CN104238533B - Railway station building electromechanical device monitoring system - Google Patents

Railway station building electromechanical device monitoring system Download PDF

Info

Publication number
CN104238533B
CN104238533B CN201410550421.1A CN201410550421A CN104238533B CN 104238533 B CN104238533 B CN 104238533B CN 201410550421 A CN201410550421 A CN 201410550421A CN 104238533 B CN104238533 B CN 104238533B
Authority
CN
China
Prior art keywords
control
monitoring
water
supervising device
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410550421.1A
Other languages
Chinese (zh)
Other versions
CN104238533A (en
Inventor
翟纯玉
付明
张军
毛虎林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Si Wei Electronic Information Inc Co
Original Assignee
Chengdu Si Wei Electronic Information Inc Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Si Wei Electronic Information Inc Co filed Critical Chengdu Si Wei Electronic Information Inc Co
Priority to CN201410550421.1A priority Critical patent/CN104238533B/en
Publication of CN104238533A publication Critical patent/CN104238533A/en
Application granted granted Critical
Publication of CN104238533B publication Critical patent/CN104238533B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a railway station building electromechanical device monitoring system, comprising a central monitoring station, a control layer, a field layer and a network layer; the control layer comprises a DDC controller, a PLC controller and an intelligent controller for completing data collection, state monitoring and automatic control of electromechanical devices on the scene; the field layer comprises a plurality of sensors for collecting data of the electromechanical devices on the scene and an execution mechanism for outputting control commands to control the electromechanical devices on the scene. According to the railway station building electromechanical device monitoring system, the electromechanical devices in the a railway station building, such as power devices, illuminating devices, water supply and drainage devices, heating ventilation air-conditioners, escalators and EPS are automatically monitored, controlled and managed, so that the purposes of saving energy and manpower, improving safety and management levels are achieved. The network structure adopts the manner of the Ethernet combined with the field bus, and is of single-layer or two-layer structure, thus being simple in structure and convenient to manage and maintain. No limitation on quantity of users and number of monitoring points; the system supports video monitoring, and also supports graphic lamination, roaming and zooming and AutoCAD graphs.

Description

A kind of railway station building electronic & mechanic machine control system
Technical field
The present invention relates to a kind of monitoring of tools field, more particularly to a kind of railway station building electronic & mechanic machine control system.
Background technology
Fast development with rail transportation system and the continuous improvement of people's living standard, either staff is still Passenger, the security to environment such as traffic, trip, work, rests and comfortableness require more and more higher.In order to meet people this A little demands, more in order to improve the safety in production level of railway enterprise, and modern management level, realize energy-saving target, Along Railway important building, such as all kinds of electromechanical equipments of station, MTU depot (institute), office block etc., such as electric power, illuminate, to They should be entered by draining, HVAC, Escalator, eps etc. using advanced computer technology, control technology and the communication technology Row automatically monitors, controls and manages, to reach save energy, the purpose saved manpower, improve level of security and managerial skills.
Content of the invention
It is an object of the invention to overcoming the deficiencies in the prior art, a kind of new railway station building electromechanical equipment is provided to monitor System, the electromechanical equipment to railway station building, carry out automatically including electric power, illumination, plumbing, HVAC, Escalator, eps etc. Monitor, control and manage, effective save energy, saving manpower, raising level of security and managerial skills.
The purpose of the present invention is achieved through the following technical solutions: a kind of railway station building electronic & mechanic machine control system, It includes central monitoring station, key-course, field layer and Internet, and central monitoring station includes monitor workstation, form/maintenance work Stand, database server, web server, the communication server, printer, optical projection system, ups power-supply system and gps positioning are System;Key-course includes ddc controller, plc controller and intelligent controller, for complete live electromechanical equipment data acquisition, Stateful Inspection and automatically controlling;Field layer include for complete live electromechanical equipment data acquisition multiple sensors, for defeated Go out the executing agency of controlling filed electromechanical equipment;Each part in central monitoring station is connected by Internet respectively, and field layer passes through Key-course access network network layers.
Described field layer includes transformation and distribution system supervising device, remote meter reading and load management device, illuminator prison Control device, air supplying and exhausting system supervising device, VMC supervising device, air-conditioning system supervising device, refrigeration station system monitoring dress Put, heat-exchange system supervising device, supply and drain water system supervising device and Escalator system monitoring device;
Transformation and distribution system supervising device passes through fieldbus and communication equipment access to communication networks, and air-conditioning system supervising device leads to Cross ddc controller or plc controller access to communication networks, air supplying and exhausting system supervising device passes through ddc controller or plc controller Access to communication networks, supply and drain water system supervising device passes through ddc controller or plc controller access to communication networks, Escalator system System supervising device passes through intelligent controller access to communication networks, and illuminator supervising device passes through fieldbus and gateway accessing leads to Communication network.
Described transformation and distribution system supervising device is used for realizing the supervision of high-tension switch cabinet, the supervision of transformer, low pressure are joined The supervision of electricity and the monitoring of generating set, the supervision of high-tension switch cabinet includes high pressure master and enters on off state supervision, and high pressure mother is opened Off status supervision, transformer service entrance switch Stateful Inspection and high side voltage, current surveillance;The supervision of transformer is used for monitoring and becomes The temperature of depressor and transformer blower fan running status;The supervision of low-voltage distribution is included to fire-fighting/non fire fighting power supply outlet switch shape State monitors, the supervision to its voltage and current, to the supervision for distribution power factor and frequency;The monitoring of generating set includes sending out Motor operating state monitors, Generator Status, distribution bottle circuit-breaker status control, and malfunction monitors, the high low oil level of fuel tank is supervised Depending on accumulator state monitoring.
Described remote meter reading and load management device are used for realizing remote automatic meter reading, load management and spatial load forecasting, Spatial load forecasting refers to control to the long-range breaker tripping and closing of electric switch or meter switch, controls and power control including remote control tripping operation, electricity Three kinds of modes of system.
Described air supplying and exhausting system supervising device, for realizing supervision and the control of exhaust blower and exhaust blower fan running status, is pressed Time-program(me) opens/stops exhaust blower and pressure fan automatically, opens/stop smoke exhaust fan by fire-fighting signal, by closed building Oxidation concentration of carbon opens/stops exhaust blower and pressure fan;Described VMC supervising device includes the Temperature Humidity Sensor, antifreeze of blowing Switch, pressure difference switch, fan valve executor, electric control valve, electric steam humidification regulating valve, are used for realizing wind pushing temperature automatically controlling System, blasting humidity automatically control, screen pack blocks warning, new blower fan on off control, interlock protection control and saving-energy operation control.
Described air-conditioning system supervising device include mixed wind-warm syndrome humidity sensor, air return temperature humidity sensor, frost prevention switch, Pressure difference switch, pressure sensor, fan valve executor, electric control valve, electric control valve and electronic humidification regulating valve, are used for realizing return air temperature automatic Control, the blocking warning of return air Humidity Automatic Control, screen pack, air quality regulation, air-conditioner set on off control, interlock protection control System and saving-energy operation control.
Described refrigeration station system supervising device include cooling-water temperature sensor, water ga(u)ge, hydraulic pressure sensor, pressure difference switch, Liquid level sensor, electric butterfly valve and actuator, differential-pressure bypass valve and actuator, are used for realizing the calculating of refrigeration duty demand, cooling-water machine Group start and stop coordinated signals, cooling water temperature detection, blower fan of cooling tower status monitoring and control, cooling water pipeline filter state prison Survey, water pump status monitoring with control, handpiece Water Chilling Units status monitoring with control, freezing differential water pressures control, expansion tank level monitoring.
Described heat-exchange system supervising device includes temperature sensor, water valve driver and controls steam valve, for reality Existing hot water Water temperature control, temperature monitoring, the monitoring of water pump are with control, heat exchanger and water pump from control.
Described supply and drain water system supervising device is for the monitoring to water supply system for the realization and the monitoring to drainage system:
Monitoring to water supply system: the running status of monitoring water pump, fault alarm, hand/automatic conversion state, and record fortune The row time;Water pump on off control, during water supply tank low liquid level, starts water pump, during water supply tank high level, stops feed pump;Work As pump break down when, stand-by pump automatically engages operation;Streamflow regime is shown on graphic operation station;Water tank two position shows And report to the police;
Monitoring to drainage system: monitoring immersible pump running status, fault alarm, hand/automatic conversion state, and record fortune The row time;Submersible sewage pump on off control, sump superelevation liquid level warning, during high level, start water pump, stop during sump low liquid level Water pump.
Described Escalator system monitoring device is for realizing supervision and the control of elevator and staircase start and stop state, and monitors Floor state, malfunction, traffic direction, illumination condition, safeties state residing for elevator.
The invention has the beneficial effects as follows:
1) electromechanical equipment to railway station building, is carried out including electric power, illumination, plumbing, HVAC, Escalator, eps etc. Automatically monitor, control and manage, reached save energy, the purpose saved manpower, improve level of security and managerial skills.
2) network structure adds fieldbus mode using Ethernet, is individual layer or double-layer structure, and structure is simple, is easy to manage And maintenance.
3) restriction of useless amount, also no monitors the restriction of points;
4) support video monitoring, and support graph layering, roaming, scaling and autocad figure;
5) user's secondary development and remote maintenance are supported.
Brief description
Fig. 1 is monitoring system structural schematic block diagram of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings technical scheme is described in further detail, but protection scope of the present invention is not limited to Described below.
A kind of railway station building electronic & mechanic machine control system, it includes central monitoring station, key-course, field layer and Internet, As shown in figure 1, central monitoring station includes monitor workstation, form/maintenance work station, database server, web server, leads to Telecommunications services device, printer, optical projection system, ups power-supply system and gps alignment system;Key equipment such as monitor workstation, database Server, communication server etc. can select redundant configuration, to improve system reliability.
Monitor workstation is mainly used in the regular job of operator on duty, including data monitoring and analysis, equipment control, pattern Control, Energy Saving Control, and printing reports, driving projecting apparatus etc..
Form work station is mainly used in automatically generating, edits various production reports and statistical computation form, and exports preservation Or drive printer to print.
Maintenance work station be used for SFC support execution parameter tuning, system configuration, network management, management of process, The tasks such as system maintenance maintenance.
Database server is used for system real time history/data analysis, statistics and calculating, and stores real time data to commercialization Historical data base, is used for retrieval, statistics, analysis.
Web server provides web services function, and the real time data of bas system and historical data are sent out in the form of a web page Cloth is gone out, and user just can complete operation monitoring task in far-end by intranet or internet, using browser.
The communication server is mainly used in being communicated between central monitoring station and each controller, subsystem, completes stipulations and turns Change, the function such as data prediction, data forwarding is it is also possible to data-interface as bas and other automated systems such as fas etc.. The communication server is a kind of logical device, both can be separately provided it is also possible to be replaced by other work stations.
Key-course (also known as substation layer) includes ddc controller, plc controller and intelligent controller, is used for completing live machine The data acquisition of electric equipment, Stateful Inspection and automatically control.
Substation layer should select optimal monitoring scheme and equipment according to the specific requirement of site environment and controll plant.
(1) general ddc controller is selected for general monitored object, this is most typical usage;
(2) for the system that transformer and distribution station, illuminator etc. are relatively large, comparison is independent, some monitor terminals are needed (rtu) or digital instrument, then composition automation subsystem can be coupled together these terminals, instrument, so using fieldbus Again communication network is connected to by communication controler afterwards;
(3) for having configured intelligent monitor, such as Escalator, eps(emergency power system) equipment Deng then, communication converter only need to be installed, the rs-232/485 interface conversion of watch-dog is Ethernet interface (tcp/ip), then Access to communication networks;
(4) for the occasion that running environment is more severe, such as major long tunnel, bridge, subway etc., then can select reliability Higher plc replaces ddc.
Field layer includes the multiple sensors, dynamo-electric for output control field for completing live electromechanical equipment data acquisition The executing agency of equipment;Each part in central monitoring station is connected by Internet respectively, and field layer passes through to control layer access net Network layers.Field layer is mainly responsible for the data acquisition of electromechanical equipment running status, including analog quantity, of ac, switching value, pulse Amount, digital quantity etc.;Receive the order of controller and higher level main website, by switch, the output control such as valve (actuator), adjuster System;In many cases, scene need configure manual-operating mechanism so as on-site maintenance, maintenance or in emergency circumstances complete operate Task.
Tbas-2000 generally adopts third generation bas technology, i.e. substation layer equipment such as ddc, plc or other Based Intelligent Control Device provides Ethernet interface, it then follows tcp/ip agreement, has access to Ethernet, so that system network architecture is more flat Change, network performance is more excellent.
For big-and-middle-sized station, in order to extend network transmission distance and improve antijamming capability, communication media can select Optical cable, switch can select optical fiber industry Ethernet switch, and network can also adopt double web frames or loop configuration to carry High reliability;For super-huge station, the higher area of floor is larger, can adopt comprehensive wiring technology, communication network is by main line Subsystem, horizontal subsystem, workspace composition, mains system and system horizontal adopt indoor fire safety optical cable, and workspace network Then adopt twisted-pair feeder or Shielded Twisted Pair.
For automation equipments such as transformer and distribution stations than the subsystem of comparatively dense, field bus technique can be adopted (such as Lonworks, rs-485) these devices are coupled together one subsystem of composition, then pass through communication controler or gateway device Connect with backbone network;If necessary, local monitoring system can be arranged in subsystem one-level, it is that operator on duty, attendant carry For interactive service.
Central monitoring station is the Dispatch and Command Center of electronic & mechanic machine control system, and its function specifically includes that
Basic monitoring function:
1) operating function
Tbas-2000 allows operator in central monitoring station, two-stage completes to operate as follows on the spot:
(1) equipment start-stop controls and monitors
(2) adjustment set point
(3) correction time control program
(4) execute or connect the alarm condition about control point
(5) execute or stop the time record/trend record about control point
(6) adjustment is about the pre-set parameter of pid control loop
(7) vacation table, the time of update the system are set
(8) input provisional overload control table
(9) numerical value of the warning gate value/danger gate value of addition or change analog input point
(10) check and report to the police and prompting warning bound numerical value
(11) execution or " order of work " that terminate execution task
(12) back-up measures that emergency control panel (ibp) automatically controls, its operating rights limit for height are supported as bas fire working In monitor workstation;Priority for equipment operation, it then follows be higher than manually automatic principle.
2) Schema control
Tbas-2000 can be divided into according to operational mode: normal operation mode, takes precautions against natural calamities and blocking model.When bas receives fas Blocking model of taking precautions against natural calamities preferentially is executed after fire alarm information.
(1) normal operation mode
According to real-time running state, control the operation of electromechanical equipment, complete automatically to monitor and control, energy-saving run, fault The function such as monitor and report to the police.
Normal operation mode can also be divided into day-to-day operation pattern, gold holiday operational mode, spring transportation according to run time Pattern etc..
(2) take precautions against natural calamities and block operational mode
Receive fas station fire information, execution station Smoke prevention, purging mode;Reception interval park position signal, according to row Car fire location information, execution tunnel smoke controlling pattern;Reception interval blocks information, and execution tunnel blocks air vent mode;Receive Other disasters such as signal such as flood, mud-rock flow, earthquake, executes corresponding disaster operational mode;Monitoring station escape indicating system and Emergency lighting system;Monitor each draining pump house flood stage etc..
In order to pursue operating mode reasonability, can be according to the operating experience of user's long term accumulation to tbas-2000 operational mode, thing Therefore pattern is modified or updated, enable a system to the change of adaptation condition, realize optimal control and the management of system.
3) Energy Saving Control
Tbas-2000 provides following energy-conservation software, and these software programs can operate without operation in system automatically The intervention of personnel.Software has enough flexibilities it is allowed to user makes corresponding setting according to field condition simultaneously, realizes excellent Change and control.
(1) daily scheduled time table
(2) annual predetermined schedule
(3) calendar of vacation (as spring transportation)
(4) surmount control calendar temporarily
(5) most preferably open/stop function
(6) night set point auto-adjustment control
(7) enthalpy handoff functionality, weather compensation, periodic load
(8) replacement of temperature set-point
(9) combination of freezing unit/heat exchanger and order control
(10) restriction of power consumption peak period etc.
4) alarming and managing
Alarming and managing includes inspection, buffering, storage and delivers to reporting to the police on the active station specified.
Warning system can provide to be improved and the alert process function of friendly interface, and this feature is answered in covering system and caused Any event reported to the police and the counter-measure taken of operating personnel.
State change can also produce a segment information and pass to operating personnel.Warning can be by data signal or analog signal Produce.
Operating personnel define warning object, then it are connected with the signal in system.When its state change, numeral letter Number triggering report to the police.The value of analog signal, compared with the high and low limit value of regulation, if broken bounds, is reported to the police.
When reporting to the police, warning system just automatically generates one and checks tracking signal, and this information occurs on screen simultaneously In zone of alarm, whom confirms, and this is responsible for processing this fault, and prints warning message on a printer.
5) colored Dynamic graphic display
Tbas-2000 monitoring system can show many data in multi-windows mode within the same time, so that Multiple difference running statuses are monitored comprehensively and is analyzed.
Colored motion graphics can independently produce, and provides an OO pattern manipulation interface for operating personnel, leads to Cross the daily operating that it can instruct equipment.Color graphics shows the structure of equipment, system in the way of clear and distinct.
The color graphics of equipment is hierarchy, and a figure is connected with another figure by hierarchy by bonding pad Get up.Operating personnel can transfer building plan using link field, then recall successively floor, room, unit or its The display picture of its equipment.
By colored motion graphics, operating personnel can control, adjust and monitor whole electromechanical equipments.
6) safety management
Operating personnel enter active station to be controlled by password, and multi-level password will be owner and administrative staff provide one It is effectively protected instrument, management and the different departmental staffs of restriction use monitoring system, and anti-locking system is made by irrelevant personnel simultaneously With.
7) time management
Signal when gps pair can be accepted, and whole system is set time it is ensured that all automation equipments and dress in system Put and there is unified, the correct time.
Offer time calendar watch, carries out time control to equipment, and these functions can be used to start and between arrestment Distinct device;Timetable can be coordinated with route map of train, provide for driving and preferably service.
Define the time control of controller with time variable and time diagram.Time variable in system and one or dozens of Time diagram is connected, and time variable is by the ON/OFF time control in time diagram.When can be carried out using " time-event " in active station Between control, for example start and terminate trend record and periodically print out etc..
(1) time variable
Time variable is logical variable, can be true or false, and variable can be forced to set or by one or more time diagrams Control.
(2) time diagram
Time diagram is the timing definition of time variable institute reference, and time diagram should give route map of train and combine closely. Time diagram defines the on an off time of time variable.All figures define daily switch time in one week, and transformation period figure has There is the priority higher than week figure and for the time control beyond normal time figure.Transformation period figure must specify validity date model Enclose.
(3) public holiday is processed
Operating personnel define which sky or which day which partly be the public holiday.In vacation to be given first day and The time and date of last day.
(4) time, date and week
From operating personnel position can read and change time in the middle of one day, the date and what day.
(5) time synchronized
The system of different time zone can be in processing equipment, and can carry out the winter when suitable/summer when conversion.
8) system documentation
Can create following lists:
(1) system configuration, that is, describe the signal table how carrying out physical connection between equipment.
(2) processing unit, that is, use the table of variable description processing unit and its related object.
(3) list object, that is, carry the list object (logical formula, physically or form) of relevant characterization.Operating personnel can So that one or more objects are selected according to object type and characteristics of objects.
(4) input/output, in equipment room, unit is physically entered/output listing.
(5) test, for test equipment between middle unit input/output list.
(6) constrained variable, the display of the constrained variable of unit in equipment room.
Above-mentioned list can show on screen, prints out on a printer, also can be saved as database file.
9) historical record
Historical record be used to automatically record and storage system in occur each event.In system, all events are all by certainly Dynamic record.When recording an event, the type of event, the date and time occurring, associated operating units, use Family, object etc. is all automatically recorded.
Historical record can follow the tracks of creating/ediing/deleting of such as object, the event before warning, the event such as logs in and exit Process.
Historical record can be circulation or acyclic.Can specify that when a certain percentage of record to predetermined space When, automatically generate warning.Specific percent value can be manually entered determination.
When showing history, event type to be shown and time range, event type available event can be selected Symbol in list represents.
Automatically or by instruction log and form can be produced.Log and form temporally, the date, also can be by daily Produce, or by the time, the date or what day combine and automatically generate, and printable or show, also can leave in hard In disk/floppy disk.
Tbas-2000 system can automatic store following event:
(1) report to the police and excite, confirm, reset, release and interlock
(2) renewal, conversion and the deletion of object are recorded.
(3) log in
(4) exit
(5) change of file object
(6) physical location is issued an order, the download of order and on reach
(7) configuration order
10) trend record
Trend record refers to obtain in selected time interval and stores measured value in case subsequent process and display Process.Sampling interval can be as short as 5 seconds, can grow to one day or longer, depending on the needs according to specific object and process/display. The fruitful building management system of trend record needs to allow operator not just know that the current ruuning situation of whole building thing, and Will appreciate that over institute's occurrence.
The historical data that each control sub-station is gathered is sent to central managing computer, and keeper just can be in central management The performance change curve that electromechanical equipment system experiences in past attempts is observed on computer.A plurality of Parameters variation on same coordinate is bent Line mutually compares, and highlights the interphase interaction of parameters.Local by certain point on the transformation of scale of reference axis, curve Amplify, and using flexible mobility in the system of axis at cursor of mouse place, manager just can be occurred to a certain moment Event does detailed understanding.Curve map can also be because in embedded certain related one page flow process in the form of " Pop-up " window A certain specific alert event and trigger.
Record value can be used for creating report, general view table and chart.
11) support and other system exchange data
Tbas-2000 can be accessed by Real-time data interface, historical data (sql) and web issues three kinds of modes and car Stand fas, Passenger-transport Information System, mis or other automated system exchange datas, realize information sharing, alarm linkage or locking etc. Function.
12) remote maintenance
Tbas-2000 can provide remote diagnosis and maintenance function.
Four just can access bas system for company technique personnel by public phone network (pstn) or other common networks Each microcomputer or controller (authorized), application software is carried out with remote diagnostic and maintenance, modification parameter, modification program are very To the program of replacing, thus shortening service response time and fault handling time, improve maintainability, the availability of system, Improve service quality.
Premium Features:
User can also match the Premium Features of tbas-2000 as needed, comprising:
1) energy conservation
Energy conservation is exactly on the basis of the monitoring of electromechanical equipment day-to-day operation, by central air-conditioning, cold and hot station, discharge The state of the various load such as water pump, illuminator, run time add up and technological parameter comprehensive analysis, online equipment is provided Efficiency, performance evaluation, provide in time and optimize operation information, reduce energy resource consumption.
The most important technological means of energy conservation is exactly remote automatic meter reading and load management.
2) equipment control and comprehensive maintenance management
On the basis of basic monitoring, equipment running status are organically unified with equipment account, equipment detection record Come, set up the pattern of comprehensive maintenance management, provide from the management method passively keeped in repair to State Maintenance transition, avoid repairing as far as possible Property maintenance, reduce preventative maintenance, progressively from preventative maintenance to State Maintenance transition, thus improving equipment running quality, fall Low operating cost, raises labour productivity.
The major function at layering station includes:
1) data acquisition and Stateful Inspection are carried out to field layer, and provide communication interface superior main website to send data.
2) accept the order of higher level main website or independently to the output control order of field layer executing agency, control mode includes out Ring controls and closed-loop control.
3) accept higher level main website pair when order, be consistent with the clock of whole system;Material particular is beaten with time mark Sign (soe, sequential affair record), send to main website for inquiry.
4) field layer ddc, plc etc. should provide programmability, to require to realize various complexity according to controlled device Control function, such as pid control, fuzzy control, feedforward control etc..
5) generally provide multiple communication interface: (1) principal communication interface, with higher level's master station communication, generally rs-232/485 Interface, present development trend is directly to provide network interface (ieee802.3, tcp/ip);(2) field-bus interface, is used for Being in communication with each other between field controller, generally lonworks, ebi or rs-485 interface;(3) maintenance interface, for controlling Adjust and detect in the scene of device, generally rs-232/485 interface.
6) web services function: controller more advanced at present, plc, rtu can provide web services function, Yong Hutong Cross intranet or internet and just can complete on-site data gathering and Stateful Inspection task using browser (as ie), awarding Control command can be issued it may also be necessary to adjusting or changing running status and the method for operation of controller on the premise of power, Performs device maintenance task.
7) self- recoverage and self-checking function.Controller is arranged on operation scene, and running environment more badly sometimes results in The fault such as " deadlock ", parts damages, instantaneous power-down, in order to ensure controller never stoppingly works it is desirable to controller has certainly Recover and self-diagnostic function, crash or instantaneous power-down after can restarting and restoring work automatically, can automatically diagnose during parts damages Fault simultaneously sends alarm signal, to improve the reliability of device and system.
8) for some more complicated operation scenes, need, in larger space, some controllers are installed, combined Become monitor task.At this point it is possible to arrange an automation subsystem between central monitoring station and field controller as centre Layer, such as transformer and distribution station intelligent monitoring subsystem, illuminating station Monitor And Control Subsystem, central air-conditioning energy control subsystem, tunnel machine Electric equipment Monitor And Control Subsystem etc..These subsystems, to the lower data collecting field controller and intelligent apparatus etc., are adopted to upper forwarding The data collecting and information;Meanwhile, receive various control commands, and be issued to intelligent apparatus execution.
Subsystem specifically completes following function:
(1) complete task in the data set of live each controller, and superior main website sends data;
(2) accept the control command of higher level main website, be distributed to corresponding controller execution control task;
(3) provide human-machine interface function if necessary, be easy to tour personnel and execute supervision, control task in locality;
(4) data-interface with fas is provided.
Field layer refers mainly to various sensors, instrument and meter, executing agency etc., and major function is as follows:
1) it is responsible for the data acquisition of the various electric equipment running status in machine scene, including analog quantity, of ac, switching value, arteries and veins Momentum, digital quantity etc., are sent to controller after being converted to standard electric signal;
2) receive the order of controller and higher level main website, by switch, the output control such as valve (actuator), adjuster;
3) in many cases, scene needs to configure manual-operating mechanism, so that on-site maintenance, maintenance or in emergency circumstances complete Become operation task.
As shown in figure 1, field layer includes transformation and distribution system supervising device, remote meter reading and load management device, illumination system System supervising device, air supplying and exhausting system supervising device, VMC supervising device, air-conditioning system supervising device, refrigeration station system prison Control device, heat-exchange system supervising device, supply and drain water system supervising device and Escalator system monitoring device;
Transformation and distribution system supervising device passes through fieldbus and communication equipment access to communication networks, and air-conditioning system supervising device leads to Cross ddc controller or plc controller access to communication networks, air supplying and exhausting system supervising device passes through ddc controller or plc controller Access to communication networks, supply and drain water system supervising device passes through ddc controller or plc controller access to communication networks, Escalator system System supervising device passes through intelligent controller access to communication networks, and illuminator supervising device passes through fieldbus and gateway accessing leads to Communication network.Described communication network is ethernet communication network.
Transformation and distribution system includes high-tension apparatus, potential device, low-voltage equipment, generating equipment, power cabinet etc..Described change is joined Electric system supervising device is used for realizing supervision, the supervision of transformer, the supervision of low-voltage distribution and the generating set of high-tension switch cabinet Monitoring, the supervision of high-tension switch cabinet includes high pressure master enters on off state and monitors, high pressure bus connection switch Stateful Inspection, and transformer enters Wiretap Stateful Inspection and high side voltage, current surveillance;The temperature and the transformer that monitor for monitoring transformer of transformer Fan operation state;The supervision of low-voltage distribution includes to fire-fighting/non fire fighting power supply outlet switch Stateful Inspection, to its voltage and electricity The supervision of stream, to the supervision for distribution power factor and frequency;The monitoring of generating set includes operation state of generator and monitors, sends out Motor status, distribution bottle circuit-breaker status control, and malfunction monitors, the high low oil level of fuel tank monitors, accumulator state monitoring.
Remote meter reading and load management are directed to various power load settings, are to realize Energy Saving Control and energy management, offer The important technical of labor productivity, system can be with change distributing monitoring system Uniting and enforcement, intelligent kilowatt-hour meter warp Communication processor accesses bas monitoring station.Described remote meter reading and load management device are used for realizing remote automatic meter reading, load Management and spatial load forecasting, the remote measurement that remote meter reading is primarily referred to as user's meter is checked meter.Mainly there is pulse in telemetry scene source Data, 232/485 meter reading data and AC sampling data.The degree of accuracy of meter can be greatly improved by remote meter reading, in time Find and prevent stealing electrical phenomena, improve the economic benefit of enterprise, mitigate labor strength, improve the operating efficiency of enterprise. Load management is on the basis of meter reading data, is automatically performed electricity statistics and analysis, obtains power consumption mode and identification master The power consumption source wanted, automatically generates curve chart, arranges electricity bill, helps the effective administrative loads of user, timing power-off, control Electricity consumption during crest electricity price processed, reduces improper power consumption, the final purpose realizing reduction electric energy cost.Spatial load forecasting refers to electricity consumption The long-range breaker tripping and closing of switch or meter switch control, and control and three kinds of modes of Power Control including remote control tripping operation, electricity.
(1) remote control tripping operation
Also referred to as " jump immediately ", main website issues jump (conjunction) lock order, and terminal is immediately performed jump (conjunction) lock.In addition, meter parameter Set the such as change of user's requirement, termination of contract etc., be also to be completed by guidance command.
(2) electricity controls
Finger user power utilization exceedes during the active energy definite value of regulation by automatic trip, is to be controlled by electricity setting value. Electricity control includes power consumption control, when the form such as m- electricity controls, the electricity charge control, guarantor's electricity.
(3) Power Control
Power Control refers to user power utilization realtime power and exceedes during regulation performance number by automatic trip, is to enter by set value of the power Row controls, including by period control, factory day-off control and urgent pressure spatial load forecasting etc..
The main contents of illumination monitoring include: building intraoral illumination, platform illumination, plaza lighting, Landscape Lighting, billboard Illumination, and emergency lighting, eps(emergency power system) etc..
Illumination monitoring may be selected the modes such as ddc directly controls, fieldbus monitors, power carrier monitoring.Wherein, based on electricity The monitoring system of power carrier communication technology, because anti-electromagnetic interference capability is poor, transmission range is unstable, is not therefore suitable for big Medium-sized station illumination monitoring.
Described air supplying and exhausting system supervising device, for realizing supervision and the control of exhaust blower and exhaust blower fan running status, is pressed Time-program(me) opens/stops exhaust blower and pressure fan automatically, opens/stop smoke exhaust fan by fire-fighting signal, by closed building Oxidation concentration of carbon opens/stops exhaust blower and pressure fan;
Monitoring of tools point:
1) blower fan ON/OFF controls (do)
2) blower fan open/close state (di)
3) manually automatically/select (di)
4) fan trouble reports to the police (di)
The monitoring function that system is realized:
Temporally program opens/stops pressure fan automatically, has the real-time time control function of any period.
The running status of monitoring blowing and discharging fan and fault-signal, and accumulated running time.
Smoke exhaust fan is chain with fire-fighting signal, after fire signal confirms, by opened smoke-discharging blower fan.
Co(carbon monoxide is set in closed building) concentration sensor, send/air draft by monitoring co concentration start and stop Machine, and accordingly open new air door, can reach effective energy-conservation and ensure air quality.
Central station Computer Graphics Display, records various parameters, including state, start-stop time, accumulated running time and its go through History data etc..
Described VMC supervising device includes blow Temperature Humidity Sensor, frost prevention switch, pressure difference switch, air-valve execution Device, electric control valve, electric steam humidification regulating valve, are used for realizing that wind pushing temperature automatically controls, blasting humidity automatically controls, mistake Filter net jam warning, new blower fan on off control, interlock protection control and saving-energy operation control.
New fan monitoring point:
1) fan switch controls (do)
2) fan operation state (di)
3) fan switch state (di)
4) fan trouble (di)
5) blower fan tripping operation warning (di)
6) determine air quantity air-valve Stateful Inspection (di)
7) determine air quantity air-valve and control (do)
8) screen pack Stateful Inspection (di)
9) the electronic valve regulation of cold/hot water controls (ao)
10) air-supply/fresh air temperature and humidity measurement (ai)
The monitoring function that system is realized:
1) wind pushing temperature automatically controls: during winter, automatically hot water valve aperture is carried out according to the temperature value of sensor actual measurement Pid operation control is it is ensured that new blower fan wind pushing temperature reaches the requirement of design temperature;Conversely, the temperature that summer surveys according to sensor Angle value carries out pid operation control to cold valves aperture automatically.By the aperture of water adjusting valve, wind pushing temperature is made to reach setting of user Definite value.
2) blasting humidity control: the measured value according to humidity sensor automatically pid operation control is carried out to humidifier valve it is ensured that Blasting humidity reaches the humidity set point of user.
3) screen pack blocking report to the police: the excessive alarm of air cleaner two ends pressure reduction, and in graphic operation station display and Print and report to the police, and point out time of fire alarming.
4) new blower fan on off control: according to the operating schedule being previously set and holiday break schedule, timing start and stop New blower fan, programming count new blower fan run time, point out timing to carry out maintaining to new blower fan.
5) interlock protection controls: after blower fan stops, fresh air air door, electric control valve, magnetic valve are automatically switched off;Blower fan starts Afterwards, fault alarm when pressure reduction is too low before and after it, and Concatenate shut-down;When the temperature is too low, carry out anti-frost protection, open hot water valve, Close air door, blowing-out machine.
6) energy-saving run, comprising:
(1) intermittent duty: make equipment reasonable interval start and stop, but do not affect amenity degree.
(2) optimum start-up: according to building librarian use situation, open air-conditioning equipment in advance, after night, do not start sky Tune equipment.
(3) optimal shutdown: according to the next situation of building personnel, stop air-conditioning equipment in advance.
(4) adjust setting value: according to outside air temperature, setting value is adjusted, reduces air-conditioning equipment energy ezpenditure.
(5) night wind: in nice and cool season, be full of building with night fresh air, to save air conditioner energy.
Described air-conditioning system supervising device include mixed wind-warm syndrome humidity sensor, air return temperature humidity sensor, frost prevention switch, Pressure difference switch, pressure sensor, fan valve executor, electric control valve, electric control valve and electronic humidification regulating valve, are used for realizing return air temperature automatic Control, the blocking warning of return air Humidity Automatic Control, screen pack, air quality regulation, air-conditioner set on off control, interlock protection control System and saving-energy operation control.
Air-conditioner set control point:
1) fan switch controls (do)
2) fan operation state (di)
3) fan switch state (di)
4) fan trouble (di)
5) blower fan tripping operation warning (di)
6) determine air quantity air-valve Stateful Inspection (di)
7) determine air quantity air-valve and control (do)
8) screen pack Stateful Inspection (di)
9) the electronic valve regulation of cold/hot water controls (ao)
10) return air/fresh air temperature survey (ai)
The live element of control system is opened by mixed wind-warm syndrome humidity sensor, air return temperature humidity sensor, frost prevention switch, pressure reduction Pass, pressure sensor, fan valve executor, electric control valve, electric control valve and electronic humidification regulating valve composition.
The monitoring function that system is realized:
1) return air temperature automatically controls: during winter, the air return temperature value according to sensor actual measurement is automatically to hot water valve aperture Carry out pid operation control it is ensured that air-conditioner set air return temperature reaches the requirement of design temperature;Conversely, summer is real according to sensor The air return temperature value surveyed carries out pid operation control to cold valves aperture automatically.By the aperture of water adjusting valve, return air temperature is made to reach Setting value to user;Then enthalpy is automatically calculated according to the humiture of outdoor feeding fresh air in transition season, and and indoor return air Enthalpy carry out pid computing, its result will automatically control the aperture of new air-valve, air returning valve, exhaust valve, with reach automatically adjust mixed The effect of wind ratio.
2) return air humid control: the measured value according to humidity sensor automatically pid operation control is carried out to humidifier valve it is ensured that Return air humidity reaches the humidity set point of user.
3) screen pack blocking report to the police: the excessive alarm of air cleaner two ends pressure reduction, and in graphic operation station display and Print and report to the police, and point out time of fire alarming.
4) air quality is adjusted: arranges carbon dioxide measurement point in important place, is automatically adjusted according to the concentration of measured value New wind ratio.
5) air-conditioner set on off control: according to the operating schedule being previously set and holiday break schedule, regularly open Stop air-conditioner set, the run time of programming count air-conditioner set, point out timing to carry out maintaining to air-conditioner set.
6) interlock protection controls: after blower fan stops, newly time air draft air door, electric control valve, magnetic valve are automatically switched off;Blower fan After startup, fault alarm when pressure reduction is too low before and after it, and Concatenate shut-down;When the temperature is too low, carry out anti-frost protection, open hot water Valve, cuts out new air door, blowing-out machine, and display alarm in graphic operation station.
7) energy-saving run, comprising:
(1) intermittent duty: make equipment reasonable interval start and stop, but do not affect amenity degree.
(2) optimum start-up: according to building librarian use situation, open air-conditioning equipment in advance, after night, do not start sky Tune equipment.
(3) optimal shutdown: according to building personnel upper and lower class situation, open in advance or stop air-conditioning equipment.
(4) adjust setting value: according to outside air temperature, setting value is adjusted, reduces air-conditioning equipment energy ezpenditure.
(5) night wind: in nice and cool season, be full of building with night fresh air, to save air conditioner energy.
Described refrigeration station system supervising device include cooling-water temperature sensor, water ga(u)ge, hydraulic pressure sensor, pressure difference switch, Liquid level sensor, electric butterfly valve and actuator, differential-pressure bypass valve and actuator, are used for realizing the calculating of refrigeration duty demand, cooling-water machine Group start and stop coordinated signals, cooling water temperature detection, blower fan of cooling tower status monitoring and control, cooling water pipeline filter state prison Survey, water pump status monitoring with control, handpiece Water Chilling Units status monitoring with control, freezing differential water pressures control, expansion tank level monitoring.
Handpiece Water Chilling Units Key Points of Monitoring:
1) operating states of the units
2) unit fault signal
3) unit hand/auto state
3) unit cooling water and chilled water streamflow regime
4) unit chilled water and cooling water electrically operated valve control and state
5) handpiece Water Chilling Units start and stop unit number control
6) chilled water return water temperature
7) chilled water water supply flow
8) chilled water circling water flow rate
9) cooling water supply temperature
10) cooling water return water temperature
11) chilled water temperature resets
12) chilled water supplies pressure of return water poor
13) by-passing valve controls
14) secondary refrigerant leakage concentration monitor and warning
15) state of secondary refrigerant leakage warning device
16) exhaust blower switch control rule
Chilled water pump and cooling water pump Key Points of Monitoring:
1) pump switch controls
2) water pump operation state
3) fault of water pump is reported to the police
4) streamflow regime shows
5) water pump motor-driven valve controls and state
6) chilled water and cooling water treatment system running status and fault signal
Cooling tower Key Points of Monitoring:
1) blower fan of cooling tower on off control
2) blower fan of cooling tower overload-alarm
The live element of control system is by cooling-water temperature sensor, water ga(u)ge, hydraulic pressure sensor, pressure difference switch, level sensing Device, electric butterfly valve and actuator, differential-pressure bypass valve and actuator composition.
The monitoring function that system is realized:
1) refrigeration duty demand calculates: according to chilled water confession, return water temperature and water supply flow measured value, calculates building air conditioning real Cooling load needed for border, and can determine to open the quantity of handpiece Water Chilling Units, reach the purpose of energy-conservation.
2) handpiece Water Chilling Units start and stop coordinated signals: open blower fan of cooling tower, open cooling water butterfly valve, open cooling water pump, open Open chilled water butterfly valve, open chilled water pump, open freezing unit;Otherwise stop.
3) cooling water temperature detection: according to cooling water supply and return water temperature, automatically control the start and stop number of units of blower fan of cooling tower.
4) blower fan of cooling tower status monitoring and control: the running status of monitoring blower fan, malfunction and hand/auto state, Control the start and stop of blower fan.
5) cooling water pipeline filter state monitoring: when screen pack blocks, pressure difference switch provides screen pack and silts warning up Signal, timely prompting personnel are carried out to screen pack.
6) water pump status monitoring and control: the running status of monitoring water pump, malfunction and hand/auto state, control water The start and stop of pump.
7) handpiece Water Chilling Units status monitoring and control: the running status of monitoring unit, malfunction, control the start and stop of unit.
8) freezing differential water pressures control: supply backwater pressure reduction according to chilled water, automatically adjust bypass regulator valve, maintain supply head Constant.
9) expansion tank level monitoring: according to monitoring high water tank sensor, water level transfinites and carries out fault alarm, makes expansion Cistern water level maintains in allowed band.
Described heat-exchange system supervising device includes temperature sensor, water valve driver and controls steam valve, for reality Existing hot water Water temperature control, temperature monitoring, the monitoring of water pump are with control, heat exchanger and water pump from control.
Monitoring content:
1) thermal source confession/return water temperature (ai)
2) circulating hot water confession/return water temperature (ai)
3) hot water total return pipe discharge (ai)
4) hot water exchanger motor-driven valve controls (ao)
5) heat exchanger supply water temperature (ai)
6) hot water circulating pump controls (do)
The live element of control system by temperature sensor, water valve driver and controls steam valve to form.
The monitoring function that system is realized:
According to actual hot water amount's demand modeling heat exchanger and water pump operation number of units, to reach energy-saving effect.
1) hot water Water temperature control: compared with the temperature value of feed pipe by hot water temperature's setting value and make pid computing, control The aperture of electric steam valve, keeps hot water supply water temperature.
2) temperature monitoring: monitoring vapor (steam) temperature, hot water supply water temperature and house steward's supply water temperature are it is ensured that system operatio is correct.
3) monitoring of water pump and control: the running status of monitoring water pump, malfunction, control the start and stop of water valve.
4) different heat exchangers and water pump can be started every time, thus increasing equipment life according to proceedings.
Described supply and drain water system supervising device is for the monitoring to water supply system for the realization and the monitoring to drainage system:
Monitoring to water supply system: the running status of monitoring water pump, fault alarm, hand/automatic conversion state, and record fortune The row time;Water pump on off control, during water supply tank low liquid level, starts water pump, during water supply tank high level, stops feed pump;Work As pump break down when, stand-by pump automatically engages operation;Streamflow regime is shown on graphic operation station;Water tank two position shows And report to the police;
Monitoring to drainage system: monitoring immersible pump running status, fault alarm, hand/automatic conversion state, and record fortune The row time;Submersible sewage pump on off control, sump superelevation liquid level warning, during high level, start water pump, stop during sump low liquid level Water pump.
Water supply system control point:
1) living pump ON/OFF controls (do)
2) living pump open/close state (di)
3) the manual/auto state of living pump (di)
4) living pump fault alarm (di)
5) the high and low water-level alarm of cistern/case (di)
6) water tank, the high and low water-level alarm of drinking water tank (di)
The monitoring function that water supply system is realized:
1) running status of monitoring water pump, fault alarm, hand/automatic conversion state, and record run time.
2) water pump on off control.During water supply tank low liquid level, start water pump;During water supply tank high level, stop feed pump.
3), when working barrel breaks down, stand-by pump automatically engages operation.And rotation work realized by reserve pump each other.
4) streamflow regime is had on graphic operation station to show.
5) water tank two position shows and reports to the police.Water level in water pool shows and high and low liquid level, superelevation overflow are reported to the police etc..
Drainage system control point
1) underground sump superelevation, low liquid level warning (di)
2) row/sewage pump ON/OFF controls (do), open/close state (di)
3) manual/auto state and fault alarm (di)
The monitoring function that drainage system is realized:
1) monitoring immersible pump running status, fault alarm, hand/automatic conversion state, and record run time.
2) submersible sewage pump on off control.Sump superelevation liquid level warning: during high level, start water pump;During sump low liquid level Stop water pump.
Above-mentioned plumbing equipment is recorded with its ruuning situation, generates tendency chart, and printing reports.System passes through color three dimension Figure shows, the state of display distinct device and warning, show the value of each parameter, arbitrarily change setting value by mouse, with Ask and reach optimum condition.Add up the run time of water pump and other plumbing equipments simultaneously.
Described Escalator system monitoring device is for realizing supervision and the control of elevator and staircase start and stop state, and monitors Floor state, malfunction, traffic direction, illumination condition, safeties state residing for elevator.
The above be only the preferred embodiment of the present invention it should be understood that the present invention be not limited to described herein Form, is not to be taken as the exclusion to other embodiment, and can be used for various other combinations, modification and environment, and can be at this In the described contemplated scope of literary composition, it is modified by the technology or knowledge of above-mentioned teaching or association area.And those skilled in the art are entered The change of row and change, then all should be in the protection domains of claims of the present invention without departing from the spirit and scope of the present invention Interior.

Claims (8)

1. a kind of railway station building electronic & mechanic machine control system it is characterised in that: it includes central monitoring station, key-course, field layer And Internet, central monitoring station includes monitor workstation, form/maintenance work station, database server, web server, communication Server, printer, optical projection system, ups power-supply system and gps alignment system;Key-course includes ddc controller, plc controller And intelligent controller, for completing the data acquisition of live electromechanical equipment, Stateful Inspection and automatically controlling;Field layer include for Complete the multiple sensors of live electromechanical equipment data acquisition, being used for the executing agency of the live electromechanical equipment of output control;Central authorities Each part in monitoring station is connected by Internet respectively, and field layer passes through key-course access network network layers;
Described field layer includes transformation and distribution system supervising device, remote meter reading and load management device, illuminator monitoring dress Put, air supplying and exhausting system supervising device, VMC supervising device, air-conditioning system supervising device, refrigeration station system supervising device, heat Exchange system supervising device, supply and drain water system supervising device and Escalator system monitoring device;
Transformation and distribution system supervising device passes through fieldbus and communication equipment access to communication networks, and air-conditioning system supervising device passes through Ddc controller or plc controller access to communication networks, air supplying and exhausting system supervising device is connect by ddc controller or plc controller Enter communication network, supply and drain water system supervising device passes through ddc controller or plc controller access to communication networks, Escalator system Supervising device passes through intelligent controller access to communication networks, and illuminator supervising device passes through fieldbus and gateway accessing communication Network;
Described transformation and distribution system supervising device is used for realizing the supervision of high-tension switch cabinet, the supervision of transformer, low-voltage distribution Supervision and the monitoring of generating set, the supervision of high-tension switch cabinet includes high pressure master and enters on off state supervision, high pressure bus connection switch shape State supervision, transformer service entrance switch Stateful Inspection and high side voltage, current surveillance;The supervision of transformer is used for monitoring transformer Temperature and transformer blower fan running status;The supervision of low-voltage distribution is included to fire-fighting/non fire fighting power supply outlet switch state prison Depending on the supervision to its voltage and current, to the supervision for distribution power factor and frequency;The monitoring of generating set includes generator Running state monitoring, Generator Status, distribution bottle circuit-breaker status control, and malfunction monitors, the high low oil level of fuel tank monitors, store Cell state monitor.
2. a kind of railway station building electronic & mechanic machine control system according to claim 1 it is characterised in that: described remotely copies Table and load management device are used for realizing remote automatic meter reading, load management and spatial load forecasting, and spatial load forecasting refers to electric switch Or the long-range breaker tripping and closing of meter switch control, control and three kinds of modes of Power Control including remote control tripping operation, electricity.
3. a kind of railway station building electronic & mechanic machine control system according to claim 1 it is characterised in that: described supply and exhaust For realizing supervision and the control of exhaust blower and exhaust blower fan running status, temporally program opens/stops row to system monitoring device automatically Blower fan and pressure fan, open/stop smoke exhaust fan by fire-fighting signal, open/stop air draft by the carbonomonoxide concentration in closed building Machine and pressure fan;Described VMC supervising device includes blow Temperature Humidity Sensor, frost prevention switch, pressure difference switch, air-valve Actuator, electric control valve, electric steam humidification regulating valve, are used for realizing that wind pushing temperature automatically controls, blasting humidity is controlled automatically System, screen pack blocking warning, new blower fan on off control, interlock protection control and saving-energy operation control.
4. a kind of railway station building electronic & mechanic machine control system according to claim 1 it is characterised in that: described air-conditioning system System supervising device include mixed wind-warm syndrome humidity sensor, air return temperature humidity sensor, frost prevention switch, pressure difference switch, pressure sensor, Fan valve executor, electric control valve, electric control valve and electronic humidification regulating valve, are used for realizing that return air temperature automatically controls, return air humidity is controlled automatically System, screen pack blocking warning, air quality regulation, air-conditioner set on off control, interlock protection control and saving-energy operation control.
5. a kind of railway station building electronic & mechanic machine control system according to claim 1 it is characterised in that: described refrigeration plant System monitoring device include cooling-water temperature sensor, water ga(u)ge, hydraulic pressure sensor, pressure difference switch, liquid level sensor, electric butterfly valve and Actuator, differential-pressure bypass valve and actuator, are used for realizing the calculating of refrigeration duty demand, handpiece Water Chilling Units start and stop coordinated signals, cooling water Temperature detection, blower fan of cooling tower status monitoring and control, the monitoring of cooling water pipeline filter state, water pump status monitoring and control System, handpiece Water Chilling Units status monitoring and control, freezing differential water pressures control, expansion tank level monitoring.
6. a kind of railway station building electronic & mechanic machine control system according to claim 1 it is characterised in that: described heat exchange System monitoring device includes temperature sensor, water valve driver and controls steam valve, is used for realizing hot water Water temperature control, temperature Degree monitoring, the monitoring of water pump and selecting of control, heat exchanger and water pump control.
7. a kind of railway station building electronic & mechanic machine control system according to claim 1 it is characterised in that: described plumbing System monitoring device is for the monitoring to water supply system for the realization and the monitoring to drainage system:
Monitoring to water supply system: the running status of monitoring water pump, fault alarm, hand/automatic conversion state, and when recording operation Between;Water pump on off control, during water supply tank low liquid level, starts water pump, during water supply tank high level, stops feed pump;Working barrel When breaking down, stand-by pump automatically engages operation;Streamflow regime is shown on graphic operation station;Water tank two position shows and reports Alert;
Monitoring to drainage system: monitoring immersible pump running status, fault alarm, hand/automatic conversion state, and when recording operation Between;Submersible sewage pump on off control, sump superelevation liquid level warning, during high level, start water pump, during sump low liquid level, stop water Pump.
8. a kind of railway station building electronic & mechanic machine control system according to claim 1 it is characterised in that: described Escalator System monitoring device is for realizing supervision and the control of elevator and staircase start and stop state, and monitors floor state residing for elevator, event Barrier state, traffic direction, illumination condition, safeties state.
CN201410550421.1A 2014-10-17 2014-10-17 Railway station building electromechanical device monitoring system Active CN104238533B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410550421.1A CN104238533B (en) 2014-10-17 2014-10-17 Railway station building electromechanical device monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410550421.1A CN104238533B (en) 2014-10-17 2014-10-17 Railway station building electromechanical device monitoring system

Publications (2)

Publication Number Publication Date
CN104238533A CN104238533A (en) 2014-12-24
CN104238533B true CN104238533B (en) 2017-01-18

Family

ID=52226829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410550421.1A Active CN104238533B (en) 2014-10-17 2014-10-17 Railway station building electromechanical device monitoring system

Country Status (1)

Country Link
CN (1) CN104238533B (en)

Families Citing this family (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104597886B (en) * 2015-01-27 2017-03-29 宁波天弘电力器具有限公司 For the monitoring system and its monitoring method of power distribution station
CN104793600A (en) * 2015-04-22 2015-07-22 南京祥源动力供应有限公司 Substation room framework based centralized circulating water system control device
CN105259857B (en) * 2015-11-23 2019-03-12 重庆微标科技股份有限公司 A kind of railway acquisition station computer room supervisory systems
CN105610661A (en) * 2015-12-23 2016-05-25 潘小胜 Distributed train information collecting device
CN107133710B (en) * 2016-02-29 2021-06-15 阿里巴巴集团控股有限公司 Data center site facility monitoring and management system and method
CN106440111B (en) * 2016-09-28 2019-08-20 珠海格力电器股份有限公司 A kind of construction method of the cold station system of central air-conditioning and water system topological diagram
CN106707958A (en) * 2017-03-01 2017-05-24 国电南瑞科技股份有限公司 Unified addressing-based comprehensive monitoring wind and water power monitoring method of large-lag system
CN107023966B (en) * 2017-04-14 2021-01-08 北京工业大学 Method for optimizing set value of outlet water temperature of cooling water of air conditioner of subway station
CN107121970A (en) * 2017-04-27 2017-09-01 四川云图瑞科技有限公司 It is electromechanical in a kind of building of use BIM technology to safeguard and supervising device
CN107680760A (en) * 2017-08-30 2018-02-09 滁州市西控电子有限公司 A kind of harmonic elimination apparatus data acquisition module
CN107733987A (en) * 2017-09-08 2018-02-23 河北建设集团股份有限公司 A kind of job site water power control system and its control method
CN107420294B (en) * 2017-09-12 2024-02-06 李军 Skid-mounted combined internet energy-saving air compressor station
CN108039016B (en) * 2017-11-27 2019-10-29 天津滨中科讯信息技术有限公司 A kind of monitoring of subway underground operation space safety and early warning system
CN108267989A (en) * 2018-01-24 2018-07-10 东莞市粤惠建筑工程技术咨询有限公司 A kind of building equipment monitoring system
ES2734727A1 (en) * 2018-06-07 2019-12-11 Rectificados Y Control S L STATE POWER TRANSFORMERS MONITORING SYSTEM NON-OPERATING AND ASSOCIATED METHOD (Machine-translation by Google Translate, not legally binding)
CN109544027B (en) * 2018-11-30 2021-07-30 南京天溯自动化控制系统有限公司 Intelligent service linkage method of comprehensive monitoring system suitable for different application scenes
CN110032125A (en) * 2019-05-10 2019-07-19 南京维杰智能科技有限公司 A kind of interactive mode station collecting method
CN110597148A (en) * 2019-10-10 2019-12-20 南京瑞松信息科技有限公司 Subway station energy management and control system architecture
CN110825047A (en) * 2019-11-08 2020-02-21 成都交大许继电气有限责任公司 Intelligent linkage customization method of railway comprehensive auxiliary monitoring system
US20230024017A1 (en) * 2019-12-02 2023-01-26 Wsp Global Inc. Railway management system with brake calculation and related method
CN111509314A (en) * 2020-04-28 2020-08-07 福开尔(西安)电气有限公司 Energy storage cabin integrated management equipment
CN111623906B (en) * 2020-04-30 2021-06-25 中国铁建电气化局集团有限公司 Health monitoring method and system for ultra-large space heating and ventilation equipment, storage medium and equipment
CN111768313B (en) * 2020-06-22 2023-06-30 上海申铁信息工程有限公司 Railway system energy consumption data acquisition method and device based on acquisition point identification code
CN112215413A (en) * 2020-09-28 2021-01-12 通号城市轨道交通技术有限公司 Operation diagram optimization method and device and readable storage medium
CN112346351B (en) * 2020-11-19 2021-09-28 四川九门科技股份有限公司 Thing networking device integration intelligence centralized control system based on BIM
CN112394697A (en) * 2020-11-24 2021-02-23 中国铁路设计集团有限公司 Railway station building equipment monitoring and energy management system, program and storage medium
CN114488974B (en) * 2021-12-31 2023-11-03 江苏扬子净化工程有限公司 Integrated management system based on clean workshop PLC control
CN114895211B (en) * 2022-04-25 2022-10-25 中铁建设集团机电安装有限公司 Theme park electromechanical engineering debugging system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000305621A (en) * 1999-04-20 2000-11-02 Toshiba Corp Monitoring control system using internet
CN101700782B (en) * 2009-11-13 2015-09-16 上海宝信软件股份有限公司 BAS control system of urban railway system and method thereof
CN101813937A (en) * 2010-03-17 2010-08-25 东华大学 Front-end processor of rail transit station equipment information based on embedded technology and method
CN202929450U (en) * 2012-11-13 2013-05-08 成都中工科技有限公司 On-site equipment control terminal based on wireless and wired network transmission

Also Published As

Publication number Publication date
CN104238533A (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN104238533B (en) Railway station building electromechanical device monitoring system
CN104260763B (en) A kind of railway station comprehensive monitoring system and method for designing
US20240044541A1 (en) Systems and methods of optimizing hvac control in a building or network of buildings
Escrivá-Escrivá Basic actions to improve energy efficiency in commercial buildings in operation
CN104267704B (en) Tunnel monitoring system
CN104238531B (en) Railway station energy management system and energy-saving control method
CN107924542A (en) HVAC performances and energy use monitoring and reporting system
CN108873842A (en) One-stop unmanned pump station automatic control system
CN104296321A (en) Station house central air-conditioning control system and method
CN103092169B (en) Digital camp apparatus management/control device
KR20130049254A (en) The intelligent building integrated automatic control and energy goal management system based on 3-dimensional modeling and the method thereof
CN104407575A (en) Railway electric power scheduling automatic system
CN113062855B (en) Unmanned system for wide-area and large-quantity urban drainage pump stations and construction method
CN110673673A (en) BIM operation and maintenance platform-based monitoring management system for high-rise ultralow-energy-consumption residence
US11796986B2 (en) System and method for smart system monitoring and control
WO2023164768A1 (en) System and method for dynamic control of hvac components of a building
CN114545850A (en) Internet of things intelligent management system for hospital water system
CN116085936A (en) Intelligent energy management system, equipment and medium for central air conditioner energy station
CN115271340A (en) Wisdom garden big data visualization analytic system
CN112769913A (en) Microenvironment on-site monitoring system and microenvironment monitoring system of electric cabinet
CN212476147U (en) Rural small-size water factory integration switch board
CN104268719B (en) A kind of railway station EMS
CN219936320U (en) Energy station management system
Prasanna et al. Benefits of Smart Buildings
CN104267703A (en) Railway electromechanical device monitoring device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Monitoring System for Electromechanical Equipment in Railway Station

Effective date of registration: 20220927

Granted publication date: 20170118

Pledgee: Chengdu SME financing Company Limited by Guarantee

Pledgor: CHENGDU SYSWARE ELECTRONIC INFORMATION CO.,LTD.

Registration number: Y2022980016380

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230414

Granted publication date: 20170118

Pledgee: Chengdu SME financing Company Limited by Guarantee

Pledgor: CHENGDU SYSWARE ELECTRONIC INFORMATION CO.,LTD.

Registration number: Y2022980016380

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Monitoring System for Mechanical and Electrical Equipment in Railway Station Buildings

Effective date of registration: 20230710

Granted publication date: 20170118

Pledgee: Chengdu SME financing Company Limited by Guarantee

Pledgor: CHENGDU SYSWARE ELECTRONIC INFORMATION CO.,LTD.

Registration number: Y2023980047869

PE01 Entry into force of the registration of the contract for pledge of patent right