CN109024320A - A kind of bridge meeting new and old bridge differential settlement spells wide construction and construction method - Google Patents

A kind of bridge meeting new and old bridge differential settlement spells wide construction and construction method Download PDF

Info

Publication number
CN109024320A
CN109024320A CN201811106984.6A CN201811106984A CN109024320A CN 109024320 A CN109024320 A CN 109024320A CN 201811106984 A CN201811106984 A CN 201811106984A CN 109024320 A CN109024320 A CN 109024320A
Authority
CN
China
Prior art keywords
bridge
new
old
steel slab
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811106984.6A
Other languages
Chinese (zh)
Other versions
CN109024320B (en
Inventor
莫利君
陈华
沈峰
魏强
杜爱兵
颜廷舟
郭峰祥
张伟
赵业梅
黄琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Communications Planning And Design Institute Ltd By Share Ltd
Original Assignee
Hubei Communications Planning And Design Institute Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Communications Planning And Design Institute Ltd By Share Ltd filed Critical Hubei Communications Planning And Design Institute Ltd By Share Ltd
Priority to CN201811106984.6A priority Critical patent/CN109024320B/en
Publication of CN109024320A publication Critical patent/CN109024320A/en
Application granted granted Critical
Publication of CN109024320B publication Critical patent/CN109024320B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Abstract

The invention discloses a kind of bridges for meeting new and old bridge differential settlement to spell wide construction and construction method, and it includes old bridge, new bridge, angle steel and connector that bridge, which spells wide construction portion,;Connector includes junction steel plate, implantation reinforcing bar, pre-embedded steel slab, bolt connection assembly and separation layer;Bolt connection assembly includes screw rod, nut I, nut II and backing plate;Nose circle shape rectangular opening is provided on pre-embedded steel slab;Longitudinal joint along the bridge is formed between old bridge and new bridge.The configuration of the present invention is simple, design are reasonable, and it is safe and reliable, new bridge and Jiu Qiao are fixed together by connector, and the nose circle shape rectangular opening up and down for bolt connection assembly is equipped on pre-embedded steel slab, both it is poor new, old bridge Vertical Settlement had been able to satisfy, it can guarantee that new, old bridge spells wide construction to the bridge that securely connects with direction across bridge along bridge again, can effectively avoid causing superstructure beam body and bridge deck pavement to crack, destroy due to new, old bridge differential settlement.

Description

A kind of bridge meeting new and old bridge differential settlement spells wide construction and construction method
Technical field
The invention belongs to highway bridges to spell wide technical field, be related to a kind of wide construction of bridge spelling for meeting new and old bridge differential settlement And construction method.
Background technique
With China's rapid development of economy, the volume of traffic also increases severely therewith, and the traffic capacity of part highway has been unable to satisfy The demand of the volume of traffic can effectively increase highway capacity and biggish society's warp to widening for existing highway Ji benefit.When both sides of highway increases a lane, the bridge width of new bridge is smaller, and bridge pier, abutment are only column, if new bridge It is completely independent with old bridge, new bridge anti-overturning is poor.Current way mainly has new bridge infrastructure to separate with old bridge, top structure Make that beam body is connected with old bridge and new bridge superstructure and infrastructure are connected two kinds with old bridge.Since new bridge and old bridge are built Time phase difference is larger, and the foundation settlement of new, old bridge differs greatly, because differential settlement cause the new, joint Jiu Qiao occur through crack, Beam body is damaged, influences bridge structure safe and durability.
Patent No. CN201611005203.5 disclose a kind of bridge using corrugated sheet steel connector spell wide construction and Its construction method, which, which spells wide construct, can guarantee that new bridge girder indulges bridge to deformation not by the constraint of old bridge girder, reduces and spells width The direction across bridge bending deformation that new, old bridge afterwards generates avoids old bridge seat that failure by shear occurs, and guarantees to spell making for wide axle casing Use performance;Shorten construction period, there is preferable economic benefit, but the patent does not propose the technical side to solve the above problems Case.
Summary of the invention
In view of the deficiencies of the prior art, the present invention proposes a kind of simple structure and reasonable designs, safe and reliable, guarantee new, old Bridge spells wide construction to the bridge that securely connects with direction across bridge along bridge, can effectively avoid leading to top due to new, old bridge differential settlement The bridge for meeting new and old bridge differential settlement of structure beam body and bridge deck pavement cracking, destruction spells wide construction and construction method.
To achieve the goals above, the invention adopts the following technical scheme:
A kind of wide construction of bridge spelling meeting new and old bridge differential settlement, including old bridge, new bridge and connector;The old bridge and new bridge Between form longitudinal joint along the bridge;Angle steel, angle steel are mounted on the old bridge of longitudinal joint two sides and the bridge deck pavement of new bridge Edge is along the bridge arranged;The old bridge and new bridge are fixedly connected with by connector;The connector includes junction steel plate, implantation Implantation reinforcing bar in old bridge and the pre-embedded steel slab being embedded in new bridge;The implantation reinforcing bar and pre-embedded steel slab pass through junction steel plate It is connected;One end of the junction steel plate is mutually welded with implantation reinforcing bar, and component and pre-embedded steel slab phase is bolted in the other end Even;Separation layer is provided between the junction steel plate and pre-embedded steel slab;Nose circle shape rectangular opening is provided on the pre-embedded steel slab, Nose circle shape rectangular opening is vertically arranged on pre-embedded steel slab;The bolt connection assembly includes screw rod;One end of the screw rod It is equipped with nut I, the other end sequentially passes through nose circle shape rectangular opening and junction steel plate on pre-embedded steel slab, and in the another of screw rod End is equipped with nut II;Backing plate is equipped on one section of screw rod between pre-embedded steel slab and nut I;Separation layer is used with good Bonding, extensibility material are made into, and angle steel can protect the deck paving of old bridge and new bridge at longitudinal joint, nose circle shape rectangular opening and every Absciss layer can satisfy the differential settlement of new bridge and old bridge.
As a further explanation of the present invention, the longitudinal joint spacing between the new bridge and old bridge is set as 20mm;It is described Backing plate with a thickness of 6~10mm.Backing plate planar dimension is determined according to the principle of equal strength of pre-embedded steel slab and junction steel plate.
As a further explanation of the present invention, multiple groups connector, every group of company are along the bridge equipped in Yan Jiuqiao and new bridge Fitting is taken root in including two into reinforcing bar, two groups of bolt connection assemblies, one piece of pre-embedded steel slab and one piece of junction steel plate;
The implantation reinforcing bar is along the bridge placed with vertical bridge floor along old bridge, and the diameter for being implanted into reinforcing bar is 20~28mm, is planted Entering the depth that reinforcing bar is implanted into old bridge is 150~250mm, and the spacing between two implantation reinforcing bars is 100mm;The pre-embedded steel slab It is 170~250mm with a thickness of 6~10mm, width, the pre-buried length into new bridge is 150~250mm;The pre-embedded steel slab Side is vertical with new bridge bridge floor, along the bridge placement of the pre-embedded steel slab along new bridge;The junction steel plate is to be added using straight steel plate Work at groove profile steel plate, junction steel plate with a thickness of 6~10mm, the width of junction steel plate is 170~250mm;Two groups of bolts connect Connected components are 100mm along the spacing along the bridge of new bridge.
As a further explanation of the present invention, every group of connector is 300~400mm along arrangement spacing along the bridge.
As a further explanation of the present invention, the horizontal spacing at the described implantation reinforcing bar and old bridge edge be 250~ 400mm;The horizontal spacing of the pre-embedded steel slab and new bridge edge is 250~400mm.
As a further explanation of the present invention, the anchor hole of the junction steel plate is circle, and anchor hole is from junction steel plate The distance at edge is at least 30mm.Anchor hole conveniently interspersed can install screw rod.
As a further explanation of the present invention, the radius in the nose circle shape hole at the nose circle shape rectangular opening both ends with connect steel Anchor bolt pore radius is identical on plate, and nose circle shape rectangular opening is at least 30mm with a distance from pre-embedded steel slab edge.On pre-embedded steel slab The length of nose circle shape rectangular opening is identical as the differential settlement of new bridge, old bridge.
As a further explanation of the present invention, the separation layer is made into using pitch ointment, separation layer with a thickness of 5~ 10mm。
As a further explanation of the present invention, one side of the angle steel and deck paving either flush, another side setting In the edge in Calculation of Thickness of Bridge Deck Pavement direction.
A kind of bridge meeting new and old bridge differential settlement spells the construction method of wide construction, comprising the following steps:
Step 1 determines the longitudinal joint distance being arranged between old bridge and new bridge, and the pile foundation position of new bridge is determined according to longitudinal joint distance;It applies Work completes new bridge infrastructure, prefabricated new bridge, and pre-embedded steel slab is arranged in the new bridge inside edge adjacent with old bridge, Nose circle shape rectangular opening is set on pre-embedded steel slab;
Step 2 cuts the anti-collision wall on the outside of old bridge, installs implantation reinforcing bar in old bridge edge;
The beam body of new bridge is completed in step 3, construction;
Step 4, junction steel plate one end and implantation reinforcement welding, the other end are bolted component and are connected with pre-embedded steel slab, Pitch ointment separation layer is equipped between junction steel plate and pre-embedded steel slab;
Step 5, construct the Central Plains Jiu Qiao anti-collision wall at and new bridge bridge deck pavement, and deck paving longitudinal joint edge be arranged angle Steel.
Compared with prior art, the present invention have the utility model has the advantages that
1. new bridge and Jiu Qiao are fixed together by the present invention by connector, and are equipped on pre-embedded steel slab for being bolted group The up and down nose circle shape rectangular opening of part, it is poor to be not only able to satisfy new, old bridge Vertical Settlement, but can guarantee new, old bridge along bridge to and it is horizontal Bridge spells wide construction to the bridge securely connected, provides a kind of safe and reliable and economic connecting structure to spell wide bridge.
It is connected 2. the present invention carries out non-fully rigid attachment with old bridge to new bridge using connector, solves the wide bridge of spelling Because superstructure beam body caused by the differential settlement between new, old bridge and bridge deck pavement cracking, destroy the problems such as, it is practical, With good economic efficiency and social benefit.
3. angle steel is arranged by the deck paving edge at the longitudinal joint between new bridge and old bridge in the present invention, can effectively prevent Wheel is to deck paving damage layer caused by the deck paving local action at longitudinal joint.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the amplification assumption diagram in the present invention at A.
Fig. 3 is the right side structural representation in Fig. 2 at B.
Fig. 4 is the left view structural representation in Fig. 2 at B.
Appended drawing reference: the old bridge of 1-, 2- new bridge, 31- implantation reinforcing bar, 32- pre-embedded steel slab, 33- junction steel plate, 34- separation layer, 35- screw rod, 36- backing plate, 37- nut I, 38- nose circle shape rectangular opening, 39- nut II, 4- angle steel.
Specific embodiment
The following further describes the present invention with reference to the drawings.
Embodiment 1:
A kind of wide construction of bridge spelling meeting new and old bridge differential settlement, including old bridge 1, new bridge 2 and connector;1 He of old bridge Longitudinal joint along the bridge is formed between new bridge 2;Angle steel is mounted on the old bridge of longitudinal joint two sides and the bridge deck pavement of new bridge 4, angle steel 4 is along being along the bridge arranged;
The old bridge 1 and new bridge 2 is fixedly connected with by connector;
The connector includes junction steel plate 33, the implantation reinforcing bar 31 in the old bridge 1 of implantation and the pre-buried steel being embedded in new bridge 2 Plate 32;
The implantation reinforcing bar 31 is connected with pre-embedded steel slab 32 by junction steel plate 33;One end of the junction steel plate 33 and plant Enter the welding of 31 phase of reinforcing bar, the other end is bolted component and is connected with pre-embedded steel slab 32;The junction steel plate 33 with it is pre-buried Separation layer 34 is provided between steel plate 32;Nose circle shape rectangular opening 38, nose circle shape rectangular opening 38 are provided on the pre-embedded steel slab 32 It is vertically arranged on pre-embedded steel slab 32;
The bolt connection assembly includes screw rod 35;One end of the screw rod 35 is equipped with nut I 37, and the other end is successively worn Nose circle shape rectangular opening 38 and the junction steel plate 33 on pre-embedded steel slab 32 are crossed, and is equipped with nut II on the other end of screw rod 35 39;Backing plate 36 is equipped on one section of screw rod between pre-embedded steel slab 32 and nut I 37;Separation layer 34 is good viscous using having Knot, extensibility material are made into, and angle steel can protect the deck paving of old bridge 1 and new bridge 2 at longitudinal joint, 38 He of nose circle shape rectangular opening Separation layer 34 can satisfy the differential settlement of new bridge 2 and old bridge 1.
Longitudinal joint spacing between the new bridge 2 and old bridge 1 is set as 20mm;The backing plate 36 with a thickness of 6~ 10mm.36 planar dimension of backing plate is determined according to the principle of equal strength of pre-embedded steel slab 32 and junction steel plate 33.
Multiple groups connector is along the bridge equipped in Yan Jiuqiao 1 and new bridge 2, and every group of connector includes two taking root in into reinforcing bar 31, two groups of bolt connection assemblies, one piece of pre-embedded steel slab 32 and one piece of junction steel plate 33;
The described implantation reinforcing bar 31 is along the bridge placed with vertical bridge floor along old bridge 1, and the diameter of implantation reinforcing bar 31 is 20~ 28mm, it is 150~250mm that implantation reinforcing bar 31, which is implanted into the depth in old bridge 1, and the spacing between two implantation reinforcing bars 31 is 100mm;It is described Pre-embedded steel slab 32 with a thickness of 6~10mm, width be 170~250mm, the pre-buried length into new bridge 2 be 150~250mm;Institute The side for the pre-embedded steel slab 32 stated is vertical with new bridge Bridge 2 face, along the bridge placement of the pre-embedded steel slab 32 along new bridge 2;The company Connecing steel plate 33 is the groove profile steel plate being processed into using straight steel plate, junction steel plate 33 with a thickness of 6~10mm, the width of junction steel plate 33 Degree is 170~250mm;Two groups of bolt connection assemblies are 100mm along the spacing along the bridge of new bridge 2.
Every group of connector is 300~400mm along arrangement spacing along the bridge.
The horizontal spacing of the implantation reinforcing bar 31 and old 1 beam body edge of bridge is 250~400mm;The pre-embedded steel slab 32 with the horizontal spacing at 2 beam body edge of new bridge be 250~400mm.
The anchor hole of the junction steel plate 33 is circle, and anchor hole is at least 30mm with a distance from junction steel plate edge. Anchor hole conveniently interspersed can install screw rod 35.
The radius in the nose circle shape hole at 38 both ends of nose circle shape rectangular opening is identical as anchor bolt pore radius on junction steel plate 33, And nose circle shape rectangular opening 38 is at least 30mm with a distance from 32 edge of pre-embedded steel slab.Nose circle shape rectangular opening 38 on pre-embedded steel slab 32 Length it is identical as the differential settlement of new bridge 2, old bridge 1.
The separation layer 34 is made into using pitch ointment, separation layer 34 with a thickness of 5~10mm.
One side of the angle steel 4 and deck paving either flush, another side are set to the side in Calculation of Thickness of Bridge Deck Pavement direction At edge.
A kind of bridge meeting new and old bridge differential settlement spells the construction method of wide construction, comprising the following steps:
Step 1 determines the longitudinal joint distance being arranged between old bridge 1 and new bridge 2, and the pile foundation position of new bridge 2 is determined according to longitudinal joint distance It sets;New bridge infrastructure, prefabricated new bridge are completed in construction, and are arranged in advance in the new bridge inside edge adjacent with old bridge 1 Steel plate 32 is buried, nose circle shape rectangular opening 38 is set on pre-embedded steel slab 32;
Step 2, cuts the anti-collision wall in old 1 outside of bridge, installs implantation reinforcing bar 31 in old bridge edge;
The beam body of new bridge 2 is completed in step 3, construction;
Step 4,33 one end of junction steel plate and implantation reinforcing bar 31 weld, and component and pre-embedded steel slab 32 is bolted in the other end It is connected, pitch ointment separation layer 34 is equipped between junction steel plate 33 and pre-embedded steel slab 32;
Step 5 at old 1 Central Plains anti-collision wall of bridge of constructing and the pave-load layer of new bridge Bridge 2 face, and is arranged in deck paving longitudinal joint edge Angle steel 4.
Embodiment 2:
Certain highway, status are two-way four-lane, width of subgrade 26m, the left and right width separation of bridge.Because being unable to satisfy friendship Throughput requirements need to be extended as two-way six-lane, and the width of subgrade after enlarging is 33.5m.Add wide way is widened for two sides, and every side is each Widen 3.75m.By taking certain across footpath is 30mT beam as an example, bridge is that width 3.75m is respectively spelled in two sides, and new bridge pier, platform are all made of only pillar.
Scantling:
It is implanted into reinforcing bar 31: diameter 22mm;
Pre-embedded steel slab 32: having a size of 350 × 180 × 10mm, the nose circle shape rectangular opening 38 of two 80 × 25mm, nose circle are set thereon Shape rectangular opening 38 is apart from 32 edge 30mm of pre-embedded steel slab, two pitch of holes 100mm, along 32 center line symmetrical setting of pre-embedded steel slab;
Junction steel plate 33: the long 590mm in bottom surface, two limb height 120mm, width 180mm, thickness 10mm, and two are drilled on a limb wherein A circle anchor hole, anchor hole aperture are 25mm, and anchor hole is away from 33 edge 3cm of junction steel plate, two pitch of holes 10cm, edge connection steel 33 center line symmetrical setting of plate;
Bolt connection assembly: 35 diameter of screw rod be 22mm, nut I 37, nut II 39 are mating with screw rod 35, backing plate 36 having a size of 40×40×10mm;
Separation layer 34: it uses and is made into a thickness of the pitch ointment of 10mm;
Angle steel 4:L70 × 45 × 6mm.
Specific construction procedure are as follows:
The longitudinal joint that distance is 20mm is arranged in step 1 between old bridge 1 and new bridge 2, the pile foundation position of new bridge 2 is determined according to longitudinal joint distance It sets;Construction completion new bridge infrastructure, prefabricated new bridge, and from new bridge side in the new bridge adjacent with old bridge 1 Edge distance is that pre-embedded steel slab 32 is provided at 300mm, and every group of pre-embedded steel slab is 300mm, pre-embedded steel slab along spacing along the bridge The nose circle shape rectangular opening 38 of 80 × 25mm is provided on 32, nose circle shape rectangular opening 38 is away from 32 edge 30mm of pre-embedded steel slab;
Step 2 cuts the anti-collision wall in 1 outside of old bridge, apart from old bridge edge 300mm at implantation be implanted into reinforcing bar 31, every group Two in the connector spacing taken root between reinforcing bar are 100mm;
The beam body of new bridge 2 is completed in step 3, construction;
Step 4,33 one end of junction steel plate and implantation reinforcing bar 31 weld, and component and pre-embedded steel slab 32 is bolted in the other end It is connected, pitch ointment separation layer 34 is equipped between junction steel plate 33 and pre-embedded steel slab 32;
Step 5 at old 1 Central Plains anti-collision wall of bridge of constructing and the pave-load layer of new bridge Bridge 2 face, and is arranged in deck paving longitudinal joint edge Angle steel 4.

Claims (10)

1. a kind of bridge for meeting new and old bridge differential settlement spells wide construction, including old bridge (1), new bridge (2) and connector;Described is old Longitudinal joint along the bridge is formed between bridge (1) and new bridge (2);Pacify on the old bridge of longitudinal joint two sides and the bridge deck pavement of new bridge Equipped with angle steel (4), angle steel (4) edge is along the bridge arranged;
It is characterized by: the old bridge (1) and new bridge (2) is fixedly connected with by connector;
The connector includes junction steel plate (33), the implantation reinforcing bar (31) in the old bridge (1) of implantation and is embedded in new bridge (2) Pre-embedded steel slab (32);
The implantation reinforcing bar (31) is connected with pre-embedded steel slab (32) by junction steel plate (33);The junction steel plate (33) One end is mutually welded with implantation reinforcing bar (31), and the other end is bolted component and is connected with pre-embedded steel slab (32);The connection Separation layer (34) are provided between steel plate (33) and pre-embedded steel slab (32);Nose circle shape rectangle is provided on the pre-embedded steel slab (32) Hole (38), nose circle shape rectangular opening (38) are vertically arranged on pre-embedded steel slab (32);
The bolt connection assembly includes screw rod (35);One end of the screw rod (35) is equipped with nut I (37), the other end Sequentially pass through the nose circle shape rectangular opening (38) and junction steel plate (33) on pre-embedded steel slab (32), and the other end in screw rod (35) It is equipped with nut II (39);Backing plate (36) are equipped on one section of screw rod between pre-embedded steel slab (32) and nut I (37).
2. the bridge according to claim 1 for meeting new and old bridge differential settlement spells wide construction, it is characterised in that: the new bridge (2) the longitudinal joint spacing between He Jiuqiao (1) is set as 20mm;The backing plate (36) with a thickness of 6~10mm.
3. a kind of bridge for meeting new and old bridge differential settlement according to claim 1 spells wide construction, it is characterised in that: along old Bridge (1) and new bridge (2) are along the bridge equipped with multiple groups connector, and every group of connector includes two taking root in into reinforcing bar (31), two groups of spiral shells Tether connected components, one piece of pre-embedded steel slab (32) and one piece of junction steel plate (33);
Implantation reinforcing bar (31) Yan Jiuqiao's (1) along the bridge places with vertical bridge floor, and the diameter of implantation reinforcing bar (31) is 20~28mm, it is 150~250mm that implantation reinforcing bar (31), which is implanted into the depth in old bridge (1), and the spacing between two implantation reinforcing bar (31) is 100mm;The pre-embedded steel slab (32) is 170~250mm with a thickness of 6~10mm, width, the pre-buried length for entering new bridge (2) For 150~250mm;The side of the pre-embedded steel slab (32) is vertical with new bridge (2) bridge floor, and pre-embedded steel slab (32) is along new bridge (2) Along the bridge placement;The junction steel plate (33) is the groove profile steel plate being processed into using straight steel plate, junction steel plate (33) With a thickness of 6~10mm, the width of junction steel plate (33) is 170~250mm;Suitable bridge of two groups of bolt connection assemblies along new bridge (2) The spacing in direction is 100mm.
4. the bridge according to claim 3 for meeting new and old bridge differential settlement spells wide construction, it is characterised in that: every group of connector It is 300~400mm along arrangement spacing along the bridge.
5. the bridge according to claim 1 for meeting new and old bridge differential settlement spells wide construction, it is characterised in that: the implantation The horizontal spacing at reinforcing bar (31) and old bridge (1) beam body edge is 250~400mm;The pre-embedded steel slab (32) and new bridge (2) beam The horizontal spacing at body edge is 250~400mm.
6. the bridge according to claim 1 for meeting new and old bridge differential settlement spells wide construction, it is characterised in that: the connection The anchor hole of steel plate (33) is circle, and anchor hole is at least 30mm with a distance from junction steel plate edge.
7. the bridge according to claim 6 for meeting new and old bridge differential settlement spells wide construction, it is characterised in that: the nose circle The radius in the nose circle shape hole at shape rectangular opening (38) both ends is identical as anchor bolt pore radius on junction steel plate (33), and nose circle shape rectangle Hole (38) is at least 30mm with a distance from pre-embedded steel slab (32) edge.
8. the bridge according to claim 1 for meeting new and old bridge differential settlement spells wide construction, it is characterised in that: the isolation Layer (34) is made into using pitch ointment, separation layer (34) with a thickness of 5~10mm.
9. the bridge according to claim 1 for meeting new and old bridge differential settlement spells wide construction, it is characterised in that: the angle steel (4) one side and deck paving either flush, another side are set to the edge in Calculation of Thickness of Bridge Deck Pavement direction.
10. a kind of bridge for meeting new and old bridge differential settlement as described in claim 1-9 is any spells the construction method of wide construction, It is characterized in that, comprising the following steps:
Step 1 determines the longitudinal joint distance being arranged between old bridge (1) and new bridge (2), and the stake of new bridge (2) is determined according to longitudinal joint distance Base location;Construction completion new bridge infrastructure, prefabricated new bridge, and in the new bridge inside edge adjacent with old bridge (1) It is arranged pre-embedded steel slab (32), nose circle shape rectangular opening (38) is set on pre-embedded steel slab (32);
Step 2 cuts the anti-collision wall on the outside of old bridge (1), installs implantation reinforcing bar (31) in old bridge edge;
The beam body of new bridge (2) is completed in step 3, construction;
Component and pre-buried steel is bolted in step 4, junction steel plate (33) one end and implantation reinforcing bar (31) welding, the other end Plate (32) is connected, and pitch ointment separation layer (34) is equipped between junction steel plate (33) and pre-embedded steel slab (32);
Step 5, at old bridge (1) Central Plains anti-collision wall of constructing and new bridge (2) bridge deck pavement, and in deck paving longitudinal joint edge It is arranged angle steel (4).
CN201811106984.6A 2018-09-21 2018-09-21 Bridge width splicing structure meeting settlement difference of new bridge and old bridge and construction method Active CN109024320B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811106984.6A CN109024320B (en) 2018-09-21 2018-09-21 Bridge width splicing structure meeting settlement difference of new bridge and old bridge and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811106984.6A CN109024320B (en) 2018-09-21 2018-09-21 Bridge width splicing structure meeting settlement difference of new bridge and old bridge and construction method

Publications (2)

Publication Number Publication Date
CN109024320A true CN109024320A (en) 2018-12-18
CN109024320B CN109024320B (en) 2023-11-24

Family

ID=64617583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811106984.6A Active CN109024320B (en) 2018-09-21 2018-09-21 Bridge width splicing structure meeting settlement difference of new bridge and old bridge and construction method

Country Status (1)

Country Link
CN (1) CN109024320B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648233A (en) * 2020-05-26 2020-09-11 中冶南方城市建设工程技术有限公司 Join together wide bridge joint and prevent subsiding board device
CN111827149A (en) * 2020-09-01 2020-10-27 浙江世润建创科技发展有限公司 Bridge widening hinge structure and construction method
CN112982192A (en) * 2021-02-26 2021-06-18 中冶南方城市建设工程技术有限公司 Flexible steel node is widened to old bridge convenient to installation is changed
CN113235396A (en) * 2021-05-27 2021-08-10 华南理工大学 Novel connecting structure for new and old bridge joints of bridge with flange plates and construction method
CN114164747A (en) * 2021-12-21 2022-03-11 上海市政工程设计研究总院(集团)有限公司 New and old structure collaborative stress structure for bridge widening

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2694581A1 (en) * 1992-08-06 1994-02-11 Razel Freres Entreprise Method for widening existing concrete bridge decks - comprises placing precast prestressed or reinforced concrete beam longitudinally with bracket supported slabs under existing deck in gap
KR200332005Y1 (en) * 2003-07-24 2003-11-03 (주)평화엔지니어링 Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge
JP2005016106A (en) * 2003-06-25 2005-01-20 Ohbayashi Corp Method for preventing settlement of viaduct
US6857156B1 (en) * 2000-04-05 2005-02-22 Stanley J. Grossman Modular bridge structure construction and repair system
CN101424075A (en) * 2008-11-24 2009-05-06 重庆交通大学 Concrete box girder bridge widening and reinforced structure and construction method thereof
CN104631348A (en) * 2015-02-03 2015-05-20 东南大学 Transversely-widening splicing structure of three-dimensional prestress concrete continuous box girder bridge
JP2015224478A (en) * 2014-05-28 2015-12-14 山内 重一 Abutted-type expansion/contraction device for road bridge, and construction and repair methods therefor
CN204944479U (en) * 2015-09-22 2016-01-06 中交通力建设股份有限公司 The wide bridge foundation settlement difference observation device of a kind of spelling
CN205138472U (en) * 2015-11-20 2016-04-06 长安大学 New bridge pre -compaction settlement observation device in wide is pieced together to bridge
CN106436592A (en) * 2016-11-16 2017-02-22 福州大学 Bridge widening structure using Z-shaped steel plate connectors and construction method thereof
CN207130634U (en) * 2017-09-10 2018-03-23 湖北省交通规划设计院股份有限公司 A kind of structure for connecting existing T beams and newly-built T beams with reinforcing pull rod using steel plate
CN208949745U (en) * 2018-09-21 2019-06-07 湖北省交通规划设计院股份有限公司 A kind of wide construction of bridge spelling meeting new and old bridge differential settlement

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2694581A1 (en) * 1992-08-06 1994-02-11 Razel Freres Entreprise Method for widening existing concrete bridge decks - comprises placing precast prestressed or reinforced concrete beam longitudinally with bracket supported slabs under existing deck in gap
US6857156B1 (en) * 2000-04-05 2005-02-22 Stanley J. Grossman Modular bridge structure construction and repair system
JP2005016106A (en) * 2003-06-25 2005-01-20 Ohbayashi Corp Method for preventing settlement of viaduct
KR200332005Y1 (en) * 2003-07-24 2003-11-03 (주)평화엔지니어링 Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge
CN101424075A (en) * 2008-11-24 2009-05-06 重庆交通大学 Concrete box girder bridge widening and reinforced structure and construction method thereof
JP2015224478A (en) * 2014-05-28 2015-12-14 山内 重一 Abutted-type expansion/contraction device for road bridge, and construction and repair methods therefor
CN104631348A (en) * 2015-02-03 2015-05-20 东南大学 Transversely-widening splicing structure of three-dimensional prestress concrete continuous box girder bridge
CN204944479U (en) * 2015-09-22 2016-01-06 中交通力建设股份有限公司 The wide bridge foundation settlement difference observation device of a kind of spelling
CN205138472U (en) * 2015-11-20 2016-04-06 长安大学 New bridge pre -compaction settlement observation device in wide is pieced together to bridge
CN106436592A (en) * 2016-11-16 2017-02-22 福州大学 Bridge widening structure using Z-shaped steel plate connectors and construction method thereof
CN207130634U (en) * 2017-09-10 2018-03-23 湖北省交通规划设计院股份有限公司 A kind of structure for connecting existing T beams and newly-built T beams with reinforcing pull rod using steel plate
CN208949745U (en) * 2018-09-21 2019-06-07 湖北省交通规划设计院股份有限公司 A kind of wide construction of bridge spelling meeting new and old bridge differential settlement

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
丁喜红;时小领;: "沪宁高速软土地区桥梁拼接施工技术", 公路, no. 11 *
李刚;吴玲正;: "改扩建工程新旧桥拼接分析探讨", 交通科技, no. 02 *
陈康明;吴庆雄;陈宝春;张岗;: "拓宽长联桥梁部分拼接方法与拼接构造试验", 中国公路学报, no. 11 *
黄燕燕;: "城市桥梁拼宽设计方式探讨", 福建建材, no. 01 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648233A (en) * 2020-05-26 2020-09-11 中冶南方城市建设工程技术有限公司 Join together wide bridge joint and prevent subsiding board device
CN111648233B (en) * 2020-05-26 2022-06-10 中冶南方城市建设工程技术有限公司 Join together wide bridge joint and prevent subsiding board device
CN111827149A (en) * 2020-09-01 2020-10-27 浙江世润建创科技发展有限公司 Bridge widening hinge structure and construction method
CN111827149B (en) * 2020-09-01 2022-01-28 浙江世润建创科技发展有限公司 Bridge widening hinge structure and construction method
CN112982192A (en) * 2021-02-26 2021-06-18 中冶南方城市建设工程技术有限公司 Flexible steel node is widened to old bridge convenient to installation is changed
CN113235396A (en) * 2021-05-27 2021-08-10 华南理工大学 Novel connecting structure for new and old bridge joints of bridge with flange plates and construction method
CN114164747A (en) * 2021-12-21 2022-03-11 上海市政工程设计研究总院(集团)有限公司 New and old structure collaborative stress structure for bridge widening
CN114164747B (en) * 2021-12-21 2023-11-03 上海市政工程设计研究总院(集团)有限公司 New and old structure cooperative stress structure for bridge widening

Also Published As

Publication number Publication date
CN109024320B (en) 2023-11-24

Similar Documents

Publication Publication Date Title
CN109024320A (en) A kind of bridge meeting new and old bridge differential settlement spells wide construction and construction method
CN106978777B (en) A kind of make-shift bridge device
CN208105305U (en) A kind of assembled steel reinforced concrete buttress formula retaining wall structure
CN107227694A (en) A kind of concrete-bridge transversely strengthening construction
CN208949745U (en) A kind of wide construction of bridge spelling meeting new and old bridge differential settlement
CN106087739A (en) A kind of combination U rib shaped steel floorings and preparation method thereof
CN207130634U (en) A kind of structure for connecting existing T beams and newly-built T beams with reinforcing pull rod using steel plate
CN113123232A (en) Rigid splicing joint structure for splicing wide bridge
CN206298836U (en) A kind of bridge of use Z bar plate connector spells construction wide
CN112323653B (en) Construction method of active bridge channel widening structure and application thereof
CN106320192A (en) Beam section replacement reinforcement method for large-span concrete continuous beam bridge
CN103981784B (en) A kind of lattice-shaped steel-mixed combination Long Life Pavement plated construction
CN203684061U (en) Steel pedestrian overcrossing fast to disassemble or assemble
JP2014118762A (en) Junction track block, and method for erecting construction girder for supporting junction track block
CN105220622A (en) T beam widens reinforcing construction and construction method thereof
RU165497U1 (en) COMBINED PLATE AND FACING SPAN STRUCTURE OF THE ROAD BRIDGE
CN105178162A (en) T-beam reinforcing structure and construction method thereof
KR101262755B1 (en) Plate girder railway bridge having integrated cross beam and construction method using the same
CN110181211A (en) A kind of bridging type box beam
CN209907191U (en) Assembled concrete crash barrier based on grout muffjoint
CN111172819B (en) Platform for assembling and walking shield trailer and construction method thereof
CN211922242U (en) Full rigid frame bridge system for long and large intervals of rail transit
CN211200056U (en) Longitudinal connection structure suitable for girder at bridge expansion joint
CN204401464U (en) A kind of construction of cast-in-place box girders construction bracket system
CN105735483A (en) Structure for coping differential settlement of high and low conjoined building and construction method of structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant