CN109184210A - A kind of 3D printing decorative model template construction technique - Google Patents

A kind of 3D printing decorative model template construction technique Download PDF

Info

Publication number
CN109184210A
CN109184210A CN201811183206.7A CN201811183206A CN109184210A CN 109184210 A CN109184210 A CN 109184210A CN 201811183206 A CN201811183206 A CN 201811183206A CN 109184210 A CN109184210 A CN 109184210A
Authority
CN
China
Prior art keywords
printing
template
building
wall
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811183206.7A
Other languages
Chinese (zh)
Inventor
孙军
杨泓斌
樊晓
盖守超
隋新春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Bozhilin Robot Co Ltd
Original Assignee
Dingchen Construction Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dingchen Construction Management Co Ltd filed Critical Dingchen Construction Management Co Ltd
Priority to CN201811183206.7A priority Critical patent/CN109184210A/en
Publication of CN109184210A publication Critical patent/CN109184210A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B33ADDITIVE MANUFACTURING TECHNOLOGY
    • B33YADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3-D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3-D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING
    • B33Y10/00Processes of additive manufacturing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The present invention proposes a kind of 3D printing decorative model template construction technique, include the following steps: base treatment, surveying setting-out and set up support system, template installation, pour, demoulding, equipment installation, 3D printing and water-proofing treatment;The present invention makes different texture and skin texture to surface of wall by the template of decorative model, diversified decorative pattern and lines can be formed, decorative effect is true to nature, to reduce the waste of resource, structural ornament integration can be realized simultaneously, secondary decoration is saved for industrialized building, also save the cost, it can be widely applied to house, enclosure wall, tunnel, subway station, the industry such as megastore and civil buildings, realize the coordination of building decoration and environment, and the construction method in 3D printing and the printing of different shaping at different level in printing head rod telescopic extensions once can be realized in print head cross beam movement, while improving printing effect, realize the flexibility of print job, it can also prevent the waste of building material.

Description

A kind of 3D printing decorative model template construction technique
Technical field
The present invention relates to technical field of buildings more particularly to a kind of 3D printing decorative model template construction techniques.
Technical background
3D printing decorative model template is printed or is poured using organic materials such as polyurethane rubber, silica gel, is had preferably Tensile strength, tearing toughness and adhesion strength, and alkaline-resisting, oil resistant, reusable 50~100 times, by there is decoration to make The template of type makes different texture and skin texture to concrete surface, can form diversified decorative pattern and lines, utilizes The depth of different skin texture display colors is different, realizes the true texture of material, has good simulated effect, however existing Template construction technique generally carries out 3D printing in advance before construction, so that decorative effect is bad, and existing template construction work Skill generally can not achieve structural ornament integration, and then cannot save secondary decoration for industrialized building, while product is not durable, Decorative model fall off etc. it is easy bring public safety hidden danger, therefore, the present invention proposes a kind of 3D printing decorative model template construction Technique so as to solve the deficiencies in the prior art place.
Summary of the invention
In view of the above-mentioned problems, the present invention proposes a kind of 3D printing decorative model template construction technique, 3D printing decoration is made Pattern plate construction technology makes different texture and skin texture to surface of wall by the template of decorative model, can be formed varied Decorative pattern and lines, decorative effect is true to nature, regardless of the arbitrary moulding such as imitative stone, imitation wood can reach and the consistent effect of the original Fruit to reduce the waste of resource, while can realize structural ornament integration, save secondary decoration for industrialized building, and And the finished product safety durable come out by 3D printing decorative model template construction method, it avoids public caused by ceramic tile falls off etc. Security risk, and the construction method in 3D printing and print head cross beam movement once can be realized printing head rod telescopic extensions The printing of different shaping building body at interior different level, to realize the flexible of print job while improving printing effect Property, additionally it is possible to prevent the waste of building material.
A kind of 3D printing decorative model template construction technique, comprising the following steps:
Step 1: base treatment
When base is metope, mortar remaining on metope, dirt, dust are cleaned out, metope keeps smooth, dry in metope Priming paint construction is carried out after dry;
Step 2: surveying setting-out and support system is set up
Axial control network is established at construction location, pilot measurement to construction location launches out construction location according to construction drawing Then the axis of each axis has bound wall steel by design template thickness ejected position sideline to guarantee that decorative model thickness is accurate Spacer is bound on the outside of exterior wall reinforcing bar after muscle;
Step 3: the installation of template
Built-in fitting is fixed on the vertical reinforcement for being used to support template, is adjacent to the extension of built-in fitting with template, it will Template is in place, and the spacing then required according to through-wall bolt drills at template edge position, and through-wall bolt is passed through hole, Fixed form;
Step 4: it pours
Concreting in lifts, one-time-concreting height are no more than 1.0m, and concrete discharging should be uniformly dispersed, be carried out continuously, Vibrating spear vibrates the not small 0.5m of spacing;
Step 5: demoulding
By form removable after decorative model condensation wait pour;
Step 6: equipment installation
The uniaxial mobile more rails of installation free-standing 3D printing devices in parallel make track-frame stablize to be attached to have poured and build The alien invasion of body, the print head of printing device are located at appropriate height above the building body poured;
Step 7: 3D printing
It moves the print head crossbeam of printing device along track cross beam, while the print head of printing device is sprayed and is built Material is built, the every movement of print head crossbeam is primary, that is, completes the 3D printing construction on this layer building walling, then make track-frame It moves up on supreme one layer building walling to be printed and stabilization is attached on the wall for having printed building body, thus will printing Equipment is jacked to highly locating on one layer on building body building walling to be printed, finally above-mentioned steps repeatedly, bottom-up The 3D printing that building outside is successively carried out above the building walling completed is printed, until completing whole on building walling 3D printing construction;
Step 8: water-proofing treatment
Carry out water-proofing treatment on the building masonry wall for completing 3D printing.
Further improvement lies in that: if base is thermal-insulating type metope in the step 1, by mortar, dirt remaining on metope Dirt, dust are cleaned out, and metope keeps smooth, carry out priming paint construction after thermal-insulating type metope is dry or base is non-guarantor When warm type metope, soil remaining on metope, dirt, dust are cleaned out, metope keeps smooth, dry in non-thermal-insulating type metope Priming paint construction is carried out afterwards.
Further improvement lies in that: axial control network, pilot measurement are established in construction location with " internal control method " in the step 2 To construction location, the axis of each axis of construction location is launched out according to construction drawing, according to completed plane axis gauze, releases column Position and beam position frame line, the position 500mm releases column control line on the outside of its sideline and beam control line, absolute altitude are controlled by bottom absolute altitude Point up successively transmitting, directly copies absolute altitude in the column main reinforcement tied up, each column main reinforcement must be there are two relief.
Further improvement lies in that: Template Location reinforcing bar is set by pop-up wall axial location control line in the step 3, It is used to support in installing reinforcing bar no more than 0.8m by spacing on exterior wall, template is in place.
Further improvement lies in that: the spacing required after template is in place in the step 3 according still further to through-wall bolt, to template It drills at marginal position, makes coincideing for template and wall, hole should not be too big in order to avoid spillage, passes through hole, school for through-wall bolt Positive template is vertical, flatness, and connecting must be tight, securely.
Further improvement lies in that: concrete strength reaches the side 1.2Mpa and can remove wall mould under room temperature in the step 5 The flatness for protecting surface of wall is examined if any cement slurry should be cleared up in time in plate, form removal back wall surface.
Further improvement lies in that: move the print head crossbeam of printing device along track cross beam, together When make printing device print head spray building material, the every movement of print head crossbeam is primary, that is, complete this layer building walling On 3D printing construction.
Further improvement lies in that: after transverse shifting printing need to lengthen in the step 7 supreme one layer of lifting rail to On printing building walling, it is detached from track-frame on the wall for having printed building body, by climbing for the component that climbs, makes track Frame moves up on supreme one layer building walling to be printed and stabilization is attached on the wall for having printed building body, thus will Printing device is jacked to highly locating on one layer on building body building walling to be printed.
Further improvement lies in that: in the step 7 after transverse shifting prints and climbs printing above-mentioned steps repeatedly, from The 3D printing of building outside is successively carried out above the building walling for having printed completion upwards down, until completing building body Whole 3D printing construction on wall.
Further improvement lies in that: it will clean out on printed building masonry wall in the step 8, finally exist It completes to carry out water-proofing treatment on the building masonry wall of 3D print.
The invention has the benefit that the present invention by the template of decorative model to surface of wall make different texture and Skin texture can form diversified decorative pattern and lines, and decorative effect is true to nature, regardless of the arbitrary moulding such as imitative stone, imitation wood is equal Can reach with the consistent effect of the original, to reduce the waste of resource, while structural ornament integration can be realized, for industrialization Building saves secondary decoration, and the finished product safety durable come out by 3D printing decorative model template construction method, avoids Public safety hidden danger caused by ceramic tile falls off etc., while save the cost, may be reused, can largely save production cost, It can be widely applied to the industry such as house, enclosure wall, tunnel, subway station, megastore and civil buildings, realize building decoration and environment Coordination, and the construction method in 3D printing and print head cross beam movement once can be realized printing head rod telescopic extensions in The printing of different shaping building body at different level, so that the flexibility of print job is realized while improving printing effect, It can also prevent the waste of building material.
Detailed description of the invention
Fig. 1 is workflow schematic diagram of the present invention.
Specific embodiment
In order to realize invention technological means, reach purpose and effect is easy to understand, below with reference to specific implementation Mode, the present invention is further explained.
A kind of 3D printing decorative model template construction technique
Step 1: base treatment
If base is thermal-insulating type metope, mortar remaining on metope, dirt, dust to be cleaned out, metope keeps smooth, When carrying out priming paint construction after thermal-insulating type metope is dry or base is non-thermal-insulating type metope, by soil, dirt remaining on metope Dirt, dust are cleaned out, and metope keeps smooth, carry out priming paint construction after non-thermal-insulating type metope is dry;
Step 2: surveying setting-out and support system is set up
Axial control network is established in construction location with " internal control method ", pilot measurement to construction location is launched according to construction drawing The axis of each axis of construction location out releases column position and beam position frame line, on the outside of its sideline according to completed plane axis gauze The position 500mm releases column control line and beam control line, absolute altitude are up successively transmitted by bottom elevation control point, directly copy absolute altitude In the column main reinforcement tied up, each column main reinforcement must there are two reliefs, then press design template thickness ejected position sideline, To guarantee that decorative model thickness is accurate, spacer is bound on the outside of exterior wall reinforcing bar after having bound wall steel bar;
Step 3: the installation of template
Template Location reinforcing bar is set by pop-up wall axial location control line, is pacified in pressing spacing on exterior wall no more than 0.8m Steel loading muscle is used to support, and template is in place, and the spacing then required according to through-wall bolt drills at template edge position, makes Template and wall coincide, and hole should not be too big in order to avoid spillage, passes through hole, fixed form for through-wall bolt, calibration template hangs down Directly, flatness, connecting must be tight, secured;
Step 4: it pours
Concreting in lifts, one-time-concreting height are no more than 1.0m, and concrete discharging should be uniformly dispersed, be carried out continuously, Vibrating spear vibrates the not small 0.5m of spacing;
Step 5: demoulding
Concrete strength, which reaches the side 1.2Mpa, under room temperature can remove wall form, and form removal back wall surface is if any cement slurry Material should be cleared up in time, and examine the flatness for protecting surface of wall;
Step 6: equipment installation
The uniaxial mobile more rails of installation free-standing 3D printing devices in parallel make track-frame stablize to be attached to have poured and build The alien invasion of body, the print head of printing device are located at appropriate height above the building body poured;
Step 7: 3D printing
It moves the print head crossbeam of printing device along track cross beam, while the print head of printing device is sprayed and is built Material is built, the every movement of print head crossbeam is primary, that is, completes the 3D printing construction on this layer building walling, then lengthen to climb and lead On supreme one layer of rail building walling to be printed, it is detached from track-frame on the wall for having printed building body, passes through the component that climbs Climb, so that track-frame is moved up on supreme one layer building walling to be printed and is stablized to be attached to and printed building body On wall, so that printing device is jacked to highly locating on one layer on building body building walling to be printed, it is finally repeatedly above-mentioned Step, the bottom-up 3D printing that building outside is successively carried out above the building walling for having printed completion, until complete At 3D printing construction whole on building walling;
Step 8: water-proofing treatment
It will clean out, finally carry out on the building masonry wall for completing 3D print anti-on printed building masonry wall Water process.
The present invention makes different texture and skin texture to surface of wall by the template of decorative model, can be formed varied Decorative pattern and lines, decorative effect is true to nature, regardless of the arbitrary moulding such as imitative stone, imitation wood can reach and the consistent effect of the original Fruit to reduce the waste of resource, while can realize structural ornament integration, save secondary decoration for industrialized building, and And the finished product safety durable come out by 3D printing decorative model template construction method, it avoids public caused by ceramic tile falls off etc. Security risk, while save the cost, may be reused, and can largely save production cost, can be widely applied to house, enclose The industry such as wall, tunnel, subway station, megastore and civil buildings realize the coordination of building decoration and environment, and the construction party Method in 3D printing and different shaping at different level once can be realized in printing head rod telescopic extensions in print head cross beam movement The printing of building body, to realize the flexibility of print job, additionally it is possible to prevent building material while improving printing effect Waste.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe originals of the invention Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (10)

1. a kind of 3D printing decorative model template construction technique, it is characterised in that: the following steps are included:
Step 1: base treatment
When base is metope, mortar remaining on metope, dirt, dust are cleaned out, metope keeps smooth, after metope is dry Carry out priming paint construction;
Step 2: surveying setting-out and support system is set up
Axial control network is established at construction location, pilot measurement to construction location launches out each axis of construction location according to construction drawing Axis, then press design template thickness ejected position sideline, to guarantee that decorative model thickness is accurate, after having bound wall steel bar Spacer is bound on the outside of exterior wall reinforcing bar;
Step 3: the installation of template
Built-in fitting is fixed on the vertical reinforcement for being used to support template, is adjacent to the extension of built-in fitting with template, by template In place, the spacing then required according to through-wall bolt drills at template edge position, and through-wall bolt is passed through hole, fixed Template;
Step 4: it pours
Concreting in lifts, one-time-concreting height are no more than 1.0m, and concrete discharging should be uniformly dispersed, be carried out continuously, vibrate Stick vibrates the not small 0.5m of spacing;
Step 5: demoulding
By form removable after decorative model condensation wait pour;
Step 6: equipment installation
Uniaxial mobile more rails free-standing 3D printing devices in parallel are installed, stable be attached to of track-frame is made to have poured building body Alien invasion, the print head of printing device are located at appropriate height above the building body poured;
Step 7: 3D printing
It moves the print head crossbeam of printing device along track cross beam, while the print head of printing device being made to spray building Material, the every movement of print head crossbeam is primary, that is, completes the 3D printing construction on this layer building walling, then make track-frame upward It is moved on one layer of building walling to be printed and stabilization is attached on the wall for having printed building body, thus by printing device Jacking is to highly locating on one layer on building body building walling to be printed, and finally above-mentioned steps repeatedly, bottom-up to print The 3D printing of building outside is successively carried out above the building walling of completion, until completing 3D whole on building walling Printing construction;
Step 8: water-proofing treatment
Carry out water-proofing treatment on the building masonry wall for completing 3D printing.
2. a kind of 3D printing decorative model template construction technique according to claim 1, it is characterised in that: the step 1 When if base is thermal-insulating type metope in, mortar remaining on metope, dirt, dust are cleaned out, metope keeps smooth, is keeping the temperature When i.e. progress priming paint construction or base are non-thermal-insulating type metope after type metope is dry, by soil, dirt, ash remaining on metope Dirt is cleaned out, and metope keeps smooth, carries out priming paint construction after non-thermal-insulating type metope is dry.
3. a kind of 3D printing decorative model template construction technique according to claim 1, it is characterised in that: the step 2 Middle to establish axial control network in construction location with " internal control method ", pilot measurement to construction location is launched out according to construction drawing and is constructed The axis of each axis in position releases column position and beam position frame line, the 500mm on the outside of its sideline according to completed plane axis gauze Position releases column control line and beam control line, absolute altitude are up successively transmitted by bottom elevation control point, directly copy absolute altitude In the column main reinforcement tied up, each column main reinforcement must be there are two relief.
4. a kind of 3D printing decorative model template construction technique according to claim 1, it is characterised in that: the step 3 In by pop-up wall axial location control line be arranged Template Location reinforcing bar, on exterior wall press spacing no more than 0.8m install reinforcing bar It is for supporting, template is in place.
5. a kind of 3D printing decorative model template construction technique according to claim 1, it is characterised in that: the step 3 The spacing required after middle template is in place according still further to through-wall bolt drills at template edge position, makes coincideing for template and wall, Hole should not be too big in order to avoid spillage, and through-wall bolt is passed through hole, and calibration template is vertical, flatness, and connecting must tight, jail Gu.
6. a kind of 3D printing decorative model template construction technique according to claim 1, it is characterised in that: the step 5 Concrete strength, which reaches the side 1.2Mpa, under middle room temperature can remove wall form, form removal back wall surface answered if any cement slurry and Shi Qingli, and examine the flatness for protecting surface of wall.
7. a kind of 3D printing decorative model template construction technique according to claim 1, it is characterised in that: the step 7 In move the print head crossbeam of printing device along track cross beam, while make printing device print head spray building Material, the every movement of print head crossbeam is primary, that is, completes the 3D printing construction on this layer building walling.
8. a kind of 3D printing decorative model template construction technique according to claim 1, it is characterised in that: the step 7 In transverse shifting printing after need to lengthen on supreme one layer of lifting rail building walling to be printed, made track-frame disengaging On the wall for printing building body, by climbing for the component that climbs, track-frame is made to move up supreme one layer of building body to be printed On wall and stabilization be attached on the wall for having printed building body, thus by printing device jack to one layer on building body it is to be printed Highly locate on building walling.
9. a kind of 3D printing decorative model template construction technique according to claim 1, it is characterised in that: the step 7 In after transverse shifting prints and climbs printing above-mentioned steps repeatedly, it is bottom-up above the building walling for having printed completion The 3D printing of building outside is successively carried out, until completing 3D printing construction whole on building walling.
10. a kind of 3D printing decorative model template construction technique according to claim 1, it is characterised in that: the step It will clean out on printed building masonry wall in eight, finally carry out at waterproof on the building masonry wall for completing 3D print Reason.
CN201811183206.7A 2018-10-11 2018-10-11 A kind of 3D printing decorative model template construction technique Withdrawn CN109184210A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811183206.7A CN109184210A (en) 2018-10-11 2018-10-11 A kind of 3D printing decorative model template construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811183206.7A CN109184210A (en) 2018-10-11 2018-10-11 A kind of 3D printing decorative model template construction technique

Publications (1)

Publication Number Publication Date
CN109184210A true CN109184210A (en) 2019-01-11

Family

ID=64947659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811183206.7A Withdrawn CN109184210A (en) 2018-10-11 2018-10-11 A kind of 3D printing decorative model template construction technique

Country Status (1)

Country Link
CN (1) CN109184210A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685414A (en) * 2019-10-12 2020-01-14 浙江年代建设工程有限公司 Wall surface decoration process and building template used for same
CN113459240A (en) * 2021-07-18 2021-10-01 安庆砼创新材料科技有限公司 Method for laying UHPC curtain wall panel pattern fabric by using 3D printing technology
CN113478607A (en) * 2021-07-18 2021-10-08 虞新华 Method for laying UHPC panel heat-preservation decorative plate fabric by utilizing 3D printing

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104110112A (en) * 2014-07-21 2014-10-22 浙江自力建设集团有限公司 Building wall decoration mortar construction technology
EP2927016A1 (en) * 2014-04-04 2015-10-07 Flooring Technologies Ltd. Method for manufacturing a decorative panel and decorative panel
CN105544910A (en) * 2015-12-07 2016-05-04 无锡捷阳节能科技股份有限公司 Production technology for 3D high-definition printing UV interior wall decorative sheet
CN105563835A (en) * 2016-02-02 2016-05-11 上海建工集团股份有限公司 Uniaxial move multi-track parallel independent type 3D printing device and printing method
CN107190861A (en) * 2017-07-21 2017-09-22 庄福臣 A kind of contrary sequence method template construction technique
CN206829401U (en) * 2017-04-12 2018-01-02 中科佳建设(深圳)有限公司 A kind of 3D printing prefabricated buildings window

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2927016A1 (en) * 2014-04-04 2015-10-07 Flooring Technologies Ltd. Method for manufacturing a decorative panel and decorative panel
CN104110112A (en) * 2014-07-21 2014-10-22 浙江自力建设集团有限公司 Building wall decoration mortar construction technology
CN105544910A (en) * 2015-12-07 2016-05-04 无锡捷阳节能科技股份有限公司 Production technology for 3D high-definition printing UV interior wall decorative sheet
CN105563835A (en) * 2016-02-02 2016-05-11 上海建工集团股份有限公司 Uniaxial move multi-track parallel independent type 3D printing device and printing method
CN206829401U (en) * 2017-04-12 2018-01-02 中科佳建设(深圳)有限公司 A kind of 3D printing prefabricated buildings window
CN107190861A (en) * 2017-07-21 2017-09-22 庄福臣 A kind of contrary sequence method template construction technique

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685414A (en) * 2019-10-12 2020-01-14 浙江年代建设工程有限公司 Wall surface decoration process and building template used for same
CN113459240A (en) * 2021-07-18 2021-10-01 安庆砼创新材料科技有限公司 Method for laying UHPC curtain wall panel pattern fabric by using 3D printing technology
CN113478607A (en) * 2021-07-18 2021-10-08 虞新华 Method for laying UHPC panel heat-preservation decorative plate fabric by utilizing 3D printing

Similar Documents

Publication Publication Date Title
CN108505644B (en) CL composite concrete shear wall construction method
CN106150001B (en) A kind of fabricated assembly overall stair construction method
CN103015717B (en) Rear superelevation steel pipe column outsourcing Construction technology of fair-faced concrete closed by a kind of floor
CN109184210A (en) A kind of 3D printing decorative model template construction technique
CN103821366B (en) Clear water concrete metope grooved stereo wood pattern decoration construction method
CN104963289B (en) A kind of abnormity pier stud mass concrete overall time pouring construction method
CN104213565B (en) A kind of formwork system that is applicable to large-scale deep trouth hole sty bed course and formwork thereof water smashes construction method
CN110107085A (en) Superelevation fair-faced concrete column construction method
CN108457243B (en) Construction method of assembled concrete breakwater
CN104563503B (en) High level and Super high-rise dwelling house cast-in-situ steel reinforced concrete high-altitude automatization method of construction
CN108612233B (en) Construction method of cast-in-situ facing clear concrete wall
CN106351376B (en) Shed deckhead construction method
CN103938866A (en) Installing method for construction formwork of bare concrete concave-convex wood grain decoration wall
CN108457299A (en) One-piece casting formula piping lane construction technology
CN115897882A (en) Construction method for cast-in-situ large-section multi-curve roof
CN108277908B (en) Energy-saving environment-friendly CL wall engineering construction method
CN106223460B (en) The prefabricated construction method of large scale wallboard
CN108071194A (en) A kind of cast-in-situ floor and thickness control of protection cover of rebar device and its construction technology
CN102383591B (en) Construction device and construction technology for slip formworks and reverse formworks
CN104612343A (en) Method for constructing extruded polystyrene board molding of building outer wall
CN103590581A (en) Construction method of concrete flue top plate insulating layer
CN115162732A (en) Construction method of independent special-shaped bare concrete column
CN107558604A (en) A kind of method for exempting from form removal raised table building
CN107842170A (en) Light aggregate sound insulation ground and construction method thereof
CN110348142B (en) Method for forming curve bridge based on BIM combined template support process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191008

Address after: 528300 East Office Building 201-11, No. 11 Junye East Road, Beijiao Town, Shunde District, Foshan City, Guangdong Province

Applicant after: Guangdong Bozhilin Robot Co., Ltd.

Address before: Room 105-46536, No. 6 Baohua Road, Hengqin New District, Zhuhai City, Guangdong Province

Applicant before: Dingchen Construction Management Co., Ltd.

WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190111