technical field
The invention belongs to technical field of bridge construction, and in particular to a kind of arch rib steel pipe location Calculation and construction method.
Background technique
The required precision of arch rib penstock installation is high, and lifting tonnage is big, is first will using main method when jig frame assembling construction On rib-hoisting to moulding bed, after then measuring segment tail end section position progress coarse position, then it is gradually fine-tuning to design position. This method needs survey crew repeatedly to measure arch rib measuring point, and especially circular arch measuring point is difficult to control, and working efficiency is low, and lifting is made The industry time is long, and danger coefficient is larger, and is often difficult to reach the ideal effect of accurate adjustment.
Summary of the invention
In order to overcome in the prior art arch rib penstock installation be difficult to control, the technologies such as activity duration length, danger coefficient height it is scarce Fall into, the present invention provides a kind of arch rib steel pipe location Calculation and construction method, pass through calculation method and write software to measuring point into Row optimization, carries out accurate adjustment construction on moulding bed before lifting in advance, and that greatly shortens the heavy-duty machineries such as loop wheel machine uses the time, significantly The accurate adjustment construction operation for reducing arch rib, reduces the security risk of construction, accurately joins the two sections of a bridge, etc for arch rib and guarantees to design linear branch Support effect, solves above-mentioned technical problem.
The present invention is achieved through the following technical solutions above-mentioned purpose, a kind of arch rib steel pipe location Calculation and construction method, Including following construction procedure:
Step 1: the seat calibration method and making software for calculating limit plate at each moulding bed are derived, determines dumbbell shape arch rib correlometer Calculate parameter, establishment arch rib steel pipe vertical section coordinate points B(1,2,3,4) and the calculating of vertical cross-section coordinate points S1, S2, K1, K2 Method works out the software of above-mentioned calculation method, calculates each arch rib steel pipe segment and is fixed on the coordinate B in moulding bed section and for multiple Traditional measuring point coordinate S, K of core precision, export calculated result count the relevant control point coordinate of each segment to excel;
Step 2: limit plate, accurate adjustment limit Board position and welding and moulding bed are made according to arch rib tilt angle, according to step Arch rib relevant parameter and calculated result in one determine the position of limit plate needed for arch rib, and according to corresponding tilt angle system Make limit plate, it is tangent at the B of control point that guarantee is installed rear position margining plate and arch rib;
Step 3: label limit plate and arch rib steel pipe control point coordinates, arch rib steel pipe carry out determining corresponding B point position when preassembling And significant label is made, respective markers are made at control point on adjusting accurate limit plate, intend the rib-lifting section both ends of lifting Moulding bed on be both needed to by step 1 and step 2 installation limit plate;
Step 4: lifting single rib-lifting section according to control point position, is adjusted, will be encircleed according to the point position B when lifting arch rib steel pipe The design position of as arch rib steel pipe after fin steel tube B1 point disposes mark point on corresponding limit plate 1, B2, B3, B4 similarly adjusts;
Step 5: the errorless rear next segment lifting construction of progress of single rib-lifting section positioning is checked, until completing arch rib installation, use Conventional method measuring point S, K check arch rib steel pipe position, and arch rib steel pipe is then welded and fixed in error range and carries out next segment Construction, if being more than error, it is only necessary to which fine tuning can reach required precision.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, can achieve following has Beneficial effect:
1, in arch rib steel pipe location Calculation and construction method of the present invention, the measurement of limit plate measuring point is convenient, by conventional vertical Vertical cross-section control is replaced in the oblique section of arch rib, compared to the difficulty that the control of former arch rib measuring point reduces measurement construction, is mentioned High arch rib installation accuracy;
2, the present invention has the foundation accurately calculated as construction operation, when greatly reducing lifting operation compared with traditional technology Between, construction risk is reduced, construction speed is accelerated.
Detailed description of the invention
Specific embodiments of the present invention are further described in detail with reference to the accompanying drawing, in which:
Fig. 1 is that arch rib steel pipe coordinate calculates schematic diagram;
Fig. 2 is arch rib penstock installation schematic diagram;
Fig. 3 is B point coordinate software for calculation interface in a kind of arch rib steel pipe location Calculation and construction method of the present invention;
Fig. 4 is traditional measuring point S, K point coordinate software for calculation interface.
Specific embodiment
A kind of arch rib steel pipe location Calculation and construction method, the calculating and construction method the following steps are included:
Step 1: deriving the coordinate and making software for calculating limit plate at each moulding bed, as shown in Figure 1, being arch rib steel pipe coordinate Calculate schematic diagram;
A, dumbbell shape arch rib relevant calculation parameter is determined;
B, work out arch rib steel pipe vertical section coordinate points B(1,2,3,4) and the calculating side of vertical cross-section coordinate points S1, S2, K1, K2 Method;
C, the software of above-mentioned calculation method is worked out;
D, calculate each arch rib steel pipe segment be fixed on the coordinate B in moulding bed section and traditional measuring point coordinate S for checking precision, K is as shown in Figure 3 and Figure 4 B point coordinate software for calculation interface and traditional measuring point S, K point coordinate software for calculation interface;
E, export calculated result counts the relevant control point coordinate of each segment to excel;
S2: limit plate, the accurate position for adjusting limit plate and welding and moulding bed are made according to arch rib tilt angle, according to step S1 Middle arch rib relevant parameter and calculated result determine the position of limit plate needed for arch rib, and make according to corresponding tilt angle Limit plate, it is tangent at the B of control point that guarantee is installed rear position margining plate and arch rib;
S3: label limit plate and arch rib steel pipe control point coordinates determine the corresponding point position B and make when arch rib steel pipe carries out preassembling Significant label out, respective markers are made at control point on adjusting accurate limit plate, intend the tire at the rib-lifting section both ends of lifting It is both needed on frame by installing limit plate described in S1, S2;
S4: lifting single rib-lifting section according to control point position, is adjusted when lifting arch rib steel pipe according to the point position B, by arch rib steel The design position of as arch rib steel pipe after pipe B1 point disposes mark point on corresponding limit plate, B2, B3, B4 similarly adjusts, such as Fig. 2 institute Show, is arch rib penstock installation schematic diagram;
S5: the errorless rear next segment lifting construction of progress of single rib-lifting section positioning is checked, until arch rib installation is completed, with tradition Method measuring point S, K check arch rib steel pipe position, and arch rib steel pipe is then welded and fixed in error range and carries out next segmental construction; If being more than error, need to only finely tune can reach required precision.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, it is not used to The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include Within protection scope of the present invention.

Claims (1)

1. a kind of arch rib steel pipe location Calculation and construction method, it is characterised in that: the calculating and construction method the following steps are included:
S1: the coordinate and making software for calculating limit plate at each moulding bed are derived;
A, dumbbell shape arch rib relevant calculation parameter is determined;
B, work out arch rib steel pipe vertical section coordinate points B(1,2,3,4) and the calculating side of vertical cross-section coordinate points S1, S2, K1, K2 Method;
C, the software of above-mentioned calculation method is worked out;
D, calculate each arch rib steel pipe segment be fixed on the coordinate B in moulding bed section and traditional measuring point coordinate S for checking precision, K;
E, export calculated result counts the relevant control point coordinate of each segment to excel;
S2: limit plate, the accurate position for adjusting limit plate and welding and moulding bed are made according to arch rib tilt angle, according to step S1 Middle arch rib relevant parameter and calculated result determine the position of limit plate needed for arch rib, and make according to corresponding tilt angle Limit plate, it is tangent at the B of control point that guarantee is installed rear position margining plate and arch rib;
S3: label limit plate and arch rib steel pipe control point coordinates determine the corresponding point position B and make when arch rib steel pipe carries out preassembling Significant label out, respective markers are made at control point on adjusting accurate limit plate, intend the tire at the rib-lifting section both ends of lifting It is both needed on frame by installing limit plate described in S1, S2;
S4: lifting single rib-lifting section according to control point position, is adjusted when lifting arch rib steel pipe according to the point position B, by arch rib steel The design position of as arch rib steel pipe after pipe B1 point disposes mark point on corresponding limit plate, B2, B3, B4 similarly adjusts;
S5: the errorless rear next segment lifting construction of progress of single rib-lifting section positioning is checked, until arch rib installation is completed, with tradition Method measuring point S, K check arch rib steel pipe position, and arch rib steel pipe is then welded and fixed in error range and carries out next segmental construction; If being more than error, need to only finely tune can reach required precision.
CN201811098199.0A 2018-09-20 2018-09-20 Arch rib steel pipe positioning and construction method Active CN109214099B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811098199.0A CN109214099B (en) 2018-09-20 2018-09-20 Arch rib steel pipe positioning and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811098199.0A CN109214099B (en) 2018-09-20 2018-09-20 Arch rib steel pipe positioning and construction method

Publications (2)

Publication Number Publication Date
CN109214099A true CN109214099A (en) 2019-01-15
CN109214099B CN109214099B (en) 2023-06-09

Family

ID=64985261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811098199.0A Active CN109214099B (en) 2018-09-20 2018-09-20 Arch rib steel pipe positioning and construction method

Country Status (1)

Country Link
CN (1) CN109214099B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130226A (en) * 2019-05-08 2019-08-16 中铁六局集团有限公司 The construction method of the positioning of bowstring arch bridge rib-hoisting and absolute altitude control
CN112211106A (en) * 2020-10-29 2021-01-12 中铁四局集团第一工程有限公司 Method for installing prefabricated bent cap of viaduct
CN114438899A (en) * 2022-02-28 2022-05-06 中铁大桥科学研究院有限公司 Linear control method of hexagonal basket arch
CN115233549A (en) * 2022-07-01 2022-10-25 广东省水利水电第三工程局有限公司 Arch rib positioning construction method based on measuring robot

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001098514A (en) * 1999-10-01 2001-04-10 Ps Corp Method for constructing arch rib of concrete arch bridge
US20120000020A1 (en) * 2010-07-05 2012-01-05 John Reginald Newton Support platform and method of construction thereof
CN103711080A (en) * 2013-12-26 2014-04-09 中国一冶集团有限公司 Method for locating arch ribs of steel tube arch bridge through coordinate correlation method
CN103821088A (en) * 2014-02-13 2014-05-28 中铁四局集团第四工程有限公司 Intelligent measurement construction method for positioning arch rib of long railway tunnel
CN106284077A (en) * 2016-07-27 2017-01-04 中铁大桥局第七工程有限公司 A kind of tubular arch sections installs measurement and positioning device and construction method
JP2017048612A (en) * 2015-09-02 2017-03-09 三井住友建設株式会社 Bridging method of arch bridge
CN107988908A (en) * 2017-06-27 2018-05-04 宝鸡中铁宝桥天元实业发展有限公司 The total assembling method of tubular arch
CN108534764A (en) * 2018-03-20 2018-09-14 中铁上海工程局集团有限公司 A kind of introversion formula steel case arch bridge main arch rib segment method for fast measuring

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001098514A (en) * 1999-10-01 2001-04-10 Ps Corp Method for constructing arch rib of concrete arch bridge
US20120000020A1 (en) * 2010-07-05 2012-01-05 John Reginald Newton Support platform and method of construction thereof
CN103711080A (en) * 2013-12-26 2014-04-09 中国一冶集团有限公司 Method for locating arch ribs of steel tube arch bridge through coordinate correlation method
CN103821088A (en) * 2014-02-13 2014-05-28 中铁四局集团第四工程有限公司 Intelligent measurement construction method for positioning arch rib of long railway tunnel
JP2017048612A (en) * 2015-09-02 2017-03-09 三井住友建設株式会社 Bridging method of arch bridge
CN106284077A (en) * 2016-07-27 2017-01-04 中铁大桥局第七工程有限公司 A kind of tubular arch sections installs measurement and positioning device and construction method
CN107988908A (en) * 2017-06-27 2018-05-04 宝鸡中铁宝桥天元实业发展有限公司 The total assembling method of tubular arch
CN108534764A (en) * 2018-03-20 2018-09-14 中铁上海工程局集团有限公司 A kind of introversion formula steel case arch bridge main arch rib segment method for fast measuring

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
刘锦华;: "钢管混凝土拱桥钢管拱肋的放样分析方法", no. 06 *
唐必刚;张小华;彭益华;: "哑铃形钢管混凝土拱肋简化建模方法研究", no. 08 *
孙九春;叶小鹏;: "浦东大道9号桥竖转提升关键施工技术", no. 11 *
李丹;: "后马庄特大桥钢管拱施工关键技术", no. 1 *
辛俊红;杨超;: "下承式钢管拱桥――空间倾斜系杆拱拱肋吊装技术", no. 06 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130226A (en) * 2019-05-08 2019-08-16 中铁六局集团有限公司 The construction method of the positioning of bowstring arch bridge rib-hoisting and absolute altitude control
CN112211106A (en) * 2020-10-29 2021-01-12 中铁四局集团第一工程有限公司 Method for installing prefabricated bent cap of viaduct
CN114438899A (en) * 2022-02-28 2022-05-06 中铁大桥科学研究院有限公司 Linear control method of hexagonal basket arch
CN115233549A (en) * 2022-07-01 2022-10-25 广东省水利水电第三工程局有限公司 Arch rib positioning construction method based on measuring robot

Also Published As

Publication number Publication date
CN109214099B (en) 2023-06-09

Similar Documents

Publication Publication Date Title
CN109214099A (en) A kind of arch rib steel pipe location Calculation and construction method
CN103114732B (en) Cast steel penetration pipe node space positioning method
CN102661699A (en) Precision measurement method of large-radius short arc part
CN102319882A (en) Method for establishing and determining slab caster-overhauling reference coordinate system
CN103317292A (en) Novel connecting and assembling jig and method for pipe flanges
CN103669314B (en) High-efficiency rack mounting method and auxiliary adjustment device of gear rack climbing type vertical ship lift
CN110102607A (en) JCO steel pipe forming tune type technique
CN103696369A (en) Four-point locating and installing method of steel box beam sections
CN103639241A (en) Method for directly measuring rolling reduction of straightening machine roll system
CN108637037B (en) A kind of method of steel cold straightener verification straightening roll levelness
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN116305443A (en) BIM-based programmed bridge support frame design construction method
CN108161364B (en) Processing technology of hyperbolic crankle component
CN109352372A (en) A kind of quick-adjustsing method of realization part benchmark
WO2017215303A1 (en) Method for detecting assembling precision of medium-low speed maglev track panel
CN114293664A (en) Quick installation process for ultrahigh-precision embedded part group
CN110185479B (en) Tunnel secondary lining circumferential steel bar positioning control device and use method thereof
CN103707054A (en) Coordinated assembly method for three-docking-surface separating unit
CN112613089A (en) BIM optimization design method based on tunnel main body structure special-shaped steel bar
CN113309014A (en) Automatic hanging basket positioning and construction method based on Windows system and total station
CN103711081B (en) Utilize the method for flange position, arch springing upper port place, coordinate modification legal position
CN102566507B (en) Method for improving manufacturing precision of metal plate products
CN206815191U (en) A kind of full framing space beam-ends cable guide pipe positioner
CN106013815B (en) The short supporting leg mounting tool of steel containment vessel of nuclear power station bottom (head) and installation method
CN110529153B (en) Laying-out die and method for steel ring for shield tunnel lining renovation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant