CN113235972A - Trolley for dismantling existing station canopy and construction method - Google Patents

Trolley for dismantling existing station canopy and construction method Download PDF

Info

Publication number
CN113235972A
CN113235972A CN202110593888.4A CN202110593888A CN113235972A CN 113235972 A CN113235972 A CN 113235972A CN 202110593888 A CN202110593888 A CN 202110593888A CN 113235972 A CN113235972 A CN 113235972A
Authority
CN
China
Prior art keywords
canopy
trolley
dismantling
existing station
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110593888.4A
Other languages
Chinese (zh)
Inventor
刘洋
杨俊�
敖凌宇
杨才鑫
崔凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN202110593888.4A priority Critical patent/CN113235972A/en
Publication of CN113235972A publication Critical patent/CN113235972A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a trolley for removing an existing station canopy and a construction method. What need demolish is tunnel type canopy, installs the platform truck track in canopy both sides before demolising, assembles the platform truck, divides the canopy into a plurality of units of tearing open entirely, moves the platform truck to canopy top and protects, utilizes the overhead traveling crane on the platform truck to hang out the unit of tearing open entirely. The invention adopts the modular trolley frame-transporting construction technology, can effectively avoid repeated investment, installation and removal of the supporting structure, greatly saves materials and labor cost, and effectively shortens the construction period.

Description

Trolley for dismantling existing station canopy and construction method
Technical Field
The invention relates to a trolley structure and a method for disassembling a canopy by using the trolley.
Background
With the expansion and development of cities, some originally built rail platforms cannot meet the requirements of passenger flow or modernization, and original stations need to be reconstructed. The existing platform canopy structure is generally arranged along a tunnel type track, the tracks on two sides of the platform and the platform are arranged below the canopy, along with reconstruction of the station, the canopy needs to be reconstructed into a larger and more attractive structure, and the existing canopy needs to be dismantled.
In order to not influence the normal operation of a station, the dismantling operation can be carried out only at midnight every day, and a large amount of high-altitude assembly and welding are required to be carried out on the existing line in the construction of newly-built steel structure net racks, so that the quality and safety risk are high; meanwhile, the smooth operation of the dismantling of the old rainshed is ensured. The construction risk is extremely high, and the construction organization degree of difficulty is huge.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: how to safely remove the rain shed in a short window period.
The technical scheme of the invention is as follows:
the utility model provides a platform truck for demolising existing station canopy, includes running gear and stand, the gate-type structure of platform truck by about two stands with about two crossbeams constitute, two crossbeams certain angle of slope upslope and constitute the top structure of hillside top shape at end connection, two gate-type structures constitute platform truck overall structure through linking the member around, the overhead traveling crane of vertical walking is installed in platform truck top both sides, the hanging track of overhead traveling crane installs the below of two crossbeams in the front and back.
And an inclined strut is arranged between the upright post and the cross beam and is used as a reinforcing structure.
The top slope surfaces of the front and rear cross beams are provided with longitudinally distributed distribution beams, and the top panel is arranged through the distribution beams.
The outer sides of the upright posts are provided with longitudinally distributed distribution beams and side panels are arranged through the distribution beams.
What need demolish is tunnel type canopy, builds the platform truck track in canopy both sides, and concatenation will existing canopy cover around a plurality of platform trucks.
A construction method for dismantling a canopy of an existing station comprises the steps that a tunnel type canopy needs to be dismantled, trolley rails are installed on two sides of the canopy before dismantling, a trolley is assembled, the canopy is divided into a plurality of integral dismantling units, a scattered dismantling area is arranged between every two adjacent integral dismantling units, and the trolley is moved to the position above the canopy to be protected; dismantling each integral dismantling unit: the method comprises the steps of firstly, detaching a connecting structure of a scattered detaching area from the end part of a canopy, separating a whole detaching unit, then connecting the whole detaching unit with a hoisting structure of a trolley, cutting the connection between a whole detaching unit framework and an embedded structure, and finally hoisting the whole detaching unit by using a crown block on the trolley.
Install the gate-type lighting fixture on the platform of canopy below, install the lamp truss transition of installing on former canopy on the gate-type lighting fixture before demolising the canopy.
When the bulk disassembly area is disassembled, a protective trolley is arranged on the lower track.
And (4) building extension platforms at two ends of the canopy to serve as areas for trolley assembly, hoisting and integral disassembly unit hoisting.
The construction is synchronously pushed from the two ends of the canopy to the middle.
The invention has the beneficial effects that:
(1) by adopting the modular trolley frame transporting construction technology, each trolley and the dismantled old canopy unit are hoisted at fixed points, the hoisting scale is effectively controlled, the occupation of hoisting construction on a construction site is reduced, and the influence range of large-scale hoisting is greatly reduced.
(2) The trolley can be simultaneously used as a main stressed support for the newly-built canopy unit block, the old canopy unit block and the protection shed project, repeated investment and installation and removal of the supporting structure can be effectively avoided, materials and labor cost are greatly saved, and the construction period is effectively shortened.
(3) According to the structural characteristics of the newly-built canopy in the track area of the project, the trolley transportation frame construction adopts a mode of synchronously pushing from two ends to the middle to organize the construction, so that the construction period can be effectively shortened.
(4) The trolley modules are mutually independent, the trolleys can be moved and dispersedly carried out, the requirement on an electrical control system is low, and resource allocation and control on site are facilitated.
Drawings
Fig. 1 is a schematic view of the entire structure of the cart.
Fig. 2 is a partially enlarged view of fig. 1.
Fig. 3 is a side view of the trolley (with the panel removed).
Fig. 4 is a schematic view of a construction scene in which the canopy is dismantled by using the trolley.
Fig. 5 is a schematic sectional view of an existing canopy.
Fig. 6 is a schematic side view of the trolley (including the deck).
Detailed Description
Example (b):
as shown in fig. 1 and 2, the trolley structure comprises a travelling mechanism 6 and columns 1, the gate structure of the trolley comprises a left column 1, a right column 1, a left beam 3, a right beam 3, two beams 3 which incline upwards for a certain angle and are connected at the end parts to form a top structure in the shape of a slope top, a front gate structure and a rear gate structure form an integral trolley structure through a connection rod piece, crown blocks 5 which travel longitudinally are arranged on two sides of the top of the trolley, and a hanging track 4 of each crown block 5 is arranged below the front beam 3 and the rear beam 3.
And an inclined strut 2 is arranged between the upright post 1 and the cross beam 3 as a reinforcing structure.
The top slope surfaces of the front and rear cross beams 3 are provided with longitudinally distributed distribution beams 31, and the top panel 32 is arranged through the distribution beams 31.
On the outside of the column 1 are mounted longitudinally distributed distribution beams 11 and through the distribution beams 11 side panels 12.
What need demolish is tunnel type canopy, builds the platform truck track in canopy both sides, and concatenation will existing canopy cover around a plurality of platform trucks.
The tunnel type canopy dismantling method comprises the following steps:
the method comprises the following steps: extension platforms are installed at two ends of the canopy and used as the mounting and dismounting areas of the door type trolley.
Step two: the method includes the steps that door type trolley rails are erected on two sides of a canopy and on an extension platform, meanwhile, a crane is used for assembling a door type truss vehicle in a ground assembling area, then the door type truss vehicle is integrally hoisted to the extension platform rail to be installed, an electrical system is debugged, and the door type truss vehicle travels to a rail running area one by one to be protected.
Step three: and (4) completing the installation of a newly-built roof and a rainproof roof in the rail traveling area, installing island type platform protection, and switching the electric power and the transformation on the platform.
Step four: the method comprises the steps of firstly, segmenting the canopy, taking each segment as an integral disassembly area, taking a connecting structure between adjacent segments as a scattered disassembly area, and utilizing a crane and a climbing vehicle to cooperate with manpower to disassemble connection rods and decorative plates between the segments of the existing canopy on two sides of a platform.
The existing canopy is divided into 11 blocks to remove the unit, 10 scattered units of tearing open, and the time of demolising of every district decomposes: the enclosure system 1d, the secondary steel structure 1d, the steel frame 1d, the single-frame dismantling time needs 3d, and the dismantling time of 11 dismantling units needs 33 d. And considering other external factors such as tooling, removal preview and the like, and considering all removal completion according to 40 d.
Step five: and in the skylight time, the rainproof tiles, the light-transmitting tiles, the roof horizontal tie bars and the cross pull cables between the sections of the canopy are sequentially dismantled by matching the door type truss cars with manpower. The suspender below the canopy ring-shaped keel is bound and locked with the keel through a rope.
Step six: the skylight time utilizes door-type truss car integral hoisting canopy segmentation, and every canopy piecemeal comprises two annular fossil fragments, and door-type truss car electric block couple is on canopy annular skeleton. And meanwhile, 4 protection trolleys are arranged on the subway rail on each side of the dismounting area to protect the rail, and then the joint of the annular framework and the embedded part is manually cut. And integrally transporting the door type truss to an extension platform for dismantling.
Step seven: and sequentially dismantling each hoisting block of the existing canopy according to the fifth step and the sixth step. And after all the door type truss car track systems are dismantled, the truck crane and the forklift are used for dismantling the door type truss car track systems.

Claims (10)

1. The utility model provides a platform truck for demolising existing station canopy, includes running gear and stand, its characterized in that: the gantry structure of the trolley consists of a left upright post, a right upright post, a left crossbeam and a right crossbeam, wherein the two crossbeams incline upwards by a certain angle and are connected at the end parts to form a top structure in the shape of a slope top, the front gantry structure and the rear gantry structure form the integral structure of the trolley through connecting rods, crown blocks which longitudinally walk are installed on two sides of the top of the trolley, and hanging rails of the crown blocks are installed below the front crossbeam and the rear crossbeam.
2. The trolley for demolishing the canopy of an existing station as set forth in claim 1, wherein: and an inclined strut is arranged between the upright post and the cross beam and is used as a reinforcing structure.
3. The trolley for demolishing the canopy of an existing station as set forth in claim 2, wherein: the top slope surfaces of the front and rear cross beams are provided with longitudinally distributed distribution beams, and the top panel is arranged through the distribution beams.
4. A trolley for demolishing the canopy of an existing station according to claim 3, wherein: the outer sides of the upright posts are provided with longitudinally distributed distribution beams and side panels are arranged through the distribution beams.
5. The trolley for demolishing the canopy of an existing station as set forth in claim 4, wherein: what need demolish is tunnel type canopy, builds the platform truck track in canopy both sides, and concatenation will existing canopy cover around a plurality of platform trucks.
6. A construction method for dismantling the existing station canopy is characterized in that: the method comprises the following steps that a tunnel-type canopy is required to be dismantled, trolley rails are installed on two sides of the canopy before the canopy is dismantled, a trolley is assembled, the canopy is divided into a plurality of integral dismantling units, a scattered dismantling area is arranged between every two adjacent integral dismantling units, and the trolley is moved to the position above the canopy for protection; dismantling each integral dismantling unit: the method comprises the steps of firstly, detaching a connecting structure of a scattered detaching area from the end part of a canopy, separating a whole detaching unit, then connecting the whole detaching unit with a hoisting structure of a trolley, cutting the connection between a whole detaching unit framework and an embedded structure, and finally hoisting the whole detaching unit by using a crown block on the trolley.
7. The construction method for dismantling the existing station canopy according to claim 6, characterized in that: install the gate-type lighting fixture on the platform of canopy below, install the lamp truss transition of installing on former canopy on the gate-type lighting fixture before demolising the canopy.
8. The construction method for dismantling the existing station canopy according to claim 6 or 7, characterized in that: when the bulk disassembly area is disassembled, a protective trolley is arranged on the lower track.
9. The construction method for dismantling the existing station canopy according to claim 6, characterized in that: and (4) building extension platforms at two ends of the canopy to serve as areas for trolley assembly, hoisting and integral disassembly unit hoisting.
10. The construction method for dismantling the existing station canopy according to claim 6, characterized in that: the construction is synchronously pushed from the two ends of the canopy to the middle.
CN202110593888.4A 2021-05-28 2021-05-28 Trolley for dismantling existing station canopy and construction method Pending CN113235972A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110593888.4A CN113235972A (en) 2021-05-28 2021-05-28 Trolley for dismantling existing station canopy and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110593888.4A CN113235972A (en) 2021-05-28 2021-05-28 Trolley for dismantling existing station canopy and construction method

Publications (1)

Publication Number Publication Date
CN113235972A true CN113235972A (en) 2021-08-10

Family

ID=77135534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110593888.4A Pending CN113235972A (en) 2021-05-28 2021-05-28 Trolley for dismantling existing station canopy and construction method

Country Status (1)

Country Link
CN (1) CN113235972A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882649A (en) * 2021-12-08 2022-01-04 中铁建工集团有限公司 Slidable platform canopy decoration construction operation platform and construction method
CN114033204A (en) * 2021-11-03 2022-02-11 中铁七局集团有限公司 Reconstruction construction method for existing single-column canopy
CN114482620A (en) * 2022-03-30 2022-05-13 山西省建筑设计研究院有限公司 Mechanical demolition device and demolition method for high-rise building

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005220520A (en) * 2004-02-03 2005-08-18 Yuji Sakurai Working platform disassembling method, simple scaffold and gondola unit for disassembling work
CN101100844A (en) * 2006-07-07 2008-01-09 中铁建工集团有限公司 Method for constructing steel truss over existing railway line and transporting, mounting and positioning bogie
JP2009062729A (en) * 2007-09-06 2009-03-26 Toda Constr Co Ltd Vertical lift for unloading strong support
CN201865321U (en) * 2010-11-23 2011-06-15 中铁建工集团有限公司 Multifunctional movable protecting and isolating operating platform
CN106088660A (en) * 2016-08-12 2016-11-09 北京住总集团有限责任公司 The construction method of reconstruction structure system widened by a kind of building up station platform
CN208122371U (en) * 2018-03-20 2018-11-20 中铁三局集团有限公司 On across the high-speed rail safe guarding shed fast dismounting device of operation line
CN108979198A (en) * 2017-06-01 2018-12-11 李聪 A kind of skyscraper tears building machine open and its tears building method open
CN112610244A (en) * 2020-12-10 2021-04-06 中铁五局集团建筑工程有限责任公司 Prefabricated part for expanding existing elevated operation subway station platform and installation method thereof
CN112681792A (en) * 2020-12-18 2021-04-20 湖南湖大合力土木工程技术发展有限公司 Corridor reconstruction method for realizing flat-floor entrance by adding elevator to crossed stairway
CN112727132A (en) * 2020-12-10 2021-04-30 中铁五局集团建筑工程有限责任公司 Method for dismantling existing canopy of overhead operation subway station
CN112727134A (en) * 2020-12-10 2021-04-30 中铁五局集团建筑工程有限责任公司 Construction method for rebuilding and expanding main structure of existing overhead operation subway station building

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005220520A (en) * 2004-02-03 2005-08-18 Yuji Sakurai Working platform disassembling method, simple scaffold and gondola unit for disassembling work
CN101100844A (en) * 2006-07-07 2008-01-09 中铁建工集团有限公司 Method for constructing steel truss over existing railway line and transporting, mounting and positioning bogie
JP2009062729A (en) * 2007-09-06 2009-03-26 Toda Constr Co Ltd Vertical lift for unloading strong support
CN201865321U (en) * 2010-11-23 2011-06-15 中铁建工集团有限公司 Multifunctional movable protecting and isolating operating platform
CN106088660A (en) * 2016-08-12 2016-11-09 北京住总集团有限责任公司 The construction method of reconstruction structure system widened by a kind of building up station platform
CN108979198A (en) * 2017-06-01 2018-12-11 李聪 A kind of skyscraper tears building machine open and its tears building method open
CN208122371U (en) * 2018-03-20 2018-11-20 中铁三局集团有限公司 On across the high-speed rail safe guarding shed fast dismounting device of operation line
CN112610244A (en) * 2020-12-10 2021-04-06 中铁五局集团建筑工程有限责任公司 Prefabricated part for expanding existing elevated operation subway station platform and installation method thereof
CN112727132A (en) * 2020-12-10 2021-04-30 中铁五局集团建筑工程有限责任公司 Method for dismantling existing canopy of overhead operation subway station
CN112727134A (en) * 2020-12-10 2021-04-30 中铁五局集团建筑工程有限责任公司 Construction method for rebuilding and expanding main structure of existing overhead operation subway station building
CN112681792A (en) * 2020-12-18 2021-04-20 湖南湖大合力土木工程技术发展有限公司 Corridor reconstruction method for realizing flat-floor entrance by adding elevator to crossed stairway

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033204A (en) * 2021-11-03 2022-02-11 中铁七局集团有限公司 Reconstruction construction method for existing single-column canopy
CN113882649A (en) * 2021-12-08 2022-01-04 中铁建工集团有限公司 Slidable platform canopy decoration construction operation platform and construction method
CN113882649B (en) * 2021-12-08 2022-02-08 中铁建工集团有限公司 Slidable platform canopy decoration construction operation platform and construction method
CN114482620A (en) * 2022-03-30 2022-05-13 山西省建筑设计研究院有限公司 Mechanical demolition device and demolition method for high-rise building

Similar Documents

Publication Publication Date Title
CN113235972A (en) Trolley for dismantling existing station canopy and construction method
CN105569358A (en) Construction method of special-shaped curved surface roof with large span and multiple curvatures
CN114961334B (en) High-altitude large-span overhanging structure closed protection dismantling system and construction method thereof
CN112727134B (en) Construction method for rebuilding and expanding main structure of existing overhead operation subway station building
CN114809699B (en) Construction method of assembled outer elevation enclosure system for transformation of upper part of super high-rise building
CN112609912B (en) Construction method for newly building canopy in overhead operation subway station
CN112727132B (en) Method for dismantling existing canopy of overhead operation subway station
CN114876239B (en) High-altitude overhanging structure closed protection dismantling system and construction method thereof
CN214005379U (en) Prefabricated part for expanding existing elevated operation subway station platform
CN206873495U (en) A kind of Portable piping lane side wall formwork jumbo
CN112726442A (en) Construction method of large-span thin-wall concrete sound barrier pouring trolley
CN113833292A (en) Reconstruction method of station canopy
CN213952287U (en) Truss vehicle device for reconstruction and extension construction of existing overhead operation subway station
CN105332345A (en) Lifting type construction system for bridge superstructure construction and construction method thereof
CN112610244B (en) Prefabricated part for expanding existing elevated operation subway station platform and installation method thereof
CN115125995A (en) Construction method for entrance and exit ring frame of assembled station
CN210563326U (en) Overhead unit type overhead sliding splicing operation platform
JP2008057226A (en) Method of constructing building on bridge girder, and bridge having the building
CN110359697A (en) The modular aerial sliding concatenation platform in high-altitude
CN112228113A (en) PBA underground excavated station roof longitudinal beam and midspan buckling arch template system and construction method
CN112681372B (en) Truss vehicle for reconstruction and extension construction of existing overhead operation subway station
CN218759027U (en) Stride modular protection canopy structure of existing public road steel construction bridge
CN212611977U (en) Protective shed frame crossing railway line
CN219910780U (en) Arch form braced system is detained to two lining
CN217232913U (en) Self-propelled mobile workshop for gantry crane construction in beam yard

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210810