CN112578690A - Intelligent building energy consumption management and control system and method - Google Patents

Intelligent building energy consumption management and control system and method Download PDF

Info

Publication number
CN112578690A
CN112578690A CN202011508597.2A CN202011508597A CN112578690A CN 112578690 A CN112578690 A CN 112578690A CN 202011508597 A CN202011508597 A CN 202011508597A CN 112578690 A CN112578690 A CN 112578690A
Authority
CN
China
Prior art keywords
information
event
energy consumption
water supply
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011508597.2A
Other languages
Chinese (zh)
Other versions
CN112578690B (en
Inventor
孙卉芳
粘双超
任好好
王广奇
王淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Shengfan Lanhai Electric Co ltd
Original Assignee
Shandong Shengfan Lanhai Electric Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Shengfan Lanhai Electric Co ltd filed Critical Shandong Shengfan Lanhai Electric Co ltd
Priority to CN202011508597.2A priority Critical patent/CN112578690B/en
Publication of CN112578690A publication Critical patent/CN112578690A/en
Application granted granted Critical
Publication of CN112578690B publication Critical patent/CN112578690B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass

Abstract

The invention discloses an intelligent building energy consumption management and control system and method, which are used for collecting temperature, sound, image and humidity information of each area, collecting the on-off state information of an electric meter loop, collecting pressure and flow data of a water supply loop and detecting the state of a water supply pipeline; judging whether an event of fire, pipeline leakage or regional power failure occurs according to the received environmental influence parameter information and the residence information, and determining the type and the occurrence place of the event according to the acquired information data; receiving the type and the occurrence place of an event, determining an emergency plan according to the type of the event, and determining the size of an area needing dredging according to the emergency plan; and mining a behavior model of the user according to the received environmental impact parameter information and the residence information, grasping and predicting the behavior of the user, allocating resources of the corresponding space according to a prediction result, and supplying or interrupting resources to the corresponding space to realize the management and control of energy consumption.

Description

Intelligent building energy consumption management and control system and method
Technical Field
The invention relates to an intelligent building energy consumption management and control system and method.
Background
With the continuous development of various buildings, the buildings are larger and larger in scale, higher in level and higher in building standard.
For large buildings, there are many factors that affect the energy consumption of the building, such as the building type, the usage of each room, the story height of the room, the wall thickness, the room temperature, the room humidity, the density of the resident, the lighting time, the temperature and humidity of the shared space, the usage period of each resource, the energy consumption of the building or/and the heat consumption of the building, etc. How to organically fuse or sequence the large number of influencing factors and how to comprehensively balance to obtain more preferable, economical and efficient energy consumption control is an important problem at present.
Disclosure of Invention
The invention aims to solve the problems and provides an intelligent building energy consumption management and control system and method.
In order to achieve the purpose, the invention adopts the following technical scheme:
the first purpose of the invention is to provide an intelligent building energy consumption management and control system, comprising:
the environment influence parameter acquisition unit comprises corresponding sensors arranged in each area and is used for receiving acquired temperature, sound, image and humidity information;
the residential information acquisition unit comprises an electricity consumption information acquisition module for acquiring the on-off state information of an ammeter loop, a water supply information acquisition module for acquiring the pressure and flow data of a water supply loop and detecting the state of a water supply pipeline, which are arranged at each node, and a heating and ventilation information acquisition module for acquiring the working states of a central heating system and a central air-conditioning system;
the event pre-judging unit is configured to judge whether an event of fire, pipeline leakage or regional power failure occurs according to the received environmental influence parameter information and the residence information, and determine the type and the occurrence place of the event according to the acquired information data;
the event processing unit is configured to receive the type and the occurrence place of the event, determine an emergency plan according to the type of the event, determine the size of an area needing to be dredged according to the emergency plan, and transmit plan information and area information to the information interaction unit;
the resource scheduling unit is configured to mine a user behavior model according to the received environment influence parameter information and the residence information, grasp and predict user behaviors, and allocate resources of corresponding spaces according to prediction results;
and the information interaction unit is configured to notify corresponding event information of personnel in a corresponding area and a dispersion measure in a plan, cooperatively process the event, receive a resource allocation instruction, supply or interrupt resources to a corresponding space, and realize the management and control of energy consumption.
Furthermore, the environmental impact parameter acquisition unit comprises a plurality of temperature sensors, humidity sensors, an image acquisition module, an infrared sensor, an ultraviolet sensor and a sound acquisition module which are arranged on each floor in the building.
Furthermore, the water supply information acquisition module comprises water supply overflow sensors arranged on the water supply main pipelines and sensors arranged on the water supply branch pipelines and used for acquiring the flow and pressure of the corresponding water supply branch pipelines.
Furthermore, the power utilization information acquisition module comprises an acquisition device for acquiring the loop information of the electric meter, so that the on-off state of the current electric power loop is acquired.
Furthermore, the environment influence parameter acquisition unit comprises a plurality of image acquisition modules, the image acquisition modules form a monitoring network, the pedestrian movement track can be recorded in an all-round manner, and the image acquisition modules are matched with each other to detect the human faces in different head postures.
Furthermore, the sensor or collector arranged in each area has a unique ID and an IP address, and collects the information of the environmental impact parameter collection unit of the area corresponding to the sensor or collector.
Further, the event pre-judging unit receives information of the infrared sensor, the ultraviolet sensor, the temperature sensor and the image acquisition module in the corresponding area of the environment influence parameter acquisition unit, judges whether a fire disaster occurs or not according to ultraviolet, infrared and temperature information in sequence, and determines whether a fire disaster emergency occurs or not by combining the information of the image acquisition module if the three values exceed set threshold values.
Further, the event pre-judging unit receives the collected sound information, extracts sound features from the sound information, matches the sound features of the smoke alarm and the gas leakage alarm which are recorded in advance, and if the matching is successful, the occurrence of a fire or a gas leakage emergency is indicated.
Further, the event pre-judging unit receives information of water supply overflow sensors of the water supply main pipelines and current/voltage sensors arranged in the electric meter loops, and judges whether a power failure emergency event that the water supply pipelines are broken or the area of the power failure emergency event exceeds a preset area occurs in each corresponding area.
Further, the event processing unit determines a processing measure according to the judgment structure and the type of the emergency event, and specifically includes:
evacuating personnel in corresponding areas according to the position and size of the fire, starting a fire spraying system, starting a fire emergency plan and informing a remote control center;
according to water leakage or trip events, loss stopping operation of regional water cut-off or power cut-off is carried out in time, event details and maintenance suggestions are notified to maintenance personnel for rush repair, and maintenance conditions are fed back and recorded.
The second purpose of the invention is to provide an intelligent building energy consumption control method, which comprises the following steps:
collecting temperature, sound, image and humidity information of each area;
collecting the on-off state information of an ammeter loop, collecting pressure and flow data of a water supply loop, and detecting the state of a water supply pipeline;
judging whether an event of fire, pipeline leakage or regional power failure occurs according to the received environmental influence parameter information and the residence information, and determining the type and the occurrence place of the event according to the acquired information data;
receiving the type and the occurrence place of an event, determining an emergency plan according to the type of the event, and determining the size of an area needing dredging according to the emergency plan;
according to the received environmental impact parameter information and residence information, performing behavior model mining on the user, grasping and predicting the user behavior, and performing resource allocation of the corresponding space according to the prediction result;
informing personnel in corresponding areas of corresponding event information and evacuation measures in the plan, cooperatively processing the events, receiving resource allocation instructions, and performing resource supply or interruption on corresponding spaces to realize energy consumption management and control.
As an alternative embodiment, the specific process of determining the type and the occurrence location of an event according to the collected information data includes: the method comprises the steps of configuring the maximum threshold and the minimum threshold of data of all acquisition element parameters in advance, carrying out corresponding equipment alarm when the received data exceed the set threshold range, finding the position of a sensor through prestored sensor ID information, and determining the position of an event.
Compared with the prior art, the invention has the beneficial effects that:
1. the invention can correctly pre-judge the degree of the emergency and make matched emergency treatment measures, thereby effectively ensuring the safety guarantee of the building;
2. the method can fuse all the sensing information, effectively and orderly screen the influencing environmental parameters of all types of events, ensures the simplification and the directness of the processing process, and can give consideration to the correctness and the timeliness of information acquisition;
3. according to the invention, the state monitoring and intelligent control can be carried out on public equipment and room equipment in the building based on the communication network and the terminal sensor, a big data system is constructed, data such as user behaviors and environmental states are collected, the data are analyzed and resource allocation and management are assisted, and economic and efficient energy consumption management and control are realized.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, illustrate embodiments of the application and, together with the description, serve to explain the application and are not intended to limit the application.
FIG. 1 is a human interaction system architecture diagram;
FIG. 2 is an architecture diagram of an access control system and a personnel information acquisition unit;
FIG. 3 is a big data processing flow diagram;
the specific implementation mode is as follows:
the invention is further described with reference to the following figures and examples.
It should be noted that the following detailed description is exemplary and is intended to provide further explanation of the disclosure. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of example embodiments according to the present application. As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, and it should be understood that when the terms "comprises" and/or "comprising" are used in this specification, they specify the presence of stated features, steps, operations, devices, components, and/or combinations thereof, unless the context clearly indicates otherwise.
In the present invention, terms such as "upper", "lower", "left", "right", "front", "rear", "vertical", "horizontal", "side", "bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only terms of relationships determined for convenience of describing structural relationships of the parts or elements of the present invention, and are not intended to refer to any parts or elements of the present invention, and are not to be construed as limiting the present invention.
In the present invention, terms such as "fixedly connected", "connected", and the like are to be understood in a broad sense, and mean either a fixed connection or an integrally connected or detachable connection; may be directly connected or indirectly connected through an intermediate. The specific meanings of the above terms in the present invention can be determined according to specific situations by persons skilled in the relevant scientific or technical field, and are not to be construed as limiting the present invention.
The details are described with the teaching dormitory building as the building to be managed as a specific embodiment.
Firstly, an intelligent management and control system for building energy consumption is provided, and the processing system has the following functions:
(1) human-computer interaction: interpersonal communication cost and threshold are reduced, corresponding management responsibility authorities are allocated for logistics workers with different responsibilities, barrier-free communication and man-machine interaction work of multiple levels of users is achieved, and logistics work efficiency is remarkably improved;
as shown in fig. 1, the human-computer interaction at least includes a voice communication module, specifically includes a microphone array for voice acquisition, and forms a pickup beam in the direction of a target speaker by using the spatial filtering characteristics of the microphone array, so as to suppress noise and reflected sound outside the beam.
The voice processing unit is configured to perform voice front-end processing such as noise reduction, echo cancellation and voice awakening on the collected sound, and output the noise-reduced audio signal, the sound source angle data and the awakening trigger signal.
The intended interaction range for which voice interaction is available may include: offline wake-up, room area state query, control command acceptance, control result feedback, identity verification request, dangerous person prompt, person evacuation prompt, equipment state query, equipment maintenance scheme suggestion, room resource query, energy consumption use prompt or/and attendance request of logistics personnel.
(2) Building autonomous management: and carrying out state monitoring and intelligent control on public equipment and room equipment in the building through a communication network and an end sensor.
The terminal sensor at least comprises a plurality of infrared sensors, ultraviolet sensors, temperature sensors, image acquisition modules and sound acquisition modules which are arranged at each floor in the building; the water supply system also comprises water supply overflow sensors arranged in the water supply main pipelines and current/voltage sensors arranged in the electric meter loops.
The communication network may be a wireless transmission network, or a combination of the internet of things and the wireless transmission network.
(3) And (3) machine vision recognition: identifying building personnel in real time, reading information such as identity and authority, intelligently identifying safety events such as building fire and the like, and assisting logistics service and security departments; the automatic distribution management of logistics work is assisted, fault detection and loss stopping are further achieved, and maintenance work and condition reporting are distributed based on the process.
The building personnel identification system comprises a video acquisition module, an image acquisition module and an identity identification system, wherein the video acquisition module, the image acquisition module and the identity identification system are arranged at a gate entrance guard for identifying building personnel.
The system specifically comprises a front-end image acquisition camera and a rear-end image processing system. The front end comprises a monitoring network consisting of a plurality of image acquisition cameras, the pedestrian movement track can be recorded in an all-round manner, and the human faces in different head postures can be detected more reliably and effectively by the cooperation of the plurality of cameras. The rear-end image processing system adopts machine learning to identify the detected face image, compares and confirms the identity of the pedestrian, and adopts different subsequent processing according to different personnel groups. The following processes are required for completing face recognition: the method comprises the steps of face image acquisition and detection, face image preprocessing, face image feature extraction, matching and identification. The system adopts network information encryption transmission and supports remote control and management.
Firstly, facial images of resident personnel and workers in a building are acquired through a front-end image acquisition system, and features are extracted through a deep learning algorithm to register identities. When the system works, the front-end camera collects images in real time, a deep learning algorithm is adopted to identify human bodies and human faces appearing in the images, and after human face features are obtained, retrieval comparison is carried out in registered household data tables and worker data tables.
If the face belongs to the resident list, opening an access control; if the face belongs to the staff list, checking the attendance of the staff by punching the card, and accessing a performance system of the staff; and for the dangerous personnel in the school and the suspicious personnel outside the school, calling a front-end camera to carry out seamless tracking on the pedestrian in the whole building, and sending a warning to a building security department.
(4) Event management based on specification standards: aiming at the handling condition of the emergency in logistics management, a standard event processing standard is designed, the emergency condition is detected, a solving process is automatically started, the coordination and organization personnel are used for processing, and the event processing condition is evaluated.
In order to accomplish the above functions, the necessary facilities include: smoke detector alarms, automatic spray heads, manual alarms, communication modules and expansion cameras which are arranged in various areas (particularly important areas such as residential areas, building crossings and the like) of the building; and the access control system and the human-computer interaction screen are arranged at the gate.
Specifically, a human-computer interaction system is constructed by means of voice interaction, image matching and the like during human-computer interaction. The voice interaction module adopts an intelligent voice system based on hardware recognition to realize the voice recognition of non-specific persons (SI).
The voice interaction module is provided with a VUI (Voice User interface) editor, so that a User can modify an identification process more conveniently and add and delete control instructions at any time, and the false triggering rate can be greatly reduced and the safety coefficient can be improved by an identification rejection algorithm based on identification scores; in addition, the voice interaction module increases the function of voice response, so that a user can conveniently change the content of the voice response, and the function of human-computer interaction is better realized; the man-machine interaction is provided with a graphical display interface to display man-machine interaction contents, related information in the building and the like, so that a more visual interaction effect is achieved.
In this embodiment, the human-computer interaction system is used as an information interaction unit to notify corresponding emergency information and a dispersion measure in a plan of personnel in a corresponding area, and to cooperatively process the emergency.
In the embodiment, public equipment and room equipment in the building are subjected to state monitoring and intelligent control through the communication network and the terminal sensor, and the management and control system mainly comprises an electric power system, a water supply system, a heating and ventilation system and a data acquisition system.
The on-off state of the current power system can be known through the ammeter loop information collected by the collector, and automatic control can be performed by configuring automatic control parameters through an administrator, wherein the automatic control parameters comprise timing parameters, time-sharing control parameters and the like.
The power subsystems controlled in the building include the following subsystems: an indoor lighting subsystem, a public area lighting subsystem, a multimedia device subsystem, a domestic water heater subsystem, an elevator subsystem, a ventilator subsystem, and a fire fighting device subsystem.
The state of the water supply pipeline is detected through pressure and flow data collected by collectors installed at all nodes, abnormal phenomena of leakage and overflow are found in time, a large number of water leakage accidents are automatically processed, the valve is closed in time according to the node flow and the pressure data, and loss is reduced. Simultaneously carry out real-time supervision to the interior water subsystem of building, report an emergency and ask for help or increased vigilance with the water condition unusually, the subsystem includes: a cleaning water subsystem and a domestic water subsystem.
The central heating system management and control in the building mainly comprises pipeline detection based on acquired pressure and flow and automatic control of a tail end heating valve, the pipeline detection is similar to a water supply system, and the automatic control of the heating valve is mainly time-sharing temperature-division control. Central air conditioning system management and control includes central air conditioning unit control, cooling pipeline detection and terminal fan control, and unit control is mainly through setting for unit automatic operation parameter, and terminal fan control includes and carries out equipment switch and temperature setting based on indoor personnel state and temperature, to installing monomer air conditioning room, carries out remote control through infrared controlgear.
According to the running state and the network communication state of each sensor and each type of sensors, timely feeding back alarm information; identifying and transmitting the running state of the metering device, supporting fault positioning and diagnosis of the metering device connected with the sensor, and transmitting fault information to a remote control end in time; the remote upgrading and restarting of the data acquisition unit are supported, the equipment can be automatically restarted according to the fault reason, the restarting information is uploaded to the remote control terminal, and the problem of data jamming is solved; and aiming at the data which cannot be successfully transmitted due to the reasons of transmission network faults and the like, the data stored by the collector is utilized to carry out breakpoint transmission after the network to be transmitted is recovered to be normal.
As an emergency management system, the core processing system of the invention combines a building management station, machine vision and a human-computer interaction system, designates an event coping standard mechanism, assists managers to find emergency (pipeline water leakage, regional power failure and the like) based on a logistics management regulation and management professional design, autonomously starts a corresponding plan, organizes linkage of a plurality of departments of logistics service staff based on the human-computer interaction system, cooperatively processes events and feeds back processing results.
Aiming at the fire disaster situation, the automatic spraying equipment is started in time to inform building managers and higher-level security departments, and the evacuation of organization personnel, the guidance of fire fighters and the like are assisted according to a campus emergency plan;
the fire emergency treatment method specifically comprises the following steps:
emergency event discovery: and if the three values exceed the set threshold value, determining whether a fire emergency happens or not by combining the information of the image acquisition module.
Meanwhile, the smoke detector alarm and the manual alarm device are integrated, so that the fire position can be found in time, and the fire size can be estimated.
And sending a voice prompt to a duty room to inform the fire occurrence and position, and starting automatic spraying.
And starting a fire emergency plan, and sending a fire prompt to an upper-level department.
The voice prompt for evacuating the building is manually or automatically started, and the voice prompt devices arranged in all areas in the building prompt the evacuation routes and the attention items corresponding to teachers and students on the relevant floors.
And (3) aiming at events such as water leakage, tripping and the like in logistics service, loss stopping operations such as regional water break and power break are carried out in time, the details of the events and maintenance suggestions are notified to maintenance personnel for rush repair, and the maintenance conditions are fed back and recorded. And aiming at events such as equipment damage and the like, the maintenance personnel are notified in time, maintenance schemes or manufacturer personnel are provided in an auxiliary mode, and maintenance conditions are fed back and recorded.
Specifically, according to building equipment management and control system, find trouble alarm information, preliminary diagnosis analysis alarm information in time carries out the processing of cutting off the water supply to the region that leaks. And sending event information and positions to the building management attendant, and informing the attendant to process.
Aiming at the building facility upgrading construction event in the building use process, the method assists in managing constructors, checking identities and authorities, providing construction assistance such as power failure and water cut-off and the like, and recording and reporting construction progress.
The operator on duty registers the information of construction time, position, personnel and the like, verifies the identity of the operator through a video acquisition module, an image acquisition module and an identity recognition system of the access control, and gives corresponding access control authority;
and collecting construction progress and reporting the construction progress to building management personnel at regular time by using a sound sensor and an image sensor which are arranged in a building to form effective supervision.
Aiming at the regular and irregular polling work of logistics management personnel, polling schedule items are arranged in an auxiliary mode, related departments and personnel are notified in time, partial contents such as building areas, equipment conditions and the like are automatically polled through a video means, and polling effects are evaluated and fed back.
And arranging inspection time for security, cleaning and maintenance personnel by combining video or image acquisition information, and sending a prompt instruction.
In the event processing, the collection of big data means that data transmitted from a client (Web, App, sensor, or the like) is received by using a plurality of databases, and simple query and processing work can be performed by using these databases. The data type, the data size, the read-write magnitude, the read-write proportion, the concurrency number, the consistency, the delay degree, the analysis complexity of the relational emergency management and control system are discriminated even without introducing a complex data mining algorithm and the like, data acquisition hardware, data transmission hardware and data acquisition detection software meeting the requirements of the energy consumption management and control system are constructed, and large data acquisition is achieved.
Since the big data of the collected environment information and the personnel information may be composed of TB level (or even PB level) information, including structured data (database, log, SQL, etc.) and unstructured data (, sensors, multimedia data). The data lack of indexes or other organizational structures and may be composed of many different file types, so that the cost of storing the data is continuously increased, the data storage capacity is explosively increased and difficult to predict, the stored data cannot be managed due to the increasingly complex environment, and the storage function of the database is challenged.
As shown in fig. 3, the system performs partition operation on the data in the processing process, increases virtual memory and batch processing by establishing a wide indexing and caching mechanism, optimizes query statements by using a temporary table and a middle table, performs processing by using a text format, customizes a cleaning rule and an error processing mechanism, and completes data storage by using a data warehouse and a multidimensional database.
In the embodiment, all sensor information data in a building are stored in a hadoop database, uploaded data are recorded in advance, distributed management is performed by adopting an HDFS (Hadoop distributed file system), all sensor parameters are set to be a maximum threshold value and a minimum threshold value, when received data exceed a set threshold value range, an equipment alarm is sent out through a real-time data platform, the position of a sensor is found through the sensor information recorded in advance, and then problem position information is determined. In the process that the database is continuously called and new data is continuously stored, whether the sensor has problems or not can be predicted through the data trend uploaded by the sensor in real time.
In the data processing process, corresponding data processing system architecture software and system integration software are designed on the data acquisition, data conversion, data grouping, data organization, data calculation, data storage, data retrieval and data sorting rules, and the data are recorded in the preparation stage of the data. After the data are recorded, the data are processed according to the indication and the requirement of the program, and finally effective information meeting the requirement is output, so that the data processing based on the big data technology is completed.
And analyzing and refining data based on a data mining algorithm by segmenting, clustering and isolating points, and mining the value. And then carry out predictive analysis, data mining can carry on the data better digestion understanding faster to the information that bears, and then promotes the accuracy of judgement, finally forms decision auxiliary system, includes:
and (5) mining a user behavior model. Knowledge such as deep user behaviors and energy consumption habits hidden in mass data is mined, a user behavior model is built, the user behaviors are mastered and accurately predicted in real time, and the user behaviors are displayed to a manager in a chart form.
Building space resource allocation decisions. Public space usage models such as campus classrooms, laboratories and libraries are mined, space resource allocation is carried out based on the assistance of the user behavior models, the space resource allocation is displayed in a chart/3D mode, and a reference allocation scheme is output.
And (5) energy supply for assisting decision making. And excavating the energy consumption use condition in the campus, predicting the energy consumption use condition, assisting in making an energy supply decision, showing in a chart/3D form, and outputting a reference distribution scheme.
And forecasting the logistics service demand. The logistics service requirements such as cleaning and security in the campus are mined, the user behaviors and distribution are combined, the logistics service requirements are subjected to prediction and distribution in an auxiliary mode, the prediction and distribution are displayed in a chart/3D mode, and a reference distribution scheme is output.
And (4) predicting an emergency. The operation and maintenance conditions of the equipment are excavated, the possible fault risk of the equipment is predicted, the robot system is informed of the personnel allocation in time, and relevant strategies for event processing and man-machine cooperative processing are provided.
In this embodiment, the maximum threshold and the minimum threshold of data of all the acquisition element parameters may be configured in advance, and when the received data exceeds the set threshold range, the corresponding device alarms, and the position of the sensor is found through the ID information of the sensor.
According to the received information collected by the sensor, determining the use habit of the corresponding user, depicting the specific behaviors of the user, including the power utilization condition, the water utilization condition and the body temperature of the corresponding user in each time period, analyzing and calculating to determine the most comfortable body temperature of the user, the peak period and the valley period of the power utilization and the water utilization, and adjusting the water and electricity consumption according to the determination result.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Although the embodiments of the present invention have been described with reference to the accompanying drawings, it is not intended to limit the scope of the present invention, and it should be understood by those skilled in the art that various modifications and variations can be made without inventive efforts by those skilled in the art based on the technical solution of the present invention.

Claims (10)

1. The utility model provides a building energy consumption intelligence management and control system which characterized by: the method comprises the following steps:
the environment influence parameter acquisition unit comprises corresponding sensors arranged in each area and is used for receiving acquired temperature, sound, image and humidity information;
the residential information acquisition unit comprises an electricity consumption information acquisition module for acquiring the on-off state information of an ammeter loop, a water supply information acquisition module for acquiring the pressure and flow data of a water supply loop and detecting the state of a water supply pipeline, which are arranged at each node, and a heating and ventilation information acquisition module for acquiring the working states of a central heating system and a central air-conditioning system;
the event pre-judging unit is configured to judge whether an event of fire, pipeline leakage or regional power failure occurs according to the received environmental influence parameter information and the residence information, and determine the type and the occurrence place of the event according to the acquired information data;
the event processing unit is configured to receive the type and the occurrence place of the event, determine an emergency plan according to the type of the event, determine the size of an area needing to be dredged according to the emergency plan, and transmit plan information and area information to the information interaction unit;
the resource scheduling unit is configured to mine a user behavior model according to the received environment influence parameter information and the residence information, grasp and predict user behaviors, and allocate resources of corresponding spaces according to prediction results;
and the information interaction unit is configured to notify corresponding event information of personnel in a corresponding area and a dispersion measure in a plan, cooperatively process the event, receive a resource allocation instruction, supply or interrupt resources to a corresponding space, and realize the management and control of energy consumption.
2. The intelligent building energy consumption management and control system as claimed in claim 1, wherein: the environment influence parameter acquisition unit comprises a plurality of temperature sensors, humidity sensors, an image acquisition module, an infrared sensor, an ultraviolet sensor and a sound acquisition module which are arranged on each floor in a building.
3. The intelligent building energy consumption management and control system as claimed in claim 1, wherein: the water supply information acquisition module comprises water supply overflow sensors arranged on each water supply main pipeline and sensors arranged on each water supply branch and used for acquiring flow and pressure of the corresponding water supply branch.
4. The intelligent building energy consumption management and control system as claimed in claim 1, wherein: the power utilization information acquisition module comprises an acquisition device for acquiring the loop information of the electric meter, and the on-off state of the current electric power loop is acquired.
5. The intelligent building energy consumption management and control system as claimed in claim 1, wherein: the environment influence parameter acquisition unit comprises a plurality of image acquisition modules, the image acquisition modules form a monitoring network, the pedestrian movement track can be recorded in an all-round mode, and the image acquisition modules are matched with one another to detect faces in different head postures.
6. The intelligent building energy consumption management and control system as claimed in claim 1, wherein: the sensor or collector arranged in each area has a unique ID and an IP address, and collects the information of the environmental impact parameter collection unit of the area corresponding to the sensor or collector.
7. The intelligent building energy consumption management and control system as claimed in claim 1, wherein:
the event pre-judging unit receives information of water supply overflow sensors of all water supply main pipelines and current/voltage sensors arranged in all electric meter loops, and judges whether power failure emergency events that water supply pipelines are broken or the power failure emergency events exceed a preset area occur in all corresponding areas.
8. The intelligent building energy consumption management and control system as claimed in claim 1, wherein: the event processing unit determines a processing measure according to the judgment structure and the type of the emergency, and specifically comprises:
evacuating personnel in corresponding areas according to the position and size of the fire, starting a fire spraying system, starting a fire emergency plan and informing a remote control center;
according to water leakage or trip events, loss stopping operation of regional water cut-off or power cut-off is carried out in time, event details and maintenance suggestions are notified to maintenance personnel for rush repair, and maintenance conditions are fed back and recorded.
9. An intelligent building energy consumption control method is characterized by comprising the following steps: the method comprises the following steps:
collecting temperature, sound, image and humidity information of each area;
collecting the on-off state information of an ammeter loop, collecting pressure and flow data of a water supply loop, and detecting the state of a water supply pipeline;
judging whether an event of fire, pipeline leakage or regional power failure occurs according to the received environmental influence parameter information and the residence information, and determining the type and the occurrence place of the event according to the acquired information data;
receiving the type and the occurrence place of an event, determining an emergency plan according to the type of the event, and determining the size of an area needing dredging according to the emergency plan;
according to the received environmental impact parameter information and residence information, performing behavior model mining on the user, grasping and predicting the user behavior, and performing resource allocation of the corresponding space according to the prediction result;
informing personnel in corresponding areas of corresponding event information and evacuation measures in the plan, cooperatively processing the events, receiving resource allocation instructions, and performing resource supply or interruption on corresponding spaces to realize energy consumption management and control.
10. The intelligent management and control method for building energy consumption of claim 9, wherein: judging whether an event of fire, pipeline leakage or regional power failure occurs according to the received environmental influence parameter information and the residence information, and the specific process of determining the type and the occurrence place of the event according to the acquired information data comprises the following steps: the method comprises the steps of configuring the maximum threshold and the minimum threshold of data of all acquisition element parameters in advance, carrying out corresponding equipment alarm when the received data exceed the set threshold range, finding the position of a sensor through prestored sensor ID information, and determining the position of an event.
CN202011508597.2A 2020-12-18 2020-12-18 Intelligent building energy consumption management and control system and method Active CN112578690B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011508597.2A CN112578690B (en) 2020-12-18 2020-12-18 Intelligent building energy consumption management and control system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011508597.2A CN112578690B (en) 2020-12-18 2020-12-18 Intelligent building energy consumption management and control system and method

Publications (2)

Publication Number Publication Date
CN112578690A true CN112578690A (en) 2021-03-30
CN112578690B CN112578690B (en) 2022-07-01

Family

ID=75136126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011508597.2A Active CN112578690B (en) 2020-12-18 2020-12-18 Intelligent building energy consumption management and control system and method

Country Status (1)

Country Link
CN (1) CN112578690B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113469459A (en) * 2021-07-22 2021-10-01 苏州玛旭自动化科技有限公司 Energy power supply and demand system based on block chain
CN113591788A (en) * 2021-08-13 2021-11-02 日立楼宇技术(广州)有限公司 Building electric equipment control method and device, computer equipment and storage medium
CN116820059A (en) * 2023-08-31 2023-09-29 北京中创慧谷数据科技有限公司 Big data platform management method and system for building operation and maintenance
CN117489858A (en) * 2023-11-01 2024-02-02 江苏高达阀门有限公司 Electric control valve monitoring system and method based on dynamic parameter situation

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060074494A1 (en) * 2004-09-29 2006-04-06 Mcfarland Norman R Automated position detection for wireless building automation devices
CN102063116A (en) * 2011-01-31 2011-05-18 海南义利达高新技术实业有限公司 Building information total management system and method
CN102193972A (en) * 2010-03-19 2011-09-21 阿瓦雅公司 System and method for predicting meeting subject, rear service and resource
CN103996095A (en) * 2013-02-20 2014-08-20 乐金信世股份有限公司 Building energy control system and method
TWM503620U (en) * 2014-11-28 2015-06-21 Nature Power Optoelectronics Technology Company Intelligent energy automatic monitoring management system with HR integration
CN108073120A (en) * 2017-11-16 2018-05-25 杭州好园科技有限公司 Wisdom garden energy environment monitoring system
CN108615143A (en) * 2018-06-12 2018-10-02 湖南建工集团有限公司 Device and method based on BIM models Yu O&M information exchange in intelligent building management
US20190190741A1 (en) * 2016-08-05 2019-06-20 Philips Lighting Holding B.V. Building automation system with commissioning device
CN110503461A (en) * 2019-07-31 2019-11-26 南京航空航天大学 A kind of demand response method based on residential customer cluster in smart grid
CN110864414A (en) * 2019-10-30 2020-03-06 郑州电力高等专科学校 Air conditioner power utilization load intelligent control scheduling method based on big data analysis
CN111667388A (en) * 2020-06-04 2020-09-15 河南赛贝电子科技有限公司 Intelligent emergency monitoring system applied to laboratory

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060074494A1 (en) * 2004-09-29 2006-04-06 Mcfarland Norman R Automated position detection for wireless building automation devices
CN102193972A (en) * 2010-03-19 2011-09-21 阿瓦雅公司 System and method for predicting meeting subject, rear service and resource
CN102063116A (en) * 2011-01-31 2011-05-18 海南义利达高新技术实业有限公司 Building information total management system and method
CN103996095A (en) * 2013-02-20 2014-08-20 乐金信世股份有限公司 Building energy control system and method
TWM503620U (en) * 2014-11-28 2015-06-21 Nature Power Optoelectronics Technology Company Intelligent energy automatic monitoring management system with HR integration
US20190190741A1 (en) * 2016-08-05 2019-06-20 Philips Lighting Holding B.V. Building automation system with commissioning device
CN108073120A (en) * 2017-11-16 2018-05-25 杭州好园科技有限公司 Wisdom garden energy environment monitoring system
CN108615143A (en) * 2018-06-12 2018-10-02 湖南建工集团有限公司 Device and method based on BIM models Yu O&M information exchange in intelligent building management
CN110503461A (en) * 2019-07-31 2019-11-26 南京航空航天大学 A kind of demand response method based on residential customer cluster in smart grid
CN110864414A (en) * 2019-10-30 2020-03-06 郑州电力高等专科学校 Air conditioner power utilization load intelligent control scheduling method based on big data analysis
CN111667388A (en) * 2020-06-04 2020-09-15 河南赛贝电子科技有限公司 Intelligent emergency monitoring system applied to laboratory

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113469459A (en) * 2021-07-22 2021-10-01 苏州玛旭自动化科技有限公司 Energy power supply and demand system based on block chain
CN113591788A (en) * 2021-08-13 2021-11-02 日立楼宇技术(广州)有限公司 Building electric equipment control method and device, computer equipment and storage medium
CN113591788B (en) * 2021-08-13 2023-05-30 日立楼宇技术(广州)有限公司 Building electric equipment control method, device, computer equipment and storage medium
CN116820059A (en) * 2023-08-31 2023-09-29 北京中创慧谷数据科技有限公司 Big data platform management method and system for building operation and maintenance
CN116820059B (en) * 2023-08-31 2023-11-10 北京中创慧谷数据科技有限公司 Big data platform management method and system for building operation and maintenance
CN117489858A (en) * 2023-11-01 2024-02-02 江苏高达阀门有限公司 Electric control valve monitoring system and method based on dynamic parameter situation

Also Published As

Publication number Publication date
CN112578690B (en) 2022-07-01

Similar Documents

Publication Publication Date Title
CN112578690B (en) Intelligent building energy consumption management and control system and method
CN112488898B (en) Emergency handling system and method based on intelligent building management and control
CN110163485A (en) A kind of computer room cruising inspection system
CN110158648A (en) A kind of Urban Underground pipe gallery O&M monitoring management system
CN109065135B (en) Hospital logistics equipment full-life-cycle management cloud platform, method and system
CN110933376A (en) Fire-fighting Internet of things unified supervision system and method
CN110889339B (en) Head and shoulder detection-based dangerous area grading early warning method and system
KR102440097B1 (en) System for predicting and preventing disaster for electric power facilities and operation method thereof
CN112650335A (en) Intelligent energy consumption management and control system and method based on big data mining
CN109493985A (en) Nuclear power plant digitizes auxiliary control panel system, design method and control system
US11580843B2 (en) Intelligent emergency response for multi-tenant dwelling units
CN107947362A (en) Electric railway traction supply intelligent auxiliary system
CN113053053B (en) Interval demonstration multi-sensor fusion disaster cellular alarm linkage system based on particle swarm optimization
WO2018156404A1 (en) A control system and control method for building
CN109746893A (en) Intelligence O&M robot, data center
CN105320093A (en) Intelligent building monitoring system and method
CN105632127A (en) Cell security system based on internet of things
KR102399268B1 (en) Method for artificial intelligence connected intelligent disaster safety management and system for performing the method
CN112800910A (en) Communication machine room maintenance operation efficiency evaluation method and system
CN112288320A (en) Subway operation risk monitoring and management system
JPH08329378A (en) Disaster prevention information processor
Xu et al. Effectiveness study of artificial intelligent facility system in maintaining building fire safety (case study: typical public building cases of fire-fighting facilities management in China)
JPH096428A (en) Plant monitoring equipment
CN111582165B (en) Monitoring system for power distribution station room
CN113955594A (en) Elevator control method and device, computer equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant