KR200332005Y1 - Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge - Google Patents

Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge Download PDF

Info

Publication number
KR200332005Y1
KR200332005Y1 KR20-2003-0023874U KR20030023874U KR200332005Y1 KR 200332005 Y1 KR200332005 Y1 KR 200332005Y1 KR 20030023874 U KR20030023874 U KR 20030023874U KR 200332005 Y1 KR200332005 Y1 KR 200332005Y1
Authority
KR
South Korea
Prior art keywords
connection
bridges
bridge
new
old
Prior art date
Application number
KR20-2003-0023874U
Other languages
Korean (ko)
Inventor
정기영
Original Assignee
(주)평화엔지니어링
정기영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)평화엔지니어링, 정기영 filed Critical (주)평화엔지니어링
Priority to KR20-2003-0023874U priority Critical patent/KR200332005Y1/en
Application granted granted Critical
Publication of KR200332005Y1 publication Critical patent/KR200332005Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 고안은 처짐 및 신축이 서로 다른 교량을 측면으로 나란히 접하게 하거나, 교량을 이루고 있는 거더의 재질이 서로 다른 교량 또는 신구 교량 간에 고정지점과 활동지점 및 지간길이가 서로 다른 교량이 서로 연결접속되어 차량의 통행이 이루어질 때 연결접속부에는 재질이 서로 다르거나 지간길이 및 지지점의 종류가 서로 다르게 설치되므로서 서로 다른 종방향 신축량과 상하 변위량에 차이가 있어 연결접속부에 설치된 연결장치가 탈락을 이루거나 돌출되는 등으로 인하여 차량이 연결접속부를 통과시 승차감이 저하되거나 차량의 윤하중의 충격하중으로 인하여 연결부의 파손이 되어 교량의 내구연한에 치명적인 영향을 주는 것을 방지하기 위하여 접속 연결부에 단위 연결판넬을 다수개 설치한 연결이음장치를 설치하여 종방향 및 수직방향의 변위를 흡수하여 교량의 접속연결부의 연결이음상태를 양호하게 하여 접속연결부의 통과차량의 승차감을 향상시키면서 교량에서 발생되는 각종 변위에도 적절히 대응하여 교량의 내구연한을 연장시켜줄 수 있는 연결이음장치의 설치방법을 제공한다.The present invention is designed to allow the bridges with different deflection and extension sides to be side by side, or between bridges or bridges with different girder materials, or bridges with different fixed points, activity points, and bridge lengths. When the connection is made, the connecting connection part is made of different materials, or the length of the support and the type of support point are different, so there is a difference in the amount of longitudinal expansion and displacement, and the connecting device installed in the connection connection is dropped or protruded. In order to prevent the vehicle from passing through the connection, the ride comfort is reduced or the connection of the vehicle is damaged due to the impact load of the vehicle's lubrication load. Longitudinal and vertical directions by installing one joint Installation of connecting joints that can absorb the displacement and improve the connection joint state of bridge connection to improve the ride comfort of the passing vehicle of bridge, and to prolong the durability of bridge by appropriately responding to various displacements generated in bridge Provide a method.

Description

거더의 재질 및 지간의 길이가 서로 다른 신구 교량이 서로 접속 연결되는 부분에 설치되어 서로 다른 신축량을 흡수할 수 있도록 하는 연결이음장치{Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge}Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge}

본 고안은 신구 교량의 서로 다른 신축량에 의하여 발생되는 교량과 교량이서로 연결되는 접속 연결부에 연결이음장치를 설치하여 종방향 및 수직방향의 변위를 흡수하여 교량의 접속연결부의 연결이음상태를 양호하게 하여 접속연결부의 통과차량의 승차감을 향상시키면서 교량에서 발생되는 각종 변위에도 적절히 대응하여 교량의 내구연한을 연장시켜줄 수 있는 연결이음장치의 설치방법에 관한 것이다.The present invention is to install the connection joints in the bridge connecting the bridge and the bridge generated by the different stretching of the old and new bridges to absorb the displacement in the longitudinal and vertical direction to improve the connection joint state of the bridge connection Therefore, the present invention relates to a method of installing a connection joint device which can extend the durability of the bridge by appropriately responding to various displacements generated in the bridge while improving the riding comfort of the passing vehicle of the connection connecting portion.

상기 연결이음장치는 강판으로 제작된 단위 연결판넬의 길이방향의 양측면에 돌출된 상부 지지플랜지를 형성하고 일정 높이의 수직판을 폭방향의 양측면 상부에 설치하면서, 상기 단위 연결판넬의 네모서리 부분의 상부 플랜지 하부면에 일정 크기의 탄성패드를 부착 설치하고 상기 단위 연결패널의 네방향의 측면에 고무시트를 부착설치하면서, 폭방향에 복수개의 홈을 양측단부에 설치하고, 홈내에 걸고리를 설치한 후에 일측의 길이방향으로 장공을 복수개 형성하되 장공의 홈은 폭방향으로 형성되도록 제작하고,The connecting joint device forms an upper support flange protruding on both sides in the longitudinal direction of the unit connecting panel made of steel, and installs a vertical plate of a predetermined height on both sides of the width direction, An elastic pad of a certain size is attached to the lower surface of the upper flange, and rubber sheets are attached to four sides of the unit connection panel, and a plurality of grooves are provided at both ends in the width direction, and hooks are provided in the grooves. Later, a plurality of long holes are formed in the longitudinal direction of one side, and the grooves of the long holes are formed to be formed in the width direction,

상기 단위 연결판넬을 신구 교량의 접속 연결부를 따라 종방향으로 설치시 상기 상부 지지플랜지가 양측에 설치된 거더의 일측에 얹혀져 설치되기 위하여 거더의 일측에 거더의 하부가 돌출되게 하부 지지플랜지를 형성하여 상기 단위 연결판넬을 상기 하부 지지플랜지상에 안착설치하여 연결이음장치를 설치한 후에 인접한 신구교량의 포장면의 높이에 맞게 형성설치된 상기 수직판내에 아스콘을 타설하여 포장면을 설치하여 신구 교량의 포장면과 유연하게 연결되도록 설치하는 연결이음장치의 설치방법이다. 이러한 설치방법의 개념은 교량 거더사이에 상기 연결이음장치를 설치하여 결과적으로 작은 교량을 신구 교량의 접속 연결부의 거더사이에더 설치되게 하는 것으로서, 이때 발생하는 상대적인 수직 처짐이나 교량 종방향 신축 이동을 상기 단위 연결판넬에 부착된 탄성패드의 탄성변형으로 흡수시켜 신축작용이나 상하변형에 대응하도록 하는 것이다.When the unit connecting panel is installed in the longitudinal direction along the connecting connection of the old and new bridges, the lower support flange is formed so that the lower part of the girder protrudes on one side of the girder so that the upper support flange is mounted on one side of the girder installed on both sides. The unit connection panel is installed on the lower support flange to install the connecting joint device, and then the ascon is installed in the vertical plate formed to fit the height of the pavement surface of the adjacent new bridge. It is the installation method of connecting joint device to be installed to be connected flexibly. The concept of this installation method is to install the connecting device between the bridge girders so that a small bridge is installed between the girder of the connecting connection of the old and new bridges, and thus the relative vertical deflection or longitudinal extension movement of the bridge occurs. The elastic pad attached to the unit connection panel is absorbed by the elastic deformation so as to correspond to the stretching action or the vertical deformation.

또한, 기존 익스펜숀 조인트를 사용할 수 없는 신구 교량의 상대 처짐이 큰 경우에도 본 고안의 연결이음장치는 사용할 수 있다.In addition, even if the relative deflection of the old and new bridges that can not use the existing expansion joints can be used in the connection joint device of the present invention.

왜냐하면, 신설 교량에만 고정볼트로 설치된 단위 연결판넬에 의하여 신구 교량간의 처짐이 서로 상이하여 단차가 발생하더라도 상기 연결판넬의 일측에만 설치된 장공에 고정볼트를 이용하여 신설교량의 거더에 고정하면 구교량에서 발생되는 신축량에 신축적으로 대응할 수 있기 때문이다.Because, even if the step difference occurs because the deflection between the old and new bridges is different due to the unit connection panel installed with fixed bolts only on the new bridges, when the fixed bolts are fixed to the girders of the new bridges by fixing bolts to the long holes installed only on one side of the connecting bridges, This is because it can flexibly respond to the amount of stretch that is generated.

본 고안의 목적은 신구 교량을 서로 연결접속하여 차량이 통행할 때 연결접속부에서 발생되는 신축량을 연결접속부에 설치된 연결이음장치가 흡수하여 차량의 승차감을 향상시키면서 접속 연결부를 주행하는 차량의 충격하중으로 인하여 연결부가 파괴되는 것을 방지하여 교량의 내구연한을 연장시켜주면서 교량의 유지보수관리에 소요되는 인건비 및 관리비를 절감하기 위함이다.The purpose of the present invention is to connect the old and new bridges with each other, so that the amount of expansion and contraction generated at the connection connection part is absorbed by the connection joint device installed at the connection connection part as the impact load of the vehicle driving the connection part while improving the ride comfort of the vehicle. This is to reduce the labor cost and administrative cost of the bridge maintenance and maintenance while extending the service life of the bridge by preventing the connection part from being destroyed.

종래에는 신구 교량의 서로 다른 신축량에 의하여 발생되는 교량과 교량이 서로 연결되는 접속 연결부에 철판을 설치하거나 신구 교량이 서로 만나는 부분에 탄성패드를 삽입한 신축이음장치를 설치하여 왔으나 신축량이 서로 다르므로 연결부에 설치된 철판이 이탈되거나 돌출되어 연결부를 통과하는 차량의 승차감을 훼손시키며 통과 차량의 충격하중에 의하여 연결부가 손상을 받게되어 교량이 파손되어 빈번하게 보수작업을 빈번하게 실시하게되거나 또는 연결부의 사이가 벌어져 차량의 운행이 매우 위험한 상황을 초래하게되는 문제점이 싱존하여 왔다.Conventionally, a steel plate is installed in a connecting connection portion where a bridge and a bridge are connected to each other by a new extension bridge of a new bridge, or a expansion joint device in which elastic pads are inserted in a portion where an old bridge meets each other, but the amount of expansion is different. The steel plate installed at the connection part is separated or protruded to impair the ride feeling of the vehicle passing through the connection part, and the connection part is damaged by the impact load of the passing vehicle, so that the bridge is broken and frequent maintenance work is performed or between the connection parts. There has been a problem in that a situation where the operation of the vehicle is very dangerous and opens.

본 고안은 상기의 문제점을 개선하고자 제안된 것으로서, 신구 교량이 서로 연결되어 발생되는 접속 연결부에 종방향 및 상하 방향에서 발생되는 변위를 흡수할 수 있는 단위 연결판넬로 이루어진 연결이음장치를 설치하여 교량의 접속 연결부를 보호하면서 교량에서 발생되는 변위를 흡수하여 교량에 변위로 인한 응력의 발생을 방지함과 동시에 운행하는 차량의 승차감을 향상시켜주고 차량의 충격하중으로부터 교량의 접속 연결부를 보호하여 교량이 파괴되는 것을 방지하여 교량의 내구연한을 연장시켜 주어 교량의 유지보수관리에 소요되는 인건비 및 관리비를 절감시켜 줄 수 있는 연결이음장치의 설치방법을 제공함에 있다.The present invention is proposed to improve the above problems, bridges by installing a joint connection device consisting of a unit connection panel that can absorb displacement generated in the longitudinal direction and the vertical direction in the connecting connection portion generated by the new bridge is connected to each other It protects the connection connection of the bridge and absorbs the displacement generated in the bridge to prevent the stress caused by the displacement on the bridge, and improves the riding comfort of the running vehicle and protects the connection connection of the bridge from the impact load of the bridge. The present invention provides a method of installing a jointed joint device which can reduce the labor and management costs required for the maintenance and management of the bridge by preventing the destruction and extending the service life of the bridge.

도 1(a)(b)는 본 고안의 연결이음장치가 설치되는 접속연결부의 한 예를 보여주는 도면.Figure 1 (a) (b) is a view showing an example of the connection connecting portion is installed connection device of the present invention.

도 2는 본 고안의 연결이음장치가 신구 교량의 접속연결부에 설치된 것을 보여주는 도면.Figure 2 is a view showing that the connection joint device of the present invention is installed in the connection connection of the old and new bridges.

도 3은 도 2에서 교량의 접속연결부에 설치된 연결이음장치의 A-A단면을 보여주는 도면.Figure 3 is a view showing an A-A cross section of the connection joint device installed in the connection connecting portion of the bridge in FIG.

도 4는 도 2에서 교량의 접속 연결부에 설치된 연결이음장치의 B-B단면을 보여주는 도면.Figure 4 is a view showing a cross-sectional view B-B of the connecting joint device installed in the connecting portion of the bridge in FIG.

도 5는 본 고안의 탄성패드를 상세히 보여주는 도면.5 is a view showing in detail the elastic pad of the present invention.

도 6은 본 고안의 고정 볼트를 보여주는 도면.6 is a view showing a fixing bolt of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10; 구 교량 11; 거더10; Old bridge 11; Girder

12; 교각 13; 포장면12; Pier 13; Packing cotton

20; 신설 교량20; New bridge

30; 접속연결부30; Connection

40; 연결이음장치40; Connection

50; 단위 연결판넬 51; 수직판50; Unit connection panel 51; Vertical

52; 상부 지지플랜지 53; 고무시트52; Upper support flange 53; Rubber sheet

54; 하부 지지플랜지 55; 걸고리54; Lower support flange 55; Hook

56; 장공 57; 홈56; Major 57; home

60; 탄성패드 61; 탄성체60; Elastic pad 61; Elastomer

62; 철판 또는 와이어 63; 베이스 플레이트62; Iron plate or wire 63; Base plate

64; 연결판 65; 볼트이음64; Connecting plate 65; Bolted joint

70; 고정볼트 71; 너트70; Fixing bolt 71; nut

72; 볼트 73; 스토퍼72; Bolt 73; stopper

본 고안은 강판으로 제작된 단위 연결판넬(50)의 길이방향의 양측면에 돌출된 상부 지지플랜지(52)를 형성하고 일정 높이의 수직판(51)을 폭방향의 양측면 상부에 설치하면서, 상기 단위 연결판넬의 네모서리 부분의 상부 지지플랜지(52) 하부면에 일정 크기의 탄성패드(60)를 부착 설치하고 상기 단위 연결패널(50)의 네방향의 측면에 고무시트(53)를 부착설치하면서, 폭방향에 복수개의 홈(57)을 양측부에 설치하고 홈(57)내에 걸고리(55)를 설치한 후에 일측의 길이방향으로 장공을 복수개 형성하되 장공(56)의 홈은 폭방향으로 형성되는 단위 연결판넬(50)을 제작하고,The present invention forms the upper support flange 52 protruding on both sides in the longitudinal direction of the unit connecting panel 50 made of a steel plate and the vertical plate 51 of a predetermined height on both sides in the width direction, the unit While attaching and installing elastic pads 60 of a predetermined size on the lower surface of the upper support flange 52 of the four corners of the connecting panel, and attaching and installing the rubber sheet 53 on the four sides of the unit connecting panel 50. After the plural grooves 57 are installed at both sides in the width direction, and the hook 55 is installed in the groove 57, a plurality of long holes are formed in one longitudinal direction, but the grooves of the long holes 56 are formed in the width direction. The unit connection panel 50 is manufactured,

상기 단위 연결판넬(50)을 신구 교량이 서로 연결되는 접속연결부를 따라 종방향으로 설치시 상기 상부 지지플랜지(52)가 양측에 설치된 거더(11)의 일측에 얹혀져 설치되기 위하여 거더(11)의 일측에 거더(11)의 하부가 돌출되게 하부 지지플랜지(54)를 형성하여 상기 단위 연결판넬(50)을 상기 하부 지지플랜지(54)상에 안착설치하여 연결이음장치(40)를 설치한 후에 인접한 신구교량(10,20)의 포장면(13)의 높이에 맞게 형성설치된 상기 수직판(51)내에 아스콘을 타설하여 포장면(13)을 설치하여 신구 교량(10,20)의 포장면(13)과 유연하게 연결되도록 설치하는 연결이음장치(40)의 설치방법에 특징이 있다.When the unit connecting panel 50 is installed in the longitudinal direction along the connection connecting the old and new bridges to each other, the upper support flange 52 is mounted on one side of the girder 11 installed on both sides of the girder 11 After forming the lower support flange 54 so that the lower portion of the girder 11 protrudes on one side, the unit connection panel 50 is seated and installed on the lower support flange 54 to install the connection joint device 40. Pavement surface of the new and old bridges (10, 20) by placing an ascon pavement (13) by placing ascone in the vertical plate 51 formed to match the height of the pavement surface (13) of the adjacent old and new bridges (10, 20) 13) is characterized in that the installation method of the connection joint device 40 to be installed to be connected flexibly.

상기 단위 연결판넬(50)을 이용하여 교량의 접속 연결부(30)에 설치하는 방법은 다음과 같다.Using the unit connection panel 50 is installed in the connection connecting portion 30 of the bridge is as follows.

a) 신구 교량(10,20)을 서로 접하게 설치하여 접속 연결부(30)를 형성하는 단계;a) installing new and old bridges 10 and 20 in contact with each other to form a connection connection part 30;

b) 상기 접속 연결부(30)의 인접한 교량의 거더(11)의 측면에 상부를 절취하고 하부에 돌출된 하부 지지플랜지(54)를 형성하면서 고정볼트(70)를 앵커링하는 단계b) anchoring the fixing bolt 70 while cutting the upper part on the side of the girder 11 of the adjacent bridge of the connecting connection part 30 and forming the lower support flange 54 protruding from the lower part.

c) 강판으로 제작된 박스형의 판넬(50)의 길이방향 양측면에 상부가 돌출된 상부 지지플랜지(52)를 형성하고 박스형 판넬의 네모서리 부분의 하부에 일정크기의 탄성패드(60)를 접착시켜 단위 연결판넬(50)을 형성하는 단계;c) forming an upper support flange 52 having an upper protrusion on both sides of the box-shaped panel 50 made of steel plate and adhering a predetermined size elastic pad 60 to the lower part of the four corners of the box-shaped panel 50. Forming a unit connection panel 50;

d) 상기 단위 연결판넬(50)의 네방향의 측면에 고무시트(53)를 부착설치하는단계;d) attaching and installing a rubber sheet 53 on four side surfaces of the unit connection panel 50;

e) 상기 단위 연결판넬(50)을 상기 하부 지지플랜지(54) 상부에 안착시키고 고정볼트(70)를 이용하여 상기 단위 연결판넬(50)의 길이방향에 복수개 설치된 장공(56)에 삽입고정설치하여 연결이음장치(40)의 설치를 완료하는 단계;e) The unit connecting panel 50 is seated on the lower support flange 54 and fixedly installed in a plurality of long holes 56 installed in the longitudinal direction of the unit connecting panel 50 using the fixing bolt 70. Completing the installation of the connection joint device 40;

f) 상기 연결이음장치(40)의 상부에 길이방향으로 설치된 일정 높이의 수직판(51)의 높이 이상으로 아스콘을 포장하여 인접한 교량의 포장면(13)과 원활하게 연결되도록 하는 단계; 및f) paving the ascon more than the height of the vertical plate 51 of a certain height installed in the longitudinal direction on the upper portion of the connection joint device 40 so as to be smoothly connected to the pavement surface 13 of the adjacent bridge; And

g) 상기 고무 시트(53)와 신구 교량(10,20) 거더(11)와의 사이 및 단위 연결판넬(50)과의 사이가 밀실하게 밀착되도록 하는 단계로 이루어진 것에 특징이 있다.g) it is characterized in that the step between the rubber sheet 53 and the old and new bridges (10, 20) girders (11) and between the unit connecting panel 50 to be in close contact.

상기 고안의 구성 및 작용을 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.If described in detail by the accompanying drawings the configuration and operation of the subject innovation as follows.

도 1(a)(b)는 본 고안의 연결이음장치가 설치되는 접속연결부의 예를 보여주는 도면으로서, 기존 교량(10)에 별도의 신설 교량(20)을 설치하면서 신구 교량(10,20) 간에 접속 연결하여 상호 차량이 통과운행할 수 있도록 접속 연결부(30)를 형성한 것이다. (a)도는 직선의 구교량의 측면에 곡선으로 신설되어 접하게 설치되는 교량의 접속 연결부를 보여주는 것이고, (b)도는 직선의 구 교량의 측면에 또 다른 직선의 신설 교량을 접하게 설치하면서 접속 연결부를 형성하는 것을 보여주는 것이다.Figure 1 (a) (b) is a view showing an example of the connection connecting portion is installed connection device of the present invention, the new bridge (10, 20) while installing a separate new bridge 20 to the existing bridge (10) The connection connecting portion 30 is formed so that the vehicle can pass through the connection connection between the two. (a) shows the connecting connection part of the bridge which is newly installed in a curve on the side of the old bridge, and (b) shows the connecting connection part while installing the new bridge of another straight line on the side of the old bridge. To show what is forming.

상기 기존 교량(10)은 예를 들어 강박스 거더로 이루어지고 신설되어 기존교량(10)의 측면에 접속되어 연결설치된 신설 교량(20)은 피시(PC) 콘크리트 거더 교량으로 이루어진 경우 각각의 거더(11)에 발생되는 종방향의 변위량과 상하방향으로 발생되는 변위량 및 비틈 변위량이 상호 다르게되어 결국 상기 접속연결부가 서로 고저차가 발생되게되어 상기 접속 연결부(30)에 설치된 연결장치가 탈락되거나 서로 뒤틀려 돌출되는 현상이 발생되게 된다. 또한, 기존 교량(10)의 교각(12)이 설치된 지간길이 및 지점의 종류가 신설되는 교량의 교각(12)이 설치된 지간길이와 지점의 종류가 상호 다르게 설치된 경우에도 또한 다양하게 발생되는 변위를 흡수할 수 없게되어 접속 연결부(30)에는 과도한 응력 및 차량의 충격에 의한 충격 하중이 빈번하게 작용하여 피로에 의한 교량의 파괴가 발생되게 된다.The existing bridge 10 is made of a steel box girder, for example, the new bridge 20 is connected to the side of the existing bridge (10) installed and connected to each other when the girder (PC) concrete girder bridge made of 11) the displacement amount in the vertical direction and the displacement amount and the non-spacing displacement amount generated in the vertical direction are different from each other, so that the connection connection parts are generated at high and low levels, so that the connection devices installed in the connection connection part 30 are dropped or distorted. The phenomenon occurs. In addition, even if the length of the bridge where the bridge 12 is installed and the type of the point where the bridge 12 of the existing bridge 10 is installed is different from the type of the length of the bridge where the bridge 12 is installed, various displacements are also generated. Since it cannot be absorbed, the connection connecting portion 30 frequently causes an impact load caused by excessive stress and impact of the vehicle to cause the bridge to be broken by fatigue.

이러한 접속연결부(30)에 본 고안에 의한 연결이음장치(40)를 설치하여 상기와 같은 교량에 미치는 악영향을 감소 내지는 방지하고자 하는 것이다.By installing the connection joint device 40 according to the present invention to the connection connection portion 30 is to reduce or prevent the adverse effect on the bridge as described above.

도 2는 본 고안의 연결이음장치가 신구 교량이 서로 접하는 접속연결부에 설치된 것을 보여주는 도면으로서, 강판으로 제작된 단위 연결판넬(50)의 길이방향의 양측면에 돌출된 상부 지지플랜지(52)를 형성하고 일정 높이의 수직판(51)을 길이방향의 양측면 상부에 설치하면서, 상기 단위 연결판넬의 네모서리 부분의 상부 플랜지(52) 하부면에 일정크기의 탄성패드(60)를 부착 설치하고 상기 단위 연결패널(50)의 네방향의 측면에 고무시트(53)를 부착설치하면서, 폭방향에 복수개의 홈(57)을 양측부에 설치하고, 홈(57)내에 걸고리(55)를 설치한 후에 일측의 길이방향으로 복수개의 장공을 형성하되 장공(56)의 홈은 폭방향으로 형성되도록 단위 연결판넬(50)을 제작하고,2 is a view showing that the connection joint device of the present invention is installed in the connection connecting portion of the old and new bridges, the upper support flange 52 protruding on both sides in the longitudinal direction of the unit connection panel 50 made of steel And while installing a vertical plate 51 of a certain height on the upper side of both sides in the longitudinal direction, the elastic pad 60 of a predetermined size is attached to the lower surface of the upper flange 52 of the four corner portions of the unit connecting panel and the unit After the rubber sheet 53 is attached to four sides of the connecting panel 50 in a lateral direction, the plurality of grooves 57 are provided on both sides in the width direction, and the hooks 55 are provided in the grooves 57. To form a plurality of long holes in the longitudinal direction of one side, the grooves of the long hole 56 to produce a unit connection panel 50 to be formed in the width direction,

상기 단위 연결판넬(50)을 신구 교량이 서로 접하는 접속 연결부를 따라 종방향으로 설치시 상기 상부 지지플랜지(52)가 양측에 설치된 거더(11)의 일측에 얹혀져 설치되기 위하여 거더(11)의 일측에 거더의 하부가 돌출되게 하부 지지플랜지(54)를 형성하여 상기 단위 연결판넬(50)을 상기 하부 지지플랜지(54)상에 안착설치하여 연결이음장치(40)를 설치한다.One side of the girder 11 so that the upper support flange 52 is mounted on one side of the girder 11 installed on both sides when the unit connecting panel 50 is installed in the longitudinal direction along the connecting connection portion where the old and new bridges are in contact with each other. The lower support flange 54 is formed so that the lower part of the girder protrudes, and the unit connection panel 50 is seated and installed on the lower support flange 54 to install the connection joint device 40.

상기의 연결이음장치(40)를 설치한 후에 인접한 신구교량(10,20)의 포장면(13)의 높이에 맞게 형성설치된 상기 수직판(51)내에 아스콘을 타설하여 포장면(13)을 설치하여 신구 교량(10,20)의 포장면(13)과 유연하게 연결되도록 설치한다.After installing the connecting joint device 40, the ascon is placed in the vertical plate 51 formed to fit the height of the paving surface 13 of the adjacent old and new bridges 10 and 20, and the paving surface 13 is installed. To be installed to be connected flexibly with the pavement surface 13 of the old and new bridges (10, 20).

상기 단위 연결판넬(50)의 네모서리 전부분에 걸쳐 부착된 고무시트(53)는 상기 신구 교량(10,20)의 사이에 설치되어 거더(11)의 일측면과 상호 접촉연결되면서 거더(11)에서 발생되는 변위를 상쇄시켜 주면서 포장면(13)에서 발생되는 우수와 같은 수분이 상기 연결이음장치(40)와 거더(11) 사이로 누수되어 부식되는 것을 방지하기 위함이다.The rubber sheet 53 attached to the entire corners of the unit connecting panel 50 is installed between the old and new bridges 10 and 20 to be in contact with one side of the girder 11 while being connected to each other. This is to prevent water from being leaked between the connection joint device 40 and the girder 11 and to be corroded while offsetting the displacement generated in the pavement surface 13.

또한, 상기 단위 연결판넬(50)의 일측면의 길이방향으로 장공이 복수개 설치되되 장공(56)의 홈은 폭방향으로 설치하고 상기 하부 지지플랜지(54)의 상부에 앵커된 볼트(72)를 상기 장공(56)에 삽입관통시키면서 볼트(72)의 상부에 일정한 간격을 갖으면서 설치된 스토퍼(73)의 상부에 너트(71)로 고정하도록 한 고정볼트(70)는 상기 신구 교량(10,20)이 접속 연결부(30)에 발생되는 상하방향의 변위에 신축적으로 대응하기 위하여 일정한 길이의 장공(56)이 폭방향으로 형성되도록 하여 장공(56)내에 설치된 볼트(72)와 스토퍼(73)가 장공(56)내에서 일정 범위를 갖으면서 거동할 수 있도록 하기 위함이다.In addition, a plurality of long holes are installed in the longitudinal direction of one side of the unit connection panel 50, but the grooves of the long holes 56 are installed in the width direction and the bolts 72 anchored on the upper part of the lower support flange 54 are provided. The fixing bolt 70 is fixed to the upper part of the stopper 73 installed at regular intervals on the upper part of the bolt 72 while penetrating the long hole 56 by the nut 71. The bolt 72 and the stopper 73 installed in the long hole 56 such that the long hole 56 of a predetermined length is formed in the width direction so as to elastically correspond to the vertical displacement generated in the connection connection part 30. This is to be able to behave while having a certain range in the long hole (56).

한편, 상기 상부 지지플랜지(52)의 하부에 부착되어 하부 지지플랜지(54)의 상면에 설치된 탄성패드(60)는 단위 연결판넬(50)에 작용하는 상하 변위량과 종방향의 변위에 대응하기 위하여 설치한다.On the other hand, the elastic pad 60 is attached to the lower portion of the upper support flange 52 and installed on the upper surface of the lower support flange 54 to correspond to the vertical displacement amount and the longitudinal displacement acting on the unit connection panel 50 Install.

상기 단위 연결판넬(50)을 접속연결부(30)에 설치하여 연결이음장치(40)를 장착하는 것은 신구 교량(10,20)의 거더(11)가 공히 기존의 익스펜션 죠인트의 설치가 불가능한 두께이거나 각각의 교량의 신축량 및 지지점의 위치가 각각 다르므로서 변위량에 차이가 있어 기존의 익스펜션 죠인트를 설치하여도 상기 교량에서 발생되는 각종 변위량을 흡수하지 못하게되어 교량 접속연결부(30)가 파손되거나 차량의 승차감을 개선시키지 못하게 되는 경우에 본 고안의 연결이음장치(40)를 설치하게된다.The unit connection panel 50 is installed on the connection connection part 30 to mount the connection joint device 40 such that the girder 11 of the old and new bridges 10 and 20 cannot be installed with the existing expansion joint. Since the amount of expansion and support of each bridge is different, there is a difference in the amount of displacement, so that even if an existing expansion joint is installed, the bridge connection connection part 30 may be damaged due to being unable to absorb various displacements generated by the bridge. In the case where the riding comfort of the vehicle cannot be improved, the connection joint device 40 of the present invention is installed.

상기 단위 연결판넬(50)의 상부의 폭방향에 복수개 설치된 홈(57)내에 걸고리(55)를 설치한 것은 상기 단위 연결판넬(50)을 설치하기 위하여 운반하고자 할때 걸고리(55)를 이용하여 운반하여 설치하고, 향후 유지보수시 상기 걸고리(55)에 중장비를 연결하여 들어올려 보수를 한 다음 다시 설치하는데 사용하고자 하기 위함이다.The hook 55 is installed in a plurality of grooves 57 installed in the width direction of the upper portion of the unit connecting panel 50 by using the hook 55 when carrying it to install the unit connecting panel 50. It is intended to be used to carry and install, to carry out the repair and then to install the heavy equipment connected to the hook 55 in the future maintenance.

상기 단위 연결판넬(50)에 형성된 장공(56)이 일측의 길이방향에만 설치된 것은 상기 단위 연결판넬(50)을 일측 즉 다시말해 신설 또는 기존 교량(10, 20)에 고정볼트(70)에 의해 단위 연결판넬(50)을 고정하도록 하고 타측에 설치된 기존 또는 신설 교량(10, 20)에는 단위 연결판넬(50)이 구속되지 않게하여 상하 변위에 상기 단위 연결판넬(50)이 대응할 수 있도록 하기 위함이며 장공(56)에 삽입된 볼트(72)의 상부로서 너트(71)의 하부에 일정한 간격을 두고 스토퍼(73)를 설치한 것은 상기 신설 교량(20)에서 발생된 상하 변위에 따라 상기 단위 연결판넬(50)이 상하로 거동할 때 일정량 이상 거동하지 못하게 하기 위함이다.The long hole 56 formed in the unit connecting panel 50 is installed only in one side of the longitudinal direction of the unit connecting panel 50 by one side, that is, the fixed bolt 70 in the new or existing bridge (10, 20) In order to fix the unit connecting panel 50 and to prevent the unit connecting panel 50 from being constrained to the existing or new bridges 10 and 20 installed on the other side, the unit connecting panel 50 can respond to vertical displacement. And the upper part of the bolt 72 inserted into the long hole 56, the stopper 73 is installed at regular intervals in the lower portion of the nut 71 is connected to the unit according to the vertical displacement generated in the new bridge (20) This is to prevent the panel 50 from behaving more than a certain amount when the panel 50 behaves up and down.

상기 단위 연결판넬(50)의 규격은 일반적으로 폭 0.5 ~ 2m, 길이 2 ~ 4m로 하되 크기는 변위 량의 크기에 따라 그 크기를 변경하여 적용한다.Generally, the unit connection panel 50 has a width of 0.5 to 2 m and a length of 2 to 4 m, but the size thereof is changed by changing the size according to the displacement amount.

도 3은 도 2에서 교량의 접속연결부에 설치된 연결이음장치의 A-A단면을 보여주는 도면으로서, 상기 도 2에서 신구 교량이 서로 접하는 접속 연결부를 따라 단위 연결판넬을 다수개 설치하여 연결이음장치를 설치한 것의 상기 단위 연결판넬의 네모서리 부분의 하부에 부착된 탄성패드가 거더의 하부 지지플랜지 상부에 설치된 것이다.FIG. 3 is a cross-sectional view illustrating a cross section AA of a connection joint installed in a connection connecting portion of a bridge in FIG. 2, in which a plurality of unit connection panels are installed along a connection connecting portion in which the new bridge is in contact with each other. An elastic pad attached to the lower part of the four corner portions of the unit connection panel of the one is installed on the upper support flange of the lower girder.

도 4는 도 2에서 교량의 접속 연결부에 설치된 연결이음장치인 단위 연결판넬의 B-B단면을 보여주는 도면으로서, 강판으로 제작된 단위 연결판넬(50)의 길이방향의 양측면에 돌출된 상부 지지플랜지(52)를 형성하고 일정 높이의 수직판(51)을 길이방향의 양측면 상부에 설치하면서, 복수개의 장공(56)은 일측의 길이방향으로 형성하되 장공(56)의 홈은 폭방향으로 형성되도록 제작한 단위 연결판넬(50)을 거더의 일측에 형성된 하부 지지플랜지 상부에 설치하고 하부 지지플랜지의 상부에 앵커된 고정볼트를 장공에 체결한 것이다.4 is a cross-sectional view illustrating a BB cross section of a unit connection panel, which is a connection joint device installed in a connection connection portion of a bridge in FIG. 2, wherein the upper support flange 52 protrudes on both sides in the longitudinal direction of the unit connection panel 50 made of steel. ) And the vertical plate 51 having a predetermined height is installed on both sides of the longitudinal direction, the plurality of long holes 56 are formed in the longitudinal direction of one side, but the grooves of the long holes 56 are formed in the width direction. The unit connection panel 50 is installed on the upper side of the lower support flange formed on one side of the girder and fastened the fixing bolt anchored on the upper side of the lower support flange to the long hole.

도 5는 본 고안의 탄성패드를 상세히 보여주는 도면으로서, 고무와 같은 탄성체(61)의 중간에 복수개 이상의 철판 또는 와이어(62)를 설치하고 상기 탄성체(61)의 상부에 철판인 연결판(64)을 설치하고 그 위에 탄성패드(60)의 크기보다 큰 철판의 재질인 베이스 플레이트(63)를 설치하면서 볼트 이음(65)을 한 탄성패드(60)이다.5 is a view showing in detail the elastic pad of the present invention, a plurality of iron plates or wires 62 are installed in the middle of the elastic body 61, such as rubber, and the connecting plate 64 is an iron plate on top of the elastic body 61 It is an elastic pad 60 with a bolted joint 65 while installing the base plate 63 made of a steel plate material larger than the size of the elastic pad 60 thereon.

상기 탄성패드(60)를 상기 단위 연결판넬(50)의 네모서리 부분의 상부 지지플랜지(52)의 하부에 설치하기 위하여 상기 베이스 플레이트(63)의 외측부분과 단위 연결판넬(50)과 볼트이음(65)을 한 단위 연결판넬(50)을 거더의 일측부에 형성된 하부 지지플랜지(54) 상부에 설치하게 되는 것이다.In order to install the elastic pad 60 in the lower portion of the upper support flange 52 of the four corner portions of the unit connecting panel 50, the outer portion of the base plate 63 and the unit connecting panel 50 and the bolt joint The unit connection panel 50 having the 65 is installed on the lower support flange 54 formed on one side of the girder.

상기 탄성체의 중간에 복수개 이상의 철판 또는 와이어를 설치하는 것은 탄성체에 강성을 부여하기 위함으로서 상기 단위 연결판넬의 상부에 하중이 작용할 때 상기 탄성패드의 탄성체가 파괴되지 않고 상기의 하중을 지지할 수 있도록 하기 위함이다.Installing a plurality of iron plates or wires in the middle of the elastic body is to give rigidity to the elastic body so that the elastic body of the elastic pad can support the load without breaking when a load is applied to the upper portion of the unit connecting panel. To do this.

일반적으로 탄성패드(60)의 규격은 두께가 40 ~ 60㎜이며 바람직한 두께는 50㎜이다. 상기 탄성패드(60)의 두께는 상하 변위량이 큰 경우에는 탄성 패드(60)의 두께를 두껍고 폭이 좁게하고, 비틈 거동이 큰 경우에는 탄성 패드(60)의 두께가 두껍고 길이를 짧게 한다.In general, the size of the elastic pad 60 is 40 ~ 60mm in thickness and the preferred thickness is 50mm. When the elastic pad 60 has a large vertical displacement, the elastic pad 60 has a large thickness and a narrow width, and when the gap is large, the elastic pad 60 has a thick thickness and a short length.

도 6은 본 고안의 고정 볼트를 보여주는 도면으로서, 볼트(72)의 상부에 일정한 간격을 갖으면서 설치된 스토퍼(73)의 상부에 너트(71)로 고정하도록 한다. 고정볼트(70)는 상기 신구 교량(10,20)이 접속 연결부(30)에 발생되는 상하방향의 변위에 신축적으로 대응하기 위하여 일정한 길이의 장공(56)이 폭방향으로 형성되도록 하여 장공(56)내에 설치된 볼트(72)가 상하 변위에 따라 거동하면서 거동량이 일정 한계내에서 거동할 수 있게 스토퍼(73)를 설치한다.6 is a view showing a fixing bolt of the present invention, to be fixed with a nut 71 on the upper portion of the stopper 73 installed at regular intervals on the upper portion of the bolt (72). The fixing bolt 70 has a long hole 56 of a predetermined length in the width direction so as to flexibly correspond to the vertical displacement of the new bridges 10 and 20 in the connection connecting portion 30. The stopper 73 is provided so that the amount of movement of the bolt 72 provided in the 56 may be changed within a certain limit while the bolt 72 behaves in accordance with the vertical displacement.

상기 탄성 패드(60)의 두께, 폭 및 단위 연결판넬(50)의 규격은 신구 교량(10,20)의 상대적인 종방향 신축량, 단위 연결판넬(50)의 비틈 거동량 및 상대 상하 변위량에 따라 결정하여 적용한다.The thickness, width, and size of the unit connecting panel 50 of the elastic pad 60 are determined according to the relative longitudinal stretch of the new bridges 10 and 20, the gap clearance of the unit connecting panel 50, and the relative vertical displacement. Apply.

본 고안은 신구 교량이 서로 만나서 교차하는 접속 연결부에 설치되는 연결이음장치가 신구 교량의 신축 변위량 및 비틈 변위량등과 같은 변위량을 흡수하여 교량의 접속연결부를 통과하는 차량의 승차감을 향상시키면서 접속 연결부를 경계로 한 신구 교량의 서로 다른 변위량을 흡수하여 접속 연결부가 원활하게 이음부 역할을 할 수 있도록 함과 동시에 접속연결부에서 발생되는 차량의 충격하중을 감소시켜 교량의 내구연한을 증가시켜 주고, 단위 연결판넬의 재질은 구조용 강재를 사용하므로서 신 교량의 내구성과 동일하게하고 탄성패드도 신설되는 교량에 사용하는 것과 동일한 것을 사용하여 내구연한이 동일하며 특별한 유지관리가 필요치 않으나 불측의 관리가 필요한 경우에는 상기 단위 연결판넬에 사용된 고정볼트를 해체하여 보수하면 간단히 유지보수가 종료되므로 유지보수 작업이 아주 간단하며, 신설 교량의 유지관리보수비용을 절감하고 유지관리에 소요되는 노력을 줄일 수 있는 매우 경제적이면서 효율적인 교량의 연결이음부를 연결하는 연결이음장치의 설치방법인 것이다.The present invention improves the riding comfort of the vehicle passing through the connection connection of the bridge by absorbing the displacement amount such as the expansion displacement and the gap displacement of the new bridge by the connecting joint device installed in the connection connection where the old and new bridges cross each other. By absorbing the different displacements of the old and new bridges as the boundary, the connecting joints can act as joints, while reducing the impact load of the vehicle generated at the connecting joints, increasing the durability of the bridges, and connecting the units. The material of the panel is the same as that used for new bridges by using structural steel, and the same durability as the one used for new bridges. The endurance is the same and no special maintenance is required. If the fixing bolt used in the unit connection panel is dismantled and repaired, The maintenance work is very simple because the maintenance is simply completed, and the connection joint connecting the connection joint of the very economical and efficient bridge can reduce the maintenance cost of the new bridge and reduce the effort required for the maintenance. It is an installation method.

Claims (9)

신구 교량이 서로 접하여 연결되는 연결부에 대하여 설치하는 연결장치에 있어서,In the connecting device for installing the old and new bridges in contact with each other, 신구 교량이 서로 접하게되는 종방향의 부분에 신구 교량의 거더의 양측면에 돌출 설치된 하부 지지플랜지의 상부에 양측면에 돌출된 상부 지지플랜지가 형성된 단위 연결판넬을 교량의 길이방향으로 연결조립하여 연결이음장치를 설치하는 것에 특징이 있는 거더의 재질 및 지간의 길이가 서로 다른 신구 교량이 서로 접속 연결되는 부분에 설치되어 서로 다른 신축량을 흡수할 수 있도록 하는 연결이음장치.Connecting joint device by connecting and connecting the unit connecting panel in which the upper support flange protruding on both sides is formed on the upper part of the lower support flange protruding on both sides of the girder of the old and new bridge in the longitudinal direction where the old and new bridges are in contact with each other. The connecting joint device, which is installed on the part where the new and old bridges with different lengths and materials of the girder, which is characterized in installing the parts, is connected to each other to absorb different amounts of expansion and contraction. 제 1항에 있어서,The method of claim 1, 상기 단위 연결판넬은 길이방향의 양측면에 돌출된 상부 지지플랜지를 형성하고 일정 높이의 수직판을 길이방향의 양측면 상부에 설치하면서, 상기 단위 연결판넬의 네모서리 부분의 상부 플랜지 하부면에 일정 크기의 탄성패드를 부착 설치하고 상기 단위 연결패널의 네방향의 측면에 고무시트를 부착설치하면서, 폭방향에 복수개의 홈을 양측부에 설치하고 홈내에 걸고리를 설치한 후에 복수개 장공의 홈을 형성한 것에 특징이 있는 거더의 재질 및 지간의 길이가 서로 다른 신구 교량이 서로 접속 연결되는 부분에 설치되어 서로 다른 신축량을 흡수할 수 있도록 하는 연결이음장치.The unit connection panel forms an upper support flange protruding on both sides in the longitudinal direction, and a vertical plate of a predetermined height is installed on both sides in the longitudinal direction, and has a predetermined size on the lower surface of the upper flange of the four corner portions of the unit connection panel. The elastic pads are attached and the rubber sheets are attached to the four sides of the unit connection panel, and the grooves are formed in the width direction on both sides and the hooks are formed in the grooves, and then the grooves of the plurality of holes are formed. Connection joint device which is installed in the part where new and old bridges with different materials and lengths of girders with different characteristics are connected to each other to absorb different amounts of expansion and contraction. 제 2항에 있어서,The method of claim 2, 상기 장공의 홈은 상기 단위 연결판넬의 폭방향으로 형성하되 장공은 일측면에만 길이방향으로 복수개 형성되도록 하여 신구 교량의 거더에서 발생하는 상하 변위량을 흡수할 수 있도록 한 것에 특징이 있는 거더의 재질 및 지간의 길이가 서로 다른 신구 교량이 서로 접속 연결되는 부분에 설치되어 서로 다른 신축량을 흡수할 수 있도록 하는 연결이음장치.The groove of the long hole is formed in the width direction of the unit connecting panel, but the long hole is formed in a plurality of longitudinal holes only on one side so as to absorb the vertical displacement generated in the girder of the old and new bridges, and Connection joint device that is installed in the part where new bridges with different lengths are connected to each other to absorb different amount of expansion and contraction. 제 2항 또는 제 3항에 있어서,The method of claim 2 or 3, 상기 장공에는 상기 하부 지지플랜지상에 앵커된 고정볼트가 삽입관통되는 것에 특징이 있는 거더의 재질 및 지간의 길이가 서로 다른 신구 교량이 서로 접속 연결되는 부분에 설치되어 서로 다른 신축량을 흡수할 수 있도록 하는 연결이음장치.The long hole is installed in the part where the old and new bridges with different materials and lengths of the girder are connected to each other so that the fixing bolt anchored on the lower support flange is inserted through to absorb different amounts of stretching. Connecting joints. 제 4항에 있어서,The method of claim 4, wherein 상기 고정볼트는 볼트의 상부에 일정한 간격을 갖으면서 설치된 스토퍼의 상부에 너트로 고정하도록 한 것에 특징이 있는 거더의 재질 및 지간의 길이가 서로 다른 신구 교량이 서로 접속 연결되는 부분에 설치되어 서로 다른 신축량을 흡수할수 있도록 하는 연결이음장치.The fixing bolt is installed on the part where the old and new bridges with different materials and lengths of the girder are connected to each other, characterized in that the fixing bolt is fixed to the upper part of the stopper installed with a certain interval on the top of the bolt. Connecting joints to absorb the amount of expansion. 제 2항에 있어서,The method of claim 2, 상기 탄성패드는 고무와 같은 탄성체의 중간에 복수개 이상의 철판 또는 와이어를 설치하고 상기 탄성체의 상부에 철판인 연결판을 설치하고 그 위에 탄성패드의 크기보다 큰 철판의 재질인 베이스 플레이트를 설치하면서 볼트 이음(65)을 한 것에 특징이 있는 거더의 재질 및 지간의 길이가 서로 다른 신구 교량이 서로 접속 연결되는 부분에 설치되어 서로 다른 신축량을 흡수할 수 있도록 하는 연결이음장치.The elastic pad is bolted while installing a plurality of iron plates or wires in the middle of the elastic body, such as rubber, and the connecting plate of the iron plate on the upper portion of the elastic body and a base plate made of a steel plate larger than the size of the elastic pad on it A jointing device for absorbing different amounts of expansion and contraction, which is installed at a portion where new and old bridges having different materials and lengths of girders, which are characterized in that they are 65, are connected to each other. 제 2항 또는 제 6항에 있어서,The method according to claim 2 or 6, 상기 탄성패드의 두께는 40 ~ 60㎜인 것에 특징이 있는 거더의 재질 및 지간의 길이가 서로 다른 신구 교량이 서로 접속 연결되는 부분에 설치되어 서로 다른 신축량을 흡수할 수 있도록 하는 연결이음장치.The thickness of the elastic pad is characterized in that the thickness of the 40 ~ 60㎜ connecting material device and the length of the bridge between the old and new bridges are connected to each other is connected to each other so as to absorb different stretch amount. 제 2항, 제 6항 및 제 7항의 어느 한 항에 있어서,The method according to any one of claims 2, 6 and 7, 상기 탄성패드의 두께는 신구 교량의 상하 변위량이 큰 경우에는 탄성 패드의 두께를 두껍고 폭이 좁게하고, 비틈 거동이 큰 경우에는 탄성 패드의 두께가 두껍고 길이를 짧게 하는 것에 특징이 있는 거더의 재질 및 지간의 길이가 서로 다른 신구 교량이 서로 접속 연결되는 부분에 설치되어 서로 다른 신축량을 흡수할 수 있도록 하는 연결이음장치.The thickness of the elastic pad is a material of the girder characterized by the thickness of the elastic pad is thick and narrow when the displacement of the old and new bridges is large, and the thickness of the elastic pad is thick and short when the gap is large. Connection joint device that is installed in the part where new bridges with different lengths are connected to each other to absorb different amount of expansion and contraction. 제 2항 내지 제 3항의 어느 한 항에 있어서,The method according to any one of claims 2 to 3, 상기 단위 연결판넬에 설치한 장공은 상기 단위 연결판넬의 일측의 길이방향에만 설치하되 기존 또는 신설 교량의 거더에 설치하여 고정볼트로 고정하는 것에 특징이 있는 거더의 재질 및 지간의 길이가 서로 다른 신구 교량이 서로 접속 연결되는 부분에 설치되어 서로 다른 신축량을 흡수할 수 있도록 하는 연결이음장치.The long hole installed in the unit connecting panel is installed only in the longitudinal direction of one side of the unit connecting panel, but it is installed in the girder of the existing or new bridge and fixed with fixing bolts. Connection joints installed on the bridges connected to each other to absorb different amounts of expansion.
KR20-2003-0023874U 2003-07-24 2003-07-24 Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge KR200332005Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2003-0023874U KR200332005Y1 (en) 2003-07-24 2003-07-24 Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2003-0023874U KR200332005Y1 (en) 2003-07-24 2003-07-24 Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020030050864A Division KR100599207B1 (en) 2003-07-24 2003-07-24 Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge and old bridge and construction method thereof

Publications (1)

Publication Number Publication Date
KR200332005Y1 true KR200332005Y1 (en) 2003-11-03

Family

ID=49418496

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0023874U KR200332005Y1 (en) 2003-07-24 2003-07-24 Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge

Country Status (1)

Country Link
KR (1) KR200332005Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024320A (en) * 2018-09-21 2018-12-18 湖北省交通规划设计院股份有限公司 A kind of bridge meeting new and old bridge differential settlement spells wide construction and construction method
CN113832876A (en) * 2021-11-08 2021-12-24 四川省交通勘察设计研究院有限公司 Wide splicing bridge connecting device, construction method and application

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024320A (en) * 2018-09-21 2018-12-18 湖北省交通规划设计院股份有限公司 A kind of bridge meeting new and old bridge differential settlement spells wide construction and construction method
CN109024320B (en) * 2018-09-21 2023-11-24 湖北省交通规划设计院股份有限公司 Bridge width splicing structure meeting settlement difference of new bridge and old bridge and construction method
CN113832876A (en) * 2021-11-08 2021-12-24 四川省交通勘察设计研究院有限公司 Wide splicing bridge connecting device, construction method and application

Similar Documents

Publication Publication Date Title
JP4040422B2 (en) Bearing exchange method for existing bearing device and bearing device
KR101784721B1 (en) bridge-type expansion joint device and its construction method which can easily replace a drainage sheet
KR101291810B1 (en) Expansion joint apparatus for bridge structure and manufacturing method thereof
KR100599207B1 (en) Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge and old bridge and construction method thereof
KR100798654B1 (en) Expansion joint with hybrid system and construction method
KR100812102B1 (en) Finger type bridge expansion joint
KR20060111215A (en) Expansion joint for highways, bridges and the like and assembling method for use the same
KR100845088B1 (en) Under exterior panel set up structure for steel bridge
KR200332005Y1 (en) Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge
JP5164234B2 (en) Expansion joint for bridge
KR100700947B1 (en) Protection member of rubber seal in expansion and contraction joint
KR100427908B1 (en) The fabricated expansion joint installation method without concrete-breaking
CN110195408B (en) Bridge expansion joint dustproof device and dustproof damping device thereof
JP2009235847A (en) Extending and contracting device and structure for bridge
KR100303287B1 (en) Scaffolding and Expansion Joints
KR102104673B1 (en) Expansion joint
KR200403788Y1 (en) Expansion equipment for bridge
KR101365436B1 (en) Expansion joint for bridge
KR102305121B1 (en) Waterproof expansion joint for partially repairable and easy maintenance using vulcanization rubber sheet
CN210288097U (en) Comb-shaped elastic telescopic component and joint filling module
KR100564093B1 (en) A flexible connection structure of a bridge using expandable rubber
KR20010068280A (en) Finger-type bridge expansion joint and repairing method for using the same
KR200432583Y1 (en) Temporary bridge without deck plate of bridge
CN112176857A (en) Comb-shaped elastic telescopic component and joint filling module
KR200245373Y1 (en) Replaceable expansion and contraction joint stracture for use in bridge

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
FPAY Annual fee payment

Payment date: 20041020

Year of fee payment: 3

EXTG Ip right invalidated