CN205138472U - New bridge pre -compaction settlement observation device in wide is pieced together to bridge - Google Patents

New bridge pre -compaction settlement observation device in wide is pieced together to bridge Download PDF

Info

Publication number
CN205138472U
CN205138472U CN201520938171.9U CN201520938171U CN205138472U CN 205138472 U CN205138472 U CN 205138472U CN 201520938171 U CN201520938171 U CN 201520938171U CN 205138472 U CN205138472 U CN 205138472U
Authority
CN
China
Prior art keywords
connecting rod
bridge
fixed
pipe
observation device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520938171.9U
Other languages
Chinese (zh)
Inventor
赵煜
周勇军
徐盼
冯伟琼
李新龙
药天运
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201520938171.9U priority Critical patent/CN205138472U/en
Application granted granted Critical
Publication of CN205138472U publication Critical patent/CN205138472U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a new bridge pre -compaction settlement observation device in wide is pieced together to bridge, is including fixing the fixed baseplate on the new bridge body and fixing the L type anchoring pipe support on the old bridge body, fixed baseplate is last through connecting rod fixed stay touch panel, the end connection percentage table of L type anchoring pipe support, and the gauge head of percentage table contacts with the touch panel. Fixed baseplate comprises chassis and the standpipe fixed on the chassis, in the middle of the connecting rod stretches into the standpipe, and the side wall mounting of standpipe is used for a fastening to decide a hexagon nut of connecting rod. L type anchoring pipe support comprises pipe support dish and the L type stay tube fixed on the pipe support dish, the percentage table passes through the end connection of gauge outfit connecting rod and L type stay tube, in the middle of gauge outfit connecting rod afterbody stretches into L type stay tube, and installs the 2nd hexagon nut who is used for the tight gauge outfit connecting rod in top on the body lateral wall. The utility model has the advantages of reasonable design, process conveniently, easy and simple to handle and excellent in use effect, test data accurate.

Description

一种桥梁拼宽中新桥预压沉降观测装置An observation device for preloading and settlement of new bridges in bridge widening

技术领域technical field

本实用新型涉及桥梁施工领域,具体涉及一种桥梁拼宽中新桥预压沉降观测装置。The utility model relates to the field of bridge construction, in particular to an observation device for preloading and settlement of a new bridge in bridge widening.

背景技术Background technique

随着我国经济持续高速发展,交通量的不断增加,大部分地区交通年增长率在5%~15%,原有的公路需要提高通行能力,城市互通亟待扩建,因此大规模旧桥拓宽工程应运而生。With the continuous rapid development of my country's economy and the continuous increase of traffic volume, the annual growth rate of traffic in most areas is 5% to 15%. The original highway needs to improve the traffic capacity, and the urban intercommunication urgently needs to be expanded. Therefore, the large-scale old bridge widening project should be carried out. And born.

在桥梁拓宽衔接后,因为新桥与旧桥的基础沉降存在很大差异,这样会导致后期桥面产生很多裂缝。尤其在黄土地区,因为黄土本身具有湿陷性,基础沉降更加显著。桥梁拓宽中为了解决新旧桥梁基础后期沉降差异很大的难题,在施工过程中,新桥架完梁后需预压数月,若基础沉降达到稳定,新旧桥可以开始拼接。现如今,对于桥梁预压沉降观测多采用水准仪,这种方式存在每次沉降观测需重复操作安装仪器的流程,同时支架反复搭设不便、难以确保支架搭设的准确安装及定位、易造成测量数据不准确等诸多实际问题。After the bridge is widened and connected, there is a big difference between the foundation settlement of the new bridge and the old bridge, which will cause many cracks on the bridge deck in the later stage. Especially in the loess area, because the loess itself has collapsibility, the foundation settlement is more significant. During the bridge widening, in order to solve the problem that the foundation settlement of the new and old bridges is very different in the later stage, during the construction process, the new bridge needs to be preloaded for several months after the beams are erected. Once the foundation settlement is stable, the old and new bridges can be spliced together. Nowadays, level instruments are often used for bridge preload settlement observations. This method requires repeated operations and installation of instruments for each settlement observation. At the same time, it is inconvenient to repeatedly erect the brackets, it is difficult to ensure accurate installation and positioning of the brackets, and it is easy to cause inaccurate measurement data. Accuracy and many other practical issues.

实用新型内容Utility model content

本实用新型的目的在于针对上述现有技术中的缺陷,提供一种桥梁拼宽中新桥预压沉降观测装置,其结构设计合理、加工制作及安装方便、操作简便且使用效果好、测试数据准确。The purpose of this utility model is to aim at the defects in the above-mentioned prior art, and provide a bridge-widening Zhongxin bridge preloading settlement observation device, which has reasonable structural design, convenient processing and installation, easy operation and good use effect, and test data precise.

为了实现上述目的,本实用新型采用的技术方案为:包括固定在新桥梁体上的固定基座以及固定在旧桥梁体上的L型锚定管架;In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is: including a fixed base fixed on the new bridge body and an L-shaped anchor pipe frame fixed on the old bridge body;

所述的固定基座上通过连杆固定支撑触板,所述的L型锚定管架的端部连接百分表,且百分表的测头与触板相接合。The contact plate is fixedly supported by the connecting rod on the fixed base, the end of the L-shaped anchor pipe frame is connected with the dial indicator, and the measuring head of the dial indicator is connected with the contact plate.

所述的固定基座由底盘以及固定在底盘上的竖管组成;连杆伸入竖管当中,且竖管的侧壁上安装用于顶紧固定连杆的第一六角螺母。The fixed base is composed of a chassis and a vertical pipe fixed on the chassis; the connecting rod extends into the vertical pipe, and the first hexagonal nut for tightening and fixing the connecting rod is installed on the side wall of the vertical pipe.

所述的固定基座的底盘四周对称开设用于安装第一膨胀螺栓的第一安装孔。The chassis of the fixed base is symmetrically provided with first installation holes for installing the first expansion bolts.

所述的L型锚定管架由管架盘以及固定在管架盘上的L型支撑管组成;百分表通过表头连接杆与L型支撑管的端部连接,表头连接杆尾部伸入L型支撑管当中,且管体侧壁上安装有用于顶紧表头连接杆的第二六角螺母。The L-shaped anchoring pipe frame is composed of a pipe frame plate and an L-shaped support tube fixed on the pipe frame plate; the dial indicator is connected to the end of the L-shaped support tube through the connecting rod of the meter head, and the tail of the connecting rod of the meter head It extends into the L-shaped support pipe, and a second hex nut for tightening the connecting rod of the meter head is installed on the side wall of the pipe body.

所述的L型锚定管架的管架盘四周对称开设用于安装第二膨胀螺栓的第二安装孔。Second installation holes for installing second expansion bolts are symmetrically opened around the pipe frame plate of the L-shaped anchor pipe frame.

所述的表头连接杆的头部设置有U型固定夹,百分表的测头套筒安装在U型固定夹上,U型固定夹的尾部通过旋紧螺母连接表头连接杆。The head of the meter connecting rod is provided with a U-shaped fixing clip, the probe sleeve of the dial indicator is installed on the U-shaped fixing clip, and the tail of the U-shaped fixing clip is connected to the meter connecting rod by a tightening nut.

所述的L型支撑管的拐角处设置有用于增加稳定性的斜杆。The corners of the L-shaped support pipe are provided with oblique rods for increasing stability.

与现有技术相比,本实用新型具有如下的有益效果:通过在新桥梁体上安装触板,在旧桥梁体上通过L型锚定管架连接百分表,使用时将百分表测头压缩并与触板相接合,当被测试的新桥梁体预压发生沉降时,在固定基座上的触板将随之往下沉降,因百分表的测头事先压缩且始终保持与触板接合,故测头下伸会使百分表产生读数,随着新桥梁体持续沉降,百分表的读数数值在逐渐变小。从一段时间内采集的百分表读数数据中分析,若后续采集的百分表的读数数据大小处于不变时,即能够判定新桥梁体的沉降达到稳定,从而提供给施工方将新桥梁体与旧桥梁体进行拼接的合理时间。本实用新型在整体上具有结构设计合理、加工制作及安装方便、操作简便且使用效果好、测试数据准确等优点。Compared with the prior art, the utility model has the following beneficial effects: by installing the contact plate on the new bridge body, the dial gauge is connected to the old bridge body through an L-shaped anchor pipe frame, and the dial gauge is measured during use. When the preload of the new bridge body under test settles, the contact plate on the fixed base will sink down accordingly, because the measuring head of the dial indicator is compressed in advance and always keeps in line with the The contact plate is connected, so the downward extension of the probe will produce a reading on the dial indicator. As the new bridge body continues to settle, the reading value of the dial indicator will gradually decrease. From the analysis of the reading data of the dial indicator collected over a period of time, if the reading data of the dial indicator collected later remains unchanged, it can be determined that the settlement of the new bridge body has reached stability, thereby providing the construction party with the new bridge body. Reasonable time for splicing with the old bridge body. The utility model has the advantages of reasonable structural design, convenient processing and installation, easy operation, good use effect, accurate test data and the like on the whole.

进一步的,本实用新型固定基座由底盘以及固定在底盘上的竖管组成,固定支撑触板的连杆伸入竖管当中,且竖管的侧壁上安装用于顶紧固定连杆的第一六角螺母,锚定管架由管架盘以及固定在管架盘上的L型支撑管组成;百分表通过表头连接杆与L型支撑管的端部连接,表头连接杆尾部伸入L型支撑管当中,且管体侧壁上安装有用于顶紧表头连接杆的第二六角螺母,通过松开第一六角螺母能够对触板高度进行调解,松开第二六角螺母能够对表头位置进行调解,使得百分表的测头满足与触板相接合的要求,也提高了适应性。Further, the fixed base of the utility model is composed of a chassis and a vertical pipe fixed on the chassis. The connecting rod for fixedly supporting the contact plate extends into the vertical pipe, and the side wall of the vertical pipe is installed on the side wall of the vertical pipe for tightening the fixed connecting rod. The first hex nut, the anchor pipe frame is composed of a pipe frame plate and an L-shaped support tube fixed on the pipe frame plate; the dial indicator is connected to the end of the L-shaped support tube through the head connecting rod The tail protrudes into the L-shaped support tube, and the second hex nut is installed on the side wall of the tube body to tighten the connecting rod of the gauge head. By loosening the first hex nut, the height of the touch plate can be adjusted, and loosening the second hex nut The two hexagonal nuts can adjust the position of the gauge head, so that the gauge head of the dial indicator can meet the requirements of connecting with the contact plate, and the adaptability is also improved.

附图说明Description of drawings

图1本实用新型的整体结构示意图;The overall structure schematic diagram of Fig. 1 the utility model;

图2本实用新型表头连接杆俯视图;Figure 2 is the top view of the connecting rod of the meter head of the utility model;

图3本实用新型固定基座主视图;Figure 3 is the front view of the fixed base of the utility model;

图4本实用新型固定基座左视图;Fig. 4 left view of the fixed base of the utility model;

图5本实用新型固定基座俯视图;Figure 5 is the top view of the fixed base of the utility model;

图6本实用新型L型锚定管架主视图;Figure 6 is the front view of the utility model L-shaped anchor pipe support;

图7本实用新型L型锚定管架左视图;Fig. 7 is the left view of the utility model L-shaped anchor pipe support;

图8本实用新型L型锚定管架俯视图。Fig. 8 is a top view of the L-shaped anchor pipe support of the utility model.

附图中:1.百分表;2.表头连接杆;2-1.U型固定夹;2-2.旋紧螺母;3-1.连杆;3-2.触板;4.固定基座;4-1.底盘;4-2.竖管;4-3.第一安装孔;5.L型锚定管架;5-1.管架盘;5-2.L型支撑管;5-3.第二安装孔;6.新桥梁体;7.旧桥梁体;8.第一膨胀螺栓;9.第一六角螺母;10.第二六角螺母;11.第二膨胀螺栓;In the attached drawings: 1. Dial indicator; 2. Meter connecting rod; 2-1. U-shaped clamp; 2-2. Tightening nut; 3-1. Connecting rod; 3-2. Touch plate; 4. Fixed base; 4-1. Chassis; 4-2. Standpipe; 4-3. First installation hole; 5. L-shaped anchor pipe frame; 5-1. Pipe frame plate; 5-2. L-shaped support Tube; 5-3. Second mounting hole; 6. New bridge body; 7. Old bridge body; 8. First expansion bolt; 9. First hex nut; 10. Second hex nut; 11. Second Expansion bolts;

具体实施方式detailed description

下面结合附图对本实用新型做进一步的详细说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.

参见图1、2,本实用新型结构上包括百分表1、表头连接杆2、连杆3-1、触板3-2、固定基座4、L型锚定管架5、新桥梁体6、旧桥梁体7、膨胀螺栓、六角螺母、U型固定夹2-1以及旋紧螺母2-2。固定基座4固定在新桥梁体6上,L型锚定管架5固定在旧桥梁体7上。其中,膨胀螺栓共有八个,六角螺母有四个,U型固定夹2-1及旋紧螺母2-2各有一个,它们均起到固定的作用。固定基座4上通过连杆3-1固定支撑触板3-2,固定基座4由底盘4-1以及固定在底盘4-1上的竖管4-2组成,连杆3-1伸入竖管4-2当中,且竖管4-2的侧壁上安装有起顶紧作用的第一六角螺母9。L型锚定管架5由管架盘5-1以及固定在管架盘5-1上的L型支撑管5-2组成;百分表1通过表头连接杆2与L型支撑管5-2的端部连接,表头连接杆2尾部伸入L型支撑管5-2当中,且管体侧壁上安装有起顶紧作用的第二六角螺母10。Referring to Figures 1 and 2, the structure of the utility model includes a dial gauge 1, a gauge head connecting rod 2, a connecting rod 3-1, a contact plate 3-2, a fixed base 4, an L-shaped anchor pipe frame 5, and a new bridge Body 6, old bridge body 7, expansion bolts, hex nuts, U-shaped clamp 2-1 and tightening nut 2-2. The fixed base 4 is fixed on the new bridge body 6, and the L-shaped anchor pipe frame 5 is fixed on the old bridge body 7. Wherein, there are eight expansion bolts, four hex nuts, one U-shaped fixing clip 2-1 and one tightening nut 2-2, and they all play a fixed role. On the fixed base 4, the contact plate 3-2 is fixedly supported by the connecting rod 3-1. The fixed base 4 is composed of the chassis 4-1 and the vertical pipe 4-2 fixed on the chassis 4-1. The connecting rod 3-1 extends Into the middle of the standpipe 4-2, and the first hexagonal nut 9 that plays a tightening effect is installed on the side wall of the standpipe 4-2. The L-shaped anchor pipe frame 5 is composed of the pipe frame plate 5-1 and the L-shaped support pipe 5-2 fixed on the pipe frame plate 5-1; -2 ends are connected, and the afterbody of the meter connecting rod 2 extends into the middle of the L-shaped support pipe 5-2, and the second hex nut 10 which plays a tightening effect is installed on the side wall of the pipe body.

参见图3-5,本实用新型固定基座4的底盘4-1四角上设置有四个第一安装孔4-3,以便第一膨胀螺栓8穿过,锚固于新桥梁体6上;固定基座4的竖管4-2一侧加工有两个内螺纹孔,以便第一六角螺母9穿过,用来固定连杆3-1的位置。Referring to Fig. 3-5, four first installation holes 4-3 are provided on the four corners of the chassis 4-1 of the fixed base 4 of the present invention, so that the first expansion bolt 8 can pass through and be anchored on the new bridge body 6; Two internally threaded holes are processed on one side of the standpipe 4-2 of the base 4, so that the first hex nut 9 passes through, and is used for fixing the position of the connecting rod 3-1.

参见图6-8,本实用新型L型锚定管架5的管架盘5-1四角上设置四个第二安装孔5-3,以便第二膨胀螺栓11穿过,锚固于旧桥梁体7上;L型支撑管5-2端部钢管的上侧加工有两个内螺纹孔,以便第二六角螺母10穿过,来固定表头连接杆2的位置。Referring to Fig. 6-8, four second installation holes 5-3 are set on the four corners of the pipe frame plate 5-1 of the L-shaped anchor pipe frame 5 of the present invention, so that the second expansion bolt 11 can pass through and be anchored to the old bridge body On 7; the upper side of the steel pipe at the end of the L-shaped support pipe 5-2 is processed with two internally threaded holes, so that the second hex nut 10 passes through to fix the position of the connecting rod 2 of the meter head.

本实用新型的工作过程是:实际使用时,在选择好测点后,先通过第一膨胀螺栓8将固定基座4安装在新桥梁体6上,然后在旧桥梁体7上找好与固定基座4相对应的位置,通过第二膨胀螺栓11安装L型锚定管架5;之后,再将连杆3-1插入固定基座4的竖管4-2内,若上下调整好适合位置,经第一六角螺母9拧紧固定;同时表头连接杆2插入L型支撑管5-2的端部钢管内,若前后调整好适合位置,经第二六角螺母10拧紧固定;百分表1通过U型固定夹2-1及旋紧螺母2-2固定于表头连接杆2的端部,此时百分表1的伸缩杆测头需压缩回将近一半,使指针位于表盘最大量程的一半附近,再与触板3-2的顶部垂直相接触。实际测试时,当预压后被测试的新桥梁体6发生沉降时,在固定基座4上的触板3-2将随之往下沉降,因百分表1的伸缩杆测头事先压缩且一直保持与触板3-2的顶部接触,故伸缩杆测头会下伸,使百分表1产生读数,随着新桥梁体6持续沉降,百分表1的读数数值大小在逐渐变小。从一段时间内采集的百分表1读数数据中分析,若后续采集的百分表1的读数数据大小处于不变中,判定新桥梁体6的沉降达到稳定,从而提供给施工方进行拼接的合理时间。The working process of the utility model is: in actual use, after selecting the measuring point, first install the fixed base 4 on the new bridge body 6 through the first expansion bolt 8, and then find and fix it on the old bridge body 7. At the position corresponding to the base 4, install the L-shaped anchor pipe frame 5 through the second expansion bolt 11; after that, insert the connecting rod 3-1 into the vertical pipe 4-2 of the fixed base 4, if it is adjusted up and down to fit The position is tightened and fixed by the first hexagonal nut 9; at the same time, the connecting rod 2 of the meter head is inserted into the end steel pipe of the L-shaped support pipe 5-2, and if the suitable position is adjusted front and rear, it is tightened and fixed by the second hexagonal nut 10; The sub-meter 1 is fixed on the end of the connecting rod 2 of the meter head through the U-shaped fixing clip 2-1 and the tightening nut 2-2. At this time, the telescopic rod measuring head of the dial indicator 1 needs to be compressed back to nearly half, so that the pointer is on the dial Near the half of the maximum range, it is in vertical contact with the top of the touch panel 3-2. During the actual test, when the new bridge body 6 to be tested after preloading settles, the contact plate 3-2 on the fixed base 4 will sink down accordingly, because the telescopic rod measuring head of the dial indicator 1 is compressed in advance. And keep in contact with the top of the contact plate 3-2, so the telescopic rod measuring head will extend downward, so that the dial indicator 1 produces a reading, and as the new bridge body 6 continues to settle, the reading value of the dial indicator 1 is gradually changing. Small. From the analysis of the reading data of the dial indicator 1 collected in a period of time, if the reading data of the dial indicator 1 collected subsequently remains unchanged, it is determined that the settlement of the new bridge body 6 has reached stability, thereby providing the construction party with the opportunity for splicing. reasonable time.

本实用新型具有的结构优点以及有益效果在于:a.表头连接杆2、连杆3-1、触板3-2、固定基座4、L型锚定管架5都是采用不锈钢材料制备,置于外界环境中,可避免锈蚀问题;b.本结构设计合理且加工制作及安装布设方便;c.各组件之间均以活动连接方式进行连接,拆卸及组装均非常简便,拆卸后携带方便,并且现场组装方便。The utility model has structural advantages and beneficial effects as follows: a. The meter connecting rod 2, the connecting rod 3-1, the contact plate 3-2, the fixed base 4, and the L-shaped anchor pipe frame 5 are all made of stainless steel materials , placed in the external environment, can avoid corrosion problems; b. The structure design is reasonable, and the processing, production, installation and layout are convenient; c. The components are connected by movable connections. It is convenient and easy to assemble on site.

以上内容是对本实用新型所作的进一步详细说明,不能认定为本实用新型的具体实施方式仅限于此,对于本实用新型所属技术领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干简单的推演或替换,都应当视为属于权利要求确定的保护范围内。The above content is a further detailed description of the utility model, and can not be considered as the specific implementation of the utility model is limited to this, for those of ordinary skill in the technical field of the utility model, without departing from the utility model concept , and several simple deduction or substitutions can also be made, all of which should be deemed to fall within the scope of protection determined by the claims.

Claims (7)

1.一种桥梁拼宽中新桥预压沉降观测装置,其特征在于:包括固定在新桥梁体(6)上的固定基座(4)以及固定在旧桥梁体(7)上的L型锚定管架(5);1. A new bridge preloading settlement observation device in bridge width, is characterized in that: comprise the fixed base (4) that is fixed on the new bridge body (6) and the L-type that is fixed on the old bridge body (7) Anchor pipe frame (5); 所述的固定基座(4)上通过连杆(3-1)固定支撑触板(3-2),所述的L型锚定管架(5)的端部连接百分表(1),且百分表(1)的测头与触板(3-2)相接合。The contact plate (3-2) is fixedly supported by the connecting rod (3-1) on the fixed base (4), and the end of the L-shaped anchor pipe bracket (5) is connected with a dial indicator (1) , and the measuring head of the dial indicator (1) is engaged with the contact plate (3-2). 2.根据权利要求1所述的桥梁拼宽中新桥预压沉降观测装置,其特征在于:所述的固定基座(4)由底盘(4-1)以及固定在底盘(4-1)上的竖管(4-2)组成;连杆(3-1)伸入竖管(4-2)当中,且竖管(4-2)的侧壁上安装用于顶紧固定连杆(3-1)的第一六角螺母(9)。2. The new bridge preloading settlement observation device in bridge widening according to claim 1, characterized in that: the fixed base (4) is fixed on the chassis (4-1) by the chassis (4-1) The vertical pipe (4-2) on the top is composed of; the connecting rod (3-1) stretches into the middle of the vertical pipe (4-2), and the side wall of the vertical pipe (4-2) is installed for tightening the fixed connecting rod ( 3-1) the first hex nut (9). 3.根据权利要求2所述的桥梁拼宽中新桥预压沉降观测装置,其特征在于:所述的固定基座(4)的底盘(4-1)四周对称开设用于安装第一膨胀螺栓(8)的第一安装孔(4-3)。3. The new bridge preload settlement observation device in bridge widening according to claim 2, characterized in that: the chassis (4-1) of the fixed base (4) is symmetrically opened around for installing the first expansion First mounting hole (4-3) for bolt (8). 4.根据权利要求1所述的桥梁拼宽中新桥预压沉降观测装置,其特征在于:所述的L型锚定管架(5)由管架盘(5-1)以及固定在管架盘(5-1)上的L型支撑管(5-2)组成;百分表(1)通过表头连接杆(2)与L型支撑管(5-2)的端部连接,表头连接杆(2)尾部伸入L型支撑管(5-2)当中,且管体侧壁上安装有用于顶紧表头连接杆(2)的第二六角螺母(10)。4. The new bridge preload settlement observation device in bridge widening according to claim 1, characterized in that: the L-shaped anchor pipe support (5) is fixed on the pipe support plate (5-1) and the pipe support plate (5-1). The L-shaped support tube (5-2) on the frame (5-1) is composed of; the dial indicator (1) is connected with the end of the L-shaped support tube (5-2) through the gauge head connecting rod (2), and the indicator The end of the head connecting rod (2) extends into the middle of the L-shaped support pipe (5-2), and the second hex nut (10) for tightening the meter connecting rod (2) is installed on the side wall of the pipe body. 5.根据权利要求4所述的桥梁拼宽中新桥预压沉降观测装置,其特征在于:所述的L型锚定管架(5)的管架盘(5-1)四周对称开设用于安装第二膨胀螺栓(11)的第二安装孔(5-3)。5. The new bridge preload settlement observation device in bridge widening according to claim 4, characterized in that: the pipe frame disk (5-1) of the L-shaped anchor pipe frame (5) is symmetrically opened around The second installation hole (5-3) for installing the second expansion bolt (11). 6.根据权利要求4所述的桥梁拼宽中新桥预压沉降观测装置,其特征在于:所述的表头连接杆(2)的头部设置有U型固定夹(2-1),百分表(1)的测头套筒安装在U型固定夹(2-1)上,U型固定夹(2-1)的尾部通过旋紧螺母(2-2)连接表头连接杆(2)。6. The new bridge preload settlement observation device in bridge widening according to claim 4, characterized in that: the head of the meter connecting rod (2) is provided with a U-shaped clamp (2-1), The measuring head sleeve of the dial indicator (1) is installed on the U-shaped fixing clip (2-1), and the tail of the U-shaped fixing clip (2-1) is connected to the meter connecting rod ( 2). 7.根据权利要求4所述的桥梁拼宽中新桥预压沉降观测装置,其特征在于:所述的L型支撑管(5-2)的拐角处设置有用于增加稳定性的斜杆。7. The observation device for preloading settlement of the new bridge in bridge widening according to claim 4, characterized in that: the corner of the L-shaped support pipe (5-2) is provided with a diagonal bar for increasing stability.
CN201520938171.9U 2015-11-20 2015-11-20 New bridge pre -compaction settlement observation device in wide is pieced together to bridge Expired - Fee Related CN205138472U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520938171.9U CN205138472U (en) 2015-11-20 2015-11-20 New bridge pre -compaction settlement observation device in wide is pieced together to bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520938171.9U CN205138472U (en) 2015-11-20 2015-11-20 New bridge pre -compaction settlement observation device in wide is pieced together to bridge

Publications (1)

Publication Number Publication Date
CN205138472U true CN205138472U (en) 2016-04-06

Family

ID=55624258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520938171.9U Expired - Fee Related CN205138472U (en) 2015-11-20 2015-11-20 New bridge pre -compaction settlement observation device in wide is pieced together to bridge

Country Status (1)

Country Link
CN (1) CN205138472U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105716574A (en) * 2016-04-27 2016-06-29 中国能源建设集团安徽省电力设计院有限公司 Settlement observer used on waterborne photovoltaic power station and observation method of settlement observer
CN109024320A (en) * 2018-09-21 2018-12-18 湖北省交通规划设计院股份有限公司 A kind of bridge meeting new and old bridge differential settlement spells wide construction and construction method
CN109137761A (en) * 2018-09-29 2019-01-04 中铁二局集团有限公司 A method of it controlling existing bridge and to widen bridge settlement poor
CN115419124A (en) * 2022-09-21 2022-12-02 湖北工业大学 Device for visually measuring different depth subsidence of side slope

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105716574A (en) * 2016-04-27 2016-06-29 中国能源建设集团安徽省电力设计院有限公司 Settlement observer used on waterborne photovoltaic power station and observation method of settlement observer
CN105716574B (en) * 2016-04-27 2017-11-21 中国能源建设集团安徽省电力设计院有限公司 A kind of settlement observation device and its observation procedure for photovoltaic plant waterborne
CN109024320A (en) * 2018-09-21 2018-12-18 湖北省交通规划设计院股份有限公司 A kind of bridge meeting new and old bridge differential settlement spells wide construction and construction method
CN109024320B (en) * 2018-09-21 2023-11-24 湖北省交通规划设计院股份有限公司 Bridge width splicing structure meeting settlement difference of new bridge and old bridge and construction method
CN109137761A (en) * 2018-09-29 2019-01-04 中铁二局集团有限公司 A method of it controlling existing bridge and to widen bridge settlement poor
CN115419124A (en) * 2022-09-21 2022-12-02 湖北工业大学 Device for visually measuring different depth subsidence of side slope

Similar Documents

Publication Publication Date Title
CN205138472U (en) New bridge pre -compaction settlement observation device in wide is pieced together to bridge
CN105928447A (en) Rapid bridge flexibility measuring device
CN203069127U (en) Verticality detector
CN103983220A (en) System and method for continuously monitoring bridge deformation through foundation radar
CN202992562U (en) Special ruler support for water supply and drainage pipeline well bottom height measurement and special ruler using support
CN208902720U (en) An automatic test device for self-shrinkage of concrete by vertical contact method
CN209027523U (en) A prestressed pipeline coordinate positioning ruler
CN202599633U (en) Bridge deflection test instrument
CN207300237U (en) The quick monitoring device of pier slope
CN206430906U (en) Measure the adjustable hinged-support attachment means of pressure
CN210981105U (en) Rock sample basic parameter measuring device
CN202519713U (en) Adjustable level monitoring device for sinking open caissons
CN211849567U (en) Adjustable can dismantle benchmark roof beam
CN205426502U (en) Prestressing force strand steering gear mechanical testing device
CN221484510U (en) A device for measuring the height of an instrument
CN204944479U (en) The wide bridge foundation settlement difference observation device of a kind of spelling
CN216052249U (en) Rainfall is surveyd and is used hydrocone type measuring device
CN211955013U (en) Novel detection device for horizontal thrust test of steel structure railing of pedestrian bridge
CN210718924U (en) Auxiliary device for displacement measurement of anti-floating anchor rod pull-out test
CN209230900U (en) A kind of loading detection device suitable for bridge main beam
CN207730609U (en) Modified form mortar consistency tester
CN216586697U (en) A deviational survey pipe erection instrument for rock matter side slope monitoring
CN206410640U (en) A kind of device for measuring arch bridge suspender length
CN208270370U (en) A kind of slump measurement device
CN205049077U (en) Comparator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406

Termination date: 20161120