CN109056795A CN201810933282.9A CN201810933282A CN109056795A CN 109056795 A CN109056795 A CN 109056795A CN 201810933282 A CN201810933282 A CN 201810933282A CN 109056795 A CN109056795 A CN 109056795A
Authority
CN
China
Prior art keywords
construction
plate
waterproof
support
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810933282.9A
Other languages
Chinese (zh)
Inventor
叶良锐
叶莉婷
邬敏
刘甫山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lujiang Rong Rui Construction Engineering Co Ltd
Original Assignee
Lujiang Rong Rui Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lujiang Rong Rui Construction Engineering Co Ltd filed Critical Lujiang Rong Rui Construction Engineering Co Ltd
Priority to CN201810933282.9A priority Critical patent/CN109056795A/en
Publication of CN109056795A publication Critical patent/CN109056795A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Electromagnetism (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a kind of skyscraper top-down construction methods, comprising the following steps: the construction of underground main structure: preparation of construction and surveying and locating;The production of structure outer;Slot section is excavated and the waterproof construction of the construction of clear slot and skyscraper and underground main structure.The present invention improves existing construction technology, not only simplifies working procedure, improves construction effect, and save construction material, reduces construction cost, while using corresponding waterproof measure to underground structure, it is ensured that obtain preferable waterproof effect.

Description

A kind of skyscraper top-down construction method
Technical field
The present invention relates to a kind of high-building construction method, specifically a kind of skyscraper top-down construction method.
Background technique
The general sense of skyscraper refers to the higher-height building of the more number of plies, but specifically reaches which kind of degree It can be regarded as high level, country variant has different regulations.In the U.S., 24.6m or 7 layer or more is considered as skyscraper;In Japan, 31m or 8 Layer or more be considered as skyscraper;In Britain, it is considered as skyscraper that must build equal to or more than 24.3m.China was from 2005 It plays residential housing of the regulation more than 10 layers and other civil buildings more than 24 meters high is skyscraper.
Reverse construction construction technology is high-rise state-of-the-art construction technical method at present, and principle: first edge is built Object underground chamber axis or surrounding construction diaphram wall or other supporting construction are built, while interior of building has off position to pour Or intermediate sup-poning pile and column are laid, the branch of superstructure self weight and construction loads is born before bottom plate back cover as construction period Support.Then one layer of construction ground of beam slab floor structure, the support very big as diaphram wall rigidity are then successively opened downwards Earth excavation and each layer underground structure is poured, until bottom plate back cover.Simultaneously as the floor structure on one layer of ground is completed, it is upper Portion's structure construction creates condition, it is possible to while the construction of superstructure is successively carried out upwards.Such ground is above and below simultaneously It constructs, until engineering terminates.
Summary of the invention
The purpose of the present invention is to provide a kind of skyscraper top-down construction methods, to solve to mention in above-mentioned background technique Out the problem of.
To achieve the above object, the invention provides the following technical scheme:
A kind of skyscraper top-down construction method, comprising the following steps:
1), the construction of underground main structure:
1.: preparation of construction and surveying and locating;
2.: the production of structure outer;
3.: slot section is excavated and clear slot: road surface broken first, when construction by the way of layering, excavation section by section, first using excavating Machine is cut the earth downwards to negative one layer, is then laterally excavated;Complete soon to complete after one section of excavation structure roof, plate in structure, The concreting of structure base slab and structural support posts works, and is constructed by the way of jumping digging, to structural support posts and column The concrete of lower strip can excavate the intercolumniation earthwork after reaching design strength;
4.: it on mechanical excavation to structure roof bottom absolute altitude after 10cm, is changed to artificial peaceful, after earth excavation to absolute altitude, sets Absolute altitude controls timber, and paving 50mm mountain flour is levelling, disposable plank sheathing or waterproof pluwood, plate thickness 18mm, template on mountain flour upper berth Start roof steel bar installation after laying, pillar reinforcing bar is previously inserted to soil while structure roof reinforcement construction In, intubating length is 50 times of Reinforcement diameters, is finished to reinforcing bar binding, and concreting work is started;
2), the construction of skyscraper:
1.: a layer concrete bed course is poured at the elevation line of structure roof bottom, sets up several first pillars, the second pillar of constructing, First pillar is that internal thread cylindrical structure is set inside upper end opening, and the second pillar is that lower end is equipped with and the first pillar phase interworking The externally threaded cylindrical structure closed, the second pillar are threadedly coupled with the first pillar;
2.: the construction of plate and roof supporting in support baseboard, support: in structure roof Construction Support bottom plate, in support plate and Roof supporting, support baseboard are fixedly connected with the upper end of the second pillar, and plate passes through several falseworks and support baseboard in support It is fixedly connected, the upside of plate is uniformly equipped with several lifting supports, the bottom of roof supporting and stretching for lifting support in support End is fixedly connected.
As a further solution of the present invention: in step 1), excavation width control in 10 meters, length control 15 meters with It is interior, and according to 1:2.5 slope.
As further scheme of the invention: in step 1), concrete will be using pumping, and the side's of pouring amount exists every time 1000m or more.
As further scheme of the invention: the waterproof measure of underground main structure 2 are as follows: seam cold for bottom plate is being applied Working hour answers indwelling ribbet or indwelling sealing rod, after construction, increases twice additional waterproof course, two layers of waterproof in structure surface layer Polyurethane coating waterproof layer and cement-base infiltration crystallization type water-proof layer is respectively adopted in extra play.
As further scheme of the invention: using on top plate can prevent with the polyurethane coating of the closely knit stickup of structure The width of 30cm on the upward continuous laying to diaphram wall of water layer, and the waterproof layer of one layer of same material is added at turning.
As further scheme of the invention: carrying out dabbing processing in diaphram wall and each veneer structure handover position And one of cement-base infiltration crystallization type rigid waterproof layer is brushed, the impermeability that water reverse osmosis effect improves concrete is met using it Energy.
As further scheme of the invention: construction joint position carries out anti-watertight using 250mm steel plate luting waterstop Envelope processing, cannot use steel plate luting waterstop position, carry out waterproof sealing using 30mm × 20mm hydro-expansive rubber item Processing;Horizontal construction joint position between middle plate and abutment wall carries out strong water-proofing treatment by the way of pre-buried 30 pipe slip casting of φ;? Deformation joint position, inside configuration carry out water-proofing treatment using PVC waterstop buried in 300mm wide, and outside uses external labeling type PVC Waterstop is handled.
Compared with prior art, not only simple the beneficial effects of the present invention are: the present invention improves existing construction technology Change working procedure, improve construction effect, and save construction material, reduces construction cost, while to underground structure using corresponding Waterproof measure, it is ensured that obtain preferable waterproof effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of skyscraper top-down construction method.
Fig. 2 is the structural schematic diagram of underground main structure in skyscraper top-down construction method.
Fig. 3 is the partial enlargement diagram in Fig. 1 at A.
In figure: 1- structure outer, the underground 2- main structure, the road surface 3-, the first pillar of 4-, the second pillar of 5-, 6- support bottom Plate, 8- roof supporting, 9- lifting support, 10- falsework, 11- stud, 12- structure roof, 13- knot in plate, 7- support Plate, 14 structure base slabs, 15- structural support posts in structure.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1~3, in the embodiment of the present invention, a kind of skyscraper top-down construction method, comprising the following steps:
1, the construction of underground main structure 2:
1.: preparation of construction and surveying and locating;
2.: the production of structure outer 1;
3.: slot section is excavated and clear slot: road surface broken first, when construction by the way of layering, excavation section by section, first using excavating Machine is cut the earth downwards to negative one layer, is then laterally excavated, and excavation width controls in 10 meters, and length controls within 15 meters, and presses According to 1:2.5 slope;Complete soon to complete after one section of excavation structure roof 12, plate 13, structure base slab 14 and structure in structure The concreting of support column 15 works, and is constructed by the way of jumping digging;To under structural support posts 15 and column strip it is mixed Solidifying soil can excavate the intercolumniation earthwork after reaching design strength;
4.: it on mechanical excavation to 12 bottom absolute altitude of structure roof after 10cm, is changed to artificial peaceful, after earth excavation to absolute altitude, beats The high control timber of bidding, paving 50mm mountain flour is levelling, disposable plank sheathing or waterproof pluwood, plate thickness 18mm on mountain flour upper berth;Mould Plate be laid with after i.e. start roof steel bar installation, while 12 reinforcement construction of structure roof by pillar reinforcing bar be previously inserted to In soil, intubating length is 50 times of Reinforcement diameters;It is finished to reinforcing bar binding, starts concreting work, concrete Will be using pumping, the side's of pouring amount is in 1000m or more every time;
2, the construction of skyscraper:
1.: a layer concrete bed course is poured at 12 bottom elevation line of structure roof, sets up several first pillars 4, is constructed second Column 5, the first pillar 4 are that internal thread cylindrical structure is set inside upper end opening, and the second pillar 5 is that lower end is equipped with and the first pillar 4 mutually matched externally threaded cylindrical structures, the second pillar 5 are threadedly coupled with the first pillar 4;
2.: the construction of plate 7 and roof supporting 8 in support baseboard 6, support: Construction Support bottom plate 6, support in structure roof 12 Middle plate 7 and roof supporting 8, support baseboard 6 are fixedly connected with the upper end of the second pillar 5, and plate 7 passes through several falseworks in support 10 are fixedly connected with support baseboard 6, and the upside of plate 7 is uniformly equipped with several lifting supports 9, the bottom of roof supporting 8 in support It is fixedly connected with the telescopic end of lifting support 9;
Preferably, in the present embodiment, the waterproof measure of underground main structure 2 are as follows: seam cold for bottom plate answers indwelling to look forward in construction Mouth seam or indwelling sealing rod after construction, increase twice additional waterproof course in structure surface layer, two layers of additional waterproof course is adopted respectively With polyurethane coating waterproof layer and cement-base infiltration crystallization type water-proof layer;Using on top plate can be with the poly- ammonia of the closely knit stickup of structure Ester paint, the width of 30cm on the upward continuous laying to diaphram wall of waterproof layer, and one layer of same material is added at turning Waterproof layer;Dabbing processing is carried out in diaphram wall and each veneer structure handover position and brushes cement-base infiltration crystallization type together Rigid waterproof layer meets the anti-permeability performance that water reverse osmosis effect improves concrete using it;Construction joint position, using 250mm steel Plate luting waterstop carries out waterproof sealing processing, cannot use steel plate luting waterstop position, meets water using 30mm × 20mm Expanded rubber item carries out waterproof sealing processing;Horizontal construction joint position between middle plate and abutment wall, using pre-buried 30 pipe slip casting of φ Mode carry out strong water-proofing treatment;At deformation joint position, inside configuration is prevented using buried PVC waterstop in 300mm wide Water process, outside are handled using external labeling type PVC waterstop.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (7)

1. a kind of skyscraper top-down construction method, which comprises the following steps:
1), the construction of underground main structure (2):
1.: preparation of construction and surveying and locating;
2.: the production of structure outer (1);
3.: slot section is excavated and clear slot: road surface broken first, when construction by the way of layering, excavation section by section, first using excavating Machine is cut the earth downwards to negative one layer, is then laterally excavated;Complete soon to complete after one section of excavation structure roof (12), in structure The concreting of plate (13), structure base slab (14) and structural support posts (15) works, and is constructed by the way of jumping digging, to The concrete of strip can excavate the intercolumniation earthwork after reaching design strength under structural support posts (15) and column;
4.: on the absolute altitude of mechanical excavation to structure roof (12) bottom after 10cm, be changed to it is artificial peaceful, after earth excavation to absolute altitude, Absolute altitude control timber is set, paving 50mm mountain flour is levelling, disposable plank sheathing or waterproof pluwood on mountain flour upper berth, plate thickness 18mm, Template starts roof steel bar installation after being laid with, and inserts pillar reinforcing bar in advance while structure roof (12) reinforcement construction Enter into soil, intubating length is 50 times of Reinforcement diameters, is finished to reinforcing bar binding, and concreting work is started;
2), the construction of skyscraper
1.: a layer concrete bed course is poured at the elevation line of structure roof (12) bottom, sets up several first pillars (4), construction the Two pillars (5), the first pillar (4) are to set internal thread cylindrical structure inside upper end opening, and the second pillar (5) is equipped with for lower end With the mutually matched externally threaded cylindrical structure of the first pillar (4), the second pillar (5) is threadedly coupled with the first pillar (4);
2.: the construction of plate (7) and roof supporting (8) in support baseboard (6), support: the Construction Support bottom on structure roof (12) Plate (7) and roof supporting (8) in plate (6), support, support baseboard (6) is fixedly connected with the upper end of the second pillar (5), in support Plate (7) is fixedly connected by several falseworks (10) with support baseboard (6), plate (7) in support if upside be uniformly equipped with The bottom of dry lifting support (9), roof supporting (8) is fixedly connected with the telescopic end of lifting support (9).
2. skyscraper top-down construction method according to claim 1, which is characterized in that in step 1), excavation width Control is in 10 meters, and length controls within 15 meters, and according to 1:2.5 slope.
3. skyscraper top-down construction method according to claim 1, which is characterized in that in step 1), concrete will Using pumping, the side's of pouring amount is in 1000m or more every time.
4. skyscraper top-down construction method according to claim 1, which is characterized in that underground main structure (2) Waterproof measure are as follows: seam cold for bottom plate answers indwelling ribbet or indwelling sealing rod in construction, after construction, in structural plane Layer increases twice additional waterproof course, and polyurethane coating waterproof layer and cement-base infiltration crystallization type is respectively adopted in two layers of additional waterproof course Waterproof layer.
5. skyscraper top-down construction method according to claim 4, which is characterized in that using on top plate can be with knot The polyurethane coating of the closely knit stickup of structure, the width of 30cm on the upward continuous laying to diaphram wall of waterproof layer, and at turning Add the waterproof layer of one layer of same material.
6. skyscraper top-down construction method according to claim 5, which is characterized in that in diaphram wall and each layer Hardened structure handover position carries out dabbing processing and brushes one of cement-base infiltration crystallization type rigid waterproof layer, and it is reverse to meet water using it The anti-permeability performance of osmosis raising concrete.
7. skyscraper top-down construction method according to claim 6, which is characterized in that construction joint position uses 250mm steel plate luting waterstop carry out waterproof sealing processing, steel plate luting waterstop position cannot used, using 30mm × 20mm hydro-expansive rubber item carries out waterproof sealing processing;Horizontal construction joint position between middle plate and abutment wall, using pre-buried φ The mode of 30 pipe slip castings carries out strong water-proofing treatment;At deformation joint position, inside configuration is using buried PVC sealing in 300mm wide Band carries out water-proofing treatment, and outside is handled using external labeling type PVC waterstop.
CN201810933282.9A 2018-08-16 2018-08-16 A kind of skyscraper top-down construction method Pending CN109056795A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810933282.9A CN109056795A (en) 2018-08-16 2018-08-16 A kind of skyscraper top-down construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810933282.9A CN109056795A (en) 2018-08-16 2018-08-16 A kind of skyscraper top-down construction method

Publications (1)

Publication Number Publication Date
CN109056795A true CN109056795A (en) 2018-12-21

Family

ID=64686217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810933282.9A Pending CN109056795A (en) 2018-08-16 2018-08-16 A kind of skyscraper top-down construction method

Country Status (1)

Country Link
CN (1) CN109056795A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736757A (en) * 2009-12-04 2010-06-16 上海市第二建筑有限公司 Two-way synchronous construction method of tube structure of high-rise building
CN103741714A (en) * 2013-12-09 2014-04-23 中国建筑第二工程局有限公司 Construction method for full cover-excavation reverse method of underground engineering
CN104652444A (en) * 2013-11-21 2015-05-27 中冶天工上海十三冶建设有限公司 Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN205776347U (en) * 2016-06-22 2016-12-07 中铁第四勘察设计院集团有限公司 Novel cover for subway station digs against making structural system
CN106320377A (en) * 2016-08-31 2017-01-11 中铁二局工程有限公司 Water-rich soft soil area deep foundation pit cover and excavation top-down construction method
CN206070562U (en) * 2016-08-17 2017-04-05 广州地铁设计研究院有限公司 Subassembly formula underground structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736757A (en) * 2009-12-04 2010-06-16 上海市第二建筑有限公司 Two-way synchronous construction method of tube structure of high-rise building
CN104652444A (en) * 2013-11-21 2015-05-27 中冶天工上海十三冶建设有限公司 Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN103741714A (en) * 2013-12-09 2014-04-23 中国建筑第二工程局有限公司 Construction method for full cover-excavation reverse method of underground engineering
CN205776347U (en) * 2016-06-22 2016-12-07 中铁第四勘察设计院集团有限公司 Novel cover for subway station digs against making structural system
CN206070562U (en) * 2016-08-17 2017-04-05 广州地铁设计研究院有限公司 Subassembly formula underground structure
CN106320377A (en) * 2016-08-31 2017-01-11 中铁二局工程有限公司 Water-rich soft soil area deep foundation pit cover and excavation top-down construction method

Similar Documents

Publication Publication Date Title
CN103741714B (en) Underground engineering full sheltered reverse excavation construction method
CN105178357B (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN109026064B (en) Construction method for large-span multi-arch tunnel with semi-bright and semi-dark
CN102392549B (en) Construction working method for seamless prestressed-concrete self-waterproof clean water reservoir
CN104060629B (en) The superimposed wall construction method in covered back-digging subway station and portable side wall formwork jumbo
CN106854873A (en) A kind of engineering method and garage parking in precast spliced sinking type garage parking
CN102587416B (en) Construction method of basement attached lane structure
CN105862873A (en) Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit
CN102430277B (en) Coarse grid sunk well for physically processing waste water and construction method thereof
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN108505805A (en) Large-scale cast-in-place pond and its construction method are split in expansion reinforcing band control
CN107700474A (en) A kind of existing construction foundation reinforcement means and campshed formula diaphram wall
CN103822017A (en) Construction method based on laying of cable duct bank
CN202466623U (en) Basement attached lane structure
CN112813757B (en) Foam light soil composite roadbed construction method for bridge head transition treatment
CN110106915A (en) One kind exempts from that support is inverse to make underground engineering construction method and underground construction structure
CN207211188U (en) Outer wall of underground structure HCMW engineering methods overlap wall
CN112012762B (en) Construction method of double-layer secondary lining multi-arch tunnel structure
CN103469828A (en) Construction method of hydrophobic structure of post-cast strip of bottom plate of basement
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
CN112411597A (en) Construction method of side formwork of underground bearing platform
CN109680722B (en) Construction method for directly reserving external building access port on basement outer wall
CN204645093U (en) Poured band of outer wall of basement advanced processing constructs
CN207727603U (en) Big cushion cap deep basal pit formwork supporting system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221