CN109026059A - 一种固定端头、预紧力施加方法及环片模型 - Google Patents
一种固定端头、预紧力施加方法及环片模型 Download PDFInfo
- Publication number
- CN109026059A CN109026059A CN201810827527.XA CN201810827527A CN109026059A CN 109026059 A CN109026059 A CN 109026059A CN 201810827527 A CN201810827527 A CN 201810827527A CN 109026059 A CN109026059 A CN 109026059A
- Authority
- CN
- China
- Prior art keywords
- steel wire
- pretightning force
- screw rod
- frame
- longitudinal steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/12—Temporary supports for use during building; Accessories
Abstract
本发明涉及一种用于纵向钢丝施加预紧力的固定端头、预紧力施加方法及环片模型,所述固定端头包括螺母(101)、螺杆(102)和框架(103),所述框架(103)两端各设有一开孔,其中一开孔用于穿过所述螺杆(102),另一开孔用于穿过所述纵向钢丝,所述螺杆(102)设置于框架(103)内,所述螺母(101)设置于框架(103)外,并固定所述螺杆(102),所述螺杆(102)一端部设有用于穿过纵向钢丝的通孔。与现有技术相比,本发明结构简单,制作方法简易,便于批量制作,适合各种需要提供钢丝预紧力地场合,预紧力施加准确直观,操作方便,可随时对预紧力进行调整,不需要额外测量仪器。
Description
技术领域
本发明属于土木工程领域,尤其是涉及一种用于纵向钢丝施加预紧力的固定端头、预紧力施加方法及环片模型。
背景技术
在工程和科研领域,经常需要对钢丝在各种装置上进行固定并准确地施加一定的预紧力。一种可以操作方便并准确地对纵向钢丝施加预紧力的固定端头装置就显得尤为重要,同时还要造价低廉,制作简便,满足大批量需求,同时要尽可能适合多种应用场景。在进行盾构隧道模型实验的背景下,通过纵向钢丝模拟原纵向螺栓的连接效果,力图还原盾构隧道结构的主要特征。为了研究盾构隧道纵向螺栓预紧力对其地震作用下环缝张开量的影响,在隧道模型实验中需设置多组纵向钢丝的纵向预紧力调整工况,因此需要一种对钢丝固定并施加预紧力的装置。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种用于纵向钢丝施加预紧力的固定端头、预紧力施加方法及环片模型。
本发明的目的可以通过以下技术方案来实现:
一种用于纵向钢丝施加预紧力的固定端头,包括螺母、螺杆和框架,所述框架两端各设有一开孔,其中一开孔用于穿过所述螺杆,另一开孔用于穿过所述纵向钢丝,所述螺杆设置于框架内,所述螺母设置于框架外,并固定所述螺杆,所述螺杆一端部设有用于穿过纵向钢丝的通孔。
进一步地,所述框架为方形框架。
进一步地,所述框架为铝制框架。
进一步地,所述螺母上设置有环状把手。
进一步地,所述螺母内嵌设有尼龙圈。
进一步地,所述螺杆的外侧壁上喷涂有耐磨涂层。
本发明还提供一种基于所述的固定端头的纵向钢丝预紧力施加方法,包括以下步骤:
螺杆穿过框架的一端开孔,与开孔另一侧的螺母连接;
纵向钢丝穿过框架的另一端开孔,并与所述螺杆的通孔固定连接;
按设定预紧力调整螺母旋转圈数。
进一步地,所述螺母旋转圈数与设定预紧力的关系式如下:
ε=σ·Es
Δl=l·ε
其中,F为设定预紧力,A为钢丝截面积,σ为所需预紧力下钢丝应力,Es为钢丝弹性模量,ε为钢丝应变,L为钢丝长度,Δl为钢丝所需伸长量,P为螺距,n为螺母旋拧圈数。
本发明还提供一种盾构隧道环片模型,包括环片模型本体和设置于环片模型本体内的纵向钢丝,所述纵向钢丝上连接有所述的固定端头。
与现有技术相比,本发明具有以下有益效果:
1)本发明固定端头可以方便地实现纵向钢丝预应力的施加,能不需要额外的测量工具就方便、精确、直观地对钢丝施加预紧力,且制作简便,成本低,能够大批量制作,并且应用场合广泛,可以应用在各种需要提供钢丝预紧力的场合。
2)本发明固定端头结构简单,受力清晰,加工制作方便。
3)本发明的各部件可由市场成品构成,造价低,便于批量制作,满足大量重复性试验的需求。
4)本发明可以通过螺母旋转圈数来实现不同预紧力的需求,简单方便。
5)本发明装置不仅适用于隧道模型试验,还可广泛应用于各种需要准确提供钢丝预紧力的场合,比如对混凝土结构中预应力筋施加预应力,以及各种实验与教学等场合中。
附图说明
图1为本发明的结构示意图;
图2为图1所示设计实例的固定端头铝制框架正视图(单位:mm);
图3为图1所示设计实例的固定端头铝制框架侧视图(单位:mm);
图4为图1所示设计实例的固定端头铝制框架顶视图;
图5为本发明螺母的结构示意图;
图6为本发明螺杆的结构示意图;
图7为本发明带有固定端头的盾构隧道环片模型示意图。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。本实施例以本发明技术方案为前提进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。
如图1-图4所示,本发明提供一种用于纵向钢丝施加预紧力的固定端头,包括螺母101、螺杆102和框架103,框架103两端各设有一开孔,其中一开孔用于穿过螺杆102,另一开孔用于穿过纵向钢丝,螺杆102设置于框架103内,螺母101设置于框架103外,并固定螺杆102,螺杆102一端部设有用于穿过纵向钢丝的通孔,如图6所示。
在某些实施例中,框架103为方形框架,方便螺母、螺杆的安装。
在某些实施例中,框架103为铝制框架。
在某些实施例中,如图5所示,螺母101上设置有环状把手,方便进行螺母的旋紧。
在某些实施例中,螺母101内嵌设有尼龙圈,一方面提高了螺母的锁紧性能,另一方面尼龙圈还具有优良的抗冲击性和耐振性。
在某些实施例中,螺杆102的外侧壁上喷涂有耐磨涂层,可以起到保护作用。
基于上述固定端头的纵向钢丝预紧力施加方法,包括以下步骤:
(1)螺杆102穿过框架103的一端开孔,与开孔另一侧的螺母101连接;
(2)纵向钢丝穿过框架103的另一端开孔,并与螺杆102的通孔固定连接;
(3)按设定预紧力调整螺母旋转圈数。根据钢丝截面积与弹性模量计算得到预计施加应力所需要的张拉变形量,并进一步通过螺距可以计算出所需旋拧螺母的圈数,对钢丝实现精确施加预紧力。
施加预紧力的计算,根据钢丝弹性模量和截面积,计算出施加相应预紧力所需的钢丝伸长量,并进一步通过螺杆螺距计算出所需旋拧螺母的圈数,实现对钢丝精确施加预紧应力。螺母旋转圈数与设定预紧力的关系式如下:
ε=σ·Es
Δl=l·ε
其中,F为设定预紧力,A为钢丝截面积,σ为所需预紧力下钢丝应力,Es为钢丝弹性模量,ε为钢丝应变,L为钢丝长度,Δl为钢丝所需伸长量,P为螺距,n为螺母旋拧圈数。
纵向钢丝固定端头铝制框架横向截面积远大于钢丝截面积,由于铝制框架纵向压缩变形带来的预紧力损失可以忽略不计。
如图7所示,本发明还提供一种盾构隧道环片模型,包括环片模型本体300和设置于环片模型本体300内的纵向钢丝200,所述纵向钢丝上连接有所述的固定端头100。
实施例
利用车床加工制作如附图所示铝制框架,并在两端开直径7mm圆孔。制作直径7mm螺杆和螺母,螺纹螺距P=1.0mm。
将钢丝穿过固定铝制框架一侧开孔后,固定于螺杆下方圆环处。将螺杆穿过开孔,在另一侧与螺母轻微旋拧至纵向刚好钢丝拉直,固定端头另一侧紧贴于盾构隧道环片表面。
钢丝采用高强度碳素钢丝,长度L=5m,直径d=0.7mm,弹性模量Es=150GPa,对应截面积为A=π·(0.7/2)2=0.385mm2,预紧力35N,施加预紧力的钢丝应变为σ=F/A=90.9MPa,应变ε=σ/Es=6.06×10-4,则钢丝所需伸长量为Δl=ε·L=3.0mm,螺母旋转圈数n=Δl/P=3。
将螺母准确旋紧三圈,则达到对钢丝精确施加预紧力的要求。
以上详细描述了本发明的较佳具体实施例。应当理解,本领域的普通技术人员无需创造性劳动就可以根据本发明的构思作出诸多修改和变化。因此,凡本技术领域中技术人员依本发明的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在由权利要求书所确定的保护范围内。
Claims (9)
1.一种用于纵向钢丝施加预紧力的固定端头,其特征在于,包括螺母(101)、螺杆(102)和框架(103),所述框架(103)两端各设有一开孔,其中一开孔用于穿过所述螺杆(102),另一开孔用于穿过所述纵向钢丝,所述螺杆(102)设置于框架(103)内,所述螺母(101)设置于框架(103)外,并固定所述螺杆(102),所述螺杆(102)一端部设有用于穿过纵向钢丝的通孔。
2.根据权利要求1所述的用于纵向钢丝施加预紧力的固定端头,其特征在于,所述框架(103)为方形框架。
3.根据权利要求1所述的用于纵向钢丝施加预紧力的固定端头,其特征在于,所述框架(103)为铝制框架。
4.根据权利要求1所述的用于纵向钢丝施加预紧力的固定端头,其特征在于,所述螺母(101)上设置有环状把手。
5.根据权利要求1所述的用于纵向钢丝施加预紧力的固定端头,其特征在于,所述螺母(101)内嵌设有尼龙圈。
6.根据权利要求1所述的用于纵向钢丝施加预紧力的固定端头,其特征在于,所述螺杆(102)的外侧壁上喷涂有耐磨涂层。
7.一种基于如权利要求1所述的固定端头的纵向钢丝预紧力施加方法,其特征在于,包括以下步骤:
螺杆(102)穿过框架(103)的一端开孔,与开孔另一侧的螺母(101)连接;
纵向钢丝穿过框架(103)的另一端开孔,并与所述螺杆(102)的通孔固定连接;
按设定预紧力调整螺母旋转圈数。
8.根据权利要求7所述的纵向钢丝预紧力施加方法,其特征在于,所述螺母旋转圈数与设定预紧力的关系式如下:
ε=σ·Es
Δl=l·ε
其中,F为设定预紧力,A为钢丝截面积,σ为所需预紧力下钢丝应力,Es为钢丝弹性模量,ε为钢丝应变,L为钢丝长度,Δl为钢丝所需伸长量,P为螺距,n为螺母旋拧圈数。
9.一种盾构隧道环片模型,包括环片模型本体和设置于环片模型本体内的纵向钢丝,其特征在于,所述纵向钢丝上连接有如权利要求1所述的固定端头。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810827527.XA CN109026059A (zh) | 2018-07-25 | 2018-07-25 | 一种固定端头、预紧力施加方法及环片模型 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810827527.XA CN109026059A (zh) | 2018-07-25 | 2018-07-25 | 一种固定端头、预紧力施加方法及环片模型 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109026059A true CN109026059A (zh) | 2018-12-18 |
Family
ID=64645983
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810827527.XA Pending CN109026059A (zh) | 2018-07-25 | 2018-07-25 | 一种固定端头、预紧力施加方法及环片模型 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109026059A (zh) |
Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1037882A (fr) * | 1951-05-30 | 1953-09-23 | Perfectionnements aux procédés de fabrication de pièces moulées en béton précontraint | |
KR200182611Y1 (ko) * | 1999-12-08 | 2000-05-15 | 박재만 | 프리스트레스 구조물의 재긴장장치 |
KR100834021B1 (ko) * | 2007-02-15 | 2008-06-02 | 주식회사 에스제이지반기술 | 재긴장 앵커시스템 |
CN101343882A (zh) * | 2008-08-18 | 2009-01-14 | 山东大学 | 用于模型试验的微型预应力锚索及其埋设和加载方法 |
CN102995835A (zh) * | 2012-12-17 | 2013-03-27 | 北京荣大兴业建筑材料有限公司 | 一种加固钢丝绳网片的连接装置及其制作方法 |
CN103063385A (zh) * | 2012-12-21 | 2013-04-24 | 北京工业大学 | 地下结构振动台试验中有效模拟人工质量的装置及方法 |
KR101293838B1 (ko) * | 2012-11-12 | 2013-08-19 | 김태균 | 응력전달길이 구간을 제거하는 프리텐션 제조장치 및 그를 이용한 프리스트레스트 구조체 제작방법 |
CN103790598A (zh) * | 2014-02-12 | 2014-05-14 | 同济大学 | 一种盾构隧道纵向预应力混凝土衬砌管片的制备方法 |
CN203891022U (zh) * | 2014-06-23 | 2014-10-22 | 湖南大学 | 一种基于无粘结预应力加筋土技术的张拉锚固装置 |
CN104453099A (zh) * | 2014-11-25 | 2015-03-25 | 沈阳建筑大学 | 一种能够补偿预应力损失的微调锚具及方法 |
CN104764553A (zh) * | 2015-04-13 | 2015-07-08 | 中国科学院长春光学精密机械与物理研究所 | 测量防松胶对螺纹连接件预紧力影响的装置及方法 |
CN105134252A (zh) * | 2015-09-24 | 2015-12-09 | 济南轨道交通集团有限公司 | 一种盾构隧道管片纵向预应力加固结构及施工方法 |
CN205955261U (zh) * | 2016-06-07 | 2017-02-15 | 江西赣粤高速公路股份有限公司 | 一种预应力钢丝绳弯剪加固混凝土t梁 |
CN206111202U (zh) * | 2016-08-03 | 2017-04-19 | 中铁三局集团有限公司 | 一种小半径曲线盾构管片姿态控制结构 |
CN206487069U (zh) * | 2017-01-18 | 2017-09-12 | 中交第一公路勘察设计研究院有限公司 | 一种加固用免千斤顶预应力钢丝张拉锚固装置 |
CN206720692U (zh) * | 2016-11-04 | 2017-12-08 | 中际联合(天津)科技有限公司 | 一种导向钢丝绳预紧装置 |
CN107724258A (zh) * | 2017-11-22 | 2018-02-23 | 上海悍马建筑科技有限公司 | 一种预应力碳纤维张拉装置 |
CN207079491U (zh) * | 2017-04-07 | 2018-03-09 | 华侨大学 | 一种桥梁预应力高强钢丝绳抗弯加固装置 |
CN207244618U (zh) * | 2017-08-10 | 2018-04-17 | 大连理工大学 | 一种土钉施加预应力的装置 |
CN107945646A (zh) * | 2017-11-10 | 2018-04-20 | 北京工业大学 | 一种装配式隧道模型结构及其制作方法 |
CN208564572U (zh) * | 2018-07-25 | 2019-03-01 | 同济大学 | 用于纵向钢丝施加预紧力的固定端头及环片模型 |
-
2018
- 2018-07-25 CN CN201810827527.XA patent/CN109026059A/zh active Pending
Patent Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1037882A (fr) * | 1951-05-30 | 1953-09-23 | Perfectionnements aux procédés de fabrication de pièces moulées en béton précontraint | |
KR200182611Y1 (ko) * | 1999-12-08 | 2000-05-15 | 박재만 | 프리스트레스 구조물의 재긴장장치 |
KR100834021B1 (ko) * | 2007-02-15 | 2008-06-02 | 주식회사 에스제이지반기술 | 재긴장 앵커시스템 |
CN101343882A (zh) * | 2008-08-18 | 2009-01-14 | 山东大学 | 用于模型试验的微型预应力锚索及其埋设和加载方法 |
KR101293838B1 (ko) * | 2012-11-12 | 2013-08-19 | 김태균 | 응력전달길이 구간을 제거하는 프리텐션 제조장치 및 그를 이용한 프리스트레스트 구조체 제작방법 |
CN102995835A (zh) * | 2012-12-17 | 2013-03-27 | 北京荣大兴业建筑材料有限公司 | 一种加固钢丝绳网片的连接装置及其制作方法 |
CN103063385A (zh) * | 2012-12-21 | 2013-04-24 | 北京工业大学 | 地下结构振动台试验中有效模拟人工质量的装置及方法 |
CN103790598A (zh) * | 2014-02-12 | 2014-05-14 | 同济大学 | 一种盾构隧道纵向预应力混凝土衬砌管片的制备方法 |
CN203891022U (zh) * | 2014-06-23 | 2014-10-22 | 湖南大学 | 一种基于无粘结预应力加筋土技术的张拉锚固装置 |
CN104453099A (zh) * | 2014-11-25 | 2015-03-25 | 沈阳建筑大学 | 一种能够补偿预应力损失的微调锚具及方法 |
CN104764553A (zh) * | 2015-04-13 | 2015-07-08 | 中国科学院长春光学精密机械与物理研究所 | 测量防松胶对螺纹连接件预紧力影响的装置及方法 |
CN105134252A (zh) * | 2015-09-24 | 2015-12-09 | 济南轨道交通集团有限公司 | 一种盾构隧道管片纵向预应力加固结构及施工方法 |
CN205955261U (zh) * | 2016-06-07 | 2017-02-15 | 江西赣粤高速公路股份有限公司 | 一种预应力钢丝绳弯剪加固混凝土t梁 |
CN206111202U (zh) * | 2016-08-03 | 2017-04-19 | 中铁三局集团有限公司 | 一种小半径曲线盾构管片姿态控制结构 |
CN206720692U (zh) * | 2016-11-04 | 2017-12-08 | 中际联合(天津)科技有限公司 | 一种导向钢丝绳预紧装置 |
CN206487069U (zh) * | 2017-01-18 | 2017-09-12 | 中交第一公路勘察设计研究院有限公司 | 一种加固用免千斤顶预应力钢丝张拉锚固装置 |
CN207079491U (zh) * | 2017-04-07 | 2018-03-09 | 华侨大学 | 一种桥梁预应力高强钢丝绳抗弯加固装置 |
CN207244618U (zh) * | 2017-08-10 | 2018-04-17 | 大连理工大学 | 一种土钉施加预应力的装置 |
CN107945646A (zh) * | 2017-11-10 | 2018-04-20 | 北京工业大学 | 一种装配式隧道模型结构及其制作方法 |
CN107724258A (zh) * | 2017-11-22 | 2018-02-23 | 上海悍马建筑科技有限公司 | 一种预应力碳纤维张拉装置 |
CN208564572U (zh) * | 2018-07-25 | 2019-03-01 | 同济大学 | 用于纵向钢丝施加预紧力的固定端头及环片模型 |
Non-Patent Citations (1)
Title |
---|
焦胜军等: "高速铁路桥梁施工与维护 下", 西南交通大学出版社, pages: 49 - 52 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103808562B (zh) | 用于非金属材料500k~4.2k力学拉伸性能的测试夹具 | |
CN208564572U (zh) | 用于纵向钢丝施加预紧力的固定端头及环片模型 | |
EP3499203A1 (de) | Verfahren, vorrichtung und computerprogrammprodukt zur prozessfähigkeitsuntersuchung einer schraubverbindung | |
CN207724122U (zh) | 空心薄壁轴类件加工装夹夹具 | |
EP1007928B1 (de) | Verfahren und vorrichtung zum prüfen von schraubverbindungen | |
CN109520922B (zh) | 一种螺栓摩擦系数和扭矩系数的测试装置及测试方法 | |
CN105527158A (zh) | 一种螺栓拉力试验夹具 | |
CN109026059A (zh) | 一种固定端头、预紧力施加方法及环片模型 | |
CN110795800B (zh) | 一种螺杆刚度确定方法 | |
CN208250933U (zh) | 一种道路桥梁裂缝加固装置 | |
CN107091803B (zh) | 叶片分解装置 | |
CN108871637B (zh) | 单向轴承的逆向扭矩检测装置及逆向扭矩检测方法 | |
CN210322568U (zh) | 一种电源线拉扭力试验机 | |
CN208223964U (zh) | 一种适用于螺栓球节点拉伸试验的夹持装置 | |
CN206308618U (zh) | 拉索固定装置 | |
DE2749537B2 (de) | Anordnung zum Messen der Vorspannung eines insbesondere zum Verschluß eines Reaktordruckbehälters dienenden Schraubenbolzens | |
CN205317224U (zh) | 梁柱节点的监测仪器的安装装置 | |
CN211082516U (zh) | 一种螺纹护套结构 | |
CN115450435B (zh) | 单根等预应力张拉装备 | |
CN101368989B (zh) | 用于切向压电应变常数d15测量中使用的切向加力部件 | |
CN214820912U (zh) | 一种口腔3d打印导板固定装置 | |
CN219466069U (zh) | 一种用于水泵油封安装的专用工具 | |
CN212722384U (zh) | 基于激光收敛仪的盾构隧道收敛量测模型试验装置 | |
CN109968454A (zh) | 一种制作垫片的工具 | |
CN103604690A (zh) | 一种用于检测连接套筒力学性能的试验芯棒及其检测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |