accident
accident prediction
power grid
prediction
automated system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009100920402A
Other languages
Chinese (zh)
Inventor
王永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Electric Power Corp
Original Assignee
Beijing Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Electric Power Corp filed Critical Beijing Electric Power Corp
Priority to CN2009100920402A priority Critical patent/CN102013041A/en
Publication of CN102013041A publication Critical patent/CN102013041A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides an accident beforehand case calling method for a dispatching automation system, comprising the following steps of compiling a power grid accident beforehand case electronic document; uploading the accident beforehand case electronic document to a beforehand case source directory of the dispatching automation system; converting the accident beforehand case electronic document to a web document through the dispatching automation system, and storing the web document in a system beforehand case directory; and displaying the web document through a browser interface in order to consult power grid accident beforehand cases. By realizing integration of the beforehand cases and correlative calling of equipment in the dispatching automation system, the invention is greatly convenient to dispatch an operator to consult a relative power grid accident beforehand case under the conditions of daily learning and accident treatment, ensures correct treatment of a power grid accident and efficiently shortens the power grid accident treatment time.

Description

The accident prediction call method that is used for dispatch automated system
Technical field
The present invention relates to power domain, in particular to a kind of accident prediction call method that is used for dispatch automated system.
Background technology
Under the larger situation of electrical network, the electrical network primary equipment is numerous, also enormous amount of accident prediction correspondingly, how fully to effectively utilize accident prediction, make the management and running personnel to carry out accident treatment work fast, guarantee fully that the accident treatment measure correctly and fast restores electricity and just seem extremely important based on accident prediction.
The inventor finds not integrate the power grid accident prediction scheme in current each electric power scheduling automatization system, the accident prediction of factory station and equipment can't be provided for the management and running personnel in system, the management and running personnel can only utilize accident prediction by the form of consulting the accident prediction document usually, and the accident prediction of management and running people finder corresponding factory station and equipment will stop over the valuable accident processing time, causes power grid accident in time not handle.
Summary of the invention
The present invention aims to provide a kind of accident prediction call method that is used for dispatch automated system, can solve in current each electric power scheduling automatization system owing to do not integrate the power grid accident prediction scheme, the accident prediction of factory station and equipment can't be provided for the management and running personnel in system, the management and running personnel can only utilize accident prediction by the form of consulting the accident prediction document usually, and the accident prediction of the corresponding factory of management and running people finder station and equipment will stop over the valuable accident processing time, causes the problem that power grid accident can not fast processing.
In an embodiment of the present invention, provide a kind of accident prediction call method that is used for dispatch automated system, may further comprise the steps: establishment power grid accident prediction scheme electronic document; The accident prediction electronic document is uploaded to the prediction scheme source directory of dispatch automated system; Dispatch automated system is converted to the accident prediction electronic document the on all four web document in corresponding factory station and implementor name and dispatch automated system automatically, and it is kept under system's prediction scheme catalogue; By browser interface display web page document so that the power grid accident prediction scheme is consulted.
In the above-described embodiment, be converted to web document by the accident prediction that will weave, and it is kept under system's prediction scheme catalogue, realized the integration of electric power scheduling automatization system and power grid accident prediction scheme, make the management and running personnel in dispatch automated system, to consult accident prediction at any time with various flexible way, thereby overcome in current each electric power scheduling automatization system owing to do not integrate the power grid accident prediction scheme, the management and running personnel can only utilize accident prediction by the form of consulting the accident prediction document usually, the problem that causes power grid accident in time not handle, and then reached the effective effect that shortens the power grid accident processing time.
Description of drawings
Accompanying drawing described herein is used to provide further understanding of the present invention, constitutes the application's a part, and illustrative examples of the present invention and explanation thereof are used to explain the present invention, do not constitute improper qualification of the present invention.In the accompanying drawings:
Fig. 1 shows the accident prediction call method process flow diagram that is used for dispatch automated system according to an embodiment of the invention;
Fig. 2 shows accident prediction according to an embodiment of the invention and integrates process flow diagram;
Fig. 3,4,5,6 shows according to the accident prediction of the embodiment shown in Fig. 2 and consults the effect screenshot capture.
Embodiment
Below with reference to the accompanying drawings and in conjunction with the embodiments, describe the present invention in detail.
Fig. 1 shows the accident prediction call method that is used for dispatch automated system according to an embodiment of the invention, may further comprise the steps:
S102, establishment power grid accident prediction scheme electronic document;
S104 is uploaded to the accident prediction electronic document prediction scheme source directory of dispatch automated system;
S106, dispatch automated system is converted to the accident prediction electronic document the on all four web document in corresponding factory station and implementor name and dispatch automated system automatically, and it is kept under system's prediction scheme catalogue;
S108, by browser interface display web page document so that the power grid accident prediction scheme is consulted.
In the present embodiment, be converted to web document by the accident prediction that will weave, and it is kept under system's prediction scheme catalogue, realized the integration of electric power scheduling automatization system and power grid accident prediction scheme, make the management and running personnel in dispatch automated system, to consult accident prediction at any time with flexible way, thereby overcome in current each electric power scheduling automatization system owing to do not integrate the power grid accident prediction scheme, the accident prediction of factory station and equipment can't be provided for the management and running personnel in system, the management and running personnel can only utilize accident prediction by the form of consulting the accident prediction document usually, and the accident prediction of management and running people finder corresponding factory station and equipment will stop over the valuable accident processing time, the problem that causes power grid accident in time not handle.
Preferably, station of the factory in the power grid accident prediction scheme and equipment all have unique numbering in dispatch automated system.Make each factory station and equipment corresponding one by one, the storage of convenient accident prediction to each factory station and equipment and searching with its accident prediction.
For example: based on " database factory station and equipment Naming conventions ", Li Suizhan and Li Suizhan station 1# main transformer are named as " A275 " and " A2751B " respectively, also automatically " A275 " and " A2751B " is stored as the accident prediction key word in the accident prediction html document after the dispatch automated system conversion, thereby can be implemented in accurately calling factory station and relevant device accident prediction in the dispatch automated system based on unique factory name of station and implementor name by matching relationship.
Preferably, may further comprise the steps by browser interface display web page document: the browser interface that in the application function of dispatch automated system, increases the power grid accident prediction scheme; Factory station that browser interface is shown and equipment are associated with web document under being kept at system's prediction scheme catalogue; By browser interface the factory station of browser interface demonstration and the accident prediction of equipment are consulted.Make in dispatch automated system and can conveniently consult, can also realize that by browser the long-range of accident prediction consult the accident prediction of each factory station and equipment.
Preferably, may further comprise the steps by browser interface display web page document: the accident prediction associated menu of adding equipment in the device identification in electrical network and station wiring diagram; Associated menu is associated with web document under being kept at system's prediction scheme catalogue; By associated menu the accident prediction of equipment is consulted.Make the management and running personnel when checking electrical network and station wiring diagram, also can directly consult, increased the dirigibility that accident prediction is consulted the accident prediction of the equipment among the figure.
Preferably, web document is html (Hyper Mark-up Language, a HTML (Hypertext Markup Language)) document, and HTML (Hypertext Markup Language) is a kind of widely used webpage descriptive language.
Fig. 2 shows accident prediction according to an embodiment of the invention and integrates process flow diagram, may further comprise the steps:
S202, the special worker of management and running works out power grid accident prediction scheme electronic document;
S204 uploads electronic document to dispatch automated system prediction scheme source directory;
S206, automated system converts accident prediction to the on all four Html format file of corresponding factory station and implementor name and dispatch automated system automatically and is stored under system's prediction scheme catalogue;
S208 judges whether to call from the prediction scheme interface;
S210 transfers corresponding factory station prediction scheme based on factory's station nomenclature principle from the accident prediction interface;
S212; From main wiring diagram, transfer corresponding factory station prediction scheme based on the equipment nomenclature principle;
S214; Accident prediction is showed.
In above-mentioned step S210, the management and running personnel can transfer the accident prediction at corresponding factory station according to the title at factory station from the accident prediction interface, as shown in Figure 3, the management and running personnel satisfy transformer station by click Lee in the accident prediction interface, just present the accident prediction that Lee satisfies transformer station in the browser interface shown in Figure 4, thereby realized consulting in browser interface accident prediction.
In above-mentioned step S212, the management and running personnel can realize consulting the accident prediction of relevant device according to device name from main wiring diagram, as shown in Figure 5, right-click menu can be associated with the accident prediction that Lee satisfies this equipment in the transformer station to the management and running personnel fast on the relevant device by satisfying Lee in transformer station's main wiring diagram, realizes consulting this equipment breakdown prediction scheme neatly.
In above-mentioned step S214, the management and running personnel can realize the consulting of accident prediction by above dual mode, shown in Fig. 4 and 6, and the accident prediction content revealing picture of phase shutout station that the browser interface system of being provides and equipment.
From above description, as can be seen, the above embodiments of the present invention have realized following technique effect: call by the integration of accident prediction in advance and the association of equipment in dispatch automated system, greatly facilitating the management and running personnel consults relevant power grid accident and handles prediction scheme under daily study and accident treatment situation, guarantee the correct processing of power grid accident, effectively shortened the power grid accident processing time.
Obviously, those skilled in the art should be understood that, above-mentioned each module of the present invention or each step can realize with the general calculation device, they can concentrate on the single calculation element, perhaps be distributed on the network that a plurality of calculation element forms, alternatively, they can be realized with the executable program code of calculation element, thereby, they can be stored in the memory storage and carry out by calculation element, perhaps they are made into each integrated circuit modules respectively, perhaps a plurality of modules in them or step are made into the single integrated circuit module and realize.Like this, the present invention is not restricted to any specific hardware and software combination.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (5)

1. an accident prediction call method that is used for dispatch automated system is characterized in that,
May further comprise the steps:
Establishment power grid accident prediction scheme electronic document;
Described accident prediction electronic document is uploaded to the prediction scheme source directory of dispatch automated system;
Described dispatch automated system is automatically converted to the on all four web document in corresponding factory station and implementor name and dispatch automated system with described accident prediction electronic document, and it is kept under system's prediction scheme catalogue;
Show that by browser interface described web document is to consult described power grid accident prediction scheme.
2. accident prediction call method according to claim 1 is characterized in that, and is described
Factory station and equipment in the power grid accident prediction scheme all have unique numbering in described dispatch automated system, and consistent with dispatch automated system.
3. accident prediction call method according to claim 1 is characterized in that, and is described
Show that by browser interface described web document may further comprise the steps:
In the application function of described dispatch automated system, increase the browser interface of described power grid accident prediction scheme;
Factory station that described browser interface is shown and equipment are associated with described web document under being kept at described system prediction scheme catalogue;
By described browser interface the factory station of described browser interface demonstration and the accident prediction of equipment are consulted.
4. accident prediction call method according to claim 1 is characterized in that, describedly shows that by browser interface described web document may further comprise the steps:
Add the accident prediction associated menu of described equipment in the device identification in electrical network and station wiring diagram;
Described associated menu is associated with described web document under being kept at described system prediction scheme catalogue;
By described associated menu the accident prediction of described equipment is consulted.
5. accident prediction call method according to claim 1 is characterized in that, described web document is the html document.
CN2009100920402A 2009-09-07 2009-09-07 Accident beforehand case calling method for dispatching automation system Pending CN102013041A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100920402A CN102013041A (en) 2009-09-07 2009-09-07 Accident beforehand case calling method for dispatching automation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100920402A CN102013041A (en) 2009-09-07 2009-09-07 Accident beforehand case calling method for dispatching automation system

Publications (1)

Publication Number Publication Date
CN102013041A true CN102013041A (en) 2011-04-13

Family

ID=43843212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100920402A Pending CN102013041A (en) 2009-09-07 2009-09-07 Accident beforehand case calling method for dispatching automation system

Country Status (1)

Country Link
CN (1) CN102013041A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103346564A (en) * 2013-07-24 2013-10-09 国家电网公司 Method for intelligently generating tripping sudden accident emergency plan of main transformer of transformer substation
CN104036374A (en) * 2014-07-08 2014-09-10 国网辽宁省电力有限公司 Method for assisting in disposing operating accidents of power grid
CN105719102A (en) * 2016-03-16 2016-06-29 江苏省电力公司常州供电公司 Intelligentized power grid accident plan processing method
CN106549423A (en) * 2016-10-11 2017-03-29 国家电网公司 Electric network fault multi-stage scheduling cooperative processing method and device
CN109062993A (en) * 2018-07-04 2018-12-21 深圳供电局有限公司 A kind of offline electric network fault Response project generation method and its device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103346564A (en) * 2013-07-24 2013-10-09 国家电网公司 Method for intelligently generating tripping sudden accident emergency plan of main transformer of transformer substation
CN104036374A (en) * 2014-07-08 2014-09-10 国网辽宁省电力有限公司 Method for assisting in disposing operating accidents of power grid
CN105719102A (en) * 2016-03-16 2016-06-29 江苏省电力公司常州供电公司 Intelligentized power grid accident plan processing method
CN106549423A (en) * 2016-10-11 2017-03-29 国家电网公司 Electric network fault multi-stage scheduling cooperative processing method and device
CN109062993A (en) * 2018-07-04 2018-12-21 深圳供电局有限公司 A kind of offline electric network fault Response project generation method and its device

Similar Documents

Publication Publication Date Title
US10169528B2 (en) Method and device for generating engineering topology of digital substation
CN102013041A (en) Accident beforehand case calling method for dispatching automation system
CN103440264B (en) The realization method and system of electric power field operation form
CN102567859A (en) Data integrated management system of intelligentized power supply system
CN103366051A (en) Method and system for modeling of primary equipment and secondary equipment
Kim et al. QVT-based model transformation to support unification of IEC 61850 and IEC 61970
CN109038473A (en) A kind of relay protection device constant value adjusting and nucleus correcting system based on file mode
CN103679557B (en) Power system operating mode data management system based on C/S framework and its implementation
CN104102973A (en) Realization method of integral operation and distributed deployment provincial and prefectural electric power scheduling data center
CN109062993A (en) A kind of offline electric network fault Response project generation method and its device
CN105809571A (en) Intelligent monitoring method and system for outputting scheduling operation tickets
Shwehdi et al. Proposed smart DC nano-grid for green buildings—A reflective view
CN105224739A (en) A kind of method and system being applied to the combing of PCB specification
CN103297520B (en) Operation of power networks service system and implementation method
CN105227639A (en) A kind of transformer station's remote pictures transfer approach and the alarm of a kind of transformer station direct transfer method
CN102064602A (en) Operating method of B/S framework networked electronic simulation drawing board system
CN103700024A (en) Automatic importing method of provincial and prefectural integrated telecontrol information based on D5000 system
CN1418394A (en) System with WEB/WAP-interface, for supervision of electrical power generation
KR101565895B1 (en) System for remote photovoltaic monitoring system and the monitoring method thereof
CN103018582A (en) Power quality monitoring system
CN102880988A (en) Topology comparison-based method and device for importing substation model
CN103377241B (en) The method and system of power grid data integration
Hayashi Japanese energy management in smart grid after the Great East Japan Earthquake
Artono et al. Smart panel system using internet of things
CN105787668A (en) Operation ticket generating method and system used for power grid remote operation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110413