CN109024309B - 一种挂篮后下横梁施工行走方法 - Google Patents
一种挂篮后下横梁施工行走方法 Download PDFInfo
- Publication number
- CN109024309B CN109024309B CN201810815020.2A CN201810815020A CN109024309B CN 109024309 B CN109024309 B CN 109024309B CN 201810815020 A CN201810815020 A CN 201810815020A CN 109024309 B CN109024309 B CN 109024309B
- Authority
- CN
- China
- Prior art keywords
- lower beam
- sunpender
- rear lower
- outer skid
- hung
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
一种挂篮后下横梁施工行走方法,后下横梁及前下横梁构成的挂篮在行走时其吊点位置由前上横梁转换为外滑梁,不再像传统的挂篮结构中后下横梁吊挂在主桁架上。挂篮浇筑后下横梁的吊点为通过后下横梁吊杆Ⅱ吊挂于同侧箱梁的翼缘上,当挂篮移动时,后下横梁的吊点为通过行走吊杆吊挂于外滑梁上,因此挂篮行走时后下横梁吊点间距变小,减小了底模和侧模移动时的晃动,提高了安全性。行走时侧模与底模吊点位置统一,两者不会产生产生冲击,使运行更稳定。
Description
技术领域
本发明涉及桥梁施工领域,具体涉及一种挂篮后下横梁施工行走方法。
背景技术
挂篮是桥梁悬臂施工中的主要设备,按结构形式可分为桁架式、斜拉式、型钢式及混合式4种。其具有自重轻、结构简单、坚固稳定、前移和装拆方便、具有较强的可重复利用性,受力后变形小等特点,并且挂篮下空间充足,可提供较大施工作业面,利于钢筋模板施工操作。
传统的悬臂挂篮结构中后下横梁的吊点始终为桥面上的主桁架中横梁外侧,因此底模、侧模浇筑完一个节段后行走时,由于两吊点间距大,下部结构自重在跨中产生弯矩大,另外由于间距大行走不稳定,为了解决后下横梁弯矩大的问题往往就需要后下横梁的截面尺寸,因此也增加了箱梁悬臂挂篮的整体重量。
发明内容
本发明为了克服以上技术的不足,提供了一种降低后下横梁弯矩、减小运行时晃动、运行平稳的挂篮后下横梁施工行走方法。
本发明克服其技术问题所采用的技术方案是:
一种挂篮后下横梁施工行走方法,当箱梁浇筑完毕后,主桁架通过轨道沿横向设置于箱梁的顶部,已浇筑的箱梁的外侧设置有N个水平设置且相互平行的外滑梁,N为大于等于2的正整数,外滑梁的中间部位由外滑梁后吊杆吊挂于上次浇筑的箱梁节段上,外滑梁前端由外滑梁前吊杆吊挂于主桁架的前上横梁上,前下横梁通过前下横梁吊杆吊挂于前上横梁上,后下横梁中间部位通过若干后下横梁吊杆Ⅰ吊挂于箱梁的内箱底板,后下横梁与前下横梁上设置有底模,底模左右两侧分别设置有侧模,侧模吊挂在外滑梁上,后下横梁的左右两端分别通过后下横梁吊杆Ⅱ吊挂于同侧箱梁的翼缘上,还包括如下步骤:
a) 将后下横梁吊杆Ⅰ及后下横梁吊杆Ⅱ下落,使后下横梁向下移动,将前下横梁吊杆下落,使前下横梁向下移动,底模下移其与箱梁底面脱离实现落模,将外滑梁后吊杆及外滑梁前吊杆下落使外滑梁带动侧模下移实现落模;
b)增设行走吊杆,将行走吊杆的下端连接于后下横梁上,其上端吊挂固定于外滑梁上;
c)拆除后下横梁吊杆Ⅰ及后下横梁吊杆Ⅱ;
d)主桁架沿轨道向前横移,外滑梁、后下横梁及前下横梁跟随主桁架前移,后下横梁及前下横梁带动底模和侧模前移至到位;
e)重新将后下横梁中间部位通过若干后下横梁吊杆Ⅰ吊挂于箱梁的内箱底板,将后下横梁的左右两端分别通过后下横梁吊杆Ⅱ吊挂于同侧箱梁的翼缘上;
f)拆除行走吊杆;
g) 将后下横梁吊杆Ⅰ及后下横梁吊杆Ⅱ上升,使后下横梁向上移动,将前下横梁吊杆上升,使前下横梁向上移动,底模上移到位,将外滑梁后吊杆及外滑梁前吊杆上升,使外滑梁上移,外滑梁带动侧模上移到位,底模及侧模上移到位后浇筑混凝土制成新的一段箱梁;
h)重复步骤步骤a)-步骤g)。
优选的,N的取值为2,每侧两个相邻的外滑梁之间通过外滑梁连杆连接固定
本发明的有益效果是:挂篮浇筑后下横梁的吊点为通过后下横梁吊杆Ⅱ吊挂于同侧箱梁的翼缘上,当挂篮移动时,后下横梁的吊点为通过行走吊杆吊挂于外滑梁上,因此挂篮行走时后下横梁吊点间距变小,减小了底模和侧模移动时的晃动,提高了安全性。行走时侧模与底模吊点位置统一,两者不会产生产生冲击,使运行更稳定。
附图说明
图1为混凝土浇筑完箱梁后的悬臂挂篮部位的主视结构示意图;
图2为混凝土浇筑完箱梁后的悬臂挂篮部位的侧视结构示意图;
图3为前下横梁与后下横梁下移使底模落模的主视结构示意图;
图4为前下横梁与后下横梁下移使底模落模的侧视结构示意图;
图5为后下横梁安装行走吊杆的主视结构示意图;
图6为后下横梁安装行走吊杆的侧视结构示意图;
图7为后下横梁拆除后下横梁吊杆Ⅰ及后下横梁吊杆Ⅱ的主视结构示意图;
图8为后下横梁拆除后下横梁吊杆Ⅰ及后下横梁吊杆Ⅱ的侧视结构示意图;
图9为主桁架沿轨道向前横移后的主视结构示意图;
图10为重新安装后下横梁吊杆Ⅰ及后下横梁吊杆Ⅱ的主视结构示意图;
图11为重新安装后下横梁吊杆Ⅰ及后下横梁吊杆Ⅱ的侧视结构示意图;
图12为后下横梁拆除行走吊杆的主视结构示意图;
图13为后下横梁拆除行走吊杆的侧视结构示意图;
图14为前下横梁与后下横梁下移使底模到位的主视结构示意图;
图15为前下横梁与后下横梁下移使底模到位的侧视结构示意图;
图中,1.主桁架 2.前上横梁 3.外滑梁 4.外滑梁后吊杆 5.后下横梁 6.后下横梁吊杆Ⅰ 7.前下横梁 8.前下横梁吊杆 9.底模 10.外滑梁前吊杆11.外滑梁连杆 12.侧模13.后下横梁吊杆Ⅱ 14.箱梁 15.行走吊杆。
具体实施方式
下面结合附图1至附图15对本发明做进一步说明。
如附图1和附图2所示,一种挂篮后下横梁施工行走方法,当箱梁14浇筑完毕后,主桁架1通过轨道沿横向设置于箱梁14的顶部,已浇筑的箱梁14的外侧设置有N个水平设置且相互平行的外滑梁3,N为大于等于2的正整数,外滑梁3的中间部位由外滑梁后吊杆4吊挂于上次浇筑的箱梁14节段上,外滑梁3前端由外滑梁前吊杆10吊挂于主桁架1的前上横梁2上,前下横梁7通过前下横梁吊杆8吊挂于前上横梁2上,后下横梁5中间部位通过若干后下横梁吊杆Ⅰ 6吊挂于箱梁14的内箱底板,后下横梁5与前下横梁7上设置有底模9,底模9左右两侧分别设置有侧模12,侧模12吊挂在外滑梁3上,后下横梁5的左右两端分别通过后下横梁吊杆Ⅱ 13吊挂于同侧箱梁14的翼缘上,还包括如下步骤:
a) 将后下横梁吊杆Ⅰ 6及后下横梁吊杆Ⅱ 13下落,使后下横梁5向下移动,将前下横梁吊杆8下落,使前下横梁7向下移动,底模9下移其与箱梁14底面脱离实现落模,将外滑梁后吊杆4及外滑梁前吊杆10下落使外滑梁3带动侧模12下移实现落模;
b)增设行走吊杆15,将行走吊杆15的下端连接于后下横梁5上,其上端吊挂固定于外滑梁3上;
c)拆除后下横梁吊杆Ⅰ 6及后下横梁吊杆Ⅱ 13;
d)主桁架1沿轨道向前横移,外滑梁3、后下横梁5及前下横梁7跟随主桁架1前移,后下横梁5及前下横梁7带动底模9和侧模12前移至到位;
e)重新将后下横梁5中间部位通过若干后下横梁吊杆Ⅰ 6吊挂于箱梁14的内箱底板,将后下横梁5的左右两端分别通过后下横梁吊杆Ⅱ 13吊挂于同侧箱梁14的翼缘上;
f)拆除行走吊杆15;
g)将后下横梁吊杆Ⅰ 6及后下横梁吊杆Ⅱ 13上升,使后下横梁5向上移动,将前下横梁吊杆8上升,使前下横梁7向上移动,底模9上移到位,将外滑梁后吊杆4及外滑梁前吊杆10上升,使外滑梁3上移,外滑梁3带动侧模12上移到位,底模9及侧模12上移到位后浇筑混凝土制成新的一段箱梁14;
h)重复步骤步骤a)-步骤g)。
由于后下横梁5及前下横梁7构成的挂篮在行走时其吊点位置由主桁架1转换为外滑梁3,不再像传统的挂篮结构中后下横梁5吊挂在主桁架1上。挂篮浇筑后下横梁5的吊点为通过后下横梁吊杆Ⅱ 13吊挂于同侧箱梁14的翼缘上,当挂篮移动时,后下横梁5的吊点为通过行走吊杆15吊挂于外滑梁3上,因此挂篮行走时后下横梁吊点间距变小,减小了底模9和侧模12移动时的晃动,提高了安全性。行走时侧模12与底模9吊点位置统一,两者不会产生产生冲击,使运行更稳定。
进一步的,N的取值为2,每侧两个相邻的外滑梁3之间通过外滑梁连杆11连接固定,外滑梁连杆11可以提高两个外滑梁3之间连接的刚性,提高使用寿命。
Claims (2)
1.一种挂篮后下横梁施工行走方法,当箱梁(14)浇筑完毕后,主桁架(1)通过轨道沿横向设置于箱梁(14)的顶部,已浇筑的箱梁(14)的外侧设置有N个水平设置且相互平行的外滑梁(3),N为大于等于2的正整数,外滑梁(3)的中间部位由外滑梁后吊杆(4)吊挂于上次浇筑的箱梁(14)节段上,外滑梁(3)前端由外滑梁前吊杆(10)吊挂于主桁架(1)的前上横梁(2)上,前下横梁(7)通过前下横梁吊杆(8)吊挂于前上横梁(2)上,后下横梁(5)中间部位通过若干后下横梁吊杆Ⅰ(6)吊挂于箱梁(14)的内箱底板,后下横梁(5)与前下横梁(7)上设置有底模(9),底模(9)左右两侧分别设有侧模(12),侧模(12)吊挂在外滑梁(3)上,其特征在于:后下横梁(5)的左右两端分别通过后下横梁吊杆Ⅱ(13)吊挂于同侧箱梁(14)的翼缘上,还包括如下步骤:
a)将后下横梁吊杆Ⅰ(6)及后下横梁吊杆Ⅱ(13)下落,使后下横梁(5)向下移动,将前下横梁吊杆(8)下落,使前下横梁(7)向下移动,底模(9)下移其与箱梁(14)底面脱离实现落模,将外滑梁后吊杆(4)及外滑梁前吊杆(10)下落使外滑梁(3)带动侧模(12)下移实现落模;
b)增设行走吊杆(15),将行走吊杆(15)的下端连接于后下横梁(5)上,其上端吊挂固定于外滑梁(3)上;
c)拆除后下横梁吊杆Ⅰ(6)及后下横梁吊杆Ⅱ(13);
d)主桁架(1)沿轨道向前横移,外滑梁(3)、后下横梁(5)及前下横梁(7)跟随主桁架(1)前移,后下横梁(5)及前下横梁(7)带动底模(9)和侧模(12)前移至到位;
e)重新将后下横梁(5)中间部位通过若干后下横梁吊杆Ⅰ(6)吊挂于箱梁(14)的内箱底板,将后下横梁(5)的左右两端分别通过后下横梁吊杆Ⅱ(13)吊挂于同侧箱梁(14)的翼缘上;
f)拆除行走吊杆(15);
g) 将后下横梁吊杆Ⅰ(6)及后下横梁吊杆Ⅱ(13)上升,使后下横梁(5)向上移动,将前下横梁吊杆(8)上升,使前下横梁(7)向上移动,底模(9)上移到位,将外滑梁后吊杆(4)及外滑梁前吊杆(10)上升,使外滑梁(3)上移,外滑梁(3)带动侧模(12)上移到位,底模(9)及侧模(12)上移到位后浇筑混凝土制成新的一段箱梁(14);
h)重复步骤步骤a)-步骤g)。
2.根据权利要求1所述的挂篮后下横梁施工行走方法,其特征在于:N的取值为2,每侧两个相邻的外滑梁(3)之间通过外滑梁连杆(11)连接固定。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810815020.2A CN109024309B (zh) | 2018-07-24 | 2018-07-24 | 一种挂篮后下横梁施工行走方法 |
PCT/CN2019/096967 WO2020020087A1 (zh) | 2018-07-24 | 2019-07-22 | 一种挂篮后下横梁施工行走方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810815020.2A CN109024309B (zh) | 2018-07-24 | 2018-07-24 | 一种挂篮后下横梁施工行走方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109024309A CN109024309A (zh) | 2018-12-18 |
CN109024309B true CN109024309B (zh) | 2019-11-08 |
Family
ID=64644363
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810815020.2A Active CN109024309B (zh) | 2018-07-24 | 2018-07-24 | 一种挂篮后下横梁施工行走方法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN109024309B (zh) |
WO (1) | WO2020020087A1 (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109024309B (zh) * | 2018-07-24 | 2019-11-08 | 山东恒堃机械有限公司 | 一种挂篮后下横梁施工行走方法 |
CN111646362A (zh) * | 2020-06-01 | 2020-09-11 | 吕友飞 | 一种应用于桥梁建设施工的快速提升机构 |
CN114214968B (zh) * | 2021-12-15 | 2023-05-12 | 中建七局安装工程有限公司 | 一种桥梁0号块底板免拆除施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
HU191500B (en) * | 1983-06-09 | 1987-02-27 | Ksze Noevenytermelesi Rendszer Gazdasagi Tarsasag,Hu | Method and apparatus for hay-producing by ammonical preserving |
CN107447683A (zh) * | 2017-09-19 | 2017-12-08 | 安徽水利开发股份有限公司 | 挂篮行走装置 |
CN206859052U (zh) * | 2017-06-07 | 2018-01-09 | 中铁隧道集团二处有限公司 | 一种用于高架桥梁施工的行走挂篮 |
CN107858937A (zh) * | 2017-10-31 | 2018-03-30 | 中交二航局第三工程有限公司 | 可转向的挂篮行走装置及转向方法 |
CN107974942A (zh) * | 2017-11-30 | 2018-05-01 | 中铁二十局集团有限公司 | 一种陡坡侧刚构连续梁边跨施工方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109024309B (zh) * | 2018-07-24 | 2019-11-08 | 山东恒堃机械有限公司 | 一种挂篮后下横梁施工行走方法 |
-
2018
- 2018-07-24 CN CN201810815020.2A patent/CN109024309B/zh active Active
-
2019
- 2019-07-22 WO PCT/CN2019/096967 patent/WO2020020087A1/zh active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
HU191500B (en) * | 1983-06-09 | 1987-02-27 | Ksze Noevenytermelesi Rendszer Gazdasagi Tarsasag,Hu | Method and apparatus for hay-producing by ammonical preserving |
CN206859052U (zh) * | 2017-06-07 | 2018-01-09 | 中铁隧道集团二处有限公司 | 一种用于高架桥梁施工的行走挂篮 |
CN107447683A (zh) * | 2017-09-19 | 2017-12-08 | 安徽水利开发股份有限公司 | 挂篮行走装置 |
CN107858937A (zh) * | 2017-10-31 | 2018-03-30 | 中交二航局第三工程有限公司 | 可转向的挂篮行走装置及转向方法 |
CN107974942A (zh) * | 2017-11-30 | 2018-05-01 | 中铁二十局集团有限公司 | 一种陡坡侧刚构连续梁边跨施工方法 |
Also Published As
Publication number | Publication date |
---|---|
WO2020020087A1 (zh) | 2020-01-30 |
CN109024309A (zh) | 2018-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109024309B (zh) | 一种挂篮后下横梁施工行走方法 | |
CN102094392B (zh) | 桥梁施工中的下承式挂篮及其应用 | |
CN103669217B (zh) | 一种后支点挂篮及其整体换幅横移方法 | |
CN102134833B (zh) | 贝雷架吊装拆除的施工方法 | |
CN202164546U (zh) | 高墩桥梁施工平台 | |
CN105540446A (zh) | 内爬式吊装平台 | |
CN205382425U (zh) | 铁路t型桥梁加筑声屏障梁模板桁架车 | |
CN106320190A (zh) | 桥梁养护加固悬吊施工平台 | |
CN202000262U (zh) | 桥梁三角挂篮 | |
CN202416192U (zh) | 一种桥梁施工中所使用的菱形桁架挂篮 | |
CN211646026U (zh) | 一种通用型模数式承重桁架 | |
CN208981742U (zh) | 一种用于房屋建筑施工的悬挑脚手架 | |
CN205348005U (zh) | 斜拉桥牵索挂篮的施工操作组合平台 | |
CN209722771U (zh) | 一种桥梁施工挂篮 | |
CN208215605U (zh) | 一种快速拆装t梁模板 | |
CN202185973U (zh) | 一种辅助t梁模板拆装的装置 | |
CN109083023B (zh) | 采用劲性骨架的连续刚构桥及其施工方法 | |
CN207109614U (zh) | 一种建筑用挂篮 | |
CN204551271U (zh) | 一种加固型挂篮 | |
CN202265781U (zh) | 三角形桁架桥用折角吊篮 | |
CN104532744A (zh) | 移动模架配套变轨门式起重机 | |
CN103266572A (zh) | 一种用于双幅桥梁间横系梁现浇施工的多功能施工平台 | |
CN204282226U (zh) | 移动模架配套变轨门式起重机 | |
CN202347447U (zh) | 一种加固吊篮 | |
CN216642133U (zh) | 一种单侧可移动隧道中隔墙模板台车 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |