CN109062993A - A kind of offline electric network fault Response project generation method and its device - Google Patents

A kind of offline electric network fault Response project generation method and its device Download PDF

Info

Publication number
CN109062993A
CN109062993A CN201810721472.4A CN201810721472A CN109062993A CN 109062993 A CN109062993 A CN 109062993A CN 201810721472 A CN201810721472 A CN 201810721472A CN 109062993 A CN109062993 A CN 109062993A
Authority
CN
China
Prior art keywords
prediction scheme
fault
accident
failure
electric network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810721472.4A
Other languages
Chinese (zh)
Inventor
田启东
刘雪飞
何晓峰
李江南
涂炼
林志贤
林子钊
邹志勇
吴爽
闪鑫
王波
徐希
何诗琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Bureau Co Ltd
Nari Technology Co Ltd
Original Assignee
Shenzhen Power Supply Bureau Co Ltd
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Bureau Co Ltd, Nari Technology Co Ltd filed Critical Shenzhen Power Supply Bureau Co Ltd
Priority to CN201810721472.4A priority Critical patent/CN109062993A/en
Publication of CN109062993A publication Critical patent/CN109062993A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The application provides a kind of offline electric network fault Response project generation method and its device, and described method includes following steps: S10 works out corresponding failure handling program according to fault category, and generates failure handling program file;S20 parses the failure handling program file, and obtains failure handling program match condition according to target device and parsing and generate prediction scheme experts database;The prediction scheme information of the prediction scheme experts database is shown and is modified by S30;S40 is that fault warning equipment generates corresponding fault countermeasure, and carries out push and the graphical representation of fault countermeasure according to the prediction scheme experts database.Described device is for realizing the method, the application of the embodiment of the present application method and device thereof facilitates the safety and stability state that dispatcher understands power grid in time, the decision support that can obtain accident handling in advance is of great significance for promoting dispatcher's reply power grid significant trouble disposing capacity.

Description

A kind of offline electric network fault Response project generation method and its device
Technical field
This application involves power grid intellectual analysis and control technology fields, and in particular to a kind of offline electric network fault Response project Generation method and its device.
Background technique
Power grid security be related to national economy shape up and people life property safety, currently, China's power industry It is in fast-developing period, the various high-risk events in power grid inside and outside and emergency event happen occasionally, facet when power grid security Face serious threat, although having been achieved for more research achievement in terms of the electrical safety operation of power grid, power grid is deposited It is in natural environment and social environment, inevitably intentionally or accidentally by the challenge of extreme natural conditions and from social environment Damage or destruction.Meanwhile power grid disaster can also bring social environment and seriously affect, the research in terms of these is slightly inadequate. The problems such as current electric grid method of operation is complicated, apparatus of load aggravates and power supply capacity is insufficient becomes increasingly conspicuous, electric power netting safe running Pressure increasingly increase, electric network fault event also increasingly frequently, more serious consequence is brought to safe operation of electric network.
To sum up, risk assessment how is quickly carried out in management and running accident treatment and the scheduling optimal plan of emergency processing is provided Slightly, to provide the accident treatment foundation for having reference value to management and running personnel, have become Power Grid Dispatching Work and need The technical issues of solution.
Summary of the invention
The purpose of the application is to propose a kind of offline electric network fault Response project generation method and its device, to solve such as Risk assessment is where quickly carried out in management and running accident treatment and scheduling emergency processing optimal policy is provided.
In order to realize the application purpose, it is raw that the application first aspect embodiment provides a kind of offline electric network fault Response project At method, include the following steps:
S10 works out corresponding failure handling program according to fault category, and generates failure handling program file;
S20 parses the failure handling program file, and obtains failure handling program match condition according to target device and parsing Generate prediction scheme experts database;
The prediction scheme information of the prediction scheme experts database is shown and is modified by S30;
S40 is that fault warning equipment generates corresponding fault countermeasure, and carries out pushing away for fault countermeasure according to the prediction scheme experts database It send and graphical representation.
In some embodiments, the fault category includes comprehensive accident, equipment class accident and the important use of 110kV or more Family accident;
Wherein, the comprehensive accident includes first and second failure of voltage transformer, circuit breaker lock, switch non-three phase, GIS device Failure, typhoon, kite string winding, dispatch automated system failure, communication disruption and black starting-up accident scene;
Wherein, the equipment class accident includes that power grid emphasis to maintain equipment, 220kV and the above device fails will cause three-level And the important equipment failure of the above event;
Wherein, 110kV or more the responsible consumer accident includes plant stand failure.
It is in some embodiments, described that work out corresponding failure handling program according to fault category include clear failure disposition The organizational form of prediction scheme, unified and standard failure handling program format.
In some embodiments, the S20 includes:
S201 establishes electric network fault prediction scheme information service object, is solved according to the business object to failure handling program file Analysis;
Pass through the names associate electricity of plant stand, exchange line segment, bus and transformer in S202 troubleshooting prediction scheme resolving Pessimistic concurrency control obtains the associated device numbering of prediction scheme, and obtains mode after the method for operation in advance of fault countermeasure, failure, at accident It sets process and to put information;
After S203 troubleshooting prediction scheme is parsed, plant stand, the accident handling prediction scheme of grid equipment are generated, forms prediction scheme expert Library.
In some embodiments, the prediction scheme experts database includes plant stand Response project and equipment Response project.
In some embodiments, in the step S30, the plant stand Response project is for showing the list of decompression plant stand, factory Station failure name, association plant stand number the method for operation, operation mode after accident and incident processing procedure and will put information before accident, And it supports to the method for operation before accident, operation mode after accident, incident processing procedure and to put information and modify and perfect.
In some embodiments, in the step S30, the equipment Response project is used for the list of presentation device prediction scheme, sets For the method for operation, operation mode after accident and incident processing procedure before failure title, associate device, accident and information is put, and Support to the method for operation before associate device, accident, operation mode after accident, incident processing procedure and to put information modify and It is perfect.
In some embodiments, the step S40 includes: real-time detection electric network fault event, and the power grid that will test The corresponding device numbering of event of failure or plant stand, which are numbered, is dealt into each work station by messaging bus, and real-time reception disappears on work station The faulty equipment number or plant stand number in bus are ceased, obtains from the prediction scheme experts database and is compiled with faulty equipment number or plant stand Number corresponding fault countermeasure.
In some embodiments, the step S40 further include: multiple faulty equipments are numbered or plant stand is compiled if having in the short time Number, then formation sequence, and each faulty equipment in sequence is obtained from the prediction scheme experts database and the faulty equipment pair The fault countermeasure answered.
The application second aspect embodiment provides a kind of offline electric network fault Response project generating means, comprising:
Forecasting edited module for working out corresponding failure handling program according to fault category, and generates failure handling program text Part;
Prediction scheme experts database produces module, for parsing the failure handling program file, and is obtained according to target device and parsing Failure handling program match condition generates prediction scheme experts database;
Prediction scheme message processing module, for the prediction scheme experts database to be shown and modify;
Fault countermeasure produces module, for being that fault warning equipment generates corresponding fault countermeasure according to the prediction scheme experts database, And the figure that pushes away for carrying out fault countermeasure is shown.
The embodiment of the present application method and device thereof at least have the advantages that
The embodiment of the present application method and device thereof are suitable for dispatching of power netwoks, can be in conjunction with regional electrical network feature, the method for operation and gas The practical factors such as environment are waited, before physical fault generation, offline failure handling program is manually formulated according to predefined format in advance, When using the embodiment of the present application method and device thereof, dispatcher is pre- in the offline accident handling of production control zone (the safe area I) importing Case by prediction scheme information computerization and is put in storage preservations by document analysis, equipment matching, and the quick of prediction scheme is supported to have access to and online Revision;After the safe area I comprehensive intelligent warning diagnostic failure, the fault countermeasure of Auto-matching prediction scheme experts database, and realize that prediction scheme pushes away Figure.The application of the embodiment of the present application method and device thereof facilitates the safety and stability state that dispatcher understands power grid in time, can The decision support for obtaining accident handling in advance copes with power grid significant trouble disposing capacity with important meaning for promoting dispatcher Justice.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of application for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is offline electric network fault Response project generation method flow chart described in the embodiment of the present application.
Fig. 2 is offline electric network fault Response project generating means system framework figure described in the embodiment of the present application.
Specific embodiment
Various exemplary embodiments, feature and the aspect of the disclosure are described in detail below with reference to attached drawing.It is identical in attached drawing Appended drawing reference indicate element functionally identical or similar.Although the various aspects of embodiment are shown in the attached drawings, remove It non-specifically points out, it is not necessary to attached drawing drawn to scale.
In addition, giving numerous details in specific embodiment below to better illustrate the application.This Field is it will be appreciated by the skilled person that without certain details, the application equally be can be implemented.In some instances, for this Method known to the technical staff of field, means, element and circuit are not described in detail, in order to highlight the purport of the application.
The application first aspect embodiment provides a kind of offline electric network fault Response project generation method, and process can join Fig. 1 is read, this method comprises the following steps:
S10 works out corresponding failure handling program according to fault category, and generates failure handling program file;
In step S10, it can be sent out in conjunction with practical factors such as regional electrical network feature, the method for operation and climatic environments in physical fault Before death, offline failure handling program is manually formulated according to predefined format in advance;Such as the electric network fault disposition of Shenzhen area is pre- Case then can with the practical factors such as Shenzhen Power Grid feature, the method for operation and multiple, the strong convection weather of Shenzhen coastal city typhoon according to Predefined format manually formulates offline failure handling program in advance.
Specifically, in step S10 content include forecast failure implementor name, in advance after the method for operation, failure mode and Four parts of disposal process and main points, the specific organizational form for determining accident handling prediction scheme, the prediction scheme format of constituting criterion are realized The electronization of Response project generates the failure handling program file.
S20 parses the failure handling program file, and obtains failure handling program with parsing according to target device and match Situation generates prediction scheme experts database;
In step S20, dispatcher imports offline accident handling prediction scheme in the dispatch automated system of production control zone (the safe area I) File, by being parsed to obtain prediction scheme information to offline accident handling prediction scheme file, then according to target device object and in advance Case information is matched one by one.
Specifically, step S20 obtains prediction scheme content by parsing offline failure handling program, and according to forecast failure name In characteristic character split out equipment substring, and then accurately matched with the implementor name in database, it is corresponding to obtain prediction scheme Equipment.To be resolved to prediction scheme failure title, the corresponding equipment of prediction scheme, in advance mode after the method for operation, failure, disposal process and The prediction schemes information such as main points is stored in prediction scheme experts database.
The prediction scheme information of the prediction scheme experts database is shown and is modified by S30;
In step S30, by the prediction scheme information computerization of successful match in step S20 and saves to experts database, support the fast of prediction scheme Velocity modulation is read and is revised online.
S40 is that fault warning equipment generates corresponding fault countermeasure, and carries out fault countermeasure according to the prediction scheme experts database Push and graphical representation;
In step S40, after the dispatch automated system comprehensive intelligent warning diagnostic failure in the safe area I, Auto-matching prediction scheme expert The fault countermeasure in library generates the corresponding fault countermeasure of fault warning equipment, and realizes the push and graphical exhibition of the fault countermeasure Show.
Specifically, the proposition of the offline electric network fault Response project generation method of the present embodiment and in Power Grid Dispatching Work Application, facilitate the safety and stability state that dispatcher understands power grid in time, the decision support of accident handling can be obtained in advance, To provide the accident treatment foundation for having reference value to management and running personnel, the great event of power grid is coped with for promoting dispatcher Barrier disposing capacity is of great significance.
In the present embodiment, the fault category includes comprehensive accident, equipment class accident and 110kV or more responsible consumer Accident;
Wherein, the comprehensive accident includes that may cause the accident scene of serious consequence, such as voltage transformer (PT) one, two Secondary failure, switch non-three phase, GIS device failure, typhoon, kite string winding, dispatch automated system failure, is led to circuit breaker lock Letter interrupts and the accident scenes such as black starting-up;
Wherein, the equipment class accident includes that power grid emphasis to maintain equipment, 220kV and the above device fails will cause three-level And the important equipment failure of the above equipment breakdown (event);It should be noted that three-level and the above equipment breakdown can be according to states Family's power grid and south electric network electric power accident classification compare correlation technique data acquisition with rank, such as cause personal injury death 3- 9 people, severely injured 10-49 people or direct economic loss 1000-5000 ten thousand etc. are three-level accident, other related accidents situations are no longer detailed It states.
Wherein, 110kV or more the responsible consumer accident includes plant stand failure.
It is in the present embodiment, described that work out corresponding failure handling program according to fault category include that clear failure disposition is pre- The organizational form of case, unified and standard failure handling program format realize that failure handling program is efficiently worked out.
Wherein, comprehensive accident treatment prediction scheme, comprising: forecast accident handles prediction scheme title, treatment principle, classification disposition in advance The contents such as case, prediction scheme brief summary.
Equipment class accident treatment prediction scheme, comprising: operation side after the method for operation, accident before forecast accident prediction scheme title, accident The contents such as risk analysis after formula, accident handling process and main points, accident.
110kV or more responsible consumer accident treatment prediction scheme, comprising: the method for operation, thing before forecast accident prediction scheme title, accident Therefore the rear method of operation, accident handling process and main points, power supply influence the contents such as situation.
In addition, containing forecast failure implementor name or plant stand name in fault countermeasure title, convenient for matching electric network model.
The basic operation of power grid after requirement and failure after failure including electricity net safety stable after failure in mode information Status information, convenient for carrying out comparing monitoring in real time with the result in line computation.
Disposal process and main points include the information such as the equipment of disposal area or adjusting, adjusting sequence, are subsequent experts database The measure space of decision is provided.
In the present embodiment, the S20 includes:
S201 establishes electric network fault prediction scheme information service object, is solved according to the business object to failure handling program file Analysis;Include: the information such as mode after failure title, accident previous mode, failure, disposition principle, recycle file parsing tool to therefore Barrier Response project file is parsed, and realizes the modelling management to failure handling program.
Pass through the names associates such as plant stand, exchange line segment, bus and transformer in S202 troubleshooting prediction scheme resolving Electric network model obtains the associated device numbering of prediction scheme, and obtains mode, thing after the method for operation in advance of fault countermeasure, failure Therefore disposal process and information is put, real-time detection faulty equipment, which is alerted, for comprehensive intelligent realizes that pushing away figure does data preparation automatically;
After S203 troubleshooting prediction scheme is parsed, plant stand, the accident handling prediction scheme of grid equipment are generated, forms prediction scheme expert Library.
In the present embodiment, after the completion of troubleshooting prediction scheme document analysis, the accident handling of plant stand, grid equipment is generated Prediction scheme forms prediction scheme experts database, therefore the prediction scheme experts database includes plant stand Response project and equipment Response project, step S30 In to the failure handling program experts database of generation, the graphical representation page is provided.
In the present embodiment, in the step S30, the plant stand Response project includes the list of decompression plant stand, plant stand failure Name, association plant stand number the method for operation, operation mode after accident and incident processing procedure and will put information before accident, and support To the method for operation before accident, operation mode after accident, incident processing procedure and to put information and modify and perfect.
In the present embodiment, in the step S30, the equipment Response project includes the list of equipment prediction scheme, equipment fault The method of operation, operation mode after accident and incident processing procedure and information is put before title, associate device, accident, and supported pair It the method for operation before associate device, accident, operation mode after accident, incident processing procedure and to put information and modify and perfect.
In the present embodiment, the step S40 includes: the alarm real-time detection power grid event of dispatch automated system comprehensive intelligent Barrier event, and the corresponding device numbering of electric network fault event or plant stand that will test number and are dealt into each work by messaging bus It stands, faulty equipment number or plant stand number on work station on real-time reception messaging bus are obtained from the prediction scheme experts database Take fault countermeasure corresponding with faulty equipment number or plant stand number.
In the present embodiment, the step S40 further include: multiple faulty equipments are numbered or plant stand is compiled if having in the short time Number, then formation sequence, and each faulty equipment in sequence is obtained from the prediction scheme experts database and the faulty equipment pair The fault countermeasure answered.
The application second aspect embodiment provides a kind of offline electric network fault Response project generating means, described device system Frame diagram as shown in Fig. 2, include: refering to the device known to Fig. 2
Forecasting edited module 1 for working out corresponding failure handling program according to fault category, and generates failure handling program text Part;
Prediction scheme experts database produces module 2, for parsing the failure handling program file, and is obtained according to target device and parsing Failure handling program match condition generates prediction scheme experts database;
Prediction scheme message processing module 3, for the prediction scheme experts database to be shown and modify;
Fault countermeasure produces module 4, for being that fault warning equipment generates corresponding fault countermeasure according to the prediction scheme experts database, And the figure that pushes away for carrying out fault countermeasure is shown.
It will be understood by those skilled in the art that Fig. 2 device frame signal is only the example of device, do not constitute pair The restriction of device may include perhaps combining certain components or different components than illustrating more or fewer components.
For device embodiment, since it corresponds to above method embodiment, so related place is referring to method reality Apply the part explanation of example.
By the descriptions of above embodiments it is found that method and device thereof provided by the embodiment of the present application at least have it is as follows Advantage:
The embodiment of the present application method and device thereof are suitable for dispatching of power netwoks, can be in conjunction with regional electrical network feature, the method for operation and gas The practical factors such as environment are waited, before physical fault generation, offline failure handling program is manually formulated according to predefined format in advance, When using the embodiment of the present application method and device thereof, dispatcher is pre- in the offline accident handling of production control zone (the safe area I) importing Case by prediction scheme information computerization and is put in storage preservations by document analysis, equipment matching, and the quick of prediction scheme is supported to have access to and online Revision;After the safe area I comprehensive intelligent warning diagnostic failure, the fault countermeasure of Auto-matching prediction scheme experts database, and realize that prediction scheme pushes away Figure.The application of the embodiment of the present application method and device thereof facilitates the safety and stability state that dispatcher understands power grid in time, can The decision support for obtaining accident handling in advance copes with power grid significant trouble disposing capacity with important meaning for promoting dispatcher Justice.
It should be noted that in several embodiments provided by the present invention, it should be understood that disclosed device and side Method may be implemented in other ways.For example, the apparatus embodiments described above are merely exemplary, for example, described The division of module, only a kind of logical function partition, there may be another division manner in actual implementation.
Present embodiments are described above, above description is exemplary, and non-exclusive, and It is not limited to disclosed each embodiment.Without departing from the scope and spirit of illustrated each embodiment, for this skill Many modifications and changes are obvious for the those of ordinary skill in art field.The selection of term used herein, purport In principle, the practical application or to the technological improvement in market for best explaining each embodiment, or make the art its Its those of ordinary skill can understand each embodiment disclosed herein.

Claims (10)

1. a kind of offline electric network fault Response project generation method, which comprises the steps of:
S10 works out corresponding failure handling program according to fault category, and generates failure handling program file;
S20 parses the failure handling program file, and obtains failure handling program match condition according to target device and parsing Generate prediction scheme experts database;
The prediction scheme information of the prediction scheme experts database is shown and is modified by S30;
S40 is that fault warning equipment generates corresponding fault countermeasure, and carries out pushing away for fault countermeasure according to the prediction scheme experts database It send and graphical representation.
2. offline electric network fault Response project generation method as described in claim 1, which is characterized in that the fault category includes Comprehensive accident, equipment class accident and 110kV or more responsible consumer accident;
Wherein, the comprehensive accident includes first and second failure of voltage transformer, circuit breaker lock, switch non-three phase, GIS device Failure, typhoon, kite string winding, dispatch automated system failure, communication disruption and black starting-up accident scene;
Wherein, the equipment class accident includes that power grid emphasis to maintain equipment, 220kV and the above device fails will cause three-level And the important equipment failure of the above event;
Wherein, 110kV or more the responsible consumer accident includes plant stand failure.
3. offline electric network fault Response project generation method as claimed in claim 2, which is characterized in that described according to fault category Work out the organizational form that corresponding failure handling program includes clear failure Response project, unified and standard failure handling program lattice Formula.
4. offline electric network fault Response project generation method as claimed in claim 3, which is characterized in that the S20 includes:
S201 establishes electric network fault prediction scheme information service object, is solved according to the business object to failure handling program file Analysis;
Pass through the names associate electricity of plant stand, exchange line segment, bus and transformer in S202 troubleshooting prediction scheme resolving Pessimistic concurrency control obtains the associated device numbering of prediction scheme, and obtains mode after the method for operation in advance of fault countermeasure, failure, at accident It sets process and to put information;
After S203 troubleshooting prediction scheme is parsed, plant stand, the accident handling prediction scheme of grid equipment are generated, forms prediction scheme expert Library.
5. offline electric network fault Response project generation method as claimed in claim 4, which is characterized in that the prediction scheme experts database packet Include plant stand Response project and equipment Response project.
6. offline electric network fault Response project generation method as claimed in claim 5, which is characterized in that in the step S30, institute Plant stand Response project is stated for showing the list of decompression plant stand, plant stand failure name, association plant stand number, the method for operation, thing before accident Therefore the rear method of operation and incident processing procedure and information is put, and support to the method for operation, operation mode after accident, thing before accident Therefore it treatment process and to put information and modify and perfect.
7. offline electric network fault Response project generation method as claimed in claim 6, which is characterized in that in the step S30, institute Equipment Response project is stated for the method for operation, accident before the list of presentation device prediction scheme, equipment fault title, associate device, accident The method of operation and incident processing procedure and information is put afterwards, and supported to being run after the method for operation, accident before associate device, accident It mode, incident processing procedure and to put information and modify and perfect.
8. offline electric network fault Response project generation method as claimed in claim 7, which is characterized in that the step S40 includes: Real-time detection electric network fault event, and the corresponding device numbering of electric network fault event or the plant stand number that will test pass through message Bus is dealt into each work station, faulty equipment on work station on real-time reception messaging bus number or plant stand number, from described Fault countermeasure corresponding with faulty equipment number or plant stand number is obtained in prediction scheme experts database.
9. offline electric network fault Response project generation method as claimed in claim 8, which is characterized in that the step S40 is also wrapped It includes: if having multiple faulty equipments numbers or plant stand number in the short time, formation sequence, and to each faulty equipment in sequence Fault countermeasure corresponding with the faulty equipment is obtained from the prediction scheme experts database.
10. a kind of offline electric network fault Response project generating means characterized by comprising
Forecasting edited module for working out corresponding failure handling program according to fault category, and generates failure handling program text Part;
Prediction scheme experts database produces module, for parsing the failure handling program file, and is obtained according to target device and parsing Failure handling program match condition generates prediction scheme experts database;
Prediction scheme message processing module, for the prediction scheme experts database to be shown and modify;
Fault countermeasure produces module, for being that fault warning equipment generates corresponding fault countermeasure according to the prediction scheme experts database, And the figure that pushes away for carrying out fault countermeasure is shown.
CN201810721472.4A 2018-07-04 2018-07-04 A kind of offline electric network fault Response project generation method and its device Pending CN109062993A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810721472.4A CN109062993A (en) 2018-07-04 2018-07-04 A kind of offline electric network fault Response project generation method and its device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810721472.4A CN109062993A (en) 2018-07-04 2018-07-04 A kind of offline electric network fault Response project generation method and its device

Publications (1)

Publication Number Publication Date
CN109062993A true CN109062993A (en) 2018-12-21

Family

ID=64818480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810721472.4A Pending CN109062993A (en) 2018-07-04 2018-07-04 A kind of offline electric network fault Response project generation method and its device

Country Status (1)

Country Link
CN (1) CN109062993A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109659936A (en) * 2018-12-29 2019-04-19 国电南瑞科技股份有限公司 A kind of smart grid Dispatching Control System failure method of disposal and system
CN109726214A (en) * 2018-12-26 2019-05-07 国电南瑞科技股份有限公司 A kind of equipment fault disposition aid decision-making method and system
CN111049131A (en) * 2019-12-12 2020-04-21 深圳供电局有限公司 Method and system for generating regional power grid online fault disposal plan
CN111089623A (en) * 2020-03-20 2020-05-01 山东沃华远达环境科技股份有限公司 Environmental protection equipment
CN111522997A (en) * 2020-03-12 2020-08-11 国电南瑞南京控制系统有限公司 Plan compiling and alarm pushing system and method based on model and file service
CN112733389A (en) * 2021-03-30 2021-04-30 中国电力科学研究院有限公司 Power grid fault handling plan generation method and device
CN112769231A (en) * 2020-12-24 2021-05-07 深圳供电局有限公司 Main distribution integrated alarm pushing method and device of intelligent power grid dispatching control system
CN113010339A (en) * 2021-03-03 2021-06-22 中国工商银行股份有限公司 Method and device for automatically processing fault in online transaction test
CN113469583A (en) * 2021-09-02 2021-10-01 中国电力科学研究院有限公司 Power grid accident plan recommendation method, system, equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013041A (en) * 2009-09-07 2011-04-13 北京市电力公司 Accident beforehand case calling method for dispatching automation system
CN105867270A (en) * 2016-04-08 2016-08-17 国电南瑞科技股份有限公司 Power transmission and transformation equipment state abnormity identification and emergency response scheme automatic pushing method
CN105913148A (en) * 2016-04-11 2016-08-31 国家电网公司 On-line platform-based power grid accident pre-arranged plan automatic realization method
CN106159939A (en) * 2016-06-30 2016-11-23 华东电网有限公司 Dispatching of power netwoks is issued an order method and system automatically
CN107480877A (en) * 2017-08-03 2017-12-15 国电南瑞科技股份有限公司 A kind of failure handling program between multi-stage scheduling combines execution method and system online

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013041A (en) * 2009-09-07 2011-04-13 北京市电力公司 Accident beforehand case calling method for dispatching automation system
CN105867270A (en) * 2016-04-08 2016-08-17 国电南瑞科技股份有限公司 Power transmission and transformation equipment state abnormity identification and emergency response scheme automatic pushing method
CN105913148A (en) * 2016-04-11 2016-08-31 国家电网公司 On-line platform-based power grid accident pre-arranged plan automatic realization method
CN106159939A (en) * 2016-06-30 2016-11-23 华东电网有限公司 Dispatching of power netwoks is issued an order method and system automatically
CN107480877A (en) * 2017-08-03 2017-12-15 国电南瑞科技股份有限公司 A kind of failure handling program between multi-stage scheduling combines execution method and system online

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109726214A (en) * 2018-12-26 2019-05-07 国电南瑞科技股份有限公司 A kind of equipment fault disposition aid decision-making method and system
CN109659936A (en) * 2018-12-29 2019-04-19 国电南瑞科技股份有限公司 A kind of smart grid Dispatching Control System failure method of disposal and system
CN111049131A (en) * 2019-12-12 2020-04-21 深圳供电局有限公司 Method and system for generating regional power grid online fault disposal plan
CN111049131B (en) * 2019-12-12 2024-03-19 深圳供电局有限公司 Regional power grid online fault handling plan generation method and system
CN111522997A (en) * 2020-03-12 2020-08-11 国电南瑞南京控制系统有限公司 Plan compiling and alarm pushing system and method based on model and file service
CN111089623A (en) * 2020-03-20 2020-05-01 山东沃华远达环境科技股份有限公司 Environmental protection equipment
CN111089623B (en) * 2020-03-20 2020-08-18 山东沃华远达环境科技股份有限公司 Environmental protection equipment
CN112769231A (en) * 2020-12-24 2021-05-07 深圳供电局有限公司 Main distribution integrated alarm pushing method and device of intelligent power grid dispatching control system
CN112769231B (en) * 2020-12-24 2022-10-11 深圳供电局有限公司 Main distribution integrated alarm pushing method and device of intelligent power grid dispatching control system
CN113010339A (en) * 2021-03-03 2021-06-22 中国工商银行股份有限公司 Method and device for automatically processing fault in online transaction test
CN112733389A (en) * 2021-03-30 2021-04-30 中国电力科学研究院有限公司 Power grid fault handling plan generation method and device
CN113469583A (en) * 2021-09-02 2021-10-01 中国电力科学研究院有限公司 Power grid accident plan recommendation method, system, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN109062993A (en) A kind of offline electric network fault Response project generation method and its device
CN113283704B (en) Intelligent power grid fault handling system and method based on knowledge graph
CN103903075B (en) Protection device constant value automatic management method based on fuzzy matching
CN107092222B (en) Based on the integrated power grid regulation operational administrative system of anti-error check analysis
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN108446396B (en) Power data processing method based on improved CIM model
CN103700031A (en) Electric power warning information publishing method in regulation and control integration mode
CN106651643A (en) Power security management and control method for whole process based on distribution and adjustment
CN104835376B (en) There is the dispatcher training system system of prepared auto restart automatic safety device action simulation
CN112769231B (en) Main distribution integrated alarm pushing method and device of intelligent power grid dispatching control system
CN111756581A (en) Power distribution network operation fault processing method and device, computer equipment and storage medium
CN106651198A (en) Power grid accident auxiliary processing method and system
CN111585352B (en) Power monitoring system, equipment and readable storage medium based on PMS2.0 system
CN114710532B (en) Method and device for suppressing security electricity utilization alarm of museum
CN104836329B (en) Local-level dispatch supporting system capable of improving analyzing and processing capability of dispatcher during accident generation
CN107168265A (en) Fixed value adjusting system and the automatic identification docking calculation for protecting letter system
CN103854230A (en) Electric power security risk management and control system and method
CN104898460B (en) Suitable for the online static security analysis system of districted dispatch system
CN104318739B (en) Electric power safety, quality In-site supervision main website-wireless data terminal management system
CN116094174A (en) Knowledge graph-based power grid operation and maintenance monitoring method, system, equipment and medium
CN108988334A (en) Electric network fault grade dissemination method
CN104218680A (en) Real-time alarm system and communication method thereof for supervisory control and data acquisition (SCADA) system
CN114239874A (en) Power grid data processing system and method based on urban energy map
CN104914813B (en) The multi-platform synchronous method of prepared auto restart model in static security analysis system
CN113850463A (en) Processing method and device for misoperation prevention of transformer substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221

RJ01 Rejection of invention patent application after publication