CN109107309A - A kind of integrated intelligent gas collecting apparatus - Google Patents

A kind of integrated intelligent gas collecting apparatus Download PDF

Info

Publication number
CN109107309A
CN109107309A CN201810437208.8A CN201810437208A CN109107309A CN 109107309 A CN109107309 A CN 109107309A CN 201810437208 A CN201810437208 A CN 201810437208A CN 109107309 A CN109107309 A CN 109107309A
Authority
CN
China
Prior art keywords
cavity
wall
block
annular groove
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810437208.8A
Other languages
Chinese (zh)
Inventor
何昊充
余芳珺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810437208.8A priority Critical patent/CN109107309A/en
Publication of CN109107309A publication Critical patent/CN109107309A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D49/00Separating dispersed particles from gases, air or vapours by other methods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B15/00Preventing escape of dirt or fumes from the area where they are produced; Collecting or removing dirt or fumes from that area
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/06Investigating concentration of particle suspensions

Landscapes

  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The invention discloses a kind of integrated intelligent gas collecting apparatus, including apparatus main body, the solar energy equipment for being set to the intracorporal gas collecting apparatus of described device master and being set in described device main body, the gas collecting apparatus includes setting and intracorporal first cavity of described device master, what first cavity was connected on the side wall of inner left wall is provided with the first annular groove, first motor is fixedly installed in the inner left wall of first cavity, the left end of the first motor is connected with the first switch block that can be rotated in first cavity by shaft power, the ventilation component that can be rotated in first annular groove is provided on first switch block.

Description

A kind of integrated intelligent gas collecting apparatus
Technical field
The present invention relates to industrial waste gas purifying technical field, specifically a kind of integrated intelligent gas collecting apparatus.
Background technique
In the today for advocating Green Development, the industrial waste gas generated in plant produced require to carry out purification it is qualified after ability Discharged, in the factory using being at most also the minimum when exhaust dust device with bag of cost, this device be only capable of removing dust and Other deleterious particles can not be purified, therefore also need additional other cleaning equipments, virtually also increased production cost, Need timing by manually carrying out replacement absorbent packet using bag dust-removing method simultaneously, it is time-consuming and laborious, therefore designing one kind can be to work Flue dust and other deleterious particles in industry exhaust gas carry out adsorption cleaning, and intelligent can be collected soot dust granule without people For replacement the integrated intelligent gas collecting apparatus of one kind it is really necessary to.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of integrated intelligent gas collecting apparatus, are able to solve above-mentioned The problems in present technology.
The present invention is achieved through the following technical solutions: the integrated intelligent gas collecting apparatus of one kind of the invention, packet Apparatus main body is included, the intracorporal gas collecting apparatus of described device master and the solar energy being set in described device main body dress are set to It sets, the gas collecting apparatus includes setting and intracorporal first cavity of described device master, and first cavity is close to inner left wall What is be connected on side wall is provided with the first annular groove, is fixedly installed first motor in the inner left wall of first cavity, described The left end of first motor is connected with the first switch block that can be rotated in first cavity by shaft power, and described first It is provided with the ventilation component that can be rotated in first annular groove on switch block, the right side of first switch block and is located at described first The second switch block is rotatably provided in cavity, the right end of first switch block is rotatably assorted by shaft is connected to described second In the left end face of switch block, it is provided on the side inner wall of first cavity and positioned at the surrounding of second switch block cricoid Second annular groove is rotatably provided with the ventilation block being fixedly connected on second switch block in second annular groove, described logical The second cavity is provided with about second switch block is symmetrical above and below in air parcel, the is provided on the right side inner wall of second cavity One connector, inside the right side of second annular groove on the right side of first connector of upside in be provided with that connection is extraneous and institute The first ventilation pipe of the first connector is stated, in the right side inner wall of second annular groove on the right side of first connector of downside It is provided with and is connected to second annular groove and the second extraneous ventilation pipe, be provided with heating device in second ventilation pipe, The second connector, second ring on the left of second connector of upside are provided in the inner left wall of second cavity It is provided in the inner left wall of slot and is connected to second annular groove and extraneous third ventilation pipe, the third ventilation pipe and institute It states the first annular groove to be connected, is fixedly installed the first air extractor on the third ventilation pipe inner wall, described the second of downside It is provided in the inner left wall of second annular groove on the left of connector and is connected to second annular groove and the 4th extraneous snorkel Road, the 4th ventilation pipe are connected with first annular groove, and third sky is provided in the right side inner wall of first cavity Chamber, is provided with the first company hole on the right side of the inner left wall of the third cavity and first cavity between inner wall, and described second turn The right end of block is fixedly connected with the first connecting shaft for extending and being passed through in first company hole, and the right end of first connecting shaft is fixedly connected There is the first link block, be provided with opening spline to the right in the right end face of first link block, in the third cavity It is provided with the first sliding block that can be horizontally slipped, mobile device is provided on the upside of first sliding block, is consolidated in first sliding block Surely it is provided with the second motor, the left end of second motor is connected with by shaft power to be matched with the spline Spline link block, what is be connected in the right side inner wall of the third cavity is provided with the 4th cavity, the right end of second motor It is connected with first gear by shaft power, the 4th cavity is provided with opening in the downside inner wall of right side inner wall Upward second connects hole, is rotatably assorted to be connected between the left and right sides inner wall in second company hole and mutually nibble with the first gear The second gear of conjunction on the side inner wall of second ventilation pipe and is located on the downside of second company hole and is fixedly installed ring-type The first fixed block, be provided on first fixed block and be connected with second ventilation pipe and connect under hole with described second The third annular groove being connected is held, is rotatably assorted in the third annular groove by change and is connected with third switch block, the third switch block Outside inner wall on be fixedly installed the ring gear being meshed with the second gear, left and right is provided through in the third switch block First through hole is fixedly installed fan blades on the inner wall of the first through hole.
As a preferred technical solution, it is described ventilation block right end face upper end and lower end about second switch block above and below It is symmetrically arranged with the first notch, what second annular groove was connected in the downside inner wall on right side is provided with first sliding groove, institute State the second sliding slot that is provided with being connected in the upper inside walls of first sliding groove, fixed setting in the right side inner wall of the first sliding groove There is third motor, the left end power of the third motor is connected with the first lead screw, and the left end of first lead screw passes through axis Forward it is dynamic be cooperatively connected in the inner left wall of the first sliding groove, be provided in the first sliding groove can horizontally slip and with institute The second sliding block that the first lead screw is meshed is stated, extension is fixedly connected on the upper surface of second sliding block and is passed through second cunning The third sliding block matched in slot and with first notch.
The ventilation component includes the component master being fixedly connected on first switch block as a preferred technical solution, Body, symmetrical above and below in the module body and left and right are provided through the second through-hole, set in the left end face of second through-hole Be equipped with opening to the left and the second notch of outward opening, in the upper inside walls of first annular groove with it is extraneous between is provided with and communicated with 5th ventilation pipe.
As a preferred technical solution, the heating device include be set in the inner wall of second ventilation pipe side and The 5th cavity being connected with second ventilation pipe is arranged with resistive heater in the 5th cavity.
As a preferred technical solution, the mobile device include be connected be set to the third cavity upper inside walls Interior third sliding slot, the 4th motor is fixedly installed in the right side inner wall of the third sliding slot, and the right end of the 4th motor is dynamic Force-fitting is connected with the second lead screw, and the right end of second lead screw is rotatably assorted by bearing is connected to the right side of the third sliding slot On the inner wall of side, it is fixedly connected with extension on the upside end face of first sliding block and is passed through in the third sliding slot and with described second The Four-slider that threads of lead screw is cooperatively connected.
First air extractor includes being fixedly connected on the third ventilation pipe inner wall as a preferred technical solution, On cricoid pumping fixed block, bleed motor fixed block is fixedly connected with by fixed frame in the ring-type fixed block, it is described Bleed motor is fixedly installed in bleed motor fixed block, the left end of the bleed motor is connected with pumping by shaft power Air fan is connected by power and matches between the shaft and the bleed motor fixed block left end face of the bleed motor left end Conjunction is connected with sealing ring.
It is fixedly connected with activated carbon block on all side end faces of the second cavity right end as a preferred technical solution, institute Activated carbon block is stated to adsorb the flue dust sundries etc. in the gas by second cavity.
Second cavity is fixedly installed on the right side inner wall of second switch block as a preferred technical solution, Gas concentration detector, the gas concentration detector is to detect the dust concentration in second cavity.
The solar energy equipment includes being fixedly connected on described device main body by connection frame as a preferred technical solution, Solar energy fixed plate on the end face of upside is fixedly installed solar panels on the upside end face of the solar energy fixed plate, described The battery being electrically connected with the solar panels is fixedly installed in apparatus main body.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, and the course of work of the present apparatus, bleed motor Starting, and then extraction fan rotation is driven by shaft, and then will be required by third ventilation pipe and the second through-hole of upside The air purified is pumped into the second cavity of upside, and in the process, the lower end surface of the 5th ventilation pipe passes through component master The upper surface of body is closed, and is discharged after the purification that dirty air passes through activated carbon block at this time by the first ventilation pipe, when The gas concentration detector of upside detects that the activated carbon block of upside can not gas after air filtering and in the second cavity of upside When bulk concentration is larger, first motor starting meets people and drives the first switch block to turn over 90 degree by shaft, and then drives module body 90 degree are turned over, third ventilation pipe and the second cavity of upside are spaced at this time, are drawn at this time by the first air extractor Air turned again in original air cavity by the second notch and the 5th ventilation pipe, the 4th electric motor starting at this time, and then pass through Second lead screw drives Four-slider to be moved to the left, and then the first sliding block is driven to be moved to the left, and then drives spline link block to the left It moves and is caught in spline, at this time the second electric motor starting, and then drive the first link block to turn over 180 degree, and then drive Second switch block turns over 180 degree, and then drives ventilation block to turn over 180 degree, and then drive the second cavity of upper and lower sides The second clean cavity is gone to upside in turn by reversing of position, and first motor drives the first switch block to turn over 90 degree at this time, at this time 5th ventilation pipe lower ending opening is closed again, can continue air cleaning by the second clean cavity at this time, simultaneously The second cavity with a large amount of soot particulates is ported to downside, the 4th motor reversal at this time, and then drives the by the second lead screw Four-slider moves to right to greatest extent in third sliding slot, so drive the first sliding block move to right to greatest extent so that first gear with Second gear engagement, while resistive heater obtains electric generation heat, the second motor is again started up at this time, and then is driven by shaft First gear rotation, and then second gear rotation is driven, and then drive the rotation of third switch block, and then drive fan blades rotation, in turn The heat and air that resistive heater is generated are pumped into the second cavity with high concentration soot dust granule, and high temperature makes at this time The soot dust granule being adsorbed on activated carbon block falls off and the second through-hole for passing through downside and the 4th ventilation pipe are by high concentration flue dust Particle is blown in collecting chamber and carries out gas collection, in the process, when ventilation block rotates and the second cavity of upper and lower sides is driven to convert When position, third electric motor starting, and then drive the second sliding block to be moved to the left by the first lead screw, and then third sliding block is driven to be caught in In first notch of downside, so prevent ventilation block occur rotation, by the present apparatus can the case where being changed without filter bag it is long-term The catharsis to industrial waste gas is carried out, in the process, what the present apparatus can be intelligent carries out the soot dust granule in industrial waste gas Purification, and the soot dust granule of absorption is recycled, it is not necessarily to human interference, only need to periodically be overhauled, present apparatus intelligence Change degree is high, easy to operate, is worth recommending.
Detailed description of the invention
The present invention is described in detail by following specific embodiments and drawings for ease of explanation,.
Fig. 1 is the schematic diagram of internal structure of the integrated intelligent gas collecting apparatus of one kind of the invention;
Fig. 2 is the enlarged diagram of " A " in Fig. 1;
Fig. 3 is the enlarged diagram of " B " in Fig. 2;
Fig. 4 is the structural schematic diagram of the ventilation component in the present invention;
Fig. 5 is the structural schematic diagram of the first air extractor in the present invention.
Specific embodiment
As Figure 1-Figure 5, the integrated intelligent gas collecting apparatus of one kind of the invention, including apparatus main body 11, are set to Gas collecting apparatus in described device main body 11 and the solar energy equipment being set in described device main body 11, the gas collecting apparatus It is connected on the side wall of inner left wall including being arranged with the first cavity 33 in described device main body 11, first cavity 33 Logical is provided with the first annular groove 30, is fixedly installed first motor 35 in the inner left wall of first cavity 33, and described first The left end of motor 35 is connected with the first switch block 34 that can be rotated in first cavity 33 by shaft power, and described The ventilation component 31 that can be rotated in first annular groove 30, the right side and position of first switch block 34 are provided on one switch block 34 In being rotatably provided with the second switch block 29 in first cavity 33, the right end of first switch block 34 is matched by shaft rotation Conjunction is connected in the left end face of second switch block 29, on the side inner wall of first cavity 33 and is located at described second turn The surrounding of block 29 is provided with cricoid second annular groove 39, is rotatably provided with described in being fixedly connected in second annular groove 29 Ventilation block 28 on second switch block 29 is provided with the second cavity about second switch block 29 is symmetrical above and below in the ventilation block 28 42, the first connector 45 is provided on the right side inner wall of second cavity 42, first connector, 45 right side of upside Extraneous the first ventilation pipe 46 with first connector 45 of connection is provided in inside the right side of second annular groove 39, under Connection second annular groove 39 is provided in the right side inner wall of second annular groove 39 on first connector, 45 right side of side With the second extraneous ventilation pipe 47, heating device, a left side for second cavity 42 are provided in second ventilation pipe 47 The second connector 41 is provided on the inner wall of side, in the left side of second annular groove 39 in second connector, 41 left side of upside It is provided in wall and is connected to second annular groove 39 and extraneous third ventilation pipe 36, the third ventilation pipe 36 and described the One annular groove 30 is connected, and is fixedly installed the first air extractor 37 on 36 inner wall of third ventilation pipe, and described the of downside Connection second annular groove 39 and extraneous the are provided in the inner left wall of second annular groove 39 in the left side of two connector 41 Four ventilation pipes 32, the 4th ventilation pipe are connected with first annular groove 30, the right side inner wall of first cavity 33 It is inside provided with third cavity 60, is provided between 33 right side inner wall of the inner left wall of the third cavity 60 and first cavity First connects hole 55, and the right end of second switch block 29 is fixedly connected with the first connecting shaft for extending and being passed through in first company hole 55 51, the right end of first connecting shaft 51 is fixedly connected with the first link block 52, sets in the right end face of first link block 52 It is equipped with opening spline 53 to the right, is provided with the first sliding block 61 that can be horizontally slipped in the third cavity 60, described first The upside of sliding block 61 is provided with mobile device, and the second motor 62, second motor are fixedly installed in first sliding block 61 62 left end is connected with the spline link block 54 matched with the spline 53, the third cavity by shaft power What is be connected in 60 right side inner wall is provided with the 4th cavity 63, and the right end of second motor 62 is connected by the cooperation of shaft power It is connected to first gear 64, the 4th cavity 63 is provided with the second company hole of opening upwards in the downside inner wall of right side inner wall 66, described second connects second for being connected with and being meshed with the first gear 64 that be rotatably assorted between the left and right sides inner wall in hole 66 Gear 65, on the side inner wall of second ventilation pipe 47 and be located on the downside of second company hole 66 be fixedly installed it is cricoid First fixed block 71 is provided on first fixed block 71 and is connected with second ventilation pipe 47 and connects with described second The third annular groove 72 that 66 lower end of hole is connected, interior be rotatably assorted by change of third annular groove 72 are connected with third switch block 73, The ring gear 69 being meshed with the second gear 65 is fixedly installed on the outside inner wall of the third switch block 73, the third turns Left and right is provided through first through hole 67 in block 73, is fixedly installed fan blades 68 on the inner wall of the first through hole 67.
Valuably, the upper end and lower end of ventilation 28 right end face of block are about second switch block 29 setting symmetrical above and below There is the first notch 26, what second annular groove 39 was connected in the downside inner wall on right side is provided with first sliding groove 27, described What is be connected in the upper inside walls of first sliding groove 27 is provided with second sliding slot 25, fixes in the right side inner wall of the first sliding groove 27 It is provided with third motor 21, the left end power of the third motor 21 is connected with the first lead screw 24, first lead screw 24 Left end be rotatably assorted in the inner left wall for being connected to the first sliding groove 27 by bearing, be provided in the first sliding groove 27 The second sliding block 22 that can be horizontally slipped and be meshed with first lead screw 24, it is fixed on the upper surface of second sliding block 22 to connect It is connected to the third sliding block 23 for extending and being passed through and matching in the second sliding slot 25 and with first notch 26.
Valuably, the ventilation component 31 includes the module body 74 being fixedly connected on first switch block 34, described Symmetrical above and below and left and right is provided through the second through-hole 75 in module body 74, is arranged in the left end face of second through-hole 75 There is opening to the left and the second notch 76 of outward opening, is connected to setting between the external world in the upper inside walls of first annular groove 30 There is the 5th ventilation pipe 38.
Valuably, the heating device includes being set in the 47 side inner wall of the second ventilation pipe and with described second The 5th cavity 48 that ventilation pipe 47 is connected is arranged with resistive heater 49 in the 5th cavity 48.
Valuably, the mobile device includes that the third being set in 60 upper inside walls of third cavity being connected is slided Slot 57 is fixedly installed the 4th motor 56, the right end power of the 4th motor 56 in the right side inner wall of the third sliding slot 57 It is connected with the second lead screw 59, the right end of second lead screw 59 is rotatably assorted by bearing is connected to the third sliding slot 57 Right side inner wall on, be fixedly connected on the upside end face of first sliding block 61 extension be passed through in the third sliding slot 57 and with Second lead screw 59 is threadedly engaged the Four-slider 58 of connection.
Valuably, first air extractor 37 includes the ring-type being fixedly connected on 36 inner wall of third ventilation pipe Pumping fixed block 91, bleed motor fixed block 93 is fixedly connected with by fixed frame 92 in the ring-type fixed block 91, it is described Bleed motor 94 is fixedly installed in bleed motor fixed block 93, the left end of the bleed motor 94 is connected by the cooperation of shaft power It is connected to extraction fan 96, the shaft and the bleed motor fixed block 93 being connected by power in 94 left end of bleed motor are left Sealing ring 95 is connected between side end face.
Valuably, activated carbon block 44, the active carbon are fixedly connected on all side end faces of 42 right end of the second cavity Block 44 is to adsorb the flue dust sundries etc. in the gas by second cavity 42.
Valuably, second cavity 42 is fixedly installed gas concentration on the right side inner wall of second switch block 29 Detector 43, the gas concentration detector 43 is to detect the dust concentration in second cavity 42.
Valuably, the solar energy equipment includes being fixedly connected on 11 upside end face of described device main body by connection frame Solar energy fixed plate 102, be fixedly installed solar panels 103, the dress on the upside end face of the solar energy fixed plate 102 Set the battery 104 for being fixedly installed in main body 11 and being electrically connected with the solar panels 103.
The course of work of the present apparatus, bleed motor 94 start, and then drive extraction fan 96 to rotate by shaft, Jin Ertong The required air purified is pumped into the second cavity 42 of upside by the second through-hole 75 for crossing third ventilation pipe 36 and upside, In the process, the lower end surface of the 5th ventilation pipe 38 is closed by the upper surface of module body 74, at this time dirty sky It is discharged after the purification that gas passes through activated carbon block 44 by the first ventilation pipe 46, when the gas concentration detector 43 of upside detects The activated carbon block 44 of upside can not be after air filtering and when the larger gas concentration in the second cavity 42 of upside, first motor 35 Starting meets people and drives the first switch block 34 to turn over 90 degree by shaft, and then drive module body 74 turns over 90 degree, and at this time the Three ventilation pipes 36 and the second cavity 42 of upside are spaced, and the air being drawn at this time by the first air extractor 37 passes through the Two notches 76 and the 5th ventilation pipe 38 turn again in original air cavity, and the 4th motor 56 starts at this time, and then pass through second Thick stick 59 drive Four-slider 58 be moved to the left, and then drive the first sliding block 61 be moved to the left, and then drive spline link block 54 to It moving left and is caught in spline 53, the second motor 62 starts at this time, and then the first link block 52 is driven to turn over 180 degree, And then the second switch block 29 is driven to turn over 180 degree, and then drive ventilation block 28 to turn over 180 degree, and then drive up and down The second clean cavity 42 is gone to upside in turn by 42 reversing of position of the second cavity of side, and first motor 35 drives first turn at this time Block 34 turns over 90 degree, and 38 lower ending opening of the 5th ventilation pipe is closed again at this time, can pass through the second clean cavity at this time 42 continue air cleaning, are ported to downside simultaneous with the second cavity 42 of a large amount of soot particulates, at this time the 4th motor 56 Reversion, and then drive Four-slider 58 to move to right to greatest extent in third sliding slot 57 by the second lead screw 59, and then drive first Sliding block 61 moves to right to greatest extent so that first gear 64 is engaged with second gear 65, while resistive heater 49 obtains electric generation Heat, the second motor 62 is again started up at this time, and then drives first gear 64 to rotate by shaft, and then drives second gear 65 Rotation, so drive third switch block 73 rotate, and then drive fan blades 68 rotate, and then the heat that resistive heater 49 is generated with And air is pumped into the second cavity 42 with high concentration soot dust granule, high temperature makes the cigarette being adsorbed on activated carbon block 44 at this time Dirt particle falls off and passes through the second through-hole 75 of downside and high concentration soot dust granule is blown in collecting chamber by the 4th ventilation pipe 32 And gas collection is carried out, and in the process, when block 28 of ventilating rotates and the second cavity 42 of upper and lower sides is driven to convert position, third electricity Machine 21 starts, and then drives the second sliding block 22 to be moved to the left by the first lead screw 24, and then third sliding block 23 is driven to be caught in downside The first notch 26 in, and then prevent ventilation block 28 occur rotation.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, and the course of work of the present apparatus, bleed motor Starting, and then extraction fan rotation is driven by shaft, and then will be required by third ventilation pipe and the second through-hole of upside The air purified is pumped into the second cavity of upside, and in the process, the lower end surface of the 5th ventilation pipe passes through component master The upper surface of body is closed, and is discharged after the purification that dirty air passes through activated carbon block at this time by the first ventilation pipe, when The gas concentration detector of upside detects that the activated carbon block of upside can not gas after air filtering and in the second cavity of upside When bulk concentration is larger, first motor starting meets people and drives the first switch block to turn over 90 degree by shaft, and then drives module body 90 degree are turned over, third ventilation pipe and the second cavity of upside are spaced at this time, are drawn at this time by the first air extractor Air turned again in original air cavity by the second notch and the 5th ventilation pipe, the 4th electric motor starting at this time, and then pass through Second lead screw drives Four-slider to be moved to the left, and then the first sliding block is driven to be moved to the left, and then drives spline link block to the left It moves and is caught in spline, at this time the second electric motor starting, and then drive the first link block to turn over 180 degree, and then drive Second switch block turns over 180 degree, and then drives ventilation block to turn over 180 degree, and then drive the second cavity of upper and lower sides The second clean cavity is gone to upside in turn by reversing of position, and first motor drives the first switch block to turn over 90 degree at this time, at this time 5th ventilation pipe lower ending opening is closed again, can continue air cleaning by the second clean cavity at this time, simultaneously The second cavity with a large amount of soot particulates is ported to downside, the 4th motor reversal at this time, and then drives the by the second lead screw Four-slider moves to right to greatest extent in third sliding slot, so drive the first sliding block move to right to greatest extent so that first gear with Second gear engagement, while resistive heater obtains electric generation heat, the second motor is again started up at this time, and then is driven by shaft First gear rotation, and then second gear rotation is driven, and then drive the rotation of third switch block, and then drive fan blades rotation, in turn The heat and air that resistive heater is generated are pumped into the second cavity with high concentration soot dust granule, and high temperature makes at this time The soot dust granule being adsorbed on activated carbon block falls off and the second through-hole for passing through downside and the 4th ventilation pipe are by high concentration flue dust Particle is blown in collecting chamber and carries out gas collection, in the process, when ventilation block rotates and the second cavity of upper and lower sides is driven to convert When position, third electric motor starting, and then drive the second sliding block to be moved to the left by the first lead screw, and then third sliding block is driven to be caught in In first notch of downside, so prevent ventilation block occur rotation, by the present apparatus can the case where being changed without filter bag it is long-term The catharsis to industrial waste gas is carried out, in the process, what the present apparatus can be intelligent carries out the soot dust granule in industrial waste gas Purification, and the soot dust granule of absorption is recycled, it is not necessarily to human interference, only need to periodically be overhauled, present apparatus intelligence Change degree is high, easy to operate, is worth recommending.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention Protection scope should be determined by the scope of protection defined in the claims.

Claims (9)

1. a kind of integrated intelligent gas collecting apparatus, including apparatus main body, be set to the intracorporal gas collecting apparatus of described device master with And it is set to the solar energy equipment in described device main body, the gas collecting apparatus includes setting and described device master intracorporal first Cavity, what first cavity was connected on the side wall of inner left wall is provided with the first annular groove, a left side for first cavity First motor is fixedly installed in the inner wall of side, the left end of the first motor is connected with by shaft power can be described The first switch block rotated in one cavity is provided with the ventilation component that can be rotated in first annular groove on first switch block, The right side of first switch block and be located at first cavity in be rotatably provided with the second switch block, the right side of first switch block End is rotatably assorted in the left end face for being connected to second switch block by shaft, on the side inner wall of first cavity and position The surrounding of second switch block is provided with cricoid second annular groove, is rotatably provided with and is fixedly connected in second annular groove Ventilation block on second switch block is provided with the second cavity about second switch block is symmetrical above and below in the ventilation block, The first connector, second ring on the right side of first connector of upside are provided on the right side inner wall of second cavity Extraneous the first ventilation pipe with first connector of connection, first connection of downside are provided in inside the right side of slot It is provided in the right side inner wall of second annular groove on the right side of mouthful and is connected to second annular groove and the second extraneous ventilation pipe, institute It states and is provided with heating device in the second ventilation pipe, be provided with the second connector, upside in the inner left wall of second cavity Second connector on the left of second annular groove inner left wall in be provided with connection second annular groove and extraneous Third ventilation pipe, the third ventilation pipe are connected with first annular groove, fixed on the third ventilation pipe inner wall It is provided with the first air extractor, the company of being provided in the inner left wall of second annular groove on the left of second connector of downside Lead to second annular groove and the 4th extraneous ventilation pipe, the 4th ventilation pipe is connected with first annular groove, described Be provided with third cavity in the right side inner wall of first cavity, on the right side of the inner left wall of the third cavity and first cavity in The first company hole is provided between wall, the right end of second switch block is fixedly connected with first for extending and being passed through in first company hole Connecting shaft, the right end of first connecting shaft are fixedly connected with the first link block, are provided in the right end face of first link block Opening spline to the right is provided with the first sliding block that can be horizontally slipped, the upside of first sliding block in the third cavity It is provided with mobile device, the second motor is fixedly installed in first sliding block, the left end of second motor is dynamic by shaft Force-fitting is connected with the spline link block matched with the spline, and what is be connected in the right side inner wall of the third cavity sets It is equipped with the 4th cavity, the right end of second motor is connected with first gear by shaft power, and the 4th cavity leans on The second of opening upwards are provided in the downside inner wall of nearly right side inner wall and connects hole, and described second connects between the left and right sides inner wall in hole Be rotatably assorted the second gear for being connected with and being meshed with the first gear, on the side inner wall of second ventilation pipe and position It is fixedly installed cricoid first fixed block on the downside of second company hole, is provided on first fixed block and described second Ventilation pipe is connected and connects the third annular groove that hole lower end is connected with described second, passes through change in the third annular groove and rotates It is connected with third switch block, is fixedly installed the tooth being meshed with the second gear on the outside inner wall of the third switch block Ring, the interior left and right of the third switch block are provided through first through hole, are fixedly installed fan blades on the inner wall of the first through hole.
2. the integrated intelligent gas collecting apparatus of one kind according to claim 1, it is characterised in that: the ventilation block right-hand end The upper end and lower end in face are provided with the first notch about second switch block is symmetrical above and below, and second annular groove is under right side What is be connected in the inner wall of side is provided with first sliding groove, and what is be connected in the upper inside walls of the first sliding groove is provided with the second cunning Slot, third motor is fixedly installed in the right side inner wall of the first sliding groove, and the left end power of the third motor is cooperatively connected There is the first lead screw, the left end of first lead screw is rotatably assorted in the inner left wall for being connected to the first sliding groove by bearing, The second sliding block that can be horizontally slipped and be meshed with first lead screw is provided in the first sliding groove, second sliding block The third sliding block for extending and being passed through and matching in the second sliding slot and with first notch is fixedly connected on upper surface.
3. the integrated intelligent gas collecting apparatus of one kind according to claim 1, it is characterised in that: the ventilation component includes The module body being fixedly connected on first switch block, symmetrical above and below in the module body and left and right are provided through second Through-hole is provided with opening in the left end face of second through-hole to the left and the second notch of outward opening, first annular groove Upper inside walls in it is extraneous between be provided with and communicated with the 5th ventilation pipe.
4. the integrated intelligent gas collecting apparatus of one kind according to claim 1, it is characterised in that: the heating device includes It is set to the 5th cavity being connected in the inner wall of second ventilation pipe side and with second ventilation pipe, the described 5th Resistive heater is arranged in cavity.
5. the integrated intelligent gas collecting apparatus of one kind according to claim 1, it is characterised in that: the mobile device includes The third sliding slot being set in the third cavity upper inside walls being connected, fixation is set in the right side inner wall of the third sliding slot It is equipped with the 4th motor, the right end power of the 4th motor is connected with the second lead screw, and the right end of second lead screw passes through Bearing is rotatably assorted on the right side inner wall for being connected to the third sliding slot, is fixedly connected on the upside end face of first sliding block Extend the Four-slider for being passed through in the third sliding slot and being cooperatively connected with second threads of lead screw.
6. the integrated intelligent gas collecting apparatus of one kind according to claim 1, it is characterised in that: first air extractor Including the cricoid pumping fixed block being fixedly connected on the third ventilation pipe inner wall, by solid in the ring-type fixed block Determine frame and be fixedly connected with bleed motor fixed block, bleed motor, the pumping are fixedly installed in the bleed motor fixed block The left end of motor is connected with extraction fan by shaft power, is connected by power in the shaft of the bleed motor left end Sealing ring is connected between the bleed motor fixed block left end face.
7. the integrated intelligent gas collecting apparatus of one kind according to claim 1, it is characterised in that: the second cavity right end All side end faces on be fixedly connected with activated carbon block, the activated carbon block is to adsorb in the gas by second cavity Flue dust sundries etc..
8. the integrated intelligent gas collecting apparatus of one kind according to claim 1, it is characterised in that: second cavity is close Gas concentration detector is fixedly installed on the right side inner wall of second switch block, the gas concentration detector is to detect State the dust concentration in the second cavity.
9. the integrated intelligent gas collecting apparatus of one kind according to claim 1, it is characterised in that: the solar energy equipment packet The solar energy fixed plate being fixedly connected on the end face of described device main body upside by connection frame is included, the solar energy fixed plate It is fixedly installed solar panels on the end face of upside, is fixedly installed in described device main body and is electrically connected with the solar panels Battery.
CN201810437208.8A 2018-05-09 2018-05-09 A kind of integrated intelligent gas collecting apparatus Withdrawn CN109107309A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810437208.8A CN109107309A (en) 2018-05-09 2018-05-09 A kind of integrated intelligent gas collecting apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810437208.8A CN109107309A (en) 2018-05-09 2018-05-09 A kind of integrated intelligent gas collecting apparatus

Publications (1)

Publication Number Publication Date
CN109107309A true CN109107309A (en) 2019-01-01

Family

ID=64821892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810437208.8A Withdrawn CN109107309A (en) 2018-05-09 2018-05-09 A kind of integrated intelligent gas collecting apparatus

Country Status (1)

Country Link
CN (1) CN109107309A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110081309A (en) * 2019-05-22 2019-08-02 新昌次长电子科技有限公司 A kind of portable volatile organic compounds collection controller
CN110141903A (en) * 2019-06-03 2019-08-20 嘉兴宜鸿贸易有限公司 A kind of filter can be used for filtering formaldehyde
CN110513794A (en) * 2019-09-29 2019-11-29 程鹏 A kind of repetitive air cleaning unit based on filter membrane filtering
CN114248294A (en) * 2021-12-23 2022-03-29 北京电子科技职业学院 Dust-resistant testing device of industrial robot under high-temperature environment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110081309A (en) * 2019-05-22 2019-08-02 新昌次长电子科技有限公司 A kind of portable volatile organic compounds collection controller
CN110141903A (en) * 2019-06-03 2019-08-20 嘉兴宜鸿贸易有限公司 A kind of filter can be used for filtering formaldehyde
CN110513794A (en) * 2019-09-29 2019-11-29 程鹏 A kind of repetitive air cleaning unit based on filter membrane filtering
CN114248294A (en) * 2021-12-23 2022-03-29 北京电子科技职业学院 Dust-resistant testing device of industrial robot under high-temperature environment
CN114248294B (en) * 2021-12-23 2023-06-13 北京电子科技职业学院 Dust-resistant testing device for industrial robot in high-temperature environment

Similar Documents

Publication Publication Date Title
CN109107309A (en) A kind of integrated intelligent gas collecting apparatus
CN213433723U (en) Zeolite runner adsorbs desorption equipment
CN109107366A (en) A kind of automation gas collecting apparatus
CN206281340U (en) A kind of smelting furnace with udst separation function
CN207871775U (en) A kind of smart home air cleaner of intelligent and high-efficiency
CN203634991U (en) Novel stand-alone smoke purifier
CN109621567A (en) A kind of air purifier with automatic dust removing effect
CN205690544U (en) A kind of movable air depurator
CN108626152B (en) A kind of environmentally friendly intelligent gas collecting apparatus
CN108786305A (en) A kind of intelligentized air pollution control device
CN108310876B (en) A kind of intelligent gas collecting apparatus for hot dip galvanizing production process exhaust-gas treatment
CN208398250U (en) A kind of window air purifier
CN211913062U (en) Waste gas purification device for desulfurization and denitrification of environmental protection engineering
CN111992031A (en) Furniture factory air pump heat energy recovery system of recycling
CN108854328A (en) A kind of air pollution control device
CN108854364A (en) A kind of integrated air pollution control device
CN216498148U (en) Methanol to olefin regeneration flue gas waste heat utilization and dust collector
CN215539265U (en) RTO catalytic combustion equipment with zeolite molecular sieve runner adsorbs concentration
CN105268258A (en) Swinging and blowing device of bag filter
CN205517128U (en) Flue gas adsorbs purification unit
CN213630455U (en) Adsorption and desorption waste gas catalytic combustion treatment device
CN210171111U (en) Novel aseptic workshop air edulcoration equipment
CN209271189U (en) A kind of photocatalyst removes the air purifier of VOC
CN209263205U (en) A kind of environmental protection air purifier
CN209423284U (en) A kind of runner all-in-one machine exhaust-gas treatment cleaning equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190101