A kind of offline electric network fault Response project generation method and its device Download PDFInfo
- Publication number
- CN109062993A CN109062993A CN201810721472.4A CN201810721472A CN109062993A CN 109062993 A CN109062993 A CN 109062993A CN 201810721472 A CN201810721472 A CN 201810721472A CN 109062993 A CN109062993 A CN 109062993A
- Authority
- CN
- China
- Prior art keywords
- prediction scheme
- fault
- accident
- failure
- electric network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 84
- 230000004044 response Effects 0.000 title claims abstract description 37
- 238000012545 processing Methods 0.000 claims description 16
- 230000008569 process Effects 0.000 claims description 10
- 238000004458 analytical method Methods 0.000 claims description 7
- 238000013024 troubleshooting Methods 0.000 claims description 7
- 238000011897 real-time detection Methods 0.000 claims description 4
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 230000006837 decompression Effects 0.000 claims description 3
- 230000005611 electricity Effects 0.000 claims description 3
- 238000012360 testing method Methods 0.000 claims description 3
- 238000004804 winding Methods 0.000 claims description 3
- 238000004891 communication Methods 0.000 claims description 2
- 230000001737 promoting effect Effects 0.000 abstract description 4
- 238000007726 management method Methods 0.000 description 5
- 230000004888 barrier function Effects 0.000 description 3
- 230000006378 damage Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000012502 risk assessment Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 230000015556 catabolic process Effects 0.000 description 2
- 238000004321 preservation Methods 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The application provides a kind of offline electric network fault Response project generation method and its device, and described method includes following steps: S10 works out corresponding failure handling program according to fault category, and generates failure handling program file;S20 parses the failure handling program file, and obtains failure handling program match condition according to target device and parsing and generate prediction scheme experts database;The prediction scheme information of the prediction scheme experts database is shown and is modified by S30;S40 is that fault warning equipment generates corresponding fault countermeasure, and carries out push and the graphical representation of fault countermeasure according to the prediction scheme experts database.Described device is for realizing the method, the application of the embodiment of the present application method and device thereof facilitates the safety and stability state that dispatcher understands power grid in time, the decision support that can obtain accident handling in advance is of great significance for promoting dispatcher's reply power grid significant trouble disposing capacity.
Description
Technical field
This application involves power grid intellectual analysis and control technology fields, and in particular to a kind of offline electric network fault Response project
Generation method and its device.
Background technique
Power grid security be related to national economy shape up and people life property safety, currently, China's power industry
It is in fast-developing period, the various high-risk events in power grid inside and outside and emergency event happen occasionally, facet when power grid security
Face serious threat, although having been achieved for more research achievement in terms of the electrical safety operation of power grid, power grid is deposited
It is in natural environment and social environment, inevitably intentionally or accidentally by the challenge of extreme natural conditions and from social environment
Damage or destruction.Meanwhile power grid disaster can also bring social environment and seriously affect, the research in terms of these is slightly inadequate.
The problems such as current electric grid method of operation is complicated, apparatus of load aggravates and power supply capacity is insufficient becomes increasingly conspicuous, electric power netting safe running
Pressure increasingly increase, electric network fault event also increasingly frequently, more serious consequence is brought to safe operation of electric network.
To sum up, risk assessment how is quickly carried out in management and running accident treatment and the scheduling optimal plan of emergency processing is provided
Slightly, to provide the accident treatment foundation for having reference value to management and running personnel, have become Power Grid Dispatching Work and need
The technical issues of solution.
Summary of the invention
The purpose of the application is to propose a kind of offline electric network fault Response project generation method and its device, to solve such as
Risk assessment is where quickly carried out in management and running accident treatment and scheduling emergency processing optimal policy is provided.
In order to realize the application purpose, it is raw that the application first aspect embodiment provides a kind of offline electric network fault Response project
At method, include the following steps:
S10 works out corresponding failure handling program according to fault category, and generates failure handling program file;
S20 parses the failure handling program file, and obtains failure handling program match condition according to target device and parsing
Generate prediction scheme experts database;
The prediction scheme information of the prediction scheme experts database is shown and is modified by S30;
S40 is that fault warning equipment generates corresponding fault countermeasure, and carries out pushing away for fault countermeasure according to the prediction scheme experts database
It send and graphical representation.
In some embodiments, the fault category includes comprehensive accident, equipment class accident and the important use of 110kV or more
Family accident;
Wherein, the comprehensive accident includes first and second failure of voltage transformer, circuit breaker lock, switch non-three phase, GIS device
Failure, typhoon, kite string winding, dispatch automated system failure, communication disruption and black starting-up accident scene;
Wherein, the equipment class accident includes that power grid emphasis to maintain equipment, 220kV and the above device fails will cause three-level
And the important equipment failure of the above event;
Wherein, 110kV or more the responsible consumer accident includes plant stand failure.
It is in some embodiments, described that work out corresponding failure handling program according to fault category include clear failure disposition
The organizational form of prediction scheme, unified and standard failure handling program format.
In some embodiments, the S20 includes:
S201 establishes electric network fault prediction scheme information service object, is solved according to the business object to failure handling program file
Analysis;
Pass through the names associate electricity of plant stand, exchange line segment, bus and transformer in S202 troubleshooting prediction scheme resolving
Pessimistic concurrency control obtains the associated device numbering of prediction scheme, and obtains mode after the method for operation in advance of fault countermeasure, failure, at accident
It sets process and to put information;
After S203 troubleshooting prediction scheme is parsed, plant stand, the accident handling prediction scheme of grid equipment are generated, forms prediction scheme expert
Library.
In some embodiments, the prediction scheme experts database includes plant stand Response project and equipment Response project.
In some embodiments, in the step S30, the plant stand Response project is for showing the list of decompression plant stand, factory
Station failure name, association plant stand number the method for operation, operation mode after accident and incident processing procedure and will put information before accident,
And it supports to the method for operation before accident, operation mode after accident, incident processing procedure and to put information and modify and perfect.
In some embodiments, in the step S30, the equipment Response project is used for the list of presentation device prediction scheme, sets
For the method for operation, operation mode after accident and incident processing procedure before failure title, associate device, accident and information is put, and
Support to the method for operation before associate device, accident, operation mode after accident, incident processing procedure and to put information modify and
It is perfect.
In some embodiments, the step S40 includes: real-time detection electric network fault event, and the power grid that will test
The corresponding device numbering of event of failure or plant stand, which are numbered, is dealt into each work station by messaging bus, and real-time reception disappears on work station
The faulty equipment number or plant stand number in bus are ceased, obtains from the prediction scheme experts database and is compiled with faulty equipment number or plant stand
Number corresponding fault countermeasure.
In some embodiments, the step S40 further include: multiple faulty equipments are numbered or plant stand is compiled if having in the short time
Number, then formation sequence, and each faulty equipment in sequence is obtained from the prediction scheme experts database and the faulty equipment pair
The fault countermeasure answered.
The application second aspect embodiment provides a kind of offline electric network fault Response project generating means, comprising:
Forecasting edited module for working out corresponding failure handling program according to fault category, and generates failure handling program text
Part;
Prediction scheme experts database produces module, for parsing the failure handling program file, and is obtained according to target device and parsing
Failure handling program match condition generates prediction scheme experts database;
Prediction scheme message processing module, for the prediction scheme experts database to be shown and modify;
Fault countermeasure produces module, for being that fault warning equipment generates corresponding fault countermeasure according to the prediction scheme experts database,
And the figure that pushes away for carrying out fault countermeasure is shown.
The embodiment of the present application method and device thereof at least have the advantages that
The embodiment of the present application method and device thereof are suitable for dispatching of power netwoks, can be in conjunction with regional electrical network feature, the method for operation and gas
The practical factors such as environment are waited, before physical fault generation, offline failure handling program is manually formulated according to predefined format in advance,
When using the embodiment of the present application method and device thereof, dispatcher is pre- in the offline accident handling of production control zone (the safe area I) importing
Case by prediction scheme information computerization and is put in storage preservations by document analysis, equipment matching, and the quick of prediction scheme is supported to have access to and online
Revision;After the safe area I comprehensive intelligent warning diagnostic failure, the fault countermeasure of Auto-matching prediction scheme experts database, and realize that prediction scheme pushes away
Figure.The application of the embodiment of the present application method and device thereof facilitates the safety and stability state that dispatcher understands power grid in time, can
The decision support for obtaining accident handling in advance copes with power grid significant trouble disposing capacity with important meaning for promoting dispatcher
Justice.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of application for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is offline electric network fault Response project generation method flow chart described in the embodiment of the present application.
Fig. 2 is offline electric network fault Response project generating means system framework figure described in the embodiment of the present application.
Specific embodiment
Various exemplary embodiments, feature and the aspect of the disclosure are described in detail below with reference to attached drawing.It is identical in attached drawing
Appended drawing reference indicate element functionally identical or similar.Although the various aspects of embodiment are shown in the attached drawings, remove
It non-specifically points out, it is not necessary to attached drawing drawn to scale.
In addition, giving numerous details in specific embodiment below to better illustrate the application.This
Field is it will be appreciated by the skilled person that without certain details, the application equally be can be implemented.In some instances, for this
Method known to the technical staff of field, means, element and circuit are not described in detail, in order to highlight the purport of the application.
The application first aspect embodiment provides a kind of offline electric network fault Response project generation method, and process can join
Fig. 1 is read, this method comprises the following steps:
S10 works out corresponding failure handling program according to fault category, and generates failure handling program file;
In step S10, it can be sent out in conjunction with practical factors such as regional electrical network feature, the method for operation and climatic environments in physical fault
Before death, offline failure handling program is manually formulated according to predefined format in advance;Such as the electric network fault disposition of Shenzhen area is pre-
Case then can with the practical factors such as Shenzhen Power Grid feature, the method for operation and multiple, the strong convection weather of Shenzhen coastal city typhoon according to
Predefined format manually formulates offline failure handling program in advance.
Specifically, in step S10 content include forecast failure implementor name, in advance after the method for operation, failure mode and
Four parts of disposal process and main points, the specific organizational form for determining accident handling prediction scheme, the prediction scheme format of constituting criterion are realized
The electronization of Response project generates the failure handling program file.
S20 parses the failure handling program file, and obtains failure handling program with parsing according to target device and match
Situation generates prediction scheme experts database;
In step S20, dispatcher imports offline accident handling prediction scheme in the dispatch automated system of production control zone (the safe area I)
File, by being parsed to obtain prediction scheme information to offline accident handling prediction scheme file, then according to target device object and in advance
Case information is matched one by one.
Specifically, step S20 obtains prediction scheme content by parsing offline failure handling program, and according to forecast failure name
In characteristic character split out equipment substring, and then accurately matched with the implementor name in database, it is corresponding to obtain prediction scheme
Equipment.To be resolved to prediction scheme failure title, the corresponding equipment of prediction scheme, in advance mode after the method for operation, failure, disposal process and
The prediction schemes information such as main points is stored in prediction scheme experts database.
The prediction scheme information of the prediction scheme experts database is shown and is modified by S30;
In step S30, by the prediction scheme information computerization of successful match in step S20 and saves to experts database, support the fast of prediction scheme
Velocity modulation is read and is revised online.
S40 is that fault warning equipment generates corresponding fault countermeasure, and carries out fault countermeasure according to the prediction scheme experts database
Push and graphical representation;
In step S40, after the dispatch automated system comprehensive intelligent warning diagnostic failure in the safe area I, Auto-matching prediction scheme expert
The fault countermeasure in library generates the corresponding fault countermeasure of fault warning equipment, and realizes the push and graphical exhibition of the fault countermeasure
Show.
Specifically, the proposition of the offline electric network fault Response project generation method of the present embodiment and in Power Grid Dispatching Work
Application, facilitate the safety and stability state that dispatcher understands power grid in time, the decision support of accident handling can be obtained in advance,
To provide the accident treatment foundation for having reference value to management and running personnel, the great event of power grid is coped with for promoting dispatcher
Barrier disposing capacity is of great significance.
In the present embodiment, the fault category includes comprehensive accident, equipment class accident and 110kV or more responsible consumer
Accident;
Wherein, the comprehensive accident includes that may cause the accident scene of serious consequence, such as voltage transformer (PT) one, two
Secondary failure, switch non-three phase, GIS device failure, typhoon, kite string winding, dispatch automated system failure, is led to circuit breaker lock
Letter interrupts and the accident scenes such as black starting-up;
Wherein, the equipment class accident includes that power grid emphasis to maintain equipment, 220kV and the above device fails will cause three-level
And the important equipment failure of the above equipment breakdown (event);It should be noted that three-level and the above equipment breakdown can be according to states
Family's power grid and south electric network electric power accident classification compare correlation technique data acquisition with rank, such as cause personal injury death 3-
9 people, severely injured 10-49 people or direct economic loss 1000-5000 ten thousand etc. are three-level accident, other related accidents situations are no longer detailed
It states.
Wherein, 110kV or more the responsible consumer accident includes plant stand failure.
It is in the present embodiment, described that work out corresponding failure handling program according to fault category include that clear failure disposition is pre-
The organizational form of case, unified and standard failure handling program format realize that failure handling program is efficiently worked out.
Wherein, comprehensive accident treatment prediction scheme, comprising: forecast accident handles prediction scheme title, treatment principle, classification disposition in advance
The contents such as case, prediction scheme brief summary.
Equipment class accident treatment prediction scheme, comprising: operation side after the method for operation, accident before forecast accident prediction scheme title, accident
The contents such as risk analysis after formula, accident handling process and main points, accident.
110kV or more responsible consumer accident treatment prediction scheme, comprising: the method for operation, thing before forecast accident prediction scheme title, accident
Therefore the rear method of operation, accident handling process and main points, power supply influence the contents such as situation.
In addition, containing forecast failure implementor name or plant stand name in fault countermeasure title, convenient for matching electric network model.
The basic operation of power grid after requirement and failure after failure including electricity net safety stable after failure in mode information
Status information, convenient for carrying out comparing monitoring in real time with the result in line computation.
Disposal process and main points include the information such as the equipment of disposal area or adjusting, adjusting sequence, are subsequent experts database
The measure space of decision is provided.
In the present embodiment, the S20 includes:
S201 establishes electric network fault prediction scheme information service object, is solved according to the business object to failure handling program file
Analysis;Include: the information such as mode after failure title, accident previous mode, failure, disposition principle, recycle file parsing tool to therefore
Barrier Response project file is parsed, and realizes the modelling management to failure handling program.
Pass through the names associates such as plant stand, exchange line segment, bus and transformer in S202 troubleshooting prediction scheme resolving
Electric network model obtains the associated device numbering of prediction scheme, and obtains mode, thing after the method for operation in advance of fault countermeasure, failure
Therefore disposal process and information is put, real-time detection faulty equipment, which is alerted, for comprehensive intelligent realizes that pushing away figure does data preparation automatically;
After S203 troubleshooting prediction scheme is parsed, plant stand, the accident handling prediction scheme of grid equipment are generated, forms prediction scheme expert
Library.
In the present embodiment, after the completion of troubleshooting prediction scheme document analysis, the accident handling of plant stand, grid equipment is generated
Prediction scheme forms prediction scheme experts database, therefore the prediction scheme experts database includes plant stand Response project and equipment Response project, step S30
In to the failure handling program experts database of generation, the graphical representation page is provided.
In the present embodiment, in the step S30, the plant stand Response project includes the list of decompression plant stand, plant stand failure
Name, association plant stand number the method for operation, operation mode after accident and incident processing procedure and will put information before accident, and support
To the method for operation before accident, operation mode after accident, incident processing procedure and to put information and modify and perfect.
In the present embodiment, in the step S30, the equipment Response project includes the list of equipment prediction scheme, equipment fault
The method of operation, operation mode after accident and incident processing procedure and information is put before title, associate device, accident, and supported pair
It the method for operation before associate device, accident, operation mode after accident, incident processing procedure and to put information and modify and perfect.
In the present embodiment, the step S40 includes: the alarm real-time detection power grid event of dispatch automated system comprehensive intelligent
Barrier event, and the corresponding device numbering of electric network fault event or plant stand that will test number and are dealt into each work by messaging bus
It stands, faulty equipment number or plant stand number on work station on real-time reception messaging bus are obtained from the prediction scheme experts database
Take fault countermeasure corresponding with faulty equipment number or plant stand number.
In the present embodiment, the step S40 further include: multiple faulty equipments are numbered or plant stand is compiled if having in the short time
Number, then formation sequence, and each faulty equipment in sequence is obtained from the prediction scheme experts database and the faulty equipment pair
The fault countermeasure answered.
The application second aspect embodiment provides a kind of offline electric network fault Response project generating means, described device system
Frame diagram as shown in Fig. 2, include: refering to the device known to Fig. 2
Forecasting edited module 1 for working out corresponding failure handling program according to fault category, and generates failure handling program text
Part;
Prediction scheme experts database produces module 2, for parsing the failure handling program file, and is obtained according to target device and parsing
Failure handling program match condition generates prediction scheme experts database;
Prediction scheme message processing module 3, for the prediction scheme experts database to be shown and modify;
Fault countermeasure produces module 4, for being that fault warning equipment generates corresponding fault countermeasure according to the prediction scheme experts database,
And the figure that pushes away for carrying out fault countermeasure is shown.
It will be understood by those skilled in the art that Fig. 2 device frame signal is only the example of device, do not constitute pair
The restriction of device may include perhaps combining certain components or different components than illustrating more or fewer components.
For device embodiment, since it corresponds to above method embodiment, so related place is referring to method reality
Apply the part explanation of example.
By the descriptions of above embodiments it is found that method and device thereof provided by the embodiment of the present application at least have it is as follows
Advantage:
The embodiment of the present application method and device thereof are suitable for dispatching of power netwoks, can be in conjunction with regional electrical network feature, the method for operation and gas
The practical factors such as environment are waited, before physical fault generation, offline failure handling program is manually formulated according to predefined format in advance,
When using the embodiment of the present application method and device thereof, dispatcher is pre- in the offline accident handling of production control zone (the safe area I) importing
Case by prediction scheme information computerization and is put in storage preservations by document analysis, equipment matching, and the quick of prediction scheme is supported to have access to and online
Revision;After the safe area I comprehensive intelligent warning diagnostic failure, the fault countermeasure of Auto-matching prediction scheme experts database, and realize that prediction scheme pushes away
Figure.The application of the embodiment of the present application method and device thereof facilitates the safety and stability state that dispatcher understands power grid in time, can
The decision support for obtaining accident handling in advance copes with power grid significant trouble disposing capacity with important meaning for promoting dispatcher
Justice.
It should be noted that in several embodiments provided by the present invention, it should be understood that disclosed device and side
Method may be implemented in other ways.For example, the apparatus embodiments described above are merely exemplary, for example, described
The division of module, only a kind of logical function partition, there may be another division manner in actual implementation.
Present embodiments are described above, above description is exemplary, and non-exclusive, and
It is not limited to disclosed each embodiment.Without departing from the scope and spirit of illustrated each embodiment, for this skill
Many modifications and changes are obvious for the those of ordinary skill in art field.The selection of term used herein, purport
In principle, the practical application or to the technological improvement in market for best explaining each embodiment, or make the art its
Its those of ordinary skill can understand each embodiment disclosed herein.
Claims (10)
1. a kind of offline electric network fault Response project generation method, which comprises the steps of:
S10 works out corresponding failure handling program according to fault category, and generates failure handling program file;
S20 parses the failure handling program file, and obtains failure handling program match condition according to target device and parsing
Generate prediction scheme experts database;
The prediction scheme information of the prediction scheme experts database is shown and is modified by S30;
S40 is that fault warning equipment generates corresponding fault countermeasure, and carries out pushing away for fault countermeasure according to the prediction scheme experts database
It send and graphical representation.
2. offline electric network fault Response project generation method as described in claim 1, which is characterized in that the fault category includes
Comprehensive accident, equipment class accident and 110kV or more responsible consumer accident;
Wherein, the comprehensive accident includes first and second failure of voltage transformer, circuit breaker lock, switch non-three phase, GIS device
Failure, typhoon, kite string winding, dispatch automated system failure, communication disruption and black starting-up accident scene;
Wherein, the equipment class accident includes that power grid emphasis to maintain equipment, 220kV and the above device fails will cause three-level
And the important equipment failure of the above event;
Wherein, 110kV or more the responsible consumer accident includes plant stand failure.
3. offline electric network fault Response project generation method as claimed in claim 2, which is characterized in that described according to fault category
Work out the organizational form that corresponding failure handling program includes clear failure Response project, unified and standard failure handling program lattice
Formula.
4. offline electric network fault Response project generation method as claimed in claim 3, which is characterized in that the S20 includes:
S201 establishes electric network fault prediction scheme information service object, is solved according to the business object to failure handling program file
Analysis;
Pass through the names associate electricity of plant stand, exchange line segment, bus and transformer in S202 troubleshooting prediction scheme resolving
Pessimistic concurrency control obtains the associated device numbering of prediction scheme, and obtains mode after the method for operation in advance of fault countermeasure, failure, at accident
It sets process and to put information;
After S203 troubleshooting prediction scheme is parsed, plant stand, the accident handling prediction scheme of grid equipment are generated, forms prediction scheme expert
Library.
5. offline electric network fault Response project generation method as claimed in claim 4, which is characterized in that the prediction scheme experts database packet
Include plant stand Response project and equipment Response project.
6. offline electric network fault Response project generation method as claimed in claim 5, which is characterized in that in the step S30, institute
Plant stand Response project is stated for showing the list of decompression plant stand, plant stand failure name, association plant stand number, the method for operation, thing before accident
Therefore the rear method of operation and incident processing procedure and information is put, and support to the method for operation, operation mode after accident, thing before accident
Therefore it treatment process and to put information and modify and perfect.
7. offline electric network fault Response project generation method as claimed in claim 6, which is characterized in that in the step S30, institute
Equipment Response project is stated for the method for operation, accident before the list of presentation device prediction scheme, equipment fault title, associate device, accident
The method of operation and incident processing procedure and information is put afterwards, and supported to being run after the method for operation, accident before associate device, accident
It mode, incident processing procedure and to put information and modify and perfect.
8. offline electric network fault Response project generation method as claimed in claim 7, which is characterized in that the step S40 includes:
Real-time detection electric network fault event, and the corresponding device numbering of electric network fault event or the plant stand number that will test pass through message
Bus is dealt into each work station, faulty equipment on work station on real-time reception messaging bus number or plant stand number, from described
Fault countermeasure corresponding with faulty equipment number or plant stand number is obtained in prediction scheme experts database.
9. offline electric network fault Response project generation method as claimed in claim 8, which is characterized in that the step S40 is also wrapped
It includes: if having multiple faulty equipments numbers or plant stand number in the short time, formation sequence, and to each faulty equipment in sequence
Fault countermeasure corresponding with the faulty equipment is obtained from the prediction scheme experts database.
10. a kind of offline electric network fault Response project generating means characterized by comprising
Forecasting edited module for working out corresponding failure handling program according to fault category, and generates failure handling program text
Part;
Prediction scheme experts database produces module, for parsing the failure handling program file, and is obtained according to target device and parsing
Failure handling program match condition generates prediction scheme experts database;
Prediction scheme message processing module, for the prediction scheme experts database to be shown and modify;
Fault countermeasure produces module, for being that fault warning equipment generates corresponding fault countermeasure according to the prediction scheme experts database,
And the figure that pushes away for carrying out fault countermeasure is shown.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810721472.4A CN109062993A (en) | 2018-07-04 | 2018-07-04 | A kind of offline electric network fault Response project generation method and its device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810721472.4A CN109062993A (en) | 2018-07-04 | 2018-07-04 | A kind of offline electric network fault Response project generation method and its device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109062993A true CN109062993A (en) | 2018-12-21 |
Family
ID=64818480
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810721472.4A Pending CN109062993A (en) | 2018-07-04 | 2018-07-04 | A kind of offline electric network fault Response project generation method and its device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109062993A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109659936A (en) * | 2018-12-29 | 2019-04-19 | 国电南瑞科技股份有限公司 | A kind of smart grid Dispatching Control System failure method of disposal and system |
CN109726214A (en) * | 2018-12-26 | 2019-05-07 | 国电南瑞科技股份有限公司 | A kind of equipment fault disposition aid decision-making method and system |
CN111049131A (en) * | 2019-12-12 | 2020-04-21 | 深圳供电局有限公司 | Method and system for generating regional power grid online fault disposal plan |
CN111089623A (en) * | 2020-03-20 | 2020-05-01 | 山东沃华远达环境科技股份有限公司 | Environmental protection equipment |
CN111522997A (en) * | 2020-03-12 | 2020-08-11 | 国电南瑞南京控制系统有限公司 | Plan compiling and alarm pushing system and method based on model and file service |
CN112733389A (en) * | 2021-03-30 | 2021-04-30 | 中国电力科学研究院有限公司 | Power grid fault handling plan generation method and device |
CN112769231A (en) * | 2020-12-24 | 2021-05-07 | 深圳供电局有限公司 | Main distribution integrated alarm pushing method and device of intelligent power grid dispatching control system |
CN113010339A (en) * | 2021-03-03 | 2021-06-22 | 中国工商银行股份有限公司 | Method and device for automatically processing fault in online transaction test |
CN113469583A (en) * | 2021-09-02 | 2021-10-01 | 中国电力科学研究院有限公司 | Power grid accident plan recommendation method, system, equipment and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102013041A (en) * | 2009-09-07 | 2011-04-13 | 北京市电力公司 | Accident beforehand case calling method for dispatching automation system |
CN105867270A (en) * | 2016-04-08 | 2016-08-17 | 国电南瑞科技股份有限公司 | Power transmission and transformation equipment state abnormity identification and emergency response scheme automatic pushing method |
CN105913148A (en) * | 2016-04-11 | 2016-08-31 | 国家电网公司 | On-line platform-based power grid accident pre-arranged plan automatic realization method |
CN106159939A (en) * | 2016-06-30 | 2016-11-23 | 华东电网有限公司 | Dispatching of power netwoks is issued an order method and system automatically |
CN107480877A (en) * | 2017-08-03 | 2017-12-15 | 国电南瑞科技股份有限公司 | A kind of failure handling program between multi-stage scheduling combines execution method and system online |
-
2018
- 2018-07-04 CN CN201810721472.4A patent/CN109062993A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102013041A (en) * | 2009-09-07 | 2011-04-13 | 北京市电力公司 | Accident beforehand case calling method for dispatching automation system |
CN105867270A (en) * | 2016-04-08 | 2016-08-17 | 国电南瑞科技股份有限公司 | Power transmission and transformation equipment state abnormity identification and emergency response scheme automatic pushing method |
CN105913148A (en) * | 2016-04-11 | 2016-08-31 | 国家电网公司 | On-line platform-based power grid accident pre-arranged plan automatic realization method |
CN106159939A (en) * | 2016-06-30 | 2016-11-23 | 华东电网有限公司 | Dispatching of power netwoks is issued an order method and system automatically |
CN107480877A (en) * | 2017-08-03 | 2017-12-15 | 国电南瑞科技股份有限公司 | A kind of failure handling program between multi-stage scheduling combines execution method and system online |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109726214A (en) * | 2018-12-26 | 2019-05-07 | 国电南瑞科技股份有限公司 | A kind of equipment fault disposition aid decision-making method and system |
CN109659936A (en) * | 2018-12-29 | 2019-04-19 | 国电南瑞科技股份有限公司 | A kind of smart grid Dispatching Control System failure method of disposal and system |
CN111049131A (en) * | 2019-12-12 | 2020-04-21 | 深圳供电局有限公司 | Method and system for generating regional power grid online fault disposal plan |
CN111049131B (en) * | 2019-12-12 | 2024-03-19 | 深圳供电局有限公司 | Regional power grid online fault handling plan generation method and system |
CN111522997A (en) * | 2020-03-12 | 2020-08-11 | 国电南瑞南京控制系统有限公司 | Plan compiling and alarm pushing system and method based on model and file service |
CN111089623A (en) * | 2020-03-20 | 2020-05-01 | 山东沃华远达环境科技股份有限公司 | Environmental protection equipment |
CN111089623B (en) * | 2020-03-20 | 2020-08-18 | 山东沃华远达环境科技股份有限公司 | Environmental protection equipment |
CN112769231A (en) * | 2020-12-24 | 2021-05-07 | 深圳供电局有限公司 | Main distribution integrated alarm pushing method and device of intelligent power grid dispatching control system |
CN112769231B (en) * | 2020-12-24 | 2022-10-11 | 深圳供电局有限公司 | Main distribution integrated alarm pushing method and device of intelligent power grid dispatching control system |
CN113010339A (en) * | 2021-03-03 | 2021-06-22 | 中国工商银行股份有限公司 | Method and device for automatically processing fault in online transaction test |
CN112733389A (en) * | 2021-03-30 | 2021-04-30 | 中国电力科学研究院有限公司 | Power grid fault handling plan generation method and device |
CN113469583A (en) * | 2021-09-02 | 2021-10-01 | 中国电力科学研究院有限公司 | Power grid accident plan recommendation method, system, equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109062993A (en) | A kind of offline electric network fault Response project generation method and its device | |
CN113283704B (en) | Intelligent power grid fault handling system and method based on knowledge graph | |
CN103903075B (en) | Protection device constant value automatic management method based on fuzzy matching | |
CN107092222B (en) | Based on the integrated power grid regulation operational administrative system of anti-error check analysis | |
CN104463696A (en) | Power grid operating risk recognition and prevention method and system | |
CN108446396B (en) | Power data processing method based on improved CIM model | |
CN103700031A (en) | Electric power warning information publishing method in regulation and control integration mode | |
CN106651643A (en) | Power security management and control method for whole process based on distribution and adjustment | |
CN104835376B (en) | There is the dispatcher training system system of prepared auto restart automatic safety device action simulation | |
CN112769231B (en) | Main distribution integrated alarm pushing method and device of intelligent power grid dispatching control system | |
CN111756581A (en) | Power distribution network operation fault processing method and device, computer equipment and storage medium | |
CN106651198A (en) | Power grid accident auxiliary processing method and system | |
CN111585352B (en) | Power monitoring system, equipment and readable storage medium based on PMS2.0 system | |
CN114710532B (en) | Method and device for suppressing security electricity utilization alarm of museum | |
CN104836329B (en) | Local-level dispatch supporting system capable of improving analyzing and processing capability of dispatcher during accident generation | |
CN107168265A (en) | Fixed value adjusting system and the automatic identification docking calculation for protecting letter system | |
CN103854230A (en) | Electric power security risk management and control system and method | |
CN104898460B (en) | Suitable for the online static security analysis system of districted dispatch system | |
CN104318739B (en) | Electric power safety, quality In-site supervision main website-wireless data terminal management system | |
CN116094174A (en) | Knowledge graph-based power grid operation and maintenance monitoring method, system, equipment and medium | |
CN108988334A (en) | Electric network fault grade dissemination method | |
CN104218680A (en) | Real-time alarm system and communication method thereof for supervisory control and data acquisition (SCADA) system | |
CN114239874A (en) | Power grid data processing system and method based on urban energy map | |
CN104914813B (en) | The multi-platform synchronous method of prepared auto restart model in static security analysis system | |
CN113850463A (en) | Processing method and device for misoperation prevention of transformer substation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181221 |
|
RJ01 | Rejection of invention patent application after publication |