CN108958133A - A kind of intelligent building project monitor and control management system - Google Patents

A kind of intelligent building project monitor and control management system Download PDF

Info

Publication number
CN108958133A
CN108958133A CN201810924141.0A CN201810924141A CN108958133A CN 108958133 A CN108958133 A CN 108958133A CN 201810924141 A CN201810924141 A CN 201810924141A CN 108958133 A CN108958133 A CN 108958133A
Authority
CN
China
Prior art keywords
monitoring
module
elevator
intelligent building
illumination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810924141.0A
Other languages
Chinese (zh)
Inventor
张文凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Thailand Mdt Infotech Ltd
Original Assignee
Hefei Thailand Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Thailand Mdt Infotech Ltd filed Critical Hefei Thailand Mdt Infotech Ltd
Priority to CN201810924141.0A priority Critical patent/CN108958133A/en
Publication of CN108958133A publication Critical patent/CN108958133A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0428Safety, monitoring
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B19/00Alarms responsive to two or more different undesired or abnormal conditions, e.g. burglary and fire, abnormal temperature and abnormal rate of flow
    • G08B19/005Alarms responsive to two or more different undesired or abnormal conditions, e.g. burglary and fire, abnormal temperature and abnormal rate of flow combined burglary and fire alarm systems
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2614HVAC, heating, ventillation, climate control
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2642Domotique, domestic, home control, automation, smart house

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Indicating And Signalling Devices For Elevators (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)
  • Elevator Control (AREA)

Abstract

The invention discloses a kind of intelligent building project monitor and control management systems, including air-conditioning and ventilation monitoring system, plumbing monitoring system, elevator operating system, electric power supply system, comprehensive security system, illumination monitoring system and safety defense monitoring system.By the way that the different device system in several scenes is carried out corresponding monitoring management, the monitoring management process of systematization completed in building improves the intelligent building efficiency of management, improves building safety coefficient the present invention;And by data in each sensor real time reaction building, and Reasonable Regulation And Control is carried out, that improves user moves in experience.

Description

A kind of intelligent building project monitor and control management system
[technical field]
The present invention relates to a kind of mixing plant, in particular to a kind of intelligent building project monitor and control management system.
[background technique]
Modern society is increasing to the demand of information, and information transmission speed is also getting faster, and 21st century is information-based Century, push mainly information technology, biotechnology and the new material technology of development of world economy, and wherein information technology pair Economy, politics and the social life of people influences maximum, and information industry is just gradually becoming the mainstay industry of society, human society Progress will depend on information technology development and application.
The development of electronic technology (especially computer technology) and network communication technology, makes social advanced IT application, is building It builds inside object, the high-tech of application message technology, ancient Building technology and modern times combines, and then generates " building intelligent Change ".Intelligent building is to be carried out automatically controlling using computer technology to the equipment in building, it is that Building technology adapts to now The crystallization required for social informatization.
During building intelligent automatically controls, need to scenes various in building and various different monitoring systems into The different monitoring management of row, the monitoring management process of systematization completed in building are to improve the intelligent building efficiency of management, promoted The important prerequisite of building safety coefficient.For this purpose, it is proposed that a kind of intelligent building project monitor and control management system.
[summary of the invention]
The main purpose of the present invention is to provide a kind of intelligent building project monitor and control management systems, can effectively solve background skill The problems in art.
To achieve the above object, the technical scheme adopted by the invention is as follows:
A kind of intelligent building project monitor and control management system, including air-conditioning and ventilation monitoring system, plumbing monitoring system, elevator Operating system, electric power supply system, comprehensive security system, illumination monitoring system and safety defense monitoring system, the air-conditioning and ventilation Monitoring system includes set state control module, damp-warm syndrome induction module and air detection module, the plumbing monitoring system packet Domestic water monitoring module, fire demand water monitoring module and sewage discharge monitoring module are included, the elevator operating system includes weight Power induction module and fault warning module, the electric power supply system include high voltage power distribution monitoring module, low-voltage distribution monitoring mould Block and transformer state monitoring module, the comprehensive security system include access control system and public domain monitoring system, the door Access control system includes identifying system and strange visitor's register system, and the illumination monitoring system includes public domain lighting system, private People's area lighting system and emergency lighting system, the safety defense monitoring system include emergency monitoring system.
Further, the air quality and damp-warm syndrome of the air detection module and damp-warm syndrome induction module to public space region Degree carries out induction monitoring, and is transferred to set state administration module by data signal transmission wire road, and air-conditioner set is right in real time Public domain carries out air extraction circulation and temperature and humidity adjustment.
Further, the domestic water monitoring system, pressure measurement sensor, liquid are installed in fire demand water monitoring system Position measuring sensor all installs received shipment row monitoring module in the three subsystems in the plumbing monitoring system.
Further, the gravity sensing module is carried out elevator operation and is controlled, and the fault alarm system is to event Hinder elevator and carries out sound effect prompt and light efficiency prompt.
Further, the high voltage power distribution monitoring modular, Transformer's Condition Monitoring module and low voltage distribution monitoring mould Block three independent connection hyper parameter alarm device, fault location module, fault logging module.
Further, the identification uses fingerprint recognition or access card identification method, and the access control system installing is infrared to take the photograph As monitoring device, strange visitor's register system is acquired visitor's identity information, electro-photographic information and finger print information, The public domain monitoring system includes the infrared monitoring to saloon, stair, elevator and aisle.
Further, the public domain lighting system includes saloon illumination, stair illumination, elevator lighting, aisle Illumination, the saloon illumination use light-operated inductive lighting device, and the stair illumination, elevator lighting, aisle illumination use Infrared induction lighting device, the emergency lighting system use independently-powered emergency lighting device to emergency case.
Further, emergency supervisory systems described in the fire-fighting includes broadcast control system, fire early-warning system, electricity Terraced accident warning systems, earthquake early-warning system, broadcast control system is to fire early-warning system, elevator accident warning system, earthquake The warning information that early warning system issues is played in real time.
Compared with prior art, the invention has the following beneficial effects: the present invention by filling the difference in several scenes It sets system and carries out corresponding monitoring management, the monitoring management process of systematization completed in building improves intelligent building management Efficiency improves building safety coefficient;And by data in each sensor real time reaction building, and Reasonable Regulation And Control is carried out, improved User's moves in experience.
[Detailed description of the invention]
Fig. 1 is a kind of whole control schematic diagram of intelligent building project monitor and control management system of the present invention.
[specific embodiment]
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to specific Embodiment, the present invention is further explained.
As shown in Figure 1, a kind of intelligent building project monitor and control management system, including air-conditioning and ventilation monitoring system, discharge Water monitoring system, elevator operating system, electric power supply system, comprehensive security system, illumination monitoring system and safety defense monitoring system, The air-conditioning and ventilation monitoring system include set state control module, damp-warm syndrome induction module and air detection module, described to give Drainage monitoring system includes domestic water monitoring module, fire demand water monitoring module and sewage discharge monitoring module, the elevator Operating system includes gravity sensing module and fault warning module, the electric power supply system include high voltage power distribution monitoring module, Low-voltage distribution monitoring module and transformer state monitoring module, the comprehensive security system include access control system and public domain prison Control system, the access control system include identifying system and strange visitor's register system, and the illumination monitoring system includes public area Area lighting system, private area lighting system and emergency lighting system, the safety defense monitoring system include emergency prison Control system.
Wherein, the air detection module and damp-warm syndrome induction module to the air quality in public space region and wet temp into Row induction monitoring, and set state administration module is transferred to by data signal transmission wire road, air-conditioner set is in real time to public Region carries out air extraction circulation and temperature and humidity adjustment.
Wherein, the domestic water monitoring system, install pressure measurement sensor in fire demand water monitoring system, liquid level is surveyed Quantity sensor all installs received shipment row monitoring module in the three subsystems in the plumbing monitoring system.
Wherein, the gravity sensing module is carried out elevator operation and is controlled, and the fault alarm system is to failure electricity Ladder carries out sound effect prompt and light efficiency prompt.
Wherein, the high voltage power distribution monitoring modular, Transformer's Condition Monitoring module and low voltage distribution monitoring module three Person independent connection hyper parameter alarm device, fault location module, fault logging module.
Wherein, the identification uses fingerprint recognition or access card identification method, the access control system installing infrared photography prison Device is controlled, strange visitor's register system is acquired visitor's identity information, electro-photographic information and finger print information, described Public domain monitoring system includes the infrared monitoring to saloon, stair, elevator and aisle.
Wherein, the public domain lighting system include saloon illumination, stair illumination, elevator lighting, aisle illumination, The saloon illumination uses light-operated inductive lighting device, and the stair illumination, elevator lighting, aisle illumination use infrared sense Lighting device is answered, the emergency lighting system uses independently-powered emergency lighting device to emergency case.
Wherein, emergency supervisory systems described in the fire-fighting includes broadcast control system, fire early-warning system, elevator thing Therefore warning system, earthquake early-warning system, broadcast control system is to fire early-warning system, elevator accident warning system, earthquake pre-warning The warning information that system issues is played in real time.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (8)

1. a kind of intelligent building project monitor and control management system, it is characterised in that: including air-conditioning and ventilation monitoring system, plumbing Monitoring system, elevator operating system, electric power supply system, comprehensive security system, illumination monitoring system and safety defense monitoring system, institute Stating air-conditioning and ventilation monitoring system includes set state control module, damp-warm syndrome induction module and air detection module, the discharge Water monitoring system includes domestic water monitoring module, fire demand water monitoring module and sewage discharge monitoring module, the elevator fortune Row system includes gravity sensing module and fault warning module, and the electric power supply system includes high voltage power distribution monitoring module, low It is press-fitted electric monitoring module and transformer state monitoring module, the comprehensive security system includes access control system and public domain monitoring System, the access control system include identifying system and strange visitor's register system, and the illumination monitoring system includes public domain Lighting system, private area lighting system and emergency lighting system, the safety defense monitoring system include emergency monitoring System.
2. a kind of intelligent building project monitor and control management system according to claim 1, it is characterised in that: the air inspection It surveys module and damp-warm syndrome induction module and induction monitoring is carried out to the air quality and wet temp in public space region, and believed by data Number transmission line is transferred to set state administration module, and air-conditioner set carries out air extraction circulation and temperature to public domain in real time Humidity regulation.
3. a kind of intelligent building project monitor and control management system according to claim 2, it is characterised in that: the life is used Pressure measurement sensor, level sensor, the plumbing monitoring are installed in water monitoring system, fire demand water monitoring system Received shipment row monitoring module is all installed in three subsystems in system.
4. a kind of intelligent building project monitor and control management system according to claim 3, it is characterised in that: the gravity-feed tank It answers module to carry out elevator operation to control, the fault alarm system carries out sound effect prompt to failure elevator and light efficiency mentions Show.
5. a kind of intelligent building project monitor and control management system according to claim 4, it is characterised in that: the height It is press-fitted pyroelectric monitor module, Transformer's Condition Monitoring module and low voltage distribution monitoring module three independent connection hyper parameter alarm dress It sets, fault location module, fault logging module.
6. a kind of intelligent building project monitor and control management system according to claim 5, it is characterised in that: the identification is adopted With fingerprint recognition or access card identification method, the access control system installs infrared photography monitoring device, strange visitor's registration System is acquired visitor's identity information, electro-photographic information and finger print information, and the public domain monitoring system includes pair Saloon, stair, elevator and aisle infrared monitoring.
7. a kind of intelligent building project monitor and control management system according to claim 6, it is characterised in that: the public area Area lighting system includes saloon illumination, stair illumination, elevator lighting, aisle illumination, and the saloon illumination uses light Inductive lighting device is controlled, the stair illumination, elevator lighting, aisle illumination use infrared induction lighting device, the urgent thing Part lighting system uses independently-powered emergency lighting device to emergency case.
8. a kind of intelligent building project monitor and control management system according to claim 7, it is characterised in that: the fire house Stating emergency supervisory systems includes broadcast control system, fire early-warning system, elevator accident warning system, earthquake pre-warning system System, the warning information that broadcast control system issues fire early-warning system, elevator accident warning system, earthquake early-warning system carry out It plays in real time.
CN201810924141.0A 2018-08-14 2018-08-14 A kind of intelligent building project monitor and control management system Withdrawn CN108958133A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810924141.0A CN108958133A (en) 2018-08-14 2018-08-14 A kind of intelligent building project monitor and control management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810924141.0A CN108958133A (en) 2018-08-14 2018-08-14 A kind of intelligent building project monitor and control management system

Publications (1)

Publication Number Publication Date
CN108958133A true CN108958133A (en) 2018-12-07

Family

ID=64469828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810924141.0A Withdrawn CN108958133A (en) 2018-08-14 2018-08-14 A kind of intelligent building project monitor and control management system

Country Status (1)

Country Link
CN (1) CN108958133A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110427008A (en) * 2019-08-30 2019-11-08 广州广电城市服务集团股份有限公司 A kind of intelligent building system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110427008A (en) * 2019-08-30 2019-11-08 广州广电城市服务集团股份有限公司 A kind of intelligent building system

Similar Documents

Publication Publication Date Title
CN103779960B (en) Intelligence switching station comprehensive monitoring system
CN104238533B (en) Railway station building electromechanical device monitoring system
CN107659645A (en) A kind of integrated intelligence community system based on Internet of Things
CN106054774A (en) Building intelligent monitoring system
CN108803460A (en) A kind of wisdom lavatory method for managing and monitoring and system
CN110471356A (en) A kind of building system based on BIM 3D interaction technique
CN206649329U (en) A kind of power distribution room intelligent environment monitoring equipment
CN108428274A (en) A kind of Property Management of residence gate inhibition based on recognition of face and disengaging management method
CN109264522B (en) System for reporting life cycle, maintenance and measurement audit condition of building equipment
CN107015548A (en) Archive office's intelligent environment detecting and controlling system
CN106886203A (en) A kind of intelligent building project monitor and control management system
CN107193267A (en) A kind of intelligent building project monitor and control management system
CN108898255A (en) One kind is based on the twinborn intelligence community O&M supervisory control simulation cloud platform of digitlization
CN108831100A (en) Building intelligent engineering monitoring management system
CN112213953A (en) Intelligent building equipment control method, platform, equipment and computer storage medium
CN109685482B (en) Intelligent building management method, system and application of human, machine and object information fusion
CN112578690A (en) Intelligent building energy consumption management and control system and method
CN106340078A (en) Property management system
CN107291028A (en) A kind of intelligent building project monitor and control management system
CN108958133A (en) A kind of intelligent building project monitor and control management system
CN108931925A (en) A kind of intelligent building project monitor and control management system
CN114545850A (en) Internet of things intelligent management system for hospital water system
CN108828969A (en) A kind of intelligent building project monitor and control management system
CN115047816A (en) Building electrical energy-saving monitoring method
CN113900391A (en) Commercial building intelligent management system based on big data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181207

WW01 Invention patent application withdrawn after publication