CN109107366A - A kind of automation gas collecting apparatus - Google Patents
A kind of automation gas collecting apparatus Download PDFInfo
- Publication number
- CN109107366A CN109107366A CN201810437889.8A CN201810437889A CN109107366A CN 109107366 A CN109107366 A CN 109107366A CN 201810437889 A CN201810437889 A CN 201810437889A CN 109107366 A CN109107366 A CN 109107366A
- Authority
- CN
- China
- Prior art keywords
- cavity
- wall
- block
- annular groove
- ventilation pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/02—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography
- B01D53/04—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with stationary adsorbents
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/34—Chemical or biological purification of waste gases
- B01D53/74—General processes for purification of waste gases; Apparatus or devices specially adapted therefor
- B01D53/75—Multi-step processes
Abstract
The invention discloses a kind of automation gas collecting apparatus, including apparatus main body, it is set to the intracorporal gas collecting apparatus of described device master and is set to the intracorporal suggestion device of described device master, the gas collecting apparatus includes setting and intracorporal first cavity of described device master, what first cavity was connected on the side wall of inner left wall is provided with the first annular groove, first motor is fixedly installed in the inner left wall of first cavity, the left end of the first motor is connected with the first switch block that can be rotated in first cavity by shaft power, the ventilation component that can be rotated in first annular groove is provided on first switch block.
Description
Technical field
The present invention relates to industrial waste gas purifying technical field, specifically a kind of automation gas collecting apparatus.
Background technique
In the today for advocating Green Development, the industrial waste gas generated in plant produced require to carry out purification it is qualified after ability
Discharged, in the factory using being at most also the minimum when exhaust dust device with bag of cost, this device be only capable of removing dust and
Other deleterious particles can not be purified, therefore also need additional other cleaning equipments, virtually also increased production cost,
Need timing by manually carrying out replacement absorbent packet using bag dust-removing method simultaneously, it is time-consuming and laborious, therefore designing one kind can be to work
Flue dust and other deleterious particles in industry exhaust gas carry out adsorption cleaning, and intelligent can be collected soot dust granule without people
For replacement a kind of automation gas collecting apparatus it is really necessary to.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of automation gas collecting apparatus, are able to solve above-mentioned present skill
The problems in art.
The present invention is achieved through the following technical solutions: a kind of automation gas collecting apparatus of the invention, including device
Main body is set to the intracorporal gas collecting apparatus of described device master and is set to the intracorporal suggestion device of described device master, the collection
Device of air includes setting and intracorporal first cavity of described device master, and first cavity is connected on the side wall of inner left wall
Logical is provided with the first annular groove, and first motor is fixedly installed in the inner left wall of first cavity, the first motor
Left end is connected with the first switch block that can be rotated in first cavity by shaft power, is arranged on first switch block
There is a ventilation component that can be rotated in first annular groove, the right side of first switch block and is located in first cavity and can turn
Dynamic is provided with the second switch block, and the right end of first switch block is rotatably assorted by shaft is connected to the left side of second switch block
On end face, it is provided with cricoid second annular groove on the side inner wall of first cavity and positioned at the surrounding of second switch block,
Rotatably be provided with the ventilation block being fixedly connected on second switch block in second annular groove, in the ventilation block about
Second switch block is symmetrical above and below to be provided with the second cavity, is provided with the first connector on the right side inner wall of second cavity,
The connection external world is provided in inside the right side of second annular groove on the right side of first connector of upside to connect with described first
First ventilation pipe of interface, the company of being provided in the right side inner wall of second annular groove on the right side of first connector of downside
Lead to second annular groove and the second extraneous ventilation pipe, is provided with heating device in second ventilation pipe, described second
The second connector, the left side of second annular groove on the left of second connector of upside are provided in the inner left wall of cavity
It is provided in inner wall and is connected to second annular groove and extraneous third ventilation pipe, the third ventilation pipe and first ring
Slot is connected, and the first air extractor is fixedly installed on the third ventilation pipe inner wall, and second connector of downside is left
It is provided in the inner left wall of second annular groove of side and is connected to second annular groove and the 4th extraneous ventilation pipe, described the
Four ventilation pipes are connected with first annular groove, are provided with third cavity in the right side inner wall of first cavity, and described
The first company hole is provided on the right side of the inner left wall of three cavitys and first cavity between inner wall, the right end of second switch block is solid
Surely it is connected with the first connecting shaft for extending and being passed through in first company hole, the right end of first connecting shaft is fixedly connected with the first connection
Block is provided with the spline of opening to the right in the right end face of first link block, and being provided in the third cavity can be left
First sliding block of right sliding is provided with mobile device on the upside of first sliding block, is fixedly installed in first sliding block
Two motors, the left end of second motor are connected with the spline matched with the spline by shaft power and connect
Block, what is be connected in the right side inner wall of the third cavity is provided with the 4th cavity, and the right end of second motor passes through shaft
Power is connected with first gear, and the 4th cavity is provided with the of opening upwards in the downside inner wall of right side inner wall
Two connect hole, and be rotatably assorted second for being connected with and being meshed with the first gear between the left and right sides inner wall in second company hole
Gear on the side inner wall of second ventilation pipe and is located on the downside of second company hole that be fixedly installed cricoid first solid
Determine block, be provided on first fixed block be connected with second ventilation pipe and with it is described second company hole lower end be connected
Third annular groove, be rotatably assorted in the third annular groove by change and be connected with third switch block, in the outside of the third switch block
The ring gear being meshed with the second gear is fixedly installed on wall, it is logical to be provided through first for left and right in the third switch block
Hole is fixedly installed fan blades on the inner wall of the first through hole.
As a preferred technical solution, it is described ventilation block right end face upper end and lower end about second switch block above and below
It is symmetrically arranged with the first notch, what second annular groove was connected in the downside inner wall on right side is provided with first sliding groove, institute
State the second sliding slot that is provided with being connected in the upper inside walls of first sliding groove, fixed setting in the right side inner wall of the first sliding groove
There is third motor, the left end power of the third motor is connected with the first lead screw, and the left end of first lead screw passes through axis
Forward it is dynamic be cooperatively connected in the inner left wall of the first sliding groove, be provided in the first sliding groove can horizontally slip and with institute
The second sliding block that the first lead screw is meshed is stated, extension is fixedly connected on the upper surface of second sliding block and is passed through second cunning
The third sliding block matched in slot and with first notch.
The ventilation component includes the component master being fixedly connected on first switch block as a preferred technical solution,
Body, symmetrical above and below in the module body and left and right are provided through the second through-hole, set in the left end face of second through-hole
Be equipped with opening to the left and the second notch of outward opening, in the upper inside walls of first annular groove with it is extraneous between is provided with and communicated with
5th ventilation pipe.
As a preferred technical solution, the heating device include be set in the inner wall of second ventilation pipe side and
The 5th cavity being connected with second ventilation pipe is arranged with resistive heater in the 5th cavity.
As a preferred technical solution, the mobile device include be connected be set to the third cavity upper inside walls
Interior third sliding slot, the 4th motor is fixedly installed in the right side inner wall of the third sliding slot, and the right end of the 4th motor is dynamic
Force-fitting is connected with the second lead screw, and the right end of second lead screw is rotatably assorted by bearing is connected to the right side of the third sliding slot
On the inner wall of side, it is fixedly connected with extension on the upside end face of first sliding block and is passed through in the third sliding slot and with described second
The Four-slider that threads of lead screw is cooperatively connected.
First air extractor includes being fixedly connected on the third ventilation pipe inner wall as a preferred technical solution,
On cricoid pumping fixed block, bleed motor fixed block is fixedly connected with by fixed frame in the ring-type fixed block, it is described
Bleed motor is fixedly installed in bleed motor fixed block, the left end of the bleed motor is connected with pumping by shaft power
Air fan is connected by power and matches between the shaft and the bleed motor fixed block left end face of the bleed motor left end
Conjunction is connected with sealing ring.
It is fixedly connected with activated carbon block on all side end faces of the second cavity right end as a preferred technical solution, institute
Activated carbon block is stated to adsorb the flue dust sundries etc. in the gas by second cavity.
Second cavity is fixedly installed on the right side inner wall of second switch block as a preferred technical solution,
Gas concentration detector, the gas concentration detector is to detect the dust concentration in second cavity.
The suggestion device includes being fixedly connected on end face right end on the downside of described device main body as a preferred technical solution,
Illumination fixed block, be fixedly installed warning light on the downside end face of the illumination fixed block, the 5th ventilation pipe it is upper
It is fixedly installed mist detecting device on the inner wall of side, warning light lights when having smog to pass through in the 5th ventilation pipe.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, and the course of work of the present apparatus, bleed motor
Starting, and then extraction fan rotation is driven by shaft, and then will be required by third ventilation pipe and the second through-hole of upside
The air purified is pumped into the second cavity of upside, and in the process, the lower end surface of the 5th ventilation pipe passes through component master
The upper surface of body is closed, and is discharged after the purification that dirty air passes through activated carbon block at this time by the first ventilation pipe, when
The gas concentration detector of upside detects that the activated carbon block of upside can not gas after air filtering and in the second cavity of upside
When bulk concentration is larger, first motor starting meets people and drives the first switch block to turn over 90 degree by shaft, and then drives module body
90 degree are turned over, third ventilation pipe and the second cavity of upside are spaced at this time, are drawn at this time by the first air extractor
Air turned again in original air cavity by the second notch and the 5th ventilation pipe, the 4th electric motor starting at this time, and then pass through
Second lead screw drives Four-slider to be moved to the left, and then the first sliding block is driven to be moved to the left, and then drives spline link block to the left
It moves and is caught in spline, at this time the second electric motor starting, and then drive the first link block to turn over 180 degree, and then drive
Second switch block turns over 180 degree, and then drives ventilation block to turn over 180 degree, and then drive the second cavity of upper and lower sides
The second clean cavity is gone to upside in turn by reversing of position, and first motor drives the first switch block to turn over 90 degree at this time, at this time
5th ventilation pipe lower ending opening is closed again, can continue air cleaning by the second clean cavity at this time, simultaneously
The second cavity with a large amount of soot particulates is ported to downside, the 4th motor reversal at this time, and then drives the by the second lead screw
Four-slider moves to right to greatest extent in third sliding slot, so drive the first sliding block move to right to greatest extent so that first gear with
Second gear engagement, while resistive heater obtains electric generation heat, the second motor is again started up at this time, and then is driven by shaft
First gear rotation, and then second gear rotation is driven, and then drive the rotation of third switch block, and then drive fan blades rotation, in turn
The heat and air that resistive heater is generated are pumped into the second cavity with high concentration soot dust granule, and high temperature makes at this time
The soot dust granule being adsorbed on activated carbon block falls off and the second through-hole for passing through downside and the 4th ventilation pipe are by high concentration flue dust
Particle is blown in collecting chamber and carries out gas collection, in the process, when ventilation block rotates and the second cavity of upper and lower sides is driven to convert
When position, third electric motor starting, and then drive the second sliding block to be moved to the left by the first lead screw, and then third sliding block is driven to be caught in
In first notch of downside, so prevent ventilation block occur rotation, by the present apparatus can the case where being changed without filter bag it is long-term
The catharsis to industrial waste gas is carried out, in the process, what the present apparatus can be intelligent carries out the soot dust granule in industrial waste gas
Purification, and the soot dust granule of absorption is recycled, it is not necessarily to human interference, only need to periodically be overhauled, present apparatus intelligence
Change degree is high, easy to operate, is worth recommending.
Detailed description of the invention
The present invention is described in detail by following specific embodiments and drawings for ease of explanation,.
Fig. 1 is a kind of schematic diagram of internal structure of automation gas collecting apparatus of the invention;
Fig. 2 is the enlarged diagram of " A " in Fig. 1;
Fig. 3 is the enlarged diagram of " B " in Fig. 2;
Fig. 4 is the structural schematic diagram of the ventilation component in the present invention;
Fig. 5 is the structural schematic diagram of the first air extractor in the present invention.
Specific embodiment
As Figure 1-Figure 5, a kind of automation gas collecting apparatus of the invention, including apparatus main body 11, are set to the dress
The suggestion device setting the gas collecting apparatus in main body 11 and being set in described device main body 11, the gas collecting apparatus include setting
With the first cavity 33 in described device main body 11, the setting that first cavity 33 is connected on the side wall of inner left wall
There is the first annular groove 30, first motor 35 is fixedly installed in the inner left wall of first cavity 33, the first motor 35
Left end is connected with the first switch block 34 that can be rotated in first cavity 33, first switch block 34 by shaft power
On be provided with the ventilation component 31 that can be rotated in first annular groove 30, the right side of first switch block 34 and be located at described the
The second switch block 29 is rotatably provided in one cavity 33, the right end of first switch block 34 is rotatably assorted by shaft to be connected to
In the left end face of second switch block 29, on the side inner wall of first cavity 33 and it is located at the four of second switch block 29
It is provided with cricoid second annular groove 39 week, is rotatably provided in second annular groove 29 and is fixedly connected on second switch block
Ventilation block 28 on 29 is provided with the second cavity 42 about second switch block 29 is symmetrical above and below in the ventilation block 28, described
It is provided with the first connector 45 on the right side inner wall of second cavity 42, described the second of first connector, 45 right side of upside
Be provided with extraneous the first ventilation pipe 46 with first connector 45 of connection in inside the right side of annular groove 39, downside it is described
Connection second annular groove 39 and the external world are provided in the right side inner wall of second annular groove 39 on 45 right side of the first connector
Second ventilation pipe 47, is provided with heating device in second ventilation pipe 47, in the inner left wall of second cavity 42
It is provided with the second connector 41, setting in the inner left wall of second annular groove 39 in second connector, 41 left side of upside
Have and is connected to second annular groove 39 and extraneous third ventilation pipe 36, the third ventilation pipe 36 and first annular groove 30
It is connected, the first air extractor 37, second connector of downside is fixedly installed on 36 inner wall of third ventilation pipe
It is provided in the inner left wall of second annular groove 39 in 41 left sides and is connected to second annular groove 39 and the 4th extraneous snorkel
Road 32, the 4th ventilation pipe are connected with first annular groove 30, are provided in the right side inner wall of first cavity 33
Third cavity 60 is provided with the first company hole between 33 right side inner wall of the inner left wall of the third cavity 60 and first cavity
55, the right end of second switch block 29 is fixedly connected with to extend and is passed through described first and connects the first connecting shaft 51 in hole 55, and described the
The right end of one connecting shaft 51 is fixedly connected with the first link block 52, be provided in the right end face of first link block 52 opening to
Right spline 53, is provided with the first sliding block 61 that can be horizontally slipped in the third cavity 60, first sliding block 61 it is upper
Side is provided with mobile device, and the second motor 62 is fixedly installed in first sliding block 61, and the left end of second motor 62 is logical
It crosses shaft power and is connected with the spline link block 54 matched with the spline 53, in the right side of the third cavity 60
What is be connected in wall is provided with the 4th cavity 63, and the right end of second motor 62 is connected with the first tooth by shaft power
Wheel 64, what the 4th cavity 63 was provided with opening upwards in the downside inner wall of right side inner wall second connects hole 66, and described the
Be rotatably assorted the second gear 65 for being connected with and being meshed with the first gear 64 between the left and right sides inner wall in two company holes 66, institute
It states on the side inner wall of the second ventilation pipe 47 and is fixedly installed cricoid first on the downside of second company hole 66 and fix
Block 71 is provided on first fixed block 71 and is connected with second ventilation pipe 47 and connects 66 lower end of hole with described second
The third annular groove 72 being connected, interior be rotatably assorted by change of third annular groove 72 are connected with third switch block 73, the third
The ring gear 69 being meshed with the second gear 65, a left side in the third switch block 73 are fixedly installed on the outside inner wall of switch block 73
The right side is provided through first through hole 67, is fixedly installed fan blades 68 on the inner wall of the first through hole 67.
Valuably, the upper end and lower end of ventilation 28 right end face of block are about second switch block 29 setting symmetrical above and below
There is the first notch 26, what second annular groove 39 was connected in the downside inner wall on right side is provided with first sliding groove 27, described
What is be connected in the upper inside walls of first sliding groove 27 is provided with second sliding slot 25, fixes in the right side inner wall of the first sliding groove 27
It is provided with third motor 21, the left end power of the third motor 21 is connected with the first lead screw 24, first lead screw 24
Left end be rotatably assorted in the inner left wall for being connected to the first sliding groove 27 by bearing, be provided in the first sliding groove 27
The second sliding block 22 that can be horizontally slipped and be meshed with first lead screw 24, it is fixed on the upper surface of second sliding block 22 to connect
It is connected to the third sliding block 23 for extending and being passed through and matching in the second sliding slot 25 and with first notch 26.
Valuably, the ventilation component 31 includes the module body 74 being fixedly connected on first switch block 34, described
Symmetrical above and below and left and right is provided through the second through-hole 75 in module body 74, is arranged in the left end face of second through-hole 75
There is opening to the left and the second notch 76 of outward opening, is connected to setting between the external world in the upper inside walls of first annular groove 30
There is the 5th ventilation pipe 38.
Valuably, the heating device includes being set in the 47 side inner wall of the second ventilation pipe and with described second
The 5th cavity 48 that ventilation pipe 47 is connected is arranged with resistive heater 49 in the 5th cavity 48.
Valuably, the mobile device includes that the third being set in 60 upper inside walls of third cavity being connected is slided
Slot 57 is fixedly installed the 4th motor 56, the right end power of the 4th motor 56 in the right side inner wall of the third sliding slot 57
It is connected with the second lead screw 59, the right end of second lead screw 59 is rotatably assorted by bearing is connected to the third sliding slot 57
Right side inner wall on, be fixedly connected on the upside end face of first sliding block 61 extension be passed through in the third sliding slot 57 and with
Second lead screw 59 is threadedly engaged the Four-slider 58 of connection.
Valuably, first air extractor 37 includes the ring-type being fixedly connected on 36 inner wall of third ventilation pipe
Pumping fixed block 91, bleed motor fixed block 93 is fixedly connected with by fixed frame 92 in the ring-type fixed block 91, it is described
Bleed motor 94 is fixedly installed in bleed motor fixed block 93, the left end of the bleed motor 94 is connected by the cooperation of shaft power
It is connected to extraction fan 96, the shaft and the bleed motor fixed block 93 being connected by power in 94 left end of bleed motor are left
Sealing ring 95 is connected between side end face.
Valuably, activated carbon block 44, the active carbon are fixedly connected on all side end faces of 42 right end of the second cavity
Block 44 is to adsorb the flue dust sundries etc. in the gas by second cavity 42.
Valuably, second cavity 42 is fixedly installed gas concentration on the right side inner wall of second switch block 29
Detector 43, the gas concentration detector 43 is to detect the dust concentration in second cavity 42.
Valuably, the suggestion device includes being fixedly connected on the illumination of 11 downside end face right end of described device main body to fix
Block 101 is fixedly installed warning light 102 on the downside end face of the illumination fixed block 101, the 5th ventilation pipe 38 it is upper
It is fixedly installed mist detecting device on the inner wall of side, warning light 102 is bright when having smog to pass through in the 5th ventilation pipe 38
It rises.
The course of work of the present apparatus, bleed motor 94 start, and then drive extraction fan 96 to rotate by shaft, Jin Ertong
The required air purified is pumped into the second cavity 42 of upside by the second through-hole 75 for crossing third ventilation pipe 36 and upside,
In the process, the lower end surface of the 5th ventilation pipe 38 is closed by the upper surface of module body 74, at this time dirty sky
It is discharged after the purification that gas passes through activated carbon block 44 by the first ventilation pipe 46, when the gas concentration detector 43 of upside detects
The activated carbon block 44 of upside can not be after air filtering and when the larger gas concentration in the second cavity 42 of upside, first motor 35
Starting meets people and drives the first switch block 34 to turn over 90 degree by shaft, and then drive module body 74 turns over 90 degree, and at this time the
Three ventilation pipes 36 and the second cavity 42 of upside are spaced, and the air being drawn at this time by the first air extractor 37 passes through the
Two notches 76 and the 5th ventilation pipe 38 turn again in original air cavity, and the 4th motor 56 starts at this time, and then pass through second
Thick stick 59 drive Four-slider 58 be moved to the left, and then drive the first sliding block 61 be moved to the left, and then drive spline link block 54 to
It moving left and is caught in spline 53, the second motor 62 starts at this time, and then the first link block 52 is driven to turn over 180 degree,
And then the second switch block 29 is driven to turn over 180 degree, and then drive ventilation block 28 to turn over 180 degree, and then drive up and down
The second clean cavity 42 is gone to upside in turn by 42 reversing of position of the second cavity of side, and first motor 35 drives first turn at this time
Block 34 turns over 90 degree, and 38 lower ending opening of the 5th ventilation pipe is closed again at this time, can pass through the second clean cavity at this time
42 continue air cleaning, are ported to downside simultaneous with the second cavity 42 of a large amount of soot particulates, at this time the 4th motor 56
Reversion, and then drive Four-slider 58 to move to right to greatest extent in third sliding slot 57 by the second lead screw 59, and then drive first
Sliding block 61 moves to right to greatest extent so that first gear 64 is engaged with second gear 65, while resistive heater 49 obtains electric generation
Heat, the second motor 62 is again started up at this time, and then drives first gear 64 to rotate by shaft, and then drives second gear 65
Rotation, so drive third switch block 73 rotate, and then drive fan blades 68 rotate, and then the heat that resistive heater 49 is generated with
And air is pumped into the second cavity 42 with high concentration soot dust granule, high temperature makes the cigarette being adsorbed on activated carbon block 44 at this time
Dirt particle falls off and passes through the second through-hole 75 of downside and high concentration soot dust granule is blown in collecting chamber by the 4th ventilation pipe 32
And gas collection is carried out, and in the process, when block 28 of ventilating rotates and the second cavity 42 of upper and lower sides is driven to convert position, third electricity
Machine 21 starts, and then drives the second sliding block 22 to be moved to the left by the first lead screw 24, and then third sliding block 23 is driven to be caught in downside
The first notch 26 in, and then prevent ventilation block 28 occur rotation.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, and the course of work of the present apparatus, bleed motor
Starting, and then extraction fan rotation is driven by shaft, and then will be required by third ventilation pipe and the second through-hole of upside
The air purified is pumped into the second cavity of upside, and in the process, the lower end surface of the 5th ventilation pipe passes through component master
The upper surface of body is closed, and is discharged after the purification that dirty air passes through activated carbon block at this time by the first ventilation pipe, when
The gas concentration detector of upside detects that the activated carbon block of upside can not gas after air filtering and in the second cavity of upside
When bulk concentration is larger, first motor starting meets people and drives the first switch block to turn over 90 degree by shaft, and then drives module body
90 degree are turned over, third ventilation pipe and the second cavity of upside are spaced at this time, are drawn at this time by the first air extractor
Air turned again in original air cavity by the second notch and the 5th ventilation pipe, the 4th electric motor starting at this time, and then pass through
Second lead screw drives Four-slider to be moved to the left, and then the first sliding block is driven to be moved to the left, and then drives spline link block to the left
It moves and is caught in spline, at this time the second electric motor starting, and then drive the first link block to turn over 180 degree, and then drive
Second switch block turns over 180 degree, and then drives ventilation block to turn over 180 degree, and then drive the second cavity of upper and lower sides
The second clean cavity is gone to upside in turn by reversing of position, and first motor drives the first switch block to turn over 90 degree at this time, at this time
5th ventilation pipe lower ending opening is closed again, can continue air cleaning by the second clean cavity at this time, simultaneously
The second cavity with a large amount of soot particulates is ported to downside, the 4th motor reversal at this time, and then drives the by the second lead screw
Four-slider moves to right to greatest extent in third sliding slot, so drive the first sliding block move to right to greatest extent so that first gear with
Second gear engagement, while resistive heater obtains electric generation heat, the second motor is again started up at this time, and then is driven by shaft
First gear rotation, and then second gear rotation is driven, and then drive the rotation of third switch block, and then drive fan blades rotation, in turn
The heat and air that resistive heater is generated are pumped into the second cavity with high concentration soot dust granule, and high temperature makes at this time
The soot dust granule being adsorbed on activated carbon block falls off and the second through-hole for passing through downside and the 4th ventilation pipe are by high concentration flue dust
Particle is blown in collecting chamber and carries out gas collection, in the process, when ventilation block rotates and the second cavity of upper and lower sides is driven to convert
When position, third electric motor starting, and then drive the second sliding block to be moved to the left by the first lead screw, and then third sliding block is driven to be caught in
In first notch of downside, so prevent ventilation block occur rotation, by the present apparatus can the case where being changed without filter bag it is long-term
The catharsis to industrial waste gas is carried out, in the process, what the present apparatus can be intelligent carries out the soot dust granule in industrial waste gas
Purification, and the soot dust granule of absorption is recycled, it is not necessarily to human interference, only need to periodically be overhauled, present apparatus intelligence
Change degree is high, easy to operate, is worth recommending.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention
Protection scope should be determined by the scope of protection defined in the claims.
Claims (9)
1. a kind of automation gas collecting apparatus, including apparatus main body are set to the intracorporal gas collecting apparatus of described device master and setting
In the intracorporal suggestion device of described device master, the gas collecting apparatus includes setting and intracorporal first cavity of described device master, institute
First annular groove that is provided with that the first cavity is connected on the side wall of inner left wall is stated, in the inner left wall of first cavity
It is fixedly installed first motor, the left end of the first motor is connected with by shaft power can be in first cavity
First switch block of rotation, is provided with the ventilation component that can be rotated in first annular groove on first switch block, and described first
The right side of switch block and it is located in first cavity and is rotatably provided with the second switch block, the right end of first switch block is by turning
Axis is rotatably assorted in the left end face for being connected to second switch block, on the side inner wall of first cavity and is located at described the
The surrounding of two switch blocks is provided with cricoid second annular groove, is rotatably provided in second annular groove and is fixedly connected on described
Ventilation block on two switch blocks is provided with the second cavity about second switch block is symmetrical above and below in the ventilation block, and described second
The first connector, the right side of second annular groove on the right side of first connector of upside are provided on the right side inner wall of cavity
It is provided in inside and is connected to extraneous the first ventilation pipe with first connector, on the right side of first connector of downside
It is provided in the right side inner wall of second annular groove and is connected to second annular groove and the second extraneous ventilation pipe, described second is logical
It is provided with heating device in feed channel, is provided with the second connector in the inner left wall of second cavity, described the of upside
It is provided in the inner left wall of second annular groove on the left of two connectors and is connected to second annular groove and extraneous third ventilation
Pipeline, the third ventilation pipe are connected with first annular groove, and is fixedly installed on the third ventilation pipe inner wall
One air extractor is provided with connection described the in the inner left wall of second annular groove on the left of second connector of downside
Two annular grooves and the 4th extraneous ventilation pipe, the 4th ventilation pipe are connected with first annular groove, first cavity
Right side inner wall in be provided with third cavity, set between inner wall on the right side of the inner left wall of the third cavity and first cavity
It is equipped with the first company hole, the right end of second switch block is fixedly connected with the first connecting shaft for extending and being passed through in first company hole, institute
The right end for stating the first connecting shaft is fixedly connected with the first link block, and opening is provided in the right end face of first link block to the right
Spline, be provided with the first sliding block that can be horizontally slipped in the third cavity, be provided with shifting on the upside of first sliding block
Device is moved, the second motor is fixedly installed in first sliding block, the left end of second motor is connected by the cooperation of shaft power
It is connected to the spline link block matched with the spline, what is be connected in the right side inner wall of the third cavity is provided with the 4th
The right end of cavity, second motor is connected with first gear by shaft power, and the 4th cavity is in right side
It is provided with the second of opening upwards in the downside inner wall of wall and connects hole, is rotatably assorted between the left and right sides inner wall in second company hole
It is connected with the second gear being meshed with the first gear, on the side inner wall of second ventilation pipe and is located at described the
It is fixedly installed cricoid first fixed block on the downside of two company holes, is provided on first fixed block and second ventilation pipe
Be connected and with second company third annular groove that is connected of hole lower end, be rotatably assorted connection in the third annular groove by change
There is third switch block, the ring gear being meshed with the second gear is fixedly installed on the outside inner wall of the third switch block, it is described
Left and right is provided through first through hole in third switch block, is fixedly installed fan blades on the inner wall of the first through hole.
2. a kind of automation gas collecting apparatus according to claim 1, it is characterised in that: the upper of block right end face of ventilating
End and lower end are provided with the first notch, downside inner wall of second annular groove close to right side about second switch block is symmetrical above and below
What is be inside connected is provided with first sliding groove, and what is be connected in the upper inside walls of the first sliding groove is provided with second sliding slot, described
Third motor is fixedly installed in the right side inner wall of first sliding groove, the left end power of the third motor is connected with first
The left end of thick stick, first lead screw is rotatably assorted in the inner left wall for being connected to the first sliding groove by bearing, and described first
The second sliding block that can be horizontally slipped and be meshed with first lead screw is provided in sliding slot, on the upper surface of second sliding block
It is fixedly connected with the third sliding block for extending and being passed through and matching in the second sliding slot and with first notch.
3. a kind of automation gas collecting apparatus according to claim 1, it is characterised in that: the ventilation component includes fixed connects
The module body being connected on first switch block, symmetrical above and below in the module body and left and right are provided through the second through-hole,
Opening is provided in the left end face of second through-hole to the left and the second notch of outward opening, the upside of first annular groove
The 5th ventilation pipe is provided with and communicated between the external world in inner wall.
4. a kind of automation gas collecting apparatus according to claim 1, it is characterised in that: the heating device includes being set to
The 5th cavity being connected in the inner wall of second ventilation pipe side and with second ventilation pipe, in the 5th cavity
It is arranged with resistive heater.
5. a kind of automation gas collecting apparatus according to claim 1, it is characterised in that: the mobile device includes being connected
The third sliding slot being set in the third cavity upper inside walls, be fixedly installed in the right side inner wall of the third sliding slot
Four motors, the right end power of the 4th motor are connected with the second lead screw, and the right end of second lead screw is turned by bearing
Dynamic mating connection is logical on the right side inner wall of the third sliding slot, being fixedly connected with extension on the upside end face of first sliding block
The Four-slider for entering in the third sliding slot and being cooperatively connected with second threads of lead screw.
6. a kind of automation gas collecting apparatus according to claim 1, it is characterised in that: first air extractor includes solid
Surely the cricoid pumping fixed block being connected on the third ventilation pipe inner wall, the ring-type fixed block are interior solid by fixed frame
Surely it is connected with bleed motor fixed block, bleed motor is fixedly installed in the bleed motor fixed block, the bleed motor
Left end is connected with extraction fan by shaft power, be connected by power the shaft in the bleed motor left end with it is described
Sealing ring is connected between bleed motor fixed block left end face.
7. a kind of automation gas collecting apparatus according to claim 1, it is characterised in that: the side of the second cavity right end
Activated carbon block is fixedly connected on end face, the activated carbon block is miscellaneous to adsorb the flue dust in the gas by second cavity
Object etc..
8. a kind of automation gas collecting apparatus according to claim 1, it is characterised in that: second cavity is close to described
Gas concentration detector is fixedly installed on the right side inner wall of two switch blocks, the gas concentration detector is to detect described second
Dust concentration in cavity.
9. a kind of automation gas collecting apparatus according to claim 1, it is characterised in that: the suggestion device includes fixed connects
It is connected to the illumination fixed block of end face right end on the downside of described device main body, is fixedly installed on the downside end face of the illumination fixed block
Warning light is fixedly installed mist detecting device in the upper inside walls of the 5th ventilation pipe, when the 5th ventilation pipe
Warning light lights when inside having smog to pass through.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810437889.8A CN109107366A (en) | 2018-05-09 | 2018-05-09 | A kind of automation gas collecting apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810437889.8A CN109107366A (en) | 2018-05-09 | 2018-05-09 | A kind of automation gas collecting apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109107366A true CN109107366A (en) | 2019-01-01 |
Family
ID=64822327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810437889.8A Withdrawn CN109107366A (en) | 2018-05-09 | 2018-05-09 | A kind of automation gas collecting apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109107366A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110513794A (en) * | 2019-09-29 | 2019-11-29 | 程鹏 | A kind of repetitive air cleaning unit based on filter membrane filtering |
CN110960938A (en) * | 2019-12-15 | 2020-04-07 | 胡斌 | Ventilation filtering system based on active carbon filtration |
CN113828072A (en) * | 2021-10-29 | 2021-12-24 | 中科深兰(福建)环境科技有限责任公司 | Residue treatment device for filtering industrial waste gas and use method thereof |
-
2018
- 2018-05-09 CN CN201810437889.8A patent/CN109107366A/en not_active Withdrawn
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110513794A (en) * | 2019-09-29 | 2019-11-29 | 程鹏 | A kind of repetitive air cleaning unit based on filter membrane filtering |
CN110960938A (en) * | 2019-12-15 | 2020-04-07 | 胡斌 | Ventilation filtering system based on active carbon filtration |
CN110960938B (en) * | 2019-12-15 | 2020-12-04 | 山西新辉活性炭有限公司 | Ventilation filtering system based on active carbon filtration |
CN113828072A (en) * | 2021-10-29 | 2021-12-24 | 中科深兰(福建)环境科技有限责任公司 | Residue treatment device for filtering industrial waste gas and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109107309A (en) | A kind of integrated intelligent gas collecting apparatus | |
CN109107366A (en) | A kind of automation gas collecting apparatus | |
CN209490605U (en) | A kind of industrial waste gas processing system | |
CN213433723U (en) | Zeolite runner adsorbs desorption equipment | |
CN111632448B (en) | Industrial waste gas purification device for coal combustion and working method | |
CN211069430U (en) | Industrial waste gas purification device | |
CN203634991U (en) | Novel stand-alone smoke purifier | |
CN207871775U (en) | A kind of smart home air cleaner of intelligent and high-efficiency | |
CN108626152B (en) | A kind of environmentally friendly intelligent gas collecting apparatus | |
CN108310876B (en) | A kind of intelligent gas collecting apparatus for hot dip galvanizing production process exhaust-gas treatment | |
CN108786305A (en) | A kind of intelligentized air pollution control device | |
CN104841227A (en) | Household air purifier and purification and regeneration process thereof | |
CN208975534U (en) | A kind of low concentration VOCs photocatalysis apparatus | |
CN207493467U (en) | A kind of organic waste gas treatment device | |
CN109550355A (en) | Rotary-type organic waste gas concentrating machine | |
CN108854328A (en) | A kind of air pollution control device | |
CN108854364A (en) | A kind of integrated air pollution control device | |
CN215539265U (en) | RTO catalytic combustion equipment with zeolite molecular sieve runner adsorbs concentration | |
CN205517128U (en) | Flue gas adsorbs purification unit | |
CN214106321U (en) | Electric furnace smelting dust removal equipment | |
CN209662963U (en) | Rotary-type organic waste gas concentrating machine | |
CN207308098U (en) | A kind of dust-extraction unit with rotation type static board | |
CN219596225U (en) | Electrical particle purifying and adsorbing device of thermal power plant | |
CN110090500A (en) | A kind of exhaust fan started automatically | |
CN219441075U (en) | Solid impurity treatment device in industrial waste gas |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190101 |