CN109057829B - 一种内装水囊组的干料成品袋及方法 - Google Patents
一种内装水囊组的干料成品袋及方法 Download PDFInfo
- Publication number
- CN109057829B CN109057829B CN201811037033.8A CN201811037033A CN109057829B CN 109057829 B CN109057829 B CN 109057829B CN 201811037033 A CN201811037033 A CN 201811037033A CN 109057829 B CN109057829 B CN 109057829B
- Authority
- CN
- China
- Prior art keywords
- bag
- dry material
- water bag
- water
- finished product
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 86
- 239000000463 material Substances 0.000 title claims abstract description 72
- 238000000034 method Methods 0.000 title claims abstract description 10
- 239000000203 mixture Substances 0.000 claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 15
- 239000010959 steel Substances 0.000 claims abstract description 15
- 230000000149 penetrating effect Effects 0.000 claims abstract description 4
- 235000008733 Citrus aurantifolia Nutrition 0.000 claims description 6
- 235000011941 Tilia x europaea Nutrition 0.000 claims description 6
- 239000010881 fly ash Substances 0.000 claims description 6
- 229910052602 gypsum Inorganic materials 0.000 claims description 6
- 239000010440 gypsum Substances 0.000 claims description 6
- 239000004571 lime Substances 0.000 claims description 6
- 238000007789 sealing Methods 0.000 claims description 3
- 230000008093 supporting effect Effects 0.000 abstract description 7
- 238000002955 isolation Methods 0.000 abstract description 6
- 238000005086 pumping Methods 0.000 abstract description 5
- 230000007547 defect Effects 0.000 abstract description 3
- 238000007711 solidification Methods 0.000 abstract description 3
- 230000008023 solidification Effects 0.000 abstract description 3
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Curing Cements, Concrete, And Artificial Stone (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明公开了一种内装水囊组的干料成品袋及方法,干料袋内布置有至少两个水囊组,水囊组的周围填充有干料组合物;水囊组包括水囊本体、水囊塞、阻塞器、钢绞线和拉环;水囊塞布置在水囊本体的对应端,水囊塞通过阻塞器固定在水囊本体的对应端,水囊塞上布置有穿出干料袋的钢绞线,露出干料袋的钢绞线上设置有拉环。通过在干料袋内增设相应个数的水囊组,使得干料成品袋可以在井下快速运输到需要支护的位置,干料成品袋在完全凝固前后都具有支撑顶板的功能并且干料成品袋本身就自带“隔离模板”,巧妙地“弥补了”泵入混凝土成型、凝固前需要隔离模板和临时单体支柱支护的缺点,有效的解决了泵入混凝土的繁琐,保证了顶板的支护效果。
Description
技术领域
本发明涉及井下支护技术领域,尤其涉及一种内装水囊组的干料成品袋及方法。
背景技术
对井下进行大面积永久支护时,往往会选择泵入混凝土进行支护。泵入的混凝土在形成墙体前必须配合隔离模板才能保证混凝土成墙体型,隔离模板使用量大,需要频繁的拆卸。同时,混凝土达到初凝前必须配合单体支柱进行临时支护,混凝土达到终凝的时间长达28天之久,需要等待时间比较长。
目前,泵入混凝土时需要的基本设备有井下搅拌机、井下输送泵、井下输送管道。毕竟,井下硐室或巷道的空间有限,这些设备的运输和存放会给矿方带来不小的麻烦。并且,混凝土在没有完全凝固前很有可能发生顶板冲击事故。因此,现有技术有待于跟更进一步的改进和发展。
发明内容
鉴于上述现有技术的不足,本发明的目的在于提供一种内装水囊组的干料成品袋及方法,能有效解决泵入混凝土的繁琐,防止顶板发生冲击危害,保证顶板的支护效果。
为解决上述技术问题,本发明方案包括:
一种内装水囊组的干料成品袋,其包括干料袋,其中,干料袋内布置有至少两个水囊组,水囊组的周围填充有干料组合物;水囊组包括水囊本体、水囊塞、阻塞器、钢绞线和拉环;水囊塞布置在水囊本体的对应端,水囊塞通过阻塞器固定在水囊本体的对应端,水囊塞上布置有穿出干料袋的钢绞线,露出干料袋的钢绞线上设置有拉环,水囊本体内填充有水,拉拽拉环通过钢绞线打开水囊塞,使水囊本体内的水快速流出,干料组合物通过水囊本体内的水迅速凝固。
所述的干料成品袋,其中,上述干料组合物由粉煤灰、石灰、石膏和赤泥组成,按照重量比,粉煤灰:石灰:石膏:赤泥=5:3:1:1。
所述的干料成品袋,其中,上述干料组合物为混凝土。
一种使用上述干料成品袋的方法,特征在于,其包括以下步骤:
A、在地面上将相应个数的水囊组布置在干料袋中的相应位置;
B、在地面上将干料组合物按照一定比例混合后填充在水囊组周围,直至充满整个干料袋后封袋;
C、将干料成品袋运至井下需要永久支护的位置,快速拉两侧的拉环使水囊组中的水流出,使干料袋内的干料组合物迅速凝固,直至堆叠干料成品袋的个数达到所需的宽度和高度,即可。
本发明提供了一种内装水囊组的干料成品袋及方法,通过在干料袋内增设相应个数的水囊组,比如两个水囊组,使得干料成品袋可以在井下快速运输到需要支护的位置,干料成品袋在完全凝固前后都具有支撑顶板的功能并且干料成品袋本身就自带“隔离模板”,巧妙地“弥补了”泵入混凝土成型、凝固前需要隔离模板和临时单体支柱支护的缺点,有效的解决了泵入混凝土的繁琐,防止了顶板发生冲击危害,保证了顶板的支护效果,本发明的使用方法简单、干料成品袋铺设打开水囊塞后干料组合物快速凝固就可以支护顶板,支护安全、可以大幅降低井下设备的操作成本;具有结构简单、使用方便、安全可靠、省心省力等有益效果。
附图说明
图1为本发明中干料成品袋的示意图;
图2位本发明中干料成品袋的俯视示意图。
具体实施方式
本发明提供了一种内装水囊组的干料成品袋及方法,为使本发明的目的、技术方案及效果更加清楚、明确,以下对本发明进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
本发明提供了一种内装水囊组的干料成品袋,其包括干料袋1,其中,干料袋1内布置有至少两个水囊组,水囊组的周围填充有干料组合物;水囊组包括水囊本体2、水囊塞3、阻塞器4、钢绞线5和拉环6;水囊塞3布置在水囊本体2的对应端,水囊塞3通过阻塞器4固定在水囊本体2的对应端,水囊塞3上布置有穿出干料袋1的钢绞线5,露出干料袋1的钢绞线5上设置有拉环6,水囊本体2内填充有水,拉拽拉环6通过钢绞线5打开水囊塞3,使水囊本体2内的水快速流出,干料组合物通过水囊本体1内的水迅速凝固。
更进一步的,干料组合物可以由粉煤灰、石灰、石膏和赤泥组成,按照重量比,粉煤灰:石灰:石膏:赤泥=5:3:1:1。当然干料组合物也可以选用混凝土。
本发明还提供了一种使用上述干料成品袋的方法,其包括以下步骤:
步骤一、在地面上将相应个数的水囊组布置在干料袋中的相应位置;
步骤二、在地面上将干料组合物按照一定比例混合后填充在水囊组周围,直至充满整个干料袋后封袋;
步骤三、将干料成品袋运至井下需要永久支护的位置,快速拉两侧的拉环6使水囊组中的水流出,使干料袋内的干料组合物迅速凝固,直至堆叠干料成品袋的个数达到所需的宽度和高度,即可。
当然,以上说明仅仅为本发明的较佳实施例,本发明并不限于列举上述实施例,应当说明的是,任何熟悉本领域的技术人员在本说明书的教导下,所做出的所有等同替代、明显变形形式,均落在本说明书的实质范围之内,理应受到本发明的保护。
Claims (2)
1.一种内装水囊组的干料成品袋,其包括干料袋,其特征在于,干料袋内布置有至少两个水囊组,水囊组的周围填充有干料组合物;水囊组包括水囊本体、水囊塞、阻塞器、钢绞线和拉环;水囊塞布置在水囊本体的对应端,水囊塞通过阻塞器固定在水囊本体的对应端,水囊塞上布置有穿出干料袋的钢绞线,露出干料袋的钢绞线上设置有拉环,水囊本体内填充有水,拉拽拉环通过钢绞线打开水囊塞,使水囊本体内的水快速流出,干料组合物通过水囊本体内的水迅速凝固;
上述干料组合物由粉煤灰、石灰、石膏和赤泥组成,按照重量比,粉煤灰:石灰:石膏:赤泥=5:3:1:1。
2.一种使用如权利要求1所述干料成品袋的方法,特征在于,其包括以下步骤:
A、在地面上将相应个数的水囊组布置在干料袋中的相应位置;
B、在地面上将干料组合物按照一定比例混合后填充在水囊组周围,直至充满整个干料袋后封袋;
C、将干料成品袋运至井下需要永久支护的位置,快速拉两侧的拉环使水囊组中的水流出,使干料袋内的干料组合物迅速凝固,直至堆叠干料成品袋的个数达到所需的宽度和高度,即可。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811037033.8A CN109057829B (zh) | 2018-09-06 | 2018-09-06 | 一种内装水囊组的干料成品袋及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811037033.8A CN109057829B (zh) | 2018-09-06 | 2018-09-06 | 一种内装水囊组的干料成品袋及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109057829A CN109057829A (zh) | 2018-12-21 |
CN109057829B true CN109057829B (zh) | 2023-12-15 |
Family
ID=64760722
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811037033.8A Active CN109057829B (zh) | 2018-09-06 | 2018-09-06 | 一种内装水囊组的干料成品袋及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109057829B (zh) |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2061348A (en) * | 1979-08-29 | 1981-05-13 | Gypsum Ind Ltd | Method of building using bags of water settable material |
JPH05248086A (ja) * | 1992-03-04 | 1993-09-24 | Onoda Cement Co Ltd | 軽量コンクリートの打設方法 |
JPH0868060A (ja) * | 1994-08-30 | 1996-03-12 | Tohoku Kaihatsu Consultant:Kk | 受水口及び連結装置を有する袋式コンクリート型枠並 びに該型枠を用いた諸構造物の構築方法 |
CN1186899A (zh) * | 1997-01-03 | 1998-07-08 | 长沙矿山研究院 | 矿山充填胶结剂 |
JP3072865U (ja) * | 2000-04-28 | 2000-11-02 | セントラル企画有限会社 | 水 嚢 |
CN2644514Y (zh) * | 2003-09-05 | 2004-09-29 | 陆见华 | 用于软基加固堆载预压的柱状水囊组 |
CN101182143A (zh) * | 2007-11-07 | 2008-05-21 | 北京航空航天大学 | 利用工业废渣制备复合型高膨胀性胶凝材料及其制备工艺 |
CN102587942A (zh) * | 2012-03-15 | 2012-07-18 | 惠兴田 | 一种预支撑袋铸隔离墙及其灌筑方法 |
CN202578778U (zh) * | 2012-05-12 | 2012-12-05 | 山东科技大学 | 沿空留巷钢筋密封体简易充填结构 |
CN102838336A (zh) * | 2011-06-22 | 2012-12-26 | 河南天方建设工程有限公司 | 一种现场浇注石膏空心墙体及其制备方法 |
CN202851078U (zh) * | 2012-09-17 | 2013-04-03 | 扬州中矿建筑新材料科技有限公司 | 一种高水材料充填柱袋体 |
CN103026000A (zh) * | 2010-04-22 | 2013-04-03 | 美康公司 | 带包层的可泵送支护 |
CN103130455A (zh) * | 2011-11-23 | 2013-06-05 | 洛阳路世丰土壤固化剂研究中心 | 赤泥砼及其生产方法 |
CN106988780A (zh) * | 2017-05-09 | 2017-07-28 | 山东科技大学 | 一种薄煤层采空区膏体充填施工方法 |
CN108223006A (zh) * | 2018-03-16 | 2018-06-29 | 北京瑞诺安科新能源技术有限公司 | 一种充填袋体、支护充填柱及构筑方法 |
CN208831021U (zh) * | 2018-09-06 | 2019-05-07 | 山东科技大学 | 一种内装水囊组的干料成品袋 |
-
2018
- 2018-09-06 CN CN201811037033.8A patent/CN109057829B/zh active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2061348A (en) * | 1979-08-29 | 1981-05-13 | Gypsum Ind Ltd | Method of building using bags of water settable material |
JPH05248086A (ja) * | 1992-03-04 | 1993-09-24 | Onoda Cement Co Ltd | 軽量コンクリートの打設方法 |
JPH0868060A (ja) * | 1994-08-30 | 1996-03-12 | Tohoku Kaihatsu Consultant:Kk | 受水口及び連結装置を有する袋式コンクリート型枠並 びに該型枠を用いた諸構造物の構築方法 |
CN1186899A (zh) * | 1997-01-03 | 1998-07-08 | 长沙矿山研究院 | 矿山充填胶结剂 |
JP3072865U (ja) * | 2000-04-28 | 2000-11-02 | セントラル企画有限会社 | 水 嚢 |
CN2644514Y (zh) * | 2003-09-05 | 2004-09-29 | 陆见华 | 用于软基加固堆载预压的柱状水囊组 |
CN101182143A (zh) * | 2007-11-07 | 2008-05-21 | 北京航空航天大学 | 利用工业废渣制备复合型高膨胀性胶凝材料及其制备工艺 |
CN103026000A (zh) * | 2010-04-22 | 2013-04-03 | 美康公司 | 带包层的可泵送支护 |
CN102838336A (zh) * | 2011-06-22 | 2012-12-26 | 河南天方建设工程有限公司 | 一种现场浇注石膏空心墙体及其制备方法 |
CN103130455A (zh) * | 2011-11-23 | 2013-06-05 | 洛阳路世丰土壤固化剂研究中心 | 赤泥砼及其生产方法 |
CN102587942A (zh) * | 2012-03-15 | 2012-07-18 | 惠兴田 | 一种预支撑袋铸隔离墙及其灌筑方法 |
CN202578778U (zh) * | 2012-05-12 | 2012-12-05 | 山东科技大学 | 沿空留巷钢筋密封体简易充填结构 |
CN202851078U (zh) * | 2012-09-17 | 2013-04-03 | 扬州中矿建筑新材料科技有限公司 | 一种高水材料充填柱袋体 |
CN106988780A (zh) * | 2017-05-09 | 2017-07-28 | 山东科技大学 | 一种薄煤层采空区膏体充填施工方法 |
CN108223006A (zh) * | 2018-03-16 | 2018-06-29 | 北京瑞诺安科新能源技术有限公司 | 一种充填袋体、支护充填柱及构筑方法 |
CN208831021U (zh) * | 2018-09-06 | 2019-05-07 | 山东科技大学 | 一种内装水囊组的干料成品袋 |
Also Published As
Publication number | Publication date |
---|---|
CN109057829A (zh) | 2018-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206016824U (zh) | 一种防止盾构空推管片位移的限位装置 | |
CN104234750B (zh) | 一种矿井快速自建移动水闸墙及其建筑方法 | |
CN107525541B (zh) | 一种低渗透性煤岩体劈裂渗透耦合注浆试验装置及方法 | |
CN106837418B (zh) | 一种矿用防爆梯形密闭墙及其构筑方法 | |
CN205296168U (zh) | 一种水下灌筑混凝土装置 | |
CN104446640A (zh) | 一种泡沫尾砂浆及其制浆注浆工艺 | |
CN109057829B (zh) | 一种内装水囊组的干料成品袋及方法 | |
CN206309353U (zh) | 一种分段砾石充填定位装置 | |
CN104005406A (zh) | 一种筒桩的施工方法及其桩筒结构 | |
CN106050303A (zh) | 一种井下巷道封堵方法和装置 | |
CN106049501A (zh) | 大落差向下输送混凝土的施工方法 | |
CN105421312B (zh) | 导流隧洞改建为弧形闸门控制后的通气孔及布置方法 | |
CN107013236A (zh) | 空间竖向岩溶管道封堵装置及封堵方法 | |
CN208831021U (zh) | 一种内装水囊组的干料成品袋 | |
CN204436425U (zh) | 一种双液注浆混合装置 | |
CN209115120U (zh) | 一种暗挖结构二衬混凝土拱顶防脱空装置 | |
CN111140252A (zh) | 一种循环式分层注浆装置 | |
CN204570696U (zh) | 高架桥基础处废弃污水管道施工系统 | |
CN103244073A (zh) | 松软煤层区域封闭式瓦斯抽放钻孔的封孔方法 | |
CN213574221U (zh) | 一种含胆快速自建水闸墙系统 | |
CN105696468B (zh) | 水中桥梁施工中的水下混凝土浇筑方法 | |
CN205348131U (zh) | 导流隧洞改建为弧形闸门控制后的通气孔 | |
CN104032742A (zh) | 一种基于双导管四料斗的水下混凝土灌注施工工艺 | |
CN201686965U (zh) | 导流隧洞现浇钢筋混凝土闸门 | |
CN203248193U (zh) | 煤矿井下联络横川填充系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |