CN107700474A - A kind of existing construction foundation reinforcement means and campshed formula diaphram wall - Google Patents

A kind of existing construction foundation reinforcement means and campshed formula diaphram wall Download PDF

Info

Publication number
CN107700474A
CN107700474A CN201711023006.0A CN201711023006A CN107700474A CN 107700474 A CN107700474 A CN 107700474A CN 201711023006 A CN201711023006 A CN 201711023006A CN 107700474 A CN107700474 A CN 107700474A
Authority
CN
China
Prior art keywords
pile
bearing
foundation
bearing pile
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711023006.0A
Other languages
Chinese (zh)
Inventor
王建平
刘明星
张庆符
冯杨
姚修文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201711023006.0A priority Critical patent/CN107700474A/en
Publication of CN107700474A publication Critical patent/CN107700474A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Abstract

The invention discloses a kind of existing construction foundation reinforcement means and campshed formula diaphram wall:Determine the quantity of bearing pile and support pile;Excavate base tunnel, operation hole;Bearing pile is installed;Alternation excavation base tunnel and the construction for carrying out all bearing piles, until all carrying pile driving constructions finish;Using the processing means same with processing bearing pile, support pile is pressed into successively;Successively excavation pit;Using manually being repaired to foundation pit walls;In bearing pile and support pile flank hole bar planting;Crater wall linked network;Arrange drainpipe;Gunite concrete on to foundation pit walls net muscle;Sprinkle water and conserve in spray plane;Form campshed formula continuous underground wall structure.The present invention in the existing building bottom of foundation by way of being pushed down into precast reinforced concrete piles, each serve as the support action of side slope after reinforcement and the excavation of foundation pit to original basis, the effective compensation bearing capacity of basic weakened part, eccentricity of foundation compression is avoided, improve the stability of structure.

Description

A kind of existing construction foundation reinforcement means and campshed formula diaphram wall
Technical field
The invention belongs to strengthening of foundation during existing building enlarging and multiple material handling method of deep foundation pit field, and in particular to one kind was both There are building lot reinforcement means and campshed formula diaphram wall.
Background technology
At present, in China also there is a large amount of tier buildings, these buildings are built in the eighties in last century or former mostly, main Will be based on brick mix structure and frame structure.In recent years, with the fast development of economic construction of China, the structure of inhering architecture Arrangement can not meet the new requirement using function.Existing building is changed, extended, increase usable floor area is passed through in engineering Be commonly encountered, how to be handled between new and old basis be ensure that can existing building and newly-built part cooperate it is important in Hold.
Based process when being extended for existing building, conventional way have two kinds:The first is Extended chemotherapy section Method, i.e., by newly-laid concrete basis after the bar planting in original basis, new and old basis is connected.The shortcomings that method is:It is 1. new It is to be rigidly connected to be formed between old basis overall, because the sedimentation of enlargement ground can cause the cracking of mass-type foundation, so as to Cause cracking or the inclination of original building structure.The load on the basis of 2. enlargement structure and original structure act on belongs to partially Heart load, causes eccentricity of foundation to be pressurized, and basic easily produce is ftractureed.3. the foundation elevation of enlargement and original building is necessary Unanimously, the flexibility of enlargement underground structure arrangement is limited.Second method is to both using pile foundation or other modes There is structure foundation to carry out preventative process, pile foundation is arranged on the outside of original basis, need to take more space, makes new and old basis It is difficult to close, superstructure processing becomes difficult, meanwhile, the old basis of weakening can not obtain reinforcement.
The content of the invention
To solve problems of the prior art, it is an object of the present invention to provide a kind of reinforcing of existing construction foundation Method and campshed formula diaphram wall.
To achieve these goals, the present invention, which adopts the following technical scheme that, is solved:
A kind of existing construction foundation reinforcement means, specifically includes following steps:
(1) quantity and embedded depth of bearing pile and support pile, the installation of the two interval are determined;
(2) it is vertical at a certain distance from the outward flange on existing building basis in the corresponding position of each bearing pile Excavate base tunnel;
(3) operation hole is excavated;
(4) the vertically-mounted first segment prefabricated pile at bearing pile orientation axis in operation hole;
(5) remaining vertically-mounted prefabricated pile successively above first prefabricated pile, obtains bearing pile;
(6) removal pile compacting equipment, precompressed is carried out to bearing pile and underpins processing, carrying pile driving construction is completed;
(7) repeat step (2)~(6) operate, and alternation excavation base tunnel and the construction for carrying out all bearing piles, are held until all Pile driving construction is carried to finish;
(8) repeat step (2)~(6), using the processing means same with processing bearing pile, support pile is pressed into branch successively The design attitude of fender pile;
(9) the foundation ditch sideline excavated is intended according to enlargement, successively excavation pit;
(10) have a shave:After the completion of being excavated per layer soil body, using manually being repaired to foundation pit walls;
(11) anchored in bearing pile and the bar planting of support pile flank hole and with epoxy resin mortar;
(12) crater wall linked network:Overlapped using transverse steel mesh sheet and pile body bar planting;
(13) if any sluicing, drainpipe is arranged;
(14) to gunite concrete on foundation pit walls net muscle;
(15) conserve:After gunite concrete final set, sprinkle water and conserve in spray plane;
(16) concrete strength to be sprayed is conserved to the 70% of design strength, repeats above-mentioned (11)~(15) operation, directly To excavation of foundation pit to projected depth, campshed formula continuous underground wall structure is formed.
Further, in step (1), the spacing of bearing pile and adjacent support pile is not more than 2.0m.
Further, in step (2), vertical excavate is led at 10~20cm of outward flange apart from existing building basis Hole, the planar dimension of the base tunnel are 1.2m × 1.0m~1.5m × 1.0m, the depth of base tunnel to the existing building bottom of foundation 1.5~2.0m below.
Further, in step (3), operation hole height is 1.5~2.0m.
Further, the length of the bearing pile is not less than plan excavation pit projected depth+1000mm.
Further, in step (8), the length of the bearing pile is not less than plan excavation pit projected depth+1000mm.
It is a further object of the invention to provide a kind of campshed formula diaphram wall, including it is supported on existing building The multiple bearing piles and support pile of ground beneath, both length are different and interval is installed;There is plant in bearing pile and support pile side Muscle, arrange that mesh sheet forms reinforced mesh in bar planting, concrete is injected with the reinforced mesh.
Further, the distance between the bearing pile and adjacent support pile are not more than 2.0m.
Further, a steel plate is fixed at the top plan of the bearing pile or support pile;In the steel plate and base One being fixed in space between plinth bottom surface and underpining steel pipe, it is coaxial with bearing pile that this underpins steel pipe, underpins steel pipe upper-end contact and holds out against The basis of existing building.
Further, horizontal drain pipe is inserted at the concrete topping back, branch armour layer is stretched out in its outer end.
It is as follows relative to prior art, beneficial effects of the present invention:
1st, by way of being pushed down into precast reinforced concrete piles in the existing building bottom of foundation, each serve as to former base The support action of side slope after the reinforcement of plinth and excavation of foundation pit, the effective compensation bearing capacity of basic weakened part, avoids basis Eccentric compression, improve the stability of structure;
2nd, load more than inhering architecture substrate is reached by ground deep supporting course by bearing pile, and substrate soil is entered Row off-load, it effectively prevent influence of the enlargement settlement of foundation to inhering architecture;
3rd, reinforced mesh is hung simultaneously between underpinned pile by stage excavation foundation ditch and sprays the microlith of some strength and thickness Concrete, combined type row-pile diaphragm wall is formed, campshed formula continuous underground wall structure is finally formed under original constructure base, Can not only be to deep basal pit effective support, while water-stop curtain can be formed to waterproof, seepage control, ensure enlargement foundation construction It can be smoothed out.The combined type row-pile diaphragm wall has the double action of carrying and bank protection concurrently.
4th, with the support technology, enlargement foundation ditch can be close to original building exterior wall and excavate vertically downward, can give Job site provides enough construction spaces, suitable for connection different between new and old basis.
Brief description of the drawings
Fig. 1 is existing building enlarging strengthening of foundation and the foundation pit supporting construction schematic diagram of the present invention;
Fig. 2 is Fig. 1 A-A profiles;
Fig. 3 is Fig. 2 B-B profiles.
Embodiment
As shown in Figure 1-Figure 3, existing construction foundation reinforcement means of the invention, specifically includes following steps:
(1) underpinned pile is divided into bearing pile according to the use function for the following underpinned pile of the substrate of existing building 1 for intending enlarging 11 and the two types of support pile 12, according to the basic 4 bottom surface above loads of existing building and enlargement foundation ditch adjacent thereto Cutting depth, strengthening of foundation and the quantity and embedded depth of bearing pile 11 and support pile 12 in foundation pit supporting project are determined respectively, Between the two every installation;Bearing pile 11 and support pile 12 are prefabricated pile, and pile shaft material uses armored concrete or steel pipe.Such as figure Shown in 2, the distance between bearing pile 11 and adjacent support pile 12 are not more than 2.0m;
(2) unwrapping wire positioning is carried out respectively to bearing pile 11 and support pile 12;
(3) operation of bearing pile 11 hole is excavated:In the corresponding position of bearing pile 11, apart from the outer of the basis 4 of existing building 1 Excavate base tunnel 2 at 10~20cm of edge vertically, the planar dimension of base tunnel 2 is 1.2m × 1.0m~1.5m × 1.0m, the depth of base tunnel 2 Spend to 1.5~2.0m below the existing building bottom of foundation;By part of the base tunnel 2 below basic 4 bottom surfaces of existing building to The direction horizontal extension of building 1, it is excavated at the orientation axis of bearing pile 11 of design requirement, and it is downward along depth under substrate Excavate, obtain wide 1.0m, high 1.5~2.0m operation hole 3;
(4) the vertically-mounted first segment prefabricated pile at the orientation axis of bearing pile 11 in operation hole 3, and carry out perpendicularity correction Just.Using the basic 4 bottom surface above loads of existing building as counter-force, using pile compacting equipment 5 (such as jack) by prefabricated pile vertically to It is pushed down into the foundation soil of operation hole bottom;For the ease of construction, it is 1.0~1.5m's that bearing pile 11 is pre-machined into length Multistage, scene carries out welding pile extension between every section;
(5) splice remaining prefabricated pile cutoff vertically successively above first segment prefabricated pile, replaced by constantly piling, pile extension Carry out, Site Welding is integral to form bearing pile 11 between each pile cutoff, until the length of the basic following prefabricated pile in 4 bottom surfaces of building Degree makes an end reach reliable supporting course 6 not less than plan excavation pit projected depth+1000mm, and so far, bearing pile 11 is pressed into Process terminates.
(6) removal pile compacting equipment 5, the steel plate 7 that a thickness is not less than 20mm is fixed at the top plan of bearing pile 11, then Bearing pile 11 is pressed again using underpinning device and carries out precompressed and underpins processing, to produce resilience after preventing the off-load of bearing pile 11. One is fixed between steel plate 7 and basic 4 bottom surfaces in space and underpins steel pipe, guarantee underpins steel pipe and bearing pile 11 is coaxial, underpins steel pipe Upper-end contact and the basis 4 for holding out against existing building 1;Removal underpinning device, the construction of bearing pile 11 are completed;
(7) repeat step (3)~(6) operate, alternation excavation base tunnel and the construction for carrying out all bearing piles 11, until all Bearing pile 11 is all constructed and finished;
(8) repeat step (3)~(6), using the processing means same with processing bearing pile 11, support pile 12 is pressed successively Enter the design attitude of support pile, the termination embedded depth of support pile 12 should be greater than enlargement design of foundation pit cutting depth 1.0m with On;
(9) the plan excavation pit sideline unwrapping wire positioning adjacent with existing building to enlargement;
(10) along the downward excavation pit of basic 4 outside verticals, this layer of cutting depth is not more than 2.0m, and human assistance is removed more The remaining earthwork, root out the soil body debris of crater wall loosening;
(11) have a shave:The layer soil body excavate after the completion of, using manually being repaired to foundation pit walls, cut existing basic 4 Ledge in foundation ditch vertical plane;
(12) using falsework or ladder in bearing pile 11 and the flank hole bar planting of support pile 12 and with epoxy resin mortar anchor Gu bar planting uses the reinforcing bars of 10~Φ of Φ 16, exposed parts length is not less than 500mm, vertical interval 500mm, individual layer arrangement;
(13) crater wall linked network:Reinforced mesh arrangement usesTwo-way elongated setting, net muscle and foundation pit walls Certain gap (being no less than 30mm) is kept between the soil body, overlap joint uses welded lap, transverse steel mesh sheet and pile body bar planting up and down Using welded lap;
(14) for soil layer moisture content be more than 30% excavation slope, at concrete topping back intubating length be 400~ 600mm, diameter are not less than 40mm horizontal drain pipe (bag filter screen), and branch armour layer, spacing 2m, to spray are stretched out in its outer end Ponding after concrete topping is drained.
(15) crater wall concrete is sprayed.Gunite concrete on to foundation pit walls net muscle, injection pressure between 0.2~0.5MPa, Strength grade of concrete is not less than C25, and the accelerator that firm place adds 0.3~0.6%, water are difficult in infiltration or pneumatically placed concrete Gray scale is 0.4~0.5, and field sampling makes sample inspection intensity;Preferably, gunite concrete thickness is 80~100mm, Bar dowel is vertically squeezed into crater wall as thickness control mark.Spraying operation segmentation and slicing is carried out successively, is sprayed in same segmentation Order should from bottom to top, and jet length control is in 0.6~1.0m, injection molding several times.
(16) conserve:After gunite concrete final set, sprinkle water and conserve in concrete surface;
(17) in order to ensure deep pit monitor, excavate and successively to carry out for soil body of deep foundation pit, the supporting when excavating.Therefore, Concrete strength to be sprayed is conserved to the 70% of design strength, repeat above-mentioned (10)~(16) operation to foundation ditch continue downwards by Layer excavates the foundation depth up to reaching design requirement, and campshed formula continuous underground wall structure 10 is finally formed under substrate.
Obtained substrate campshed formula diaphram wall is constructed using the method for the present invention, including is supported on existing building 1 The multiple bearing piles 11 and support pile 12 of the lower section of basis 4, both length are different and interval is installed;Preferably, bearing pile 11 and branch Fender pile 12 is the entirety that prefabricated pile cutoff is formed;
Preferably, the distance between bearing pile 11 and adjacent support pile 12 are not more than 2.0m;The length of the bearing pile 11 Degree is not less than plan excavation pit projected depth+1000mm.The length of the support pile 12 not less than intend excavation pit projected depth+ 1000mm。
Fixed at the top plan of bearing pile 11 or support pile 12 thickness be not less than 20mm steel plate 7, this be for Bearing pile 11 (or support pile 12) pressed and carries out precompressed again using underpinning device and underpins processing, with prevent bearing pile 11 (or Support pile 12) resilience is produced after off-load.One being fixed in space between steel plate 7 and basic 4 bottom surfaces and underpining steel pipe, this underpins steel pipe With bearing pile 11 (or support pile 12) coaxially, underpin steel pipe upper-end contact and hold out against the basis 4 of existing building 1.
There is bar planting in bearing pile 11 and the side of support pile 12 and anchored with epoxy resin mortar, the preferred steel of 10~Φ of Φ 16 of bar planting Muscle;Its exposed parts length is not less than 500mm, vertical interval 500mm, individual layer arrangement;Arrange that mesh sheet forms steel on reinforcing bar Muscle mesh sheet, certain gap (being no less than 30mm) keeping between reinforced mesh and the foundation pit walls soil body, overlap joint uses welded lap up and down, Transverse steel mesh sheet uses welded lap with pile body bar planting.
Preferably, for more firm supporting existing building basis 4, concrete is injected with reinforced mesh, is sprayed Pressure is not less than C25 between 0.2~0.5MPa, strength grade of concrete, and firm place is difficult in infiltration or pneumatically placed concrete and is added 0.3~0.6% accelerator, the ratio of mud is 0.4~0.5, and field sampling makes sample inspection intensity;Preferably, injection is mixed Solidifying soil thickness is 80~100mm.Spraying operation segmentation and slicing is carried out successively, and injection order should be sprayed from bottom to top in same segmentation Distance controlling is penetrated in 0.6~1.0m, several times injection molding.
In order to which the ponding after pneumatically placed concrete surface layer is drained, for the excavation slope that soil moisture in layer is larger, in concrete Surface layer back intubating length is 400~600mm, and diameter is not less than 40mm horizontal drain pipe (bag filter screen), and branch is stretched out in its outer end Armour layer, spacing 2m.
Embodiment:
In order to illustrate that the specific implementation process of the present invention and checking effectiveness of the invention, inventor provide following construction Embodiment.
Certain existing office building is 3 layers, long 49.8m, wide 6.0m, and brick mix structure, strip footing, buried depth of basement is -1.1m.By In the change using function, plan the office building add-story reconstruction as 5 layers of residential building and extended in the plane, enlarging is (i.e. new Build) partly it is 5 layers, floor space is 49.8m × 7.8m, and buried depth of basement is -1.8m.Enlargement basement process is used and opened greatly Dig, cutting depth about 5.0m, more than former office building embedded depth of foundation.In order to solve it is new and old basis between linking and relative settlement ask Topic, compares through kinds of schemes, it is determined that be pushed down into bearing pile and support pile using in former office building substrate, then excavation pit, M esh-hanging sprayed concrete between stake, form substrate campshed formula continuous underground wall structure.According to exploration report, Site Soil is glued with silty Based on soil, bearing stratum depth about 8m or so.By design requirement, 15 bearing piles, stake spacing are arranged altogether under former strip footing 3300mm, stake is long to be not less than 8.5m, and single pile termination pressure is 380kN.Support pile arranges 14, stake spacing 3300mm altogether, and stake is long Not less than 6.0m.
Specific construction process is as follows:
(1) underpinned pile is divided into bearing pile according to the use function for the following underpinned pile of the substrate of existing building 1 for intending enlarging 11 and the two types of support pile 12, arrange 15 bearing piles 11 altogether under former strip footing 4, stake spacing 3300mm, stake is long small In 8.5m;14 support piles 12 are arranged altogether, and stake spacing 3300mm, stake is long to be not less than 6.0m.Bearing pile 11 and support pile 12 are Prefabricated pile, pile shaft material are armored concrete, and the distance between bearing pile 11 and adjacent support pile 12 are 1.65m;
(2) unwrapping wire positioning is carried out respectively to bearing pile 11 and support pile 12;
(3) operation of bearing pile 11 hole is excavated:In the corresponding position of bearing pile 11, apart from the outer of the basis 4 of existing building 1 Excavate base tunnel 2 at edge 20cm vertically, the planar dimension of base tunnel 2 is 1.2m × 1.0m, the depth of base tunnel 2 to existing building base 2.0m below plinth bottom surface;Direction horizontal extension by from part of the base tunnel 2 below basic 4 bottom surfaces of existing building to building 1, It is excavated at the bearing pile orientation axis of design requirement, and is excavated downwards along depth under substrate, obtains wide 1.0m, high 1.80m Operation hole 3;
(4) the vertically-mounted first segment prefabricated pile at the orientation axis of bearing pile 11 in operation hole, and carry out perpendicularity correction just. Using the basic 4 bottom surface above loads of existing building 1 as counter-force, using pile compacting equipment 5 (such as jack) by prefabricated pile straight down In the foundation soil of push operation hole bottom;For the ease of construction, it is the more of 1.2~1.5m that bearing pile 11 is pre-machined into length Section, scene carries out welding pile extension between every section;
(5) splice remaining prefabricated pile cutoff vertically successively above first segment prefabricated pile, replaced by constantly piling, pile extension Carrying out, Site Welding is integral between pile cutoff, until the length of the basic following bearing pile in 4 bottom surfaces of building 1 is not less than 8.5m, And an end is reached reliable supporting course 6 (pressure is not less than 380kN), so far, the process of press in of bearing pile 11 terminates.
(6) removal pile compacting equipment 5, the steel plate 7 that a thickness is 20mm is fixed at the top plan of bearing pile 11, is then used Underpinning device is pressed bearing pile 11 and carries out precompressed again underpins processing, to produce resilience after preventing the off-load of bearing pile 11.In steel plate 7 One is fixed in space between basic 4 bottom surfaces and underpins steel pipe, guarantee underpins steel pipe and bearing pile 11 is coaxial, underpins and is terminated on steel pipe Touch and hold out against the basis 4 of existing building 1.Removal underpinning device, the construction of bearing pile 11 are completed;
(7) repeat step (3)~(6) operate, alternation excavation base tunnel and the construction for carrying out all bearing piles 11, until all Bearing pile 11 is all constructed and finished;
(8) repeat step (3)~(6), using the processing means same with processing bearing pile 11, support pile 12 is pressed successively Enter the design attitude of support pile, the termination embedded depth of support pile 12 should be not less than 6.0m;
(9) the foundation ditch sideline unwrapping wire positioning excavated is intended enlargement;
(10) unnecessary soil is removed along the old basic downward excavation pit of 4 outside vertical, cutting depth 2.0m, human assistance Side, root out the soil body debris of crater wall loosening;
(11) have a shave:The layer soil body excavate after the completion of, using manually being repaired to foundation pit walls, cut existing basic 4 Projection in foundation ditch vertical plane;
(12) using falsework or ladder in bearing pile 11 and the flank hole bar planting of support pile 12 and with epoxy resin mortar anchor Gu bar planting uses the reinforcing bars of Φ 12, exposed parts length is not less than 500mm, vertical interval 500mm, individual layer arrangement;
(13) crater wall linked network:Reinforced mesh arrangement usesTwo-way elongated setting, net muscle and foundation pit walls 30mm gap is kept between the soil body, overlap joint uses welded lap up and down, and transverse steel mesh sheet uses welded lap with pile body bar planting;
(14) it is 500mm in concrete topping back intubating length, a diameter of 50mm horizontal drain pipe (bag filter screen), its Branch armour layer, spacing 2m, so as to which the ponding after pneumatically placed concrete surface layer is drained are stretched out in outer end.
(15) crater wall concrete is sprayed.Gunite concrete on to foundation pit walls net muscle, spray pressure 0.5MPa, concrete strength Grade C25, the accelerator that firm place adds 0.3%, the ratio of mud 0.45, and field sampling are difficult in infiltration or pneumatically placed concrete Make sample inspection intensity.Gunite concrete thickness is 100mm, and bar dowel is vertically squeezed into crater wall as thickness control mark Will.Spraying operation segmentation and slicing is carried out successively, and injection order should from bottom to top in same segmentation, and jet length is controlled in 0.80m, Injection molding several times.
(16) conserve:After gunite concrete final set, sprinkle water and conserve in concrete surface;
(17) concrete strength to be sprayed is conserved to the 70% of design strength, repeats above-mentioned (10)~(16) operation to base Hole continues successively to excavate the foundation depth up to reaching design requirement downwards, and campshed formula diaphram wall is finally formed under substrate Structure 10.
Through multiple settlement observation during the engineering construction and after being completed, old basis is without sinking, and difference is sunk between new and old basis Drop amount is less than 1.5cm, reinforces all right.

Claims (10)

1. a kind of existing construction foundation reinforcement means, it is characterised in that specifically include following steps:
(1) quantity and embedded depth of bearing pile and support pile, the installation of the two interval are determined;
(2) in the corresponding position of each bearing pile, excavated vertically at a certain distance from the outward flange on existing building basis Base tunnel;
(3) operation hole is excavated;
(4) the vertically-mounted first segment prefabricated pile at bearing pile orientation axis in operation hole;
(5) remaining vertically-mounted prefabricated pile successively above first prefabricated pile, obtains bearing pile;
(6) removal pile compacting equipment, precompressed is carried out to bearing pile and underpins processing, carrying pile driving construction is completed;
(7) repeat step (2)~(6) operate, alternation excavation base tunnel and the construction for carrying out all bearing piles, until all bearing piles Construction finishes;
(8) repeat step (2)~(6), using the processing means same with processing bearing pile, support pile is pressed into support pile successively Design attitude;
(9) the foundation ditch sideline excavated is intended according to enlargement, successively excavation pit;
(10) have a shave:After the completion of being excavated per layer soil body, using manually being repaired to foundation pit walls;
(11) anchored in bearing pile and the bar planting of support pile flank hole and with epoxy resin mortar;
(12) crater wall linked network:Overlapped using transverse steel mesh sheet and pile body bar planting;
(13) if any sluicing, drainpipe is arranged;
(14) to gunite concrete on foundation pit walls net muscle;
(15) conserve:After gunite concrete final set, sprinkle water and conserve in spray plane;
(16) concrete strength to be sprayed is conserved to the 70% of design strength, above-mentioned (11)~(15) operation is repeated, until base Hole, which is excavated, arrives projected depth, forms campshed formula continuous underground wall structure.
2. existing construction foundation reinforcement means as claimed in claim 1, it is characterised in that in step (1), bearing pile with it is adjacent The spacing of support pile be not more than 2.0m.
3. existing construction foundation reinforcement means as claimed in claim 1, it is characterised in that in step (2), built apart from existing Build thing basis 10~20cm of outward flange places it is vertical excavate base tunnel, the planar dimension of the base tunnel be 1.2m × 1.0m~1.5m × 1.0m, 1.5~2.0m below depth to the existing building bottom of foundation of base tunnel.
4. existing construction foundation reinforcement means as claimed in claim 1, it is characterised in that in step (3), the operation hole is high Spend for 1.5~2.0m.
5. existing construction foundation reinforcement means as claimed in claim 1, it is characterised in that the length of the bearing pile is not less than Intend excavation pit projected depth+1000mm.
6. existing construction foundation reinforcement means as claimed in claim 1, it is characterised in that in the step (8), the carrying The length of stake is not less than plan excavation pit projected depth+1000mm.
A kind of 7. campshed formula diaphram wall, it is characterised in that multiple carryings including being supported on existing building ground beneath Stake and support pile, both length are different and interval is installed;There is bar planting in bearing pile and support pile side, mesh sheet is arranged in bar planting Reinforced mesh is formed, concrete is injected with the reinforced mesh.
8. campshed formula diaphram wall as claimed in claim 1, it is characterised in that the bearing pile and adjacent support pile it Between distance be not more than 2.0m.
9. campshed formula diaphram wall as claimed in claim 1, it is characterised in that on the top of the bearing pile or support pile A steel plate is fixed at transverse plane;Fix one in space between the steel plate and the bottom of foundation and underpin steel pipe, this underpin steel pipe with Bearing pile is coaxial, underpins steel pipe upper-end contact and holds out against the basis of existing building.
10. campshed formula diaphram wall as claimed in claim 1, it is characterised in that inserted at the concrete topping back Branch armour layer is stretched out in horizontal drain pipe, its outer end.
CN201711023006.0A 2017-10-27 2017-10-27 A kind of existing construction foundation reinforcement means and campshed formula diaphram wall Pending CN107700474A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711023006.0A CN107700474A (en) 2017-10-27 2017-10-27 A kind of existing construction foundation reinforcement means and campshed formula diaphram wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711023006.0A CN107700474A (en) 2017-10-27 2017-10-27 A kind of existing construction foundation reinforcement means and campshed formula diaphram wall

Publications (1)

Publication Number Publication Date
CN107700474A true CN107700474A (en) 2018-02-16

Family

ID=61182334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711023006.0A Pending CN107700474A (en) 2017-10-27 2017-10-27 A kind of existing construction foundation reinforcement means and campshed formula diaphram wall

Country Status (1)

Country Link
CN (1) CN107700474A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653534A (en) * 2019-02-18 2019-04-19 河北建筑设计研究院有限责任公司 Set building club-footed pile strip footing straining beam and set building
CN109750694A (en) * 2019-01-15 2019-05-14 北京国电水利电力工程有限公司 For having the root pile and its construction method of building base shift reinforcement
CN110629778A (en) * 2018-06-21 2019-12-31 北京东地岩土工程有限公司 Construction method for stopping leakage of waterproof curtain
CN111549784A (en) * 2020-05-26 2020-08-18 武汉金涛岩土工程有限公司 Construction process of foundation pit adjacent to building
CN113235613A (en) * 2021-05-24 2021-08-10 中国铁路设计集团有限公司 Newly-built foundation pit excavation supporting method using adjacent existing fender post
CN113235613B (en) * 2021-05-24 2024-04-05 中国铁路设计集团有限公司 Method for excavating and supporting newly-built foundation pit by utilizing adjacent existing guard piles

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6200070B1 (en) * 2000-02-14 2001-03-13 David W. Knight Process of installing piles for supporting a structure upon the earth
CN103774674A (en) * 2014-01-15 2014-05-07 西安建筑科技大学 Support structure for steel tube underpinned pile and anchor rod deep pit and construction method thereof
CN104179204A (en) * 2014-08-28 2014-12-03 山西钢铁建设(集团)有限公司 Pile foundation underpinning method for building foundation adjacent to deep foundation pit
CN105297797A (en) * 2015-11-30 2016-02-03 浙江华展工程研究设计院有限公司 Hoop support form for in-situ protection of existing building in underground space development
CN106522242A (en) * 2016-12-21 2017-03-22 大连交通大学 Foundation pit supporting system for subsurface structure close to soft ground stratum and construction method of foundation pit supporting system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6200070B1 (en) * 2000-02-14 2001-03-13 David W. Knight Process of installing piles for supporting a structure upon the earth
CN103774674A (en) * 2014-01-15 2014-05-07 西安建筑科技大学 Support structure for steel tube underpinned pile and anchor rod deep pit and construction method thereof
CN104179204A (en) * 2014-08-28 2014-12-03 山西钢铁建设(集团)有限公司 Pile foundation underpinning method for building foundation adjacent to deep foundation pit
CN105297797A (en) * 2015-11-30 2016-02-03 浙江华展工程研究设计院有限公司 Hoop support form for in-situ protection of existing building in underground space development
CN106522242A (en) * 2016-12-21 2017-03-22 大连交通大学 Foundation pit supporting system for subsurface structure close to soft ground stratum and construction method of foundation pit supporting system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
魏宝祥等: "《全国注册岩土工程师专业考试培训教材 第5版 下》", 华中科技大学出版社, pages: 97 - 99 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629778A (en) * 2018-06-21 2019-12-31 北京东地岩土工程有限公司 Construction method for stopping leakage of waterproof curtain
CN109750694A (en) * 2019-01-15 2019-05-14 北京国电水利电力工程有限公司 For having the root pile and its construction method of building base shift reinforcement
CN109653534A (en) * 2019-02-18 2019-04-19 河北建筑设计研究院有限责任公司 Set building club-footed pile strip footing straining beam and set building
CN111549784A (en) * 2020-05-26 2020-08-18 武汉金涛岩土工程有限公司 Construction process of foundation pit adjacent to building
CN113235613A (en) * 2021-05-24 2021-08-10 中国铁路设计集团有限公司 Newly-built foundation pit excavation supporting method using adjacent existing fender post
CN113235613B (en) * 2021-05-24 2024-04-05 中国铁路设计集团有限公司 Method for excavating and supporting newly-built foundation pit by utilizing adjacent existing guard piles

Similar Documents

Publication Publication Date Title
CN103741714B (en) Underground engineering full sheltered reverse excavation construction method
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN107700474A (en) A kind of existing construction foundation reinforcement means and campshed formula diaphram wall
CN104110038A (en) Construction method for large-area pit support structure in deep-sludge type soft soil area
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN110438999A (en) A kind of deep basal pit slope excavation construction method of rich groundwater
CN1067453C (en) Supporting and protecting method for base pit, side slope, flat anchor and spray net
CN108316339A (en) A kind of construction method of water penetration geology large size arch bridge base
CN111608701B (en) Method for treating roof collapse of shallow tunnel entrance section
CN207331740U (en) A kind of heightening and consolidation structure of in-service reinforced concrete retaining wall
CN1279319A (en) Full-reverse construction technology for basement
CN102235007B (en) Method for supporting deep foundation with upper nail-lower pile combination
CN208934002U (en) A kind of barrier wall structure
CN207419441U (en) A kind of campshed formula diaphram wall
CN1127596C (en) Continuous wall foundation pit supporting method with short brad
CN102561362A (en) Construction method for foundation pit supporting by dynamic compaction replacement of muddy soil
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN113431097A (en) Protection structure of shallow foundation building next to deep foundation pit engineering and construction method
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN107700521A (en) One kind is built(Structure)Build thing foundation stabilization and underpin pier and its construction method
CN110820756A (en) Shield well and vertical shaft deep foundation pit excavation safety construction method
CN111622234A (en) Unloading type thin-wall box-type retaining wall supported by obliquely and vertically combined steel pipe pile and construction process
CN111456021A (en) Construction method for reversely making enclosure structure by utilizing RJP piles
CN111379273A (en) Construction method of corrugated steel comprehensive pipe gallery
CN211421139U (en) Shield constructs well crown beam bearing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180216

WD01 Invention patent application deemed withdrawn after publication