CN105867270A - Power transmission and transformation equipment state abnormity identification and emergency response scheme automatic pushing method - Google Patents

Power transmission and transformation equipment state abnormity identification and emergency response scheme automatic pushing method Download PDF

Info

Publication number
CN105867270A
CN105867270A CN201610218504.XA CN201610218504A CN105867270A CN 105867270 A CN105867270 A CN 105867270A CN 201610218504 A CN201610218504 A CN 201610218504A CN 105867270 A CN105867270 A CN 105867270A
Authority
CN
China
Prior art keywords
emergency
accident
plan
power transmission
identification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610218504.XA
Other languages
Chinese (zh)
Other versions
CN105867270B (en
Inventor
唐元合
马洁
朱斌
吴奕
刘翌
朱海兵
熊浩
韩肖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Nanjing NARI Group Corp
Suzhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Jiangsu Electric Power Co Ltd, Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical State Grid Jiangsu Electric Power Co Ltd
Priority to CN201610218504.XA priority Critical patent/CN105867270B/en
Publication of CN105867270A publication Critical patent/CN105867270A/en
Application granted granted Critical
Publication of CN105867270B publication Critical patent/CN105867270B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/048Monitoring; Safety

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a power transmission and transformation equipment state abnormity identification and emergency response scheme automatic pushing method. The method comprises the following steps: step one, establishing an accident emergency scheme database; step two, monitoring and identifying abnormities of power transmission and transformation equipment, and storing abnormity events in an equipment abnormity event caching queue, and deleting failed abnormity events; and step three, examining each accident scheme in the emergency scheme database one by one, determining whether equipment associated with each accident scheme and a corresponding abnormity type simultaneously exit in the abnormity event caching queue, if so, removing switch-out sequences defined by the schemes, automatically starting switch-out control, and entering a scheme automatic pushing process. According to the invention, the accident emergency response scheme database is established in accordance with various equipment abnormity state processing rules, when equipment faults are discovered, an emergency scheme processing process is automatically started, the processing time of abnormities of the power transmission and transformation equipment is shortened, the existing faults are rapidly eliminated, and stable operation of a power grid is maintained.

Description

A kind of power transmission and transformation equipment state anomalous identification and the automatic method for pushing of plan for emergency handling
Technical field
The invention belongs to electric power network technique field, particularly relate to a kind of power transmission and transformation equipment state anomalous identification and plan for emergency handling from Dynamic method for pushing.
Background technology
Power transmission and transforming equipment, as the core of operation of power networks, monitors it is basic way in real time to its running status.In real time On the basis of supervision, maintain each equipment to run and be in steady statue, find the equipment that load is higher in real time, and carry out in time in order With process exactly, eliminate abnormality so that it is maintain below fault critical scope, system can be strengthened to a certain extent Stable, improve operation of power networks efficiency.
In engineering practice, the operation monitoring of equipment is typically, by setting telemetry limit value, to move closer to limit at remote data Value or carry out early warning when having exceeded limit value, tentatively judges operation of power networks state.The problem that presently, there are mainly has: equipment is transported Row supervision is not accurate enough, supervision angle is the most perfect, the non-architectonical of integrated supervision;Scattered trouble point in electrical network is lacked and closes The analysis of connection property;Appearance to abnormality is typically only capable to early warning, it is difficult to propose solution accurately;Emergence treatment scheme and Processing speed typically regulation and control person rule of thumb formed, and varies with each individual.
Major network runs the basis that equipment is operation of power networks, and the reason causing each equipment operation exception is various, and equipment running status is difficult With precognition, need found fault by power transmission and transformation equipment state integrated supervision in time, accurately and propose rapidly troubleshooting side Case, it is to avoid state deteriorating causes the catastrophe failure such as device damage or power shortage, improves electrical network utilization rate.
Summary of the invention
For the problems referred to above, the present invention sets up equipment state comprehensive monitoring mechanism, accurately and timely finds bus, power transmission line The fault of the equipment such as road, transformator or hidden danger, reflect equipment running status in real time.Rule are processed according to various kinds of equipment abnormality Rule sets up emergency management prediction scheme storehouse, automatically starts urgent prediction scheme handling process when discovering device fault, and regulation is flat in order Weigh each equipment load, quickly eliminates the fault existed, safeguards power grid operation.
Realizing above-mentioned technical purpose, reach above-mentioned technique effect, the present invention is achieved through the following technical solutions:
A kind of power transmission and transformation equipment state anomalous identification and the automatic method for pushing of plan for emergency handling, comprise the following steps:
Step one: set up emergency plan for accidents storehouse;
Step 2: monitor and identify the exception of power transmission and transforming equipment, stores in unit exception event buffer queue by anomalous event, And carry out checking management to unit exception event buffer queue, delete the anomalous event lost efficacy;
Step 3: check each bar accident prediction in emergency plan for accidents storehouse one by one, it is judged that the equipment of every accident prediction association and Whether corresponding Exception Type is present in anomalous event buffer queue, exists when simultaneously, takes out and draws road defined in prediction scheme Sequence, automatically starts and draws road control, enters prediction scheme and automatically pushes flow process.
In described step one, set up emergency plan for accidents storehouse include thus emergency preplan table, emergency plan for accidents device relationships table, Accident emergency draws road sequence table.
In described step one, the overall information of accident emergent management prediction scheme defined in emergency plan for accidents table, including prediction scheme ID, Title, description, associate device quantity, sequence draw way amount, and emergency plan for accidents table is pre-with accident emergency by prediction scheme ID Case device relationships table, accident emergency draw road sequence table association.
In described step one, trigger the faulty equipment information of prediction scheme association defined in emergency plan for accidents device relationships table, with Accident prediction association is one group of equipment, when all devices all occurs abnormal in group, draws road sequence table certainly by accident emergency Road control is drawn in dynamic startup, enters prediction scheme and automatically pushes flow process.
In described step one, accident emergency needs the switch automatically drawing road to believe when drawing the emergency processing of accident defined in the sequence table of road Breath, a corresponding Zu La road sequence of prediction scheme, the switch models of control derives from chopper table.
In described step 2, identify that object includes bus, exchange line segment, transformator;Identify content include busbar grounding identification, The out-of-limit identification of busbar voltage, busbar voltage fluctuation identification, device current overload identification, transformer overload capability identification.
Beneficial effects of the present invention:
The present invention proposes a kind of power transmission and transformation equipment state anomalous identification and the automatic method for pushing of plan for emergency handling, sets in tradition On the basis of standby Stateful Inspection, set up equipment state comprehensive inspection system, identify power transmission and transforming equipment abnormality, and fully profit Use abnormality recognition result, according to the accident prediction storehouse pre-build, analyze each scattered unit exception in electrical network in real time Relatedness between point, discovering device is abnormal accurately and in time, pushes prediction scheme assistant regulating and controlling and processes, and orderly adjustment is each Equipment load, shortens the process time that power transmission and transforming equipment is abnormal, quickly eliminates the fault existed, and improves operation of power networks efficiency.
Accompanying drawing explanation
Fig. 1 is power transmission and transformation equipment state anomalous identification and the flow process signal of the automatic method for pushing of plan for emergency handling of the present invention Figure.
Fig. 2 is the design structure diagram in emergency management prediction scheme storehouse.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with embodiment, the present invention is entered Row further describes.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not used to limit Determine the present invention.
Below in conjunction with the accompanying drawings the application principle of the present invention is explained in detail.
As it is shown in figure 1, a kind of power transmission and transformation equipment state anomalous identification and the automatic method for pushing of plan for emergency handling, including following Step:
Step one: set up emergency plan for accidents storehouse;
Step 2: monitor and identify the exception of power transmission and transforming equipment, stores in unit exception event buffer queue by anomalous event, And carry out checking management to unit exception event buffer queue, delete the anomalous event lost efficacy;
Step 3: check each bar accident prediction in emergency plan for accidents storehouse one by one, it is judged that the equipment of every accident prediction association and Whether corresponding Exception Type is present in anomalous event buffer queue, if exist the most simultaneously, and the most not triggering following process, If exist simultaneously, take out and draw road sequence defined in prediction scheme, automatically start and draw road control, enter prediction scheme and automatically push flow process;
As in figure 2 it is shown, in described step one, set up emergency plan for accidents storehouse and include therefore emergency preplan table, emergency plan for accidents Device relationships table, accident emergency draw road sequence table.
In described step one, the overall information of accident emergent management prediction scheme defined in emergency plan for accidents table, including prediction scheme ID, Title, description, associate device quantity, sequence draw way amount etc., and emergency plan for accidents table passes through prediction scheme ID and accident emergency Prediction scheme device relationships table, accident emergency draw road sequence table association.
In described step one, trigger the faulty equipment information of prediction scheme association defined in emergency plan for accidents device relationships table, with Usually one group of equipment of accident prediction association, when all devices all occurs abnormal in group, draws road sequence by accident emergency Table automatically starts and draws road control, enters prediction scheme and automatically pushes flow process.The equipment source of association is in bus, exchange line segment, transformation Three kinds of device types of device.
In described step one, accident emergency needs the switch automatically drawing road to believe when drawing the emergency processing of accident defined in the sequence table of road Breath, a corresponding Zu La road sequence of prediction scheme, the switch models of control derives from chopper table.
In described step 2, the anomaly monitoring of power transmission and transforming equipment includes: busbar grounding supervision, the out-of-limit supervision of busbar voltage, mother Line voltage pulsation supervision, device current overload monitor, transformer overload ability monitors that this 5 class monitors method, right by them Bus, exchange line segment, transformator monitor, when an abnormality is discovered, anomalous event are stored in unit exception event buffer team In row, storage content includes device type, device identification, Exception Type, time of origin.
Just can mate further, since single prediction scheme needs multiple equipment to meet abnormal condition simultaneously, and the monitoring of equipment state Journey is asynchronous process, it is therefore desirable to sets up unit exception event buffer queue, takes out every anomalous event from buffer queue, Checking whether each Time To Event and current time difference exceed the setting time, if exceeding, it being removed, no from caching It is re-used as the foundation that accident prediction judges, thus step 2 needs to manage anomalous event in anomalous event buffer queue, in time Delete the anomalous event lost efficacy.
In an embodiment of the present invention, the recognition methods of described busbar grounding is as follows: obtains bus three-phase voltage and calculates Three-phase imbalance value, when Voltage unbalance value is more than 15%, it is judged that for busbar grounding;The identification that described busbar voltage is out-of-limit Method is as follows: bus real-time voltage is crossed bound scope and is then judged as voltage out-of-limit;The identification side of described busbar voltage fluctuation Method is as follows: obtains busbar voltage maxima and minima on the same day in real time, and calculates the upwards difference between currency and maximum, Calculate the downward difference between currency and minima, when maxima and minima difference exceedes the 4.1% of rated voltage, sentence Break critical out-of-limit for busbar voltage fluctuation, when exceeding the 5% of rated voltage, it is judged that out-of-limit for busbar voltage fluctuation;Described equipment The recognition methods of current overload is as follows: monitoring wire or the current value of main transformer equipment in real time, when current loading rate reaches specified electricity Stream 90% time be judged as critical out-of-limit, reach to be judged as when 100% out-of-limit, reach to be judged as when 110% the most out-of-limit;Described The recognition methods of transformer overload ability is as follows: monitor the ratio of main transformer high-pressure side winding power and main transformer capacity, and root in real time Setting corresponding threshold value according to temperature, ratio is judged as main transformer overload when exceeding corresponding threshold.
In a kind of specific embodiment of the present invention, in shown step 3, definition prediction scheme S need to meet two conditions: 1) line Road L electric current is critical out-of-limit;2) bus B line voltage out-of-limit, prediction scheme needs to check in anomalous event buffer queue when checking and is No " critical out-of-limit " event that simultaneously there is circuit L and " voltage out-of-limit " event of bus B, if exist the most simultaneously, The most not triggering following process, if exist simultaneously, then the match is successful for prediction scheme, takes out and draws road sequence defined in prediction scheme, automatically opens Dong La road controls, and enters prediction scheme and automatically pushes flow process.
The ultimate principle of the present invention and principal character and advantages of the present invention have more than been shown and described.The technical staff of the industry It should be appreciated that the present invention is not restricted to the described embodiments, described in above-described embodiment and description, the present invention is simply described Principle, without departing from the spirit and scope of the present invention, the present invention also has various changes and modifications, these change Both fall within scope of the claimed invention with improvement.Claimed scope by appending claims and etc. Effect thing defines.

Claims (6)

1. a power transmission and transformation equipment state anomalous identification and the automatic method for pushing of plan for emergency handling, it is characterised in that: include following Step:
Step one: set up emergency plan for accidents storehouse;
Step 2: monitor and identify the exception of power transmission and transforming equipment, stores in unit exception event buffer queue by anomalous event, And carry out checking management to unit exception event buffer queue, delete the anomalous event lost efficacy;
Step 3: check each bar accident prediction in emergency plan for accidents storehouse one by one, it is judged that the equipment of every accident prediction association and Whether corresponding Exception Type is present in anomalous event buffer queue, exists when simultaneously, takes out defined in prediction scheme Draw road sequence, automatically start and draw road control, enter prediction scheme and automatically push flow process.
A kind of power transmission and transformation equipment state anomalous identification the most according to claim 1 and the automatic method for pushing of plan for emergency handling, It is characterized in that: in described step one, set up emergency plan for accidents storehouse and include that emergency plan for accidents table, accident emergency are pre- Case device relationships table, accident emergency draw road sequence table.
A kind of power transmission and transformation equipment state anomalous identification the most according to claim 2 and the automatic method for pushing of plan for emergency handling, It is characterized in that: in described step one, the overall information of accident emergent management prediction scheme defined in emergency plan for accidents table, Way amount, emergency plan for accidents table is drawn to pass through prediction scheme including prediction scheme ID, title, description, associate device quantity, sequence ID draws road sequence table to associate with emergency plan for accidents device relationships table, accident emergency.
A kind of power transmission and transformation equipment state anomalous identification the most according to claim 2 and the automatic method for pushing of plan for emergency handling, It is characterized in that: in described step one, trigger the fault of prediction scheme association defined in emergency plan for accidents device relationships table Facility information, associate with accident prediction is one group of equipment, when all devices all occurs abnormal in group, passes through accident Road sequence table should be jerked automatically start and draw road control, enter prediction scheme and automatically push flow process.
A kind of power transmission and transformation equipment state anomalous identification the most according to claim 2 and the automatic method for pushing of plan for emergency handling, It is characterized in that: in described step one, accident emergency needs automatically when drawing the emergency processing of accident defined in the sequence table of road Drawing the switching information on road, a corresponding Zu La road sequence of prediction scheme, the switch models of control derives from chopper table.
A kind of power transmission and transformation equipment state anomalous identification the most according to claim 1 and the automatic method for pushing of plan for emergency handling, It is characterized in that: in described step 2, identify that object includes bus, exchange line segment, transformator;Identification content includes Busbar grounding identification, the out-of-limit identification of busbar voltage, busbar voltage fluctuation identification, device current overload identification, transformator Overload capacity identification.
CN201610218504.XA 2016-04-08 2016-04-08 A kind of power transmission and transformation equipment state anomalous identification and plan for emergency handling automatic push method Active CN105867270B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610218504.XA CN105867270B (en) 2016-04-08 2016-04-08 A kind of power transmission and transformation equipment state anomalous identification and plan for emergency handling automatic push method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610218504.XA CN105867270B (en) 2016-04-08 2016-04-08 A kind of power transmission and transformation equipment state anomalous identification and plan for emergency handling automatic push method

Publications (2)

Publication Number Publication Date
CN105867270A true CN105867270A (en) 2016-08-17
CN105867270B CN105867270B (en) 2018-08-14

Family

ID=56637180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610218504.XA Active CN105867270B (en) 2016-04-08 2016-04-08 A kind of power transmission and transformation equipment state anomalous identification and plan for emergency handling automatic push method

Country Status (1)

Country Link
CN (1) CN105867270B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108765893A (en) * 2018-06-06 2018-11-06 广东电网有限责任公司 A kind of power failure alarm method and system based on metering automation system
CN109062993A (en) * 2018-07-04 2018-12-21 深圳供电局有限公司 Method and device for generating offline power grid fault handling plan
CN110378581A (en) * 2019-07-03 2019-10-25 中国铁道科学研究院集团有限公司电子计算技术研究所 Railway passenger station and passenger train emergency rating installations and facilities configuration method and device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102788933A (en) * 2012-09-25 2012-11-21 河北省电力公司 Method for utilizing automatic switch-out controller to search power grid low-current single-phase ground fault
CN103441478A (en) * 2013-08-21 2013-12-11 国家电网公司 AVC system bus-bar one-phase grounding sequence switch-out module and using method thereof
CN103543384A (en) * 2013-10-15 2014-01-29 国家电网公司 Method for determining bus ground faults
CN104751300A (en) * 2015-04-22 2015-07-01 国家电网公司 Method and system for quick emergency handling of power outage of transformer substation
CN104821900A (en) * 2015-05-29 2015-08-05 国家电网公司 Power communication network emergency repairing whole-course control system based on mobile platform application
CN105099783A (en) * 2015-08-20 2015-11-25 长威信息科技发展股份有限公司 Method and system for realizing automation of warning emergency disposal of business system
CN105159255A (en) * 2015-08-21 2015-12-16 成都格理特电子技术有限公司 Industrial safety emergency command integrated system-based emergency plan control method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102788933A (en) * 2012-09-25 2012-11-21 河北省电力公司 Method for utilizing automatic switch-out controller to search power grid low-current single-phase ground fault
CN103441478A (en) * 2013-08-21 2013-12-11 国家电网公司 AVC system bus-bar one-phase grounding sequence switch-out module and using method thereof
CN103543384A (en) * 2013-10-15 2014-01-29 国家电网公司 Method for determining bus ground faults
CN104751300A (en) * 2015-04-22 2015-07-01 国家电网公司 Method and system for quick emergency handling of power outage of transformer substation
CN104821900A (en) * 2015-05-29 2015-08-05 国家电网公司 Power communication network emergency repairing whole-course control system based on mobile platform application
CN105099783A (en) * 2015-08-20 2015-11-25 长威信息科技发展股份有限公司 Method and system for realizing automation of warning emergency disposal of business system
CN105159255A (en) * 2015-08-21 2015-12-16 成都格理特电子技术有限公司 Industrial safety emergency command integrated system-based emergency plan control method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108765893A (en) * 2018-06-06 2018-11-06 广东电网有限责任公司 A kind of power failure alarm method and system based on metering automation system
CN109062993A (en) * 2018-07-04 2018-12-21 深圳供电局有限公司 Method and device for generating offline power grid fault handling plan
CN110378581A (en) * 2019-07-03 2019-10-25 中国铁道科学研究院集团有限公司电子计算技术研究所 Railway passenger station and passenger train emergency rating installations and facilities configuration method and device

Also Published As

Publication number Publication date
CN105867270B (en) 2018-08-14

Similar Documents

Publication Publication Date Title
KR102218268B1 (en) Substation Automation Operating Device Equipped with Automatic Generation of Failure Judgment and Failure Recovery Scenarios
US9426248B2 (en) Data collection and transfer apparatus
WO2015043441A1 (en) Smart alarm inference method based on multi-scenario analysis
CN107506849A (en) A kind of intelligent optimization distribution transforming, which has a power failure, studies and judges system
CN107707380B (en) A kind of monitoring alarm method and apparatus
CN114594349B (en) Direct current insulation monitoring method and terminal in energy storage system
CN105867270A (en) Power transmission and transformation equipment state abnormity identification and emergency response scheme automatic pushing method
CN115333062B (en) Fault processing method and device for power distribution network system
EP2819270A1 (en) Network overseeing device and network overseeing method
US10476268B2 (en) Optimized decoupling and load shedding
CN105932777A (en) Intelligent processing method for transmission line fault and apparatus thereof
CN109655715A (en) Power grid fault identification method based on power grid fault intelligent identification equipment
CN114156901A (en) Method for detecting state abnormity of low-voltage distribution transformer reactive power compensation device
CN107271804A (en) The failure wave-recording method and apparatus of power system
CN108757418A (en) Piston type air compressor fault early warning method, piston type air compressor and track train
CN117239929A (en) Power control method, device, equipment and storage medium for power equipment
CN114400766A (en) OMS scheduling intelligent analysis system and method
CN111313383B (en) Method for judging validity of distribution line protection configuration
CN114204686A (en) Power distribution network power distribution state monitoring system and monitoring method thereof
CN113779327A (en) Equipment monitoring management system based on ship equipment full life cycle data
CN203102357U (en) An accident auxiliary processing system of a high-voltage DC convertor station
CN113097981A (en) Method for judging missing of monitoring alarm signal of transformer substation
CN111865822A (en) Service flow warning method and device based on intelligent substation switch
CN110851329A (en) Machine room state diagnosis system and method
CN116418121B (en) Substation secondary security system, method, device and computer equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170210

Address after: High road high tech Development Zone Nanjing city Jiangsu province 210032 No. 20

Applicant after: NARI Technology Development Co., Ltd.

Applicant after: STATE GRID JIANGSU ELECTRIC POWER COMPANY

Applicant after: SGCC NARI Nanjing Control System Co., Ltd.

Applicant after: Nanjing Nari Co., Ltd.

Applicant after: State Grid Corporation of China

Applicant after: SUZHOU POWER SUPPLY COMPANY OF STATE GRID JIANGSU ELECTRIC POWER COMPANY

Address before: High road high tech Development Zone Nanjing city Jiangsu province 210032 No. 20

Applicant before: NARI Technology Development Co., Ltd.

Applicant before: STATE GRID JIANGSU ELECTRIC POWER COMPANY

Applicant before: SGCC NARI Nanjing Control System Co., Ltd.

GR01 Patent grant
GR01 Patent grant