Prior art keywords
arch rib
steel box
segment
measuring point
rib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810230775.6A
Other languages
Chinese (zh)
Other versions
CN108534764B (en
Inventor
徐小游
肖延军
高剑峰
丁明波
何鹏
邓海洪
吴宇
韦干
熊冬
罗俊
唐平青
胡洁
张柏聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Fifth Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Fifth Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Fifth Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201810230775.6A priority Critical patent/CN108534764B/en
Publication of CN108534764A publication Critical patent/CN108534764A/en
Application granted granted Critical
Publication of CN108534764B publication Critical patent/CN108534764B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of introversion formula steel case arch bridge main arch rib segment method for fast measuring, include the following steps:S1. the selection of each segment measuring point of steel box arch rib and label;S2. the Tangent line coordinate system for defining bridge arch rib measurement, using main bridge center as origin, mileage direction is x-axis, and upstream and downstream direction is y-axis, and elevation direction is z-axis, and total powerstation is arranged on the polygon control survey point with steel box arch rib measuring point intervisibility;S3., first segment steel box arch rib is installed;S4. when the second section of installation steel box arch rib, the second section steel box arch rib installation coarse positioning is completed by positioning device, by prism setting at some or all of steel box arch rib label measuring point, carry out the accurate adjustment of the second section steel box arch rib installation site, it is fine-tuning in certain error range, carries out the installation of the second section steel box arch rib;S5 repeats step S4, until the position for completing all steel box arch ribs measures and installation.The present invention can greatly speed up the speed of main arch rib segment measurement by converting point of contact coordinate system.

Description

A kind of introversion formula steel case arch bridge main arch rib segment method for fast measuring
Technical field
The present invention relates to the quick sides of measurement in bridge construction field, especially a kind of introversion formula steel case arch bridge main arch rib segment Method.
Background technology
Under the new period, Bridges in Our Country engineering development trend be technological innovation, constantly change, in addition to meet traffic, safety It is required that also the art of bridge aesthetics is required it is higher and higher, on the basis of traditional arch bridge, the continuous renewal of arch structure form with Variation, promotes that Bridges are more and more abundant colorful, some combined system arch bridges, novel special-shaped bridge are more and more.Example Such as, the Landscape Bridge engineering of sea 2 is that the sleeping arched girder of introversion formula encircles composite bridge before Shenzhen, and Hun River primary official's bridge in Shenyang City's floats for half-through Band shape cable-carried arch bridge.Currently, during large span basket type steel case arch bridge steel box arch rib installation, due to steel box arch rib sheet Body dead weight is larger, and needing crane barge to sling, steel box arch rib is in place, measures, adjustment, welds, until girth welding is completed, crane barge ability Pine is hooked into the next steel box arch rib segment installation of row, and crane barge hiring cost is very high, if the time of wherein measurement links can be shortened, It is so very favorable to reducing construction cost.The Liuzhou City official pool bridge built now is to use 80 state coordinates System, elevation use 1985 state height benchmark, and because main bridge arch rib line style is catenary, it is interior to encircle the angle of plane and perpendicular Incline 10 °, calculating measuring point coordinate is very difficult, time-consuming longer, therefore, a kind of method that can quickly calculate measuring point need to be found, to add The measurement of fast main arch rib segment and precise velocity.
Invention content
The invention discloses a kind of introversion formula steel case arch bridge main arch rib segment method for fast measuring, are sat by being converted into point of contact Mark system, can greatly speed up the speed of main arch rib segment measurement.
To achieve the above object, the technical scheme is that:
A kind of introversion formula steel case arch bridge main arch rib segment method for fast measuring, includes the following steps:
S1. each segment of steel box arch rib 3 groups of measuring points of label, wherein:Steel box arch rib segment front end 1 group of measuring point of top plate, front end bottom 1 group of measuring point of plate, 1 group of measuring point of end top plate, every group of measuring point include 3 measuring points, respectively 1 center measuring point and 2 both ends measuring points; Front end roof station is apart from 300 ~ 800mm of front port, and end roof station is apart from 300 ~ 800mm of end port, front end floor station Apart from 300 ~ 800mm of front port, the center measuring point of each top plate and bottom plate is located at arch rib axis, and one of both ends measuring point is set It sets at the 1/5 ~ 1/7 of arch rib width, the relatively unilateral arch rib axis of two both ends measuring points in every group of measuring point is symmetrical set;
S2. the Tangent line coordinate system for defining bridge arch rib measurement, using main bridge center as origin, mileage direction is x-axis, upper and lower roam all around the would To for y-axis, elevation direction is z-axis, and total powerstation is arranged on the polygon control survey point with steel box arch rib measuring point intervisibility;
S3., first segment steel box arch rib is installed, by prism be arranged steel box arch rib mark front end top plate and front end bottom plate part or At whole measuring points, the co-ordinate system location of the orientation measurement first segment arch rib of total powerstation is faced, and encircle with the first segment precalculated The conventional coordinates position of rib is compared, and the accurate adjustment of first segment steel box arch rib installation site is carried out according to comparing result, is fine-tuning to one In fixed error range, the installation of first segment steel box arch rib is carried out;
S4. after in first segment steel box arch rib, installation is complete, when installation second saves steel box arch rib, in first segment steel box arch rib top plate Position and web position mounting and positioning device complete the second section steel box arch rib installation coarse positioning by this positioning device, will At some or all of steel box arch rib label measuring point, the orientation measurement second for facing total powerstation saves the coordinate of arch rib for prism setting It is position, and compared with the conventional coordinates position of the second section arch rib precalculated, the second section steel is carried out according to comparing result The accurate adjustment of case arch rib installation site, is fine-tuning in certain error range, carries out the installation of the second section steel box arch rib;
S5. step S4 is repeated, until the position for completing all steel box arch ribs measures and installation.
Further, in the step S3, positioning device is the ribbed stiffener being arranged in arch rib ceiling location and web position.
Further, in the step S3, arch rib accurate adjustment 20 DEG C ± 4 DEG C of temperature and also without sunshine under conditions of into Row.
Further, in the step S3 and S4, when carrying out accurate adjustment when having sunshine daytime, side arch rib on the sunny side Expanded by heating, the side inclination that arch rib can support or oppose positive, the inclined of arch rib is calculated according to steel linear expansion coefficient 1.2*10-4* Δs t*l Shifting amount, wherein Δ t are the temperature difference, and l is the length of side arch rib on the sunny side, on daytime according to the pre- deviator of calculating come accurate adjustment arch rib, evening Upper review arch rib position is installed after determining in the error range of arch rib position.
Further, in the step S1, front end roof station is apart from front port 500mm, end roof station distance end Port 500mm, front end floor station is apart from front port 500mm.
Further, in the step S1, one of both ends measuring point is arranged at the 1/6 of arch rib width, every group of measuring point In the relatively unilateral arch rib axis of two both ends measuring points be symmetrical set.
Further, in the step S3, prism is arranged at the both ends measuring point that steel box arch rib marks, carries out steel case arch The adjustment of rib position, then mirror is arranged at the center measuring point that steel box arch rib marks, carry out the review of steel box arch rib position.
Above-described introversion formula steel case arch bridge main arch rib segment method for fast measuring, has the following advantages:
(1)By selection Tangent line coordinate system, the fussy degree of calculating can be substantially reduced, and then improve the speed of calculating, and Rib-lifting section will not obscure orientation when being adjusted, improve accurate adjustment arch rib efficiency.
(2)Due to the raising of calculating speed, mating lifting machine usage time can be greatly decreased in the present invention, improve hoisting machine Tool service efficiency.
(3)The present invention used in measurement process can rapid-aligning positioning device, and then improve measuring speed and Precision, construction error significantly reduce.
(4)The present invention further on daytime by the pre- deviator of calculating come accurate adjustment arch rib, when to considerably increase measurement Between, and then shorten the construction period.
(5)The quick positioning of introversion formula steel case arch bridge main arch rib segment, especially large span can be realized through the invention The quick positioning of introversion formula steel case arch bridge main arch rib segment can greatly reduce the hiring cost of crane barge, accelerate arch rib adjustment contraposition Speed, have preferable popularizing application prospect.
Description of the drawings
Fig. 1 is the measuring point main structure diagram of the present invention.
Fig. 2 is the A-A section structure diagrams of Fig. 1.
Fig. 3 is the B-B section structure diagrams of Fig. 1.
Fig. 4 is the Tangent line coordinate system schematic diagram of the present invention.
Fig. 5 is the horse plate main structure diagram of the present invention.
Fig. 6 is the C-C section structure diagrams of Fig. 5.
In figure, measuring point 1, center measuring point 1a, both ends measuring point 1b, top plate 2, bottom plate 3, horse plate 4, main bridge center 5.
Specific implementation mode
Below with reference to specific embodiment, the invention will be further described, but protection scope of the present invention be not limited to it is following Embodiment.
A kind of introversion formula steel case arch bridge main arch rib segment method for fast measuring, includes the following steps:
S1. each segment of steel box arch rib 3 groups of measuring points 1 of label, as shown in Figure 1,2 and 3, wherein:It pushes up steel box arch rib segment front end 1 group of measuring point 1 of plate, 1 group of measuring point 1 of front end bottom plate, 1 group of measuring point 1 of end top plate, every group of measuring point 1 include 3 measuring points, in respectively 1 Heart measuring point 1a and 2 both ends measuring points;Front end roof station 1 is apart from 300 ~ 800mm of front port, and end roof station 1 is apart from end Mouthful 300 ~ 800mm, for front end floor station 1 apart from 300 ~ 800mm of front port, the center measuring point 1a of each top plate and bottom plate is located at arch At rib axis, one of both ends measuring point 1b is arranged at the 1/5 ~ 1/7 of arch rib width, two both ends measuring points in every group of measuring point The relatively unilateral arch rib axis of 1b are symmetrical set.
In this step, measuring point keeps certain distance with front port, rear port, has the following advantages:(1)Ensure to measure people The safety of member;(2)It can avoid arch rib diaphragm plate;(3)If measuring point is too near to arch rib port, when arch rib wielding neck, generates high temperature Measuring point may be made to change, so influence measure accuracy, the present embodiment by measuring point be set as apart from port 300 ~ 800mm can improve the accuracy of measurement well.
And the selection of both ends measuring point 1b distances, mainly consider following factor:(1)The calculating side of measuring point coordinate and elevation Just;(2)The safety of personnel's erect-position when measurement;(3)Prevent generation high temperature when arch rib wielding neck from measuring point being made to change.
In this step, in summary factor, optimal scheme are front end roof station 1 apart from front port 500mm, end Roof station 1 is apart from end port 500mm, and front end floor station 1 is apart from front port 500mm, the center survey of each top plate and bottom plate Point 1a is located at arch rib axis, and one of both ends measuring point 1b is arranged at the 1/6 of arch rib width, two two in every group of measuring point The end relatively unilateral arch rib axis of measuring point 1b are symmetrical set.
S2. the Tangent line coordinate system for defining bridge arch rib measurement, as shown in figure 4, with main bridge center 5(I.e. main bridge arch axis with The intersection point of main bridge median plane)For origin, mileage direction is x-axis, and upstream and downstream direction is y-axis(General upstream is positive direction), elevation Direction is z-axis, and total powerstation is arranged on the polygon control survey point with steel box arch rib measuring point intervisibility.
At most it is only 3 digits since Tangent line coordinate system is mainly using arch rib center as origin, before decimal point in this step, Can quickly calculate and error amount and judge the direction of arch rib deviation, easily facilitate operation, operating personnel can be made to be easier to understand, can and When rectify a deviation to arch rib.It is 6 digits compared to 80 national coordinate systems, before decimal point, calculates more complicated, is inputted when building a station Data are more cumbersome.Therefore, the present embodiment substantially increases the speed of calculating, and in rib-lifting section by the adjustment of coordinate system Orientation will not be obscured when being adjusted, and improve accurate adjustment arch rib efficiency.
S3., first segment steel box arch rib is installed, prism is arranged to the portion for marking front end top plate and front end bottom plate in steel box arch rib Point or whole measuring point at, face the co-ordinate system location of the orientation measurement first segment arch rib of total powerstation, and with precalculate first The conventional coordinates position of section arch rib is compared, and the accurate adjustment of first segment steel box arch rib installation site, accurate adjustment are carried out according to comparing result To certain error range, the installation of first segment steel box arch rib is carried out.
In this step, positioning device generally use is ribbed stiffener in arch rib ceiling location and web position, both can be with The intensity of steel box arch rib is reinforced, and the quick positioning of part realization steel box arch rib one end of its protrusion can be utilized.
In addition, positioning device can also include horse plate 4, after first segment steel box arch rib segment is installed, in its extreme higher position Top plate and web inner wall welding horse plate 4, and 4 part of horse plate protrudes from the port of extreme higher position, thus, in installation second When saving steel box arch rib, so that it may the second section steel box arch rib to be lifted on to 4 outside of horse plate of prepackage and close to horse plate 4, slightly determine Subsequent fine tune pendulous frequency is reduced, to achieve the purpose that quick measurement and positioning in position.
S4. after in first segment steel box arch rib, installation is complete, when installation second saves steel box arch rib, in first segment steel box arch rib Ceiling location and web position mounting and positioning device, it is by this positioning device that the second section steel box arch rib installation coarse positioning is complete At by prism setting at some or all of steel box arch rib label measuring point 1, the orientation measurement second for facing total powerstation saves arch rib Co-ordinate system location, and compared with the conventional coordinates position of the second section arch rib precalculated, the is carried out according to comparing result The accurate adjustment of two section steel box arch rib installation sites, is fine-tuning in certain error range, carries out the installation of the second section steel box arch rib.
The positioning device of second section steel box arch rib equally also includes the ribbed stiffener of arch rib ceiling location and web position, and Horse plate 4.
S5. step S4 is repeated, until the position for completing all steel box arch ribs measures and installation.
It is to have certain limitation for measuring timing in procedure described above S3 and S4, arch rib accurate adjustment one As carried out within 20 DEG C ± 4 DEG C of temperature and under conditions of there is no sunshine.In the case of daytime, side arch rib on the sunny side by It thermally expands, the side inclination that arch rib can support or oppose positive, to solve the problems, such as to be unable to daytime accurate measurement adjustment, the present embodiment can also have Accurate adjustment is carried out when sunshine, at this moment, the offset of arch rib can be calculated according to steel linear expansion coefficient 1.2*10-4* Δs t*l, Wherein Δ t is the temperature difference, and l is the length of side arch rib on the sunny side, on daytime according to the pre- deviator of calculating come accurate adjustment arch rib, at night again Arch rib position is checked, is installed after determining in the error range of arch rib position.This method is in day temperature height When provide the discreet value of arch rib adjusting, utilize immeasurable time on conventional daytime to carry out rib-lifting section and measure to adjust, increase Time of measuring is added, and then has achieved the purpose that quickly to position.
To improve the accuracy of accurate adjustment, and ensure the speed of accurate adjustment, in step s3, prism is arranged in steel box arch rib mark At the both ends measuring point 1b of note, the adjustment of steel box arch rib position can be carried out, mirror is arranged in steel box arch rib mark again after the completion of adjustment At the center measuring point 1a of note, the review of steel box arch rib position is carried out.

Claims (7)

1. a kind of introversion formula steel case arch bridge main arch rib segment method for fast measuring, it is characterised in that include the following steps:
S1. each segment of steel box arch rib 3 groups of measuring points of label, wherein:Steel box arch rib segment front end 1 group of measuring point of top plate, front end bottom 1 group of measuring point of plate, 1 group of measuring point of end top plate, every group of measuring point include 3 measuring points, respectively 1 center measuring point and 2 both ends measuring points; Front end roof station is apart from 300 ~ 800mm of front port, and end roof station is apart from 300 ~ 800mm of end port, front end floor station Apart from 300 ~ 800mm of front port, the center measuring point of each top plate and bottom plate is located at arch rib axis, and one of both ends measuring point is set It sets at the 1/5 ~ 1/7 of arch rib width, the relatively unilateral arch rib axis of two both ends measuring points in every group of measuring point is symmetrical set;
S2. the Tangent line coordinate system for defining bridge arch rib measurement, using main bridge center as origin, mileage direction is x-axis, upper and lower roam all around the would To for y-axis, elevation direction is z-axis, and total powerstation is arranged on the polygon control survey point with steel box arch rib measuring point intervisibility;
S3., first segment steel box arch rib is installed, by prism be arranged steel box arch rib mark front end top plate and front end bottom plate part or At whole measuring points, the co-ordinate system location of the orientation measurement first segment arch rib of total powerstation is faced, and encircle with the first segment precalculated The conventional coordinates position of rib is compared, and the accurate adjustment of first segment steel box arch rib installation site is carried out according to comparing result, is fine-tuning to one In fixed error range, the installation of first segment steel box arch rib is carried out;
S4. after in first segment steel box arch rib, installation is complete, when installation second saves steel box arch rib, in first segment steel box arch rib top plate Position and web position mounting and positioning device complete the second section steel box arch rib installation coarse positioning by this positioning device, will At some or all of steel box arch rib label measuring point, the orientation measurement second for facing total powerstation saves the coordinate of arch rib for prism setting It is position, and compared with the conventional coordinates position of the second section arch rib precalculated, the second section steel is carried out according to comparing result The accurate adjustment of case arch rib installation site, is fine-tuning in certain error range, carries out the installation of the second section steel box arch rib;
S5. step S4 is repeated, until the position for completing all steel box arch ribs measures and installation.
2. introversion formula steel case arch bridge main arch rib according to claim 1 segment method for fast measuring, it is characterised in that:
In the step S3, positioning device is the ribbed stiffener being arranged in arch rib ceiling location and web position.
3. introversion formula steel case arch bridge main arch rib according to claim 1 segment method for fast measuring, it is characterised in that:
In the step S3, arch rib accurate adjustment is carried out in 20 DEG C ± 4 DEG C of temperature and do not have sunshine under conditions of.
4. introversion formula steel case arch bridge main arch rib according to claim 1 segment method for fast measuring, it is characterised in that:
In the step S3 and S4, when carrying out accurate adjustment when having sunshine daytime, side arch rib expanded by heating on the sunny side, arch rib The side inclination that can support or oppose positive, the offset of arch rib is calculated according to steel linear expansion coefficient 1.2*10-4* Δs t*l, wherein Δ t is The temperature difference, l are the length of side arch rib on the sunny side, and arch rib position is checked at night according to the pre- deviator of calculating come accurate adjustment arch rib on daytime, It is installed after determining in the error range of arch rib position.
5. introversion formula steel case arch bridge main arch rib according to claim 1 segment method for fast measuring, it is characterised in that:
In the step S1, front end roof station is apart from front port 500mm, and end roof station is apart from end port 500mm, front end Floor station is apart from front port 500mm.
6. introversion formula steel case arch bridge main arch rib according to claim 1 segment method for fast measuring, it is characterised in that:
In the step S1, one of both ends measuring point is arranged at the 1/6 of arch rib width, and two both ends in every group of measuring point are surveyed The relatively unilateral arch rib axis of point is symmetrical set.
7. introversion formula steel case arch bridge main arch rib according to claim 1 segment method for fast measuring, it is characterised in that:
In the step S3, prism is arranged at the both ends measuring point that steel box arch rib marks, carries out the adjustment of steel box arch rib position, Prism is arranged at the center measuring point that steel box arch rib marks again, carries out the review of steel box arch rib position.
CN201810230775.6A 2018-03-20 2018-03-20 Method for quickly measuring main arch rib section of inward-inclined steel box arch bridge Active CN108534764B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810230775.6A CN108534764B (en) 2018-03-20 2018-03-20 Method for quickly measuring main arch rib section of inward-inclined steel box arch bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810230775.6A CN108534764B (en) 2018-03-20 2018-03-20 Method for quickly measuring main arch rib section of inward-inclined steel box arch bridge

Publications (2)

Publication Number Publication Date
CN108534764A true CN108534764A (en) 2018-09-14
CN108534764B CN108534764B (en) 2020-05-15

Family

ID=63484261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810230775.6A Active CN108534764B (en) 2018-03-20 2018-03-20 Method for quickly measuring main arch rib section of inward-inclined steel box arch bridge

Country Status (1)

Country Link
CN (1) CN108534764B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109214099A (en) * 2018-09-20 2019-01-15 中建三局基础设施建设投资有限公司 A kind of arch rib steel pipe location Calculation and construction method
CN109238077A (en) * 2018-10-31 2019-01-18 湖南联智桥隧技术有限公司 A kind of positioning device and its measurement method of determining round arch rib axis physical location
CN109612429A (en) * 2018-12-27 2019-04-12 郑州市第建筑工程集团有限公司 A kind of 3-D positioning method of the segment beam end prestress pipe based on total station
CN112525091A (en) * 2020-11-04 2021-03-19 中铁大桥局第七工程有限公司 Construction method integrating installation, positioning and monitoring of steel box truss arch bridge

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117795A (en) * 2007-08-29 2008-02-06 中铁大桥局股份有限公司 Mounting method for steel case basket arch single-frame segment
CN102071644A (en) * 2010-12-31 2011-05-25 中铁港航工程局有限公司 Lifting installation method of integral bridge arch rib
JP2011257256A (en) * 2010-06-09 2011-12-22 Fukken Co Ltd Method of measuring altitude of bridge in no-live-load state
CN104652281A (en) * 2014-12-29 2015-05-27 中铁二局股份有限公司 External slanted type steel box arch installing method
CN106638265A (en) * 2016-12-21 2017-05-10 中铁第四勘察设计院集团有限公司 Steel reinforced concrete beam rigid framework bridge
CN206189277U (en) * 2016-10-17 2017-05-24 中建交通建设集团有限公司 Steel case arched bridge political integrity section arch rib promotes measurement system
CN107447674A (en) * 2017-09-19 2017-12-08 中铁上海工程局集团有限公司 A kind of steel box arch rib lifting positioner and its construction method
CN207017134U (en) * 2017-04-06 2018-02-16 四川交通职业技术学院 A kind of big across CFST Arch Bridge damping system based on anti-seismic performance

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117795A (en) * 2007-08-29 2008-02-06 中铁大桥局股份有限公司 Mounting method for steel case basket arch single-frame segment
JP2011257256A (en) * 2010-06-09 2011-12-22 Fukken Co Ltd Method of measuring altitude of bridge in no-live-load state
CN102071644A (en) * 2010-12-31 2011-05-25 中铁港航工程局有限公司 Lifting installation method of integral bridge arch rib
CN104652281A (en) * 2014-12-29 2015-05-27 中铁二局股份有限公司 External slanted type steel box arch installing method
CN206189277U (en) * 2016-10-17 2017-05-24 中建交通建设集团有限公司 Steel case arched bridge political integrity section arch rib promotes measurement system
CN106638265A (en) * 2016-12-21 2017-05-10 中铁第四勘察设计院集团有限公司 Steel reinforced concrete beam rigid framework bridge
CN207017134U (en) * 2017-04-06 2018-02-16 四川交通职业技术学院 A kind of big across CFST Arch Bridge damping system based on anti-seismic performance
CN107447674A (en) * 2017-09-19 2017-12-08 中铁上海工程局集团有限公司 A kind of steel box arch rib lifting positioner and its construction method

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
周栋梁,华强: "大跨度拱桥吊装施工线形控制研究", 《铁道科学与工程学报》 *
方绪华: "钢管砼肋拱桥静载试验挠度观测方法", 《福州大学学报(自然科学版)》 *
李恩良: "客运专线大跨度提篮拱桥拱肋定位坐标计算方法", 《铁道标准设计》 *
王海林: "钢铁路大桥成桥试验方法", 《交通世界(建养.机械)》 *
陈冲: "S336公路桥主桥施工监控方案的探讨", 《黑龙江科技信息》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109214099A (en) * 2018-09-20 2019-01-15 中建三局基础设施建设投资有限公司 A kind of arch rib steel pipe location Calculation and construction method
CN109214099B (en) * 2018-09-20 2023-06-09 中建三局基础设施建设投资有限公司 Arch rib steel pipe positioning and construction method
CN109238077A (en) * 2018-10-31 2019-01-18 湖南联智桥隧技术有限公司 A kind of positioning device and its measurement method of determining round arch rib axis physical location
CN109612429A (en) * 2018-12-27 2019-04-12 郑州市第建筑工程集团有限公司 A kind of 3-D positioning method of the segment beam end prestress pipe based on total station
CN112525091A (en) * 2020-11-04 2021-03-19 中铁大桥局第七工程有限公司 Construction method integrating installation, positioning and monitoring of steel box truss arch bridge

Also Published As

Publication number Publication date
CN108534764B (en) 2020-05-15

Similar Documents

Publication Publication Date Title
CN108534764A (en) A kind of introversion formula steel case arch bridge main arch rib segment method for fast measuring
CN103711080B (en) Utilize the method for locating between coordinate method of comparison determination steel pipe arch bridge arch rib
CN108914782A (en) A kind of large size open web type highway steel box girder stayed-cable bridge manufacturing method
CN105586834B (en) A kind of bridge arch rib section manufacture craft
CN103084806A (en) Large curve steel box grider manufacture method
CN101799276A (en) Method for measuring and controlling tower column and cable pipeline in synchronous construction of tower and beam of cable-stayed bridge
CN206090317U (en) High pier slip form construction perpendicularity control device
CN108345318A (en) A kind of beam sections free cantilever erection pier top block installation measurement method
CN102680942A (en) Blast furnace frame measuring positioning method based on total station
CN102493296B (en) Method for measuring longspan steel truss girder rail control network
CN106223623A (en) Steel construction box arched roof truss installation method
CN102877421A (en) Construction control method capable of realizing unstressed line shapes of pushing construction beam bodies at high accuracy
CN115387221A (en) High pier line type control method for high altitude area
CN103696369A (en) Four-point locating and installing method of steel box beam sections
CN201391091Y (en) Super high-rise building giant steel member mounting measurement pre-control and correcting system
CN105887686A (en) Inward-tilting triangular arch-bridge steel arch rib closing method
CN111945569B (en) Small-angle inclined steel arch tower support-free in-situ assembly type asymmetric tensioning assembly construction method
CN106869319A (en) Large span steel truss installation method
CN115467243A (en) Method for controlling angle error of tie bar arch rib anchor pipe of steel box
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN110144828A (en) The linear control method of the location structure of steel box girder assembling, support construction and bridge
CN108425321A (en) A kind of installation method of Novel variable-section bridge linear controller
CN112161611A (en) In-plant concentricity positioning method for offshore wind power guide frame
CN209082323U (en) A kind of super-span steel truss continuous bridge having initial curvature
CN207419388U (en) A kind of stiff skeleton structure of arched aqueduct box arch ring closure section

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 1317 and 1319, 13th floor, building 1, Xingwu building, No.3 Qifeng Road, biaoying New District, biaoying community, Wuming District, Nanning City, Guangxi Zhuang Autonomous Region

Patentee after: NO 5 ENGINEERING Co.,Ltd. OF SHANGHAI CIVIL ENGINEERING CO LTD OF CREC

Patentee after: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Address before: No. 278, No. three, Jingan District River, Shanghai, Shanghai

Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Patentee before: NO 5 ENGINEERING Co.,Ltd. OF SHANGHAI CIVIL ENGINEERING CO LTD OF CREC

CP03 Change of name, title or address