CN108979198A CN201710403970.XA CN201710403970A CN108979198A CN 108979198 A CN108979198 A CN 108979198A CN 201710403970 A CN201710403970 A CN 201710403970A CN 108979198 A CN108979198 A CN 108979198A
Authority
CN
China
Prior art keywords
open
building machine
building
floor
tearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710403970.XA
Other languages
Chinese (zh)
Inventor
李聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710403970.XA priority Critical patent/CN108979198A/en
Publication of CN108979198A publication Critical patent/CN108979198A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • E04G23/082Wrecking of buildings using shears, breakers, jaws and the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Building machine is torn open the invention discloses a kind of skyscraper and its tears building method open, tearing building machine open includes four tracks, double tower and girder, tower structure successively includes: that wheel, vertical beam, tower body and stock are walked in driving from lower to upper in the double tower, the tower body is to be connected and composed by more standard section by bolt group, the girder is twin-spar construction, the girder is equipped with overhead traveling crane, the driving of the double tower lower end walks wheel installation in orbit, and the girder, which is located above double tower and is fixedly connected to be integrally formed by double tower, tears building machine open;It is that integrally segmentation is blocking removes by floor, beam, wall, pillar and stair etc. that it, which tears building method open, then transports factory back on transport vehicle downstairs and is handled using tearing building machine open and be lifted into.Building machine is torn open using skyscraper of the present invention and its tears building method open, site workload is transferred to factory and is completed, the environmental pollutions such as live disintegrating slag accumulation, fugitive dust, noise is reduced, has many advantages, such as to remove high-efficient, short time limit and labor intensity is small.

Description

A kind of skyscraper tears building machine open and its tears building method open
Technical field
The present invention relates to technical field of engineering machinery, specifically a kind of skyscraper tears building machine open and its tears building method open.
Technical background
With the development of the social economy, the level of urbanization is higher and higher, construction industry is also rapidly developed, old building It is constantly removed, then builds new building or change and do other purposes.Usually there are three types of modes for projects at present: first is that people Work is removed, adaptable since worker is removed using small mechanical equipment, is suitable for any place situation, but effect Low, long in time limit, large labor intensity;Second is that mechanical removal, long-armed to tear the dismounting of building machine open, although labor intensity is small, it is in clinkerer Phase is too long and steel recycling is difficult, and mainly for median low structure;Third is that demolition blasting, although this method can disposably allow Building collapse, but, coordination difficulty high along with risk requires height, scarfing cinder long in time limit greatly, to surrounding enviroment and steel recycle difficulty The disadvantages of.
Summary of the invention
Tear building machine open it is an object of that present invention to provide a kind of skyscraper and its tear building method open, it is adaptable it is strong, high-efficient, Short time limit, environmental protection, can by the construction materials such as steel recycle the advantages that.
To achieve the goals above, the present invention adopts the following technical scheme:
A kind of skyscraper tears building machine open, includes four tracks, double tower and girder, in the double tower tower structure from lower to upper according to Secondary includes: that wheel, vertical beam, tower body and stock are walked in driving, and the tower body is to be connected and composed by more standard section by bolt group, described Girder is twin-spar construction, and the girder is equipped with overhead traveling crane, and the driving of the double tower lower end walks wheel installation in orbit, the girder It is located above double tower and is fixedly connected to be integrally formed by double tower and tear building machine open;
The vertical beam lower end is set there are four driving wheel, and driving is walked wheel and is connected and fixed by pin shaft and vertical beam, and vertical beam passes through Lower connection frame forms a fixed connection with tower body, and tower body and girder are formed a fixed connection by upper connection frame;
The tower body lower part be equipped with Waistband structure, Waistband structure by bolt group be fixedly connected to form waistband mount structure and with Tower body formation is fastenedly connected, and brace is equipped between waistband mount structure and vertical beam, and brace one end passes through bolt and waistband frame knot Structure is connected and fixed, and the brace other end is connected and fixed by bolt and vertical beam;
The stock is covered in tower body upper end and is formed a fixed connection by bolt group and upper connection frame, and stock includes hydraulic pressure system System, main frame, guardrail and platform;
Operating room is equipped with above the tower body, operating room is formed a fixed connection by tripod and upper connection frame;
Wheel, hoist engine, suspension hook and grab bucket are walked equipped with driving on the overhead traveling crane, the driving of overhead traveling crane walks wheel and is mounted on the double of girder In girder construction.
For the building machine of tearing open equipped with excavator, excavator is furnished with hydraulic shear and quartering hammer.
Skyscraper of the present invention tears the building Lou Jichai method open, its operating procedure is as follows:
1) group assembly and disassembly building machine: it is laid with track on needing the building both sides ground removed, then assembles and tears building machine open;
2) it lifts excavator: assembling excavator on the ground, then excavator is lifted into and to be removed using tearing building machine open On building roof;
3) remove floor: floor is divided into several piecemeals by line setting first on floor, with being crushed on excavator Floor is exposed floor bar by line segmentation is broken by hammer, and it is broken to be then fixed on segmentation with the boom hoisting for tearing building machine open On floor block, then with hydraulic shear floor bar is cut, using on the haulage vehicle tearing building machine open for floor block and being lifted into downstairs, finally Floor is transported factory base to handle;
4) it removes beam: the both ends of beam being subjected to the broken exposing beam steel of concrete segmentation with the quartering hammer on excavator, so The boom hoisting of the building Hou Yongchai machine is fixed on the broken beam of segmentation, then the reinforcing bar at beam both ends is cut with hydraulic shear, is made With on the haulage vehicle tearing building machine open for beam and being lifted into downstairs, beam is finally transported into factory base and is handled;
5) it removes wall: being crushed wall with the quartering hammer on excavator, the grab bucket on the building Zai Yongchai machine grabs wall Then body fragment is lifted on transport vehicle downstairs, wall fragment is finally transported factory and is handled;
6) pillar and stair are removed: stair both ends or bottom of the pillar being split broken dew with the quartering hammer on excavator Then stair reinforcing bar or pillar reinforcing bar out are fixed on the broken stair of segmentation or pillar with the boom hoisting for tearing building machine open On, then with hydraulic shear stair or pillar exposed steel bar are cut, stair or pillar are lifted into transport vehicle downstairs using building machine is torn open On, stair or pillar are finally transported into factory base and are handled;
7) it clears up disintegrating slag: finally carrying out the processing of disintegrating slag with the grab bucket for tearing Lou Jishang open, such first floor is just removed and finished;
8) it reduces and tears building machine height open: tearing building machine double tower tower body open while removing a standard knot, tearing building machine open reduces about first floor Height, continue to repeat above-mentioned removal step, the dismounting of every floor is such as aforesaid operations, until until entire building removes completion.
Compared with prior art, technical advantage of the invention specifically has the following aspects:
1) building machine is torn open using Double-Tower Structure, and the tower body of double tower is to be connected and composed by more standard section by bolt group, tower body The function of height adjustment is realized by increasing or reducing the joint number of standard knot, is applicable to skyscraper, tears building main beam open Using twin-spar construction and girder both ends are supported by double tower is fixed, and lifting capacity is big;
2) it tears building motor spindle open and wheel construction is walked using the driving of four tracks, track length and width can be true by practice of construction situation Fixed, level lifting is apart from big, strong applicability;Bottom uses four Track desighs, and stability and stress condition are good;Girder is equipped with The movement on transverse and longitudinal direction may be implemented in overhead traveling crane, the building Shi Chai machine, it can realizes all-around mobile hoisting material in skyscraper;
3) it tears building machine open using skyscraper of the present invention and its tears building method, floor, beam, wall, pillar, the stair of dismounting etc. open It blocking dismounting and then transports to factory processes, the equal recoverable of the materials such as steel and concrete and completes clearing and retrieving in factory The environment such as the workload of the live overwhelming majority is transferred to factory and completed by work, and the live disintegrating slag accumulation of reduction, fugitive dust, noise are big Pollution;
4) it tears building machine open using skyscraper of the present invention and its tears building method open, floor, beam, wall, pillar of dismounting etc. are blocking Factory processes are removed and then transport to, scene has the high-efficient of dismounting, short time limit and labor intensity almost without the accumulation of disintegrating slag The advantages that small;
5) it tears building machine open using skyscraper of the present invention and its tears building method open, worker utilizes and tears the machinery such as building machine and excavator open Equipment carries out Building demolition work, and the height for tearing building machine open can be adjusted, adaptable, is suitable for a variety of place situations;Tear building open The component overwhelming majority of machine is designed using existing standard component, reduces cost.
Detailed description of the invention
Fig. 1 is the agent structure schematic diagram that skyscraper of the present invention tears building machine open.
Fig. 2 is the schematic front view of Fig. 1.
Fig. 3 is left view schematic diagram in Fig. 2.
Fig. 4 is amplifier section at A in Fig. 2.
Fig. 5 is amplifier section at B in Fig. 3.
Fig. 6 is amplifier section at C in Fig. 3.
Fig. 7 is amplifier section at D in Fig. 2.
Fig. 8 is amplifier section at E in Fig. 3.
Specific embodiment
With reference to the accompanying drawing 1 building machine torn open to 8 pairs of skyscrapers of the present invention of attached drawing be further described:
As shown in Figures 1 to 8, a kind of skyscraper tears building machine open, includes four tracks 2, double tower and girder 7, the double tower Middle tower structure successively includes: that wheel 3, vertical beam 4, tower body 5 and stock 6 are walked in driving from lower to upper, and the tower body 5 is by more standard section It is connected and composed by bolt group, the girder 7 is twin-spar construction, and the girder 7 is equipped with overhead traveling crane 8, the drive of the double tower lower end It moves away wheel 3 to be mounted on track 2, the girder 7, which is located above double tower and is fixedly connected to be integrally formed by double tower, tears building machine open.
4 lower end of vertical beam set there are four driving walk wheel 3, driving walk wheel 3 tops installation otic placode 16 by pin shaft 10 with The installation otic placode 15 of 4 lower part of vertical beam is connected and fixed, and the mounting plate 19 of the mounting plate 20 on 4 top of vertical beam and lower connection frame 11 passes through spiral shell Bolt group is connected and fixed, and the connector sleeve 18 on lower 11 top of connection frame and the connector sleeve 17 of 5 Plays section lower part of tower body pass through bolt group It being connected and fixed, the connector sleeve of 5 top standard knot of tower body and the connector sleeve of upper 29 lower part of connection frame are connected and fixed by bolt group, on The mounting plate on 29 top of connection frame and the mounting plate of 7 lower part of girder are connected and fixed by bolt group.
5 lower part of tower body is equipped with Waistband structure, and the connecting plate 24 at Waistband structure both ends is fixedly connected with shape by bolt group It is fastenedly connected at waistband mount structure 21 and with the formation of tower body 5, brace 13, oblique pull is equipped between waistband mount structure 21 and vertical beam 4 13 one end of bar is connected and fixed by bolt with waistband mount structure 21, and 13 other end of brace is connect by bolt 14 with vertical beam 4 solid It is fixed.
6 sets of the stock form a fixed connection in 5 upper end of tower body and by bolt group and the engaging lug 28 of upper connection frame 29, Stock 6 includes hydraulic system 31, main frame 27, guardrail 30 and platform 25, and platform is equipped with directive wheel 26.
Operating room 9 is equipped with above the tower body 5, operating room 9 is formed a fixed connection by tripod 33 with upper connection frame 29; Wheel, hoist engine, suspension hook and grab bucket are walked equipped with driving on the overhead traveling crane 8, the twin beams knot that wheel is mounted on girder 7 is walked in the driving of overhead traveling crane 8 On structure.For the building machine of tearing open equipped with excavator, excavator is furnished with hydraulic shear and quartering hammer.
Skyscraper of the present invention tears the building Lou Jichai method open, its operating procedure is as follows:
1) group assembly and disassembly building machine: it is laid with track 2 on the building both sides ground for needing to remove, then assembles and tears building machine open;
2) it lifts excavator: assembling excavator on the ground, then excavator is lifted into and to be removed using tearing building machine open On building roof;
3) remove floor: floor is divided into several piecemeals by line setting first on floor, with being crushed on excavator Floor is exposed floor bar by line segmentation is broken by hammer, and it is broken to be then fixed on segmentation with the boom hoisting for tearing building machine open On floor block, then with hydraulic shear floor bar is cut, using on the haulage vehicle tearing building machine open for floor block and being lifted into downstairs, finally Floor is transported factory base to handle;
4) it removes beam: the both ends of beam being subjected to the broken exposing beam steel of concrete segmentation with the quartering hammer on excavator, so The boom hoisting of the building Hou Yongchai machine is fixed on the broken beam of segmentation, then the reinforcing bar at beam both ends is cut with hydraulic shear, is made With on the haulage vehicle tearing building machine open for beam and being lifted into downstairs, beam is finally transported into factory base and is handled;
5) it removes wall: being crushed wall with the quartering hammer on excavator, the grab bucket on the building Zai Yongchai machine grabs wall Then body fragment is lifted on transport vehicle downstairs, wall fragment is finally transported factory and is handled;
6) pillar and stair are removed: stair both ends or bottom of the pillar being split broken dew with the quartering hammer on excavator Then stair reinforcing bar or pillar reinforcing bar out are fixed on the broken stair of segmentation or pillar with the boom hoisting for tearing building machine open On, then with hydraulic shear stair or pillar exposed steel bar are cut, stair or pillar are lifted into transport vehicle downstairs using building machine is torn open On, stair or pillar are finally transported into factory base and are handled;
7) it clears up disintegrating slag: finally carrying out the processing of disintegrating slag with the grab bucket for tearing Lou Jishang open, such first floor is just removed and finished;
8) it reduces and tears building machine height open: tearing building machine double tower tower body 5 open while removing a standard knot, tearing building machine open reduces about first floor Height, continue to repeat above-mentioned removal step, the dismounting of every floor is such as aforesaid operations, until until entire building removes completion.
Above-mentioned steps 5) in wall if reinforced concrete structure, first wall is divided into several points by scribing line on wall Wall is exposed wall steel bar by line segmentation is broken with the quartering hammer on excavator, then with the boom hoisting peace for tearing building machine open by block Dress is fixed on the broken wall block of segmentation, then cuts wall steel bar with hydraulic shear, is lifted into wall block using building machine is torn open On haulage vehicle downstairs, wall block is finally transported into factory base and is handled.
Skyscraper of the present invention tears the height of the adjustable lifting of building machine open, the method for adjusting height are as follows: release tower body 5 first The bolt group that upper end standard knot is connected with upper connection frame 29;Pushing the butterfly block of hydraulic cylinder 32 on stock makes itself and standard knot On pawl 12 of climbing be connected and fixed, start stock on hydraulic system 31, make hydraulic cylinder 32 upwards by upper connection frame 29 jack one Fixed height;The bolt group that 5 upper end standard knot of tower body is connected with lower section standard knot is unclamped again, the standard knot after unclamping connection is pushed, On the platform 25 that the effect of directive wheel 26 is moved into stock;Start hydraulic system 31, declines hydraulic cylinder 32 slowly Supreme connection frame 29 is in contact with tower body 5, then upper connection frame 29 is connected and fixed with tower body 5;Finally hang away the standard on platform Height adjustment can be completed in section.
Building machine is torn open using skyscraper of the present invention and its tears building method open, floor, beam, wall, pillar, stair of dismounting etc. at Block is removed and then transports to factory processes, the equal recoverable of the materials such as steel and concrete and completes clearing and retrieving work in factory The environment such as the workload of the live overwhelming majority is transferred to factory and completed by work, and the disintegrating slag accumulation of reduction scene, fugitive dust, noise are big are dirty Dye has many advantages, such as to remove high-efficient, short time limit and labor intensity is small;Worker utilizes and tears the mechanical equipments such as building machine and excavator open Building demolition work is carried out, and the height for tearing building machine open can be adjusted, it is adaptable, it is suitable for a variety of place situations.

Claims (3)

1. a kind of skyscraper tears building machine open, which is characterized in that include four tracks, double tower and girder, tower structure in the double tower It from lower to upper successively include: that wheel, vertical beam, tower body and stock are walked in driving, the tower body is to be connected by more standard section by bolt group Composition is connect, the girder is twin-spar construction, and the girder is equipped with overhead traveling crane, and the driving of the double tower lower end walks wheel and is mounted on track On, the girder, which is located above double tower and is fixedly connected to be integrally formed by double tower, tears building machine open;
The vertical beam lower end is set there are four driving wheel, and driving is walked wheel and is connected and fixed by pin shaft and vertical beam, and vertical beam passes through lower company It connects frame to form a fixed connection with tower body, tower body and girder are formed a fixed connection by upper connection frame;
The tower body lower part is equipped with Waistband structure, and Waistband structure is fixedly connected to form waistband mount structure and and tower body by bolt group Formation is fastenedly connected, and brace is equipped between waistband mount structure and vertical beam, and brace one end is connected by bolt and waistband mount structure Fixation is connect, the brace other end is connected and fixed by bolt and vertical beam;
The stock is covered in tower body upper end and is formed a fixed connection by bolt group and upper connection frame, stock include hydraulic system, Main frame, guardrail and platform;
Operating room is equipped with above the tower body, operating room is formed a fixed connection by tripod and upper connection frame;
Wheel, hoist engine, suspension hook and grab bucket are walked equipped with driving on the overhead traveling crane, the twin beams knot that wheel is mounted on girder is walked in the driving of overhead traveling crane On structure.
2. skyscraper according to claim 1 tears building machine open, which is characterized in that the building machine of tearing open is excavated equipped with excavator Machine is furnished with hydraulic shear and quartering hammer.
3. skyscraper according to claim 1 tears the building Lou Jichai method open, which is characterized in that its operating procedure is such as Under:
1) group assembly and disassembly building machine: it is laid with track on needing the building both sides ground removed, then assembles and tears building machine open;
2) it lifts excavator: assembling excavator on the ground, excavator is then lifted into building to be removed using tearing building machine open On roof;
3) remove floor: floor is divided into several piecemeals by line setting first on floor, will with the quartering hammer on excavator Floor exposes floor bar by line segmentation is broken, is then fixed on the broken floor of segmentation with the boom hoisting for tearing building machine open On block, then with hydraulic shear floor bar is cut, using on the haulage vehicle tearing building machine open for floor block and being lifted into downstairs, finally by building Plate transports factory base and is handled;
4) it removes beam: the both ends of beam being subjected to the broken exposing beam steel of concrete segmentation with the quartering hammer on excavator, are then used The boom hoisting for tearing building machine open is fixed on the broken beam of segmentation, then the reinforcing bar at beam both ends is cut with hydraulic shear, using tearing open Beam is lifted on haulage vehicle downstairs by building machine, and beam is finally transported factory base and is handled;
5) it removes wall: being crushed wall with the quartering hammer on excavator, the grab bucket crawl wall on the building Zai Yongchai machine is broken Then block is lifted on transport vehicle downstairs, wall fragment is finally transported factory and is handled;
6) pillar and stair are removed: stair both ends or bottom of the pillar being split broken exposing building with the quartering hammer on excavator Then terraced reinforcing bar or pillar reinforcing bar are fixed on the broken stair of segmentation or pillar with the boom hoisting for tearing building machine open, then Stair or pillar exposed steel bar are cut with hydraulic shear, using on the haulage vehicle tearing building machine open for stair or pillar and being lifted into downstairs, Stair or pillar are finally transported factory base to handle;
7) it clears up disintegrating slag: finally carrying out the processing of disintegrating slag with the grab bucket for tearing Lou Jishang open, such first floor is just removed and finished;
8) it reduces and tears building machine height open: tearing building machine double tower tower body open while removing a standard knot, tearing building machine open reduces the height of about first floor Degree continues to repeat above-mentioned removal step, the dismounting of every floor such as aforesaid operations, until entire building removes completion.
CN201710403970.XA 2017-06-01 2017-06-01 A kind of skyscraper tears building machine open and its tears building method open Pending CN108979198A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710403970.XA CN108979198A (en) 2017-06-01 2017-06-01 A kind of skyscraper tears building machine open and its tears building method open

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710403970.XA CN108979198A (en) 2017-06-01 2017-06-01 A kind of skyscraper tears building machine open and its tears building method open

Publications (1)

Publication Number Publication Date
CN108979198A true CN108979198A (en) 2018-12-11

Family

ID=64501628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710403970.XA Pending CN108979198A (en) 2017-06-01 2017-06-01 A kind of skyscraper tears building machine open and its tears building method open

Country Status (1)

Country Link
CN (1) CN108979198A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736592A (en) * 2019-01-15 2019-05-10 湖南厚德重工机械有限公司 One kind tearing building machine open
CN113235972A (en) * 2021-05-28 2021-08-10 中铁五局集团建筑工程有限责任公司 Trolley for dismantling existing station canopy and construction method
CN114412229A (en) * 2022-01-12 2022-04-29 厦门安科科技有限公司 Control method and control device of high-altitude-based building dismantling machine
CN114482620A (en) * 2022-03-30 2022-05-13 山西省建筑设计研究院有限公司 Mechanical demolition device and demolition method for high-rise building

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100296904A1 (en) * 2009-05-20 2010-11-25 Kobelco Construction Machinery Co., Ltd. Gripping device of working machine and working machine with the same
CN102807167A (en) * 2012-08-16 2012-12-05 温州东瓯建设集团有限公司 Building tower crane
CN103334464A (en) * 2013-06-03 2013-10-02 陈相源 Overhead working device of hydraulic excavator
CN203333185U (en) * 2013-07-01 2013-12-11 河南省中原起重机械有限公司 Trussed gantry crane
CN203820379U (en) * 2014-05-04 2014-09-10 中国建筑科学研究院建筑机械化研究分院 Fine adjusting and anti-falling device of aerial working platform
CN204130682U (en) * 2014-10-24 2015-01-28 安徽电信规划设计有限责任公司 A kind of Novel belt lightning rod antenna tower
CN206753105U (en) * 2017-06-01 2017-12-15 李聪 A kind of skyscraper tears building machine open

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100296904A1 (en) * 2009-05-20 2010-11-25 Kobelco Construction Machinery Co., Ltd. Gripping device of working machine and working machine with the same
CN102807167A (en) * 2012-08-16 2012-12-05 温州东瓯建设集团有限公司 Building tower crane
CN103334464A (en) * 2013-06-03 2013-10-02 陈相源 Overhead working device of hydraulic excavator
CN203333185U (en) * 2013-07-01 2013-12-11 河南省中原起重机械有限公司 Trussed gantry crane
CN203820379U (en) * 2014-05-04 2014-09-10 中国建筑科学研究院建筑机械化研究分院 Fine adjusting and anti-falling device of aerial working platform
CN204130682U (en) * 2014-10-24 2015-01-28 安徽电信规划设计有限责任公司 A kind of Novel belt lightning rod antenna tower
CN206753105U (en) * 2017-06-01 2017-12-15 李聪 A kind of skyscraper tears building machine open

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736592A (en) * 2019-01-15 2019-05-10 湖南厚德重工机械有限公司 One kind tearing building machine open
CN113235972A (en) * 2021-05-28 2021-08-10 中铁五局集团建筑工程有限责任公司 Trolley for dismantling existing station canopy and construction method
CN114412229A (en) * 2022-01-12 2022-04-29 厦门安科科技有限公司 Control method and control device of high-altitude-based building dismantling machine
CN114482620A (en) * 2022-03-30 2022-05-13 山西省建筑设计研究院有限公司 Mechanical demolition device and demolition method for high-rise building

Similar Documents

Publication Publication Date Title
CN104963301B (en) The dilatory translation downward putting device and method removed for pier top beam section and bridge pier
CN108979198A (en) A kind of skyscraper tears building machine open and its tears building method open
JP6180376B2 (en) Main girder provision method in composite girder floor slab replacement method, composite girder floor slab replacement method, and main girder provision structure in composite girder floor slab replacement method
CN110905232A (en) Mechanical static force dismantling method for concrete structure
CN103306205A (en) Construction method of longitudinal wet joint formwork of prefabricated T beam or box beam
CN206753105U (en) A kind of skyscraper tears building machine open
JP2017020290A (en) Disassembling method of bridge
CN105569692A (en) Trolley for welding tunnel waterproof board hanging cloth
JP5890060B1 (en) Bridge dismantling method using erection girder
CN211081117U (en) Air building dismantling machine
CN211775640U (en) Modular staircase regularization steel protection passageway
CN114150593B (en) Simple arch bridge dismantling and reconstructing structure and arch bridge dismantling and reconstructing method
CN103993739B (en) The construction method of granulation tower spraying layer stiff beam
CN111979935A (en) Dismantling construction method for bridge superstructure
CN110409325A (en) The method for dismounting of box beam
CN115897439A (en) Method for dismantling multi-span prestressed concrete continuous beam bridge
CN216549362U (en) Assembling and hoisting device for components above foundation pit
CN108821127A (en) The devices and methods therefor of disassembly lifting open type TBM in a kind of hole
JP2001082095A (en) Form handling machine, form, and form fitting method and form extracting method
CN112726434B (en) Three-span deck reinforced concrete arch bridge dismantling method
CN210361895U (en) Prefabricated field opening and closing door type protective steel plate trolley
CN209228054U (en) Large cantilever combined type anchors Bailey beam operation platform
CN106592438A (en) Two-column pier and middle tie beam construction method employing integral movement of trusses
CN209228053U (en) Large cantilever combined type anchor curable type steel operation platform
CN114134828A (en) Method for quickly dismantling upper structure of truss arch bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181211

WD01 Invention patent application deemed withdrawn after publication