CN109137925A - A kind of base bed flattening method - Google Patents

A kind of base bed flattening method Download PDF

Info

Publication number
CN109137925A
CN109137925A CN201811179270.8A CN201811179270A CN109137925A CN 109137925 A CN109137925 A CN 109137925A CN 201811179270 A CN201811179270 A CN 201811179270A CN 109137925 A CN109137925 A CN 109137925A
Authority
CN
China
Prior art keywords
bedding
quasi
installation component
leveling
base bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811179270.8A
Other languages
Chinese (zh)
Inventor
刘其杰
王迎
李坚
刘海鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Port Engineering Group Co Ltd
Original Assignee
China State Construction Port Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Port Engineering Group Co Ltd filed Critical China State Construction Port Engineering Group Co Ltd
Priority to CN201811179270.8A priority Critical patent/CN109137925A/en
Publication of CN109137925A publication Critical patent/CN109137925A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/10Placing gravel or light material under water inasmuch as not provided for elsewhere

Abstract

The invention discloses a kind of base bed flattening methods, this method comprises: treating leveling bedding carries out bedding jackstone;Quasi- installation component is positioned to position to be installed;Smoothening material is sprayed to below the quasi- installation component on bedding by jet pipe.This method through the invention is flattened using component to be installed as leveling plane and height limiter, so that project cost is lower, construction efficiency is higher;Work progress is not by the image of the depth of water and underwater visibility, good construction adaptability;It does not need diver and carries out detection under water and construction, improve working security, ensured the personal safety of construction personnel.

Description

A kind of base bed flattening method
Technical field
The present invention relates to Underwater Engineering fields, more particularly, to a kind of base bed flattening method.
Background technique
It when underwater components are installed, needs to flatten bedding top surface, guarantees component to improve the flatness of bedding top surface Steady on bedding, safety.Leveling, which is divided into, slightly to be put down, is thin flat and superfine flat, and material therefor is two slabstones, rubble etc..
Traditional rubble mound foundation levelling matches the construction work of diver's manual work using leveling ship waterborne suspention floating rule Skill.Leveling ship is usually that repacking is refuted by side, stretches out two I-steel or rail as floating rule bracket, bracket outer end on the ship side just refuted Pulley is installed, the floating rule being made into heavy rail suspended in midair in water by pulley, in floating rule both ends system with sounding line ruler, is controlled with this Floating rule elevation.When construction, leveling ship is in place, controls floating rule by leveling absolute altitude coaster and transfers depth, at any time according to SEA LEVEL VARIATION Adjustment, diver are subject to floating rule bottom, are flattened by " height is gone to fill out low-lying area ", and side leveling, Bian Yichuan, pressure stubble are carried forward.Tradition Construction method is influenced big by meteorological, stormy waves and trend, and when construction needs ship to position, shift repeatedly, and artificial levelling process, labor Fatigue resistance is big, and operating efficiency is generally relatively low;When especially the depth of water is deeper, since hydraulic pressure is big, diver can not work;Because of the bottom Sediment content is big, and underwater visibility is extremely low, and diver's operation is also extremely difficult;And diver's underwater operation has greatly danger Property.
Summary of the invention
In order to solve above-mentioned problems of the prior art, a kind of method of base bed flattening is provided, can be improved operation Efficiency reduces the labor intensity and labour difficulty of construction personnel, preferably ensures the personal safety of construction personnel.
To achieve the above object, first aspect present invention provides a kind of base bed flattening method, includes the following steps:
It treats leveling bedding and carries out bedding jackstone;
Quasi- installation component is positioned to position to be installed;
Smoothening material is sprayed to below the quasi- installation component on bedding by jet pipe.
Due to flattening sideline and usually requiring the bottom sideline beyond quasi- installation component, to guarantee leveling according to code requirement All areas in sideline are flattened, therefore preferably, it can be the following steps are included: moving horizontally the quasi- installation structure Part, until the smoothening material is completely spread to leveling sideline.
It for the height for making base bed flattening reach unified, needs to be filled with thickness limitation for smoothening material, and needs One horizontal plane is set.
Preferably, the quasi- installation component bottom is as leveling plane, the quasi- installation component bottom and the bedding top The distance in portion is leveling height.
Preferably, the smoothening material is filled up by the quasi- peace by the sprinkling position and spray angle of the control jet pipe Fill bedding below component.
The sprinkling position of jet pipe is given with spray angle and is controlled, spraying operation can be effectively carried out, so that leveling material Material be paved with sprinkling in need region.
Further, for the needs of different constructions, it is preferable that the more jet pipes can be arranged while spraying described whole Flat material.
To accelerate the spray rate of jet pipe and the sprinkling quality of smoothening material, it is preferable that the smoothening material passes through pressure The effect of contracting air is sprayed from the jet pipe.
According to a second aspect of the present invention, a kind of base bed flattening device is provided, comprising:
Jackstone device, for carrying out riprap work to bedding;
Mobile device, for quasi- installation component to be moved and positioned;
Flusher, for smoothening material to be sprayed to the quasi- installation component bottom.
According to one embodiment of present invention, traditional underwater leveling construction technology construction efficiency is overcome using this method It is low, safety low disadvantage big by water depth effect, so that leveling construction efficiency improves under water, more to the adaptability of different water depth It is good, and diver's underwater operation need not be used, working security is greatly improved, ensure that the person peace of construction personnel Entirely.
By referring to the drawings to the detailed description of exemplary embodiment of the present invention, other feature of the invention and its Advantage will become apparent.
Detailed description of the invention
It is combined in the description and the attached drawing for constituting part of specification shows the embodiment of the present invention, and even With its explanation together principle for explaining the present invention.
Fig. 1 is the flow chart of the base bed flattening method of the embodiment of the present invention.
Fig. 2 is the flow chart of the base bed flattening method of another embodiment of the present invention.
Fig. 3 is the floor map of the base bed flattening method of the embodiment of the present invention.
Fig. 4 is the side schematic view of the base bed flattening method of the embodiment of the present invention.
Fig. 5 is the structural schematic diagram of the basic apparatus for leveling of the embodiment of the present invention
Specific embodiment
Carry out the various exemplary embodiments of detailed description of the present invention now with reference to attached drawing.It should also be noted that unless in addition having Body explanation, the unlimited system of component and the positioned opposite of step, numerical expression and the numerical value otherwise illustrated in these embodiments is originally The range of invention.
Be to the description only actually of at least one exemplary embodiment below it is illustrative, never as to the present invention And its application or any restrictions used.
Technology, method and apparatus known to person of ordinary skill in the relevant may be not discussed in detail, but suitable In the case of, the technology, method and apparatus should be considered as part of specification.
It is shown here and discuss all examples in, any occurrence should be construed as merely illustratively, without It is as limitation.Therefore, other examples of exemplary embodiment can have different values.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, then in subsequent attached drawing does not need that it is further discussed.
<base bed flattening method>
As shown in Figure 1, base bed flattening method of the invention includes the following steps:
S1100 treats leveling bedding and carries out bedding jackstone.
In the present embodiment, the step is identical as traditional bedding jackstone workflow, and building stones are transported to base to be flattened Bed position carries out riprap work, slightly puts down to bedding.
S1200 positions quasi- installation component to position to be installed.
After the completion of bedding jackstone, the component of quasi- installation is moved to installed position and is positioned.
In the present embodiment, the component is moved to installed position by tugboat or other Large Construction ships, and carried out The positioning of horizontal direction and the positioning of vertical direction, horizontal direction positioning carry out accurate plane positioning, vertical direction using GPS Positioning the instruments such as level can be used accurately control decentralization height, until reaching the component needs position height to be mounted.
Smoothening material is sprayed to below the quasi- installation component on bedding by S1300 by jet pipe.
After completing to the positioning horizontally and vertically of quasi- installation component, smoothening material is sprayed by jet pipe Below to the component on bedding, until quasi- installation component bottom surface to the space between bedding is filled up.
In the present embodiment, smoothening material is consistent with the material in tradition leveling construction, is two slabstones, rubble etc., wherein The maximum gauge of two slabstones or rubble is not greater than the minimum diameter of jet pipe.
In the present embodiment, using the bottom surface of quasi- installation component as base bed flattening plane and thickness restrictor, Ke Yi great It is big to improve construction efficiency, without using the leveling plane of peripheral hardware, and do not need the laying depth of manual control smoothening material.
In the present embodiment, the sprinkling position of jet pipe is given with spray angle and controls, so that spraying operation is more efficient, Be more advantageous to by smoothening material be paved with sprinkling in need region.The control of jet pipe can be it is artificial, such as in jet pipe Upper installation tricing line, draws and is connected on stone dumper, and personnel assist dilatory jet pipe by devices such as chain blocks, carries out jet pipe positioning; Also the equipment such as underwater robot be can use, by way of remote control, carry out the positioning of jet pipe.
In the present embodiment, according to specific project amount, more jet pipes can be set while carrying out spraying operation, to meet The needs of construction speed.
In the present embodiment, the smoothening material is given with kinetic energy by compressed air, sprayed out by jet pipe, accelerate The spray rate of jet pipe, improves the sprinkling quality of smoothening material,
In other embodiments, smoothening material can be given by other supercharging modes with kinetic energy, such as booster water pump.
This method through the invention makes full use of component to be installed to be flattened as leveling plane and limit for height equipment, no Other levelling means are needed, so that project cost is lower, construction efficiency is greatly improved;Work progress is not by the depth of water and underwater energy The influence of degree of opinion, good construction adaptability;Importantly, not needing diver using the base bed flattening method and being visited under water It touches and constructs, greatly improve working security, ensured the personal safety of construction personnel.
In other embodiment of the present invention, as shown in Fig. 2, it is further comprising the steps of:
S2100 moves horizontally the installation component, until the smoothening material is completely spread to leveling sideline.
Due to flattening sideline and usually requiring the bottom sideline beyond quasi- installation component, to guarantee leveling according to code requirement All areas in sideline are flattened, and guarantee that the leveling height of all areas in leveling sideline is consistent, can will be intended Installation component is horizontally moved a distance, then jet pipe is moved to the region not being leveled below component and is sprayed, until The component is moved at leveling sideline, so that all areas are flattened inside leveling sideline.
In this embodiment, cooperate GPS to examine leveling sideline by measuring devices such as water stone rollers, guarantee that leveling range reaches Region in all leveling sidelines.
It ensure that flattened zone high consistency while so that flattened zone obtains expanding by the step, and The positioning for needing again to carry out quasi- installation component vertical direction, improves construction efficiency.
<embodiment>
In one embodiment of the invention, as shown in Figure 3 and Figure 4, the construction work of base bed flattening method of the present invention is utilized Journey, comprising: stone dumper 1, smoothening material 2, jet pipe store mouth 3, loading machine 4, jet pipe 5, caisson 6, component mounting shipping 7, to whole Flat bedding 8.
In the present embodiment, quasi- installation component is caisson, specific implementation step are as follows:
Step 1, leveling bedding 8 is treated by stone dumper 1 and carries out riprap work;
Step 2, after the completion of jackstone, component mounting shipping 7 carries caisson 6 and reaches installed position, and it is accurate to be carried out using GPS Plane positioning, stone dumper 1 carry smoothening material 2 and reach designated position;
Step 3, caisson 6 transfer, using level accurately control decentralization height, as shown in figure 4, make 6 bottom of caisson and to The distance for flattening 8 top of bedding is equal to leveling height, to control leveling thickness;
Step 4, smoothening material 2 is transported at jet pipe storage mouth 3 by loading machine 4, using the air compressor machine on stone dumper 1, is Smoothening material 2 applies pressure, so that smoothening material 2 is sprayed to the space of 6 lower section of caisson with certain initial velocity by jet pipe 5 In, until 6 lower space of caisson is filled up;
Step 5, component mounting shipping 7 drives caisson 6 to move horizontally certain distance, and the construction personnel on stone dumper 1 passes through The cooperation of tricing line and chain block is moved and is positioned to jet pipe 5, and the non-flattened zone sprinkling to 6 lower section of caisson is continued Smoothening material 2;
Step 6, it is tested by water stone roller cooperation GPS to leveling sideline, until the edge of caisson 6 is mobile as leveling Sideline is overlapped, and completes spraying operation, is completed to the screed operation in the region.
Step 7, after the completion of flattening to a caisson position, component mounting shipping 7 drives caisson 6 to be transported to other caisson positions, Repeat above step after positioning, completes base bed flattening operation.
Step 8, the bedding after leveling can directly carry out the installation of caisson 6.
The embodiment through the invention is flattened using caisson 6, does not need other levelling means and limit for height equipment, drop Low project cost, improves construction efficiency;Work progress is not influenced by the depth of water and underwater visibility, construction adaptability It is good;In base bed flattening work progress, no diver participates in work progress, improves working security.
<base bed flattening device>
As shown in figure 5, base bed flattening device 1000 includes jackstone device 1100, mobile device 1200 and flusher 1300, in which:
Jackstone device 1100 carries out riprap work for treating leveling bedding.
Building stones are transported to bedding position to be flattened, riprap work is carried out, bedding is slightly put down;It can also transport and store and is whole Flat material
Mobile device 1200, for quasi- installation component to be moved and positioned.
Installation component can be delivered, and is located in position to be installed, is filled equipped with positioning such as GPS positioning and levels It sets.
Flusher 1300, for smoothening material to be sprayed to bedding below the quasi- installation component.
With air compressor machine or high-pressure hydraulic pump, smoothening material is sprayed on the bedding below quasi- installation component by jet pipe, Manually the sprinkling position of flusher 1300 and sprinkling direction are adjusted.
Although some specific embodiments of the invention are described in detail by example, the skill of this field Art personnel it should be understood that example above merely to being illustrated, the range being not intended to be limiting of the invention.The skill of this field Art personnel are it should be understood that can without departing from the scope and spirit of the present invention modify to above embodiments.This hair Bright range is defined by the following claims.

Claims (7)

1. a kind of base bed flattening method, which comprises the following steps:
It treats leveling bedding and carries out bedding jackstone;
Quasi- installation component is positioned to position to be installed;
Smoothening material is sprayed to below the quasi- installation component on bedding by jet pipe.
2. base bed flattening method according to claim 1, which is characterized in that further include following steps: moving horizontally described Quasi- installation component, until the smoothening material is completely spread to the leveling sideline of bedding.
3. base bed flattening method according to claim 1, which is characterized in that the quasi- installation component bottom is flat as leveling Face, the quasi- installation component bottom at the top of the bedding at a distance from for leveling height.
4. base bed flattening method according to claim 1, which is characterized in that by control the sprinkling position of the jet pipe with The smoothening material is filled up bedding below the quasi- installation component by spray angle.
5. base bed flattening method according to claim 1, which is characterized in that the more jet pipes can be arranged while spraying The smoothening material.
6. base bed flattening method according to claim 1, which is characterized in that the work that the smoothening material passes through compressed air It is sprayed with from the jet pipe.
7. a kind of base bed flattening device characterized by comprising
Jackstone device, for carrying out riprap work to bedding;
Mobile device, for quasi- installation component to be moved and positioned;
Flusher, for smoothening material to be sprayed to the quasi- installation component bottom.
CN201811179270.8A 2018-10-10 2018-10-10 A kind of base bed flattening method Pending CN109137925A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811179270.8A CN109137925A (en) 2018-10-10 2018-10-10 A kind of base bed flattening method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811179270.8A CN109137925A (en) 2018-10-10 2018-10-10 A kind of base bed flattening method

Publications (1)

Publication Number Publication Date
CN109137925A true CN109137925A (en) 2019-01-04

Family

ID=64811328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811179270.8A Pending CN109137925A (en) 2018-10-10 2018-10-10 A kind of base bed flattening method

Country Status (1)

Country Link
CN (1) CN109137925A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101130991A (en) * 2006-08-24 2008-02-27 中船第九设计研究院 Caisson cofferdam based on prepacked foundation bed
CN103615016A (en) * 2013-11-28 2014-03-05 中交一航局第三工程有限公司 Oversized caisson installation process
CN203701121U (en) * 2013-12-04 2014-07-09 中交一航局第二工程有限公司 Island building caisson without leveling of foundation bed
CN104947708A (en) * 2015-04-24 2015-09-30 中国交通建设股份有限公司 Combined foundation bed for immersed tube tunnels and construction method thereof
CN105200993A (en) * 2015-09-09 2015-12-30 中交一航局第三工程有限公司 Rubble bed leveling equipment and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101130991A (en) * 2006-08-24 2008-02-27 中船第九设计研究院 Caisson cofferdam based on prepacked foundation bed
CN103615016A (en) * 2013-11-28 2014-03-05 中交一航局第三工程有限公司 Oversized caisson installation process
CN203701121U (en) * 2013-12-04 2014-07-09 中交一航局第二工程有限公司 Island building caisson without leveling of foundation bed
CN104947708A (en) * 2015-04-24 2015-09-30 中国交通建设股份有限公司 Combined foundation bed for immersed tube tunnels and construction method thereof
CN105200993A (en) * 2015-09-09 2015-12-30 中交一航局第三工程有限公司 Rubble bed leveling equipment and construction method thereof

Similar Documents

Publication Publication Date Title
CN104196034B (en) A kind of utilize steel sheet pile as the foundation ditch construction method in supporting cofferdam
CN106677156B (en) A method of disturbance treatment being carried out to soft soil foundation using aerosol
CN104762973B (en) A kind of deep water jackstone elevation control system
CN109595007A (en) A kind of full-automatic wet shot control method and full-automatic wet shot system
KR20190060245A (en) Integrated steep slope collapse simulation system
CN109183787A (en) A kind of forming method of man-made digging pile mould-pipe
CN207553144U (en) Automatic paver system with detection adjustment structure
CN109137925A (en) A kind of base bed flattening method
CN205502008U (en) A location structure for suddenling change on a section of thick bamboo is protected in cross -section drilled pile stake
CN110172916A (en) Bridge High-pier concrete curing method
Riss et al. Description of a fracture morphology in regard of its behaviour during shearing
CN107761751A (en) A kind of Double-Wall Steel Boxed Cofferdam and its construction method
CN208917842U (en) A kind of base bed flattening system
CN106802978A (en) A kind of self-elevating drilling platform environment collection of illustrative plates method for drafting
CN207567817U (en) Automatic paver system with movable blanking structure
CN104895043B (en) A kind of deep water long period that is applied to is surged the Macadam Pile Construction method in waters
US20080016726A1 (en) Method for Automatically Profiling Ground in Waters
CN204626184U (en) A kind of road surface with soft subgrade dusts treating apparatus
CN210439273U (en) Vibration and impact device for vibration and impact treatment of overwater foundation
CN105093924B (en) A kind of air curtain lifts the control method of eutrophy salt deep sea water
CN109252514A (en) Construction method of the high-pressure rotary jet grouting pile in artificial Backfilled Stone Layer
CN109898557B (en) Laying method of underwater broken stone foundation bed
CN207176709U (en) A kind of Double-Wall Steel Boxed Cofferdam
US3659425A (en) Method and apparatus for burying pipeline
CN206143819U (en) Take injection system&#39;s perpendicular membrane equipment down

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination