CN107193267A - A kind of intelligent building project monitor and control management system - Google Patents
A kind of intelligent building project monitor and control management system Download PDFInfo
- Publication number
- CN107193267A CN107193267A CN201710563183.1A CN201710563183A CN107193267A CN 107193267 A CN107193267 A CN 107193267A CN 201710563183 A CN201710563183 A CN 201710563183A CN 107193267 A CN107193267 A CN 107193267A
- Authority
- CN
- China
- Prior art keywords
- monitoring
- module
- elevator
- intelligent building
- illumination
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000012544 monitoring process Methods 0.000 claims abstract description 84
- 238000005286 illumination Methods 0.000 claims abstract description 25
- 238000004378 air conditioning Methods 0.000 claims abstract description 7
- 230000007123 defense Effects 0.000 claims abstract description 7
- 238000009428 plumbing Methods 0.000 claims abstract description 7
- 238000009423 ventilation Methods 0.000 claims abstract description 7
- 238000000034 method Methods 0.000 claims abstract description 6
- 230000033228 biological regulation Effects 0.000 claims abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 14
- 230000006698 induction Effects 0.000 claims description 12
- 208000011580 syndromic disease Diseases 0.000 claims description 7
- 238000001514 detection method Methods 0.000 claims description 5
- 230000005484 gravity Effects 0.000 claims description 4
- 238000009530 blood pressure measurement Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 claims description 3
- 238000000605 extraction Methods 0.000 claims description 3
- 230000001939 inductive effect Effects 0.000 claims description 3
- 239000010865 sewage Substances 0.000 claims description 3
- 230000005540 biological transmission Effects 0.000 claims description 2
- 238000007689 inspection Methods 0.000 claims 1
- 230000008569 process Effects 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 description 13
- 238000011161 development Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 230000008054 signal transmission Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 238000002425 crystallisation Methods 0.000 description 1
- 230000008025 crystallization Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/4183—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by data acquisition, e.g. workpiece identification
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D21/00—Measuring or testing not otherwise provided for
- G01D21/02—Measuring two or more variables by means not covered by a single other subclass
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Automation & Control Theory (AREA)
- Indicating And Signalling Devices For Elevators (AREA)
- Maintenance And Inspection Apparatuses For Elevators (AREA)
Abstract
The invention discloses a kind of intelligent building project monitor and control management system, including air-conditioning and ventilation monitoring system, plumbing monitoring system, elevator runtime, electric power supply system, comprehensive security system, illumination monitoring system and safety defense monitoring system.The present invention by the different device system in some scenes by carrying out corresponding monitoring management, and the monitoring management process completed in building of systematization improves the intelligent building efficiency of management, improves building safety coefficient;And by data in each sensor real time reaction building, and Reasonable Regulation And Control is carried out, that improves user moves in experience.
Description
Technical field
The present invention relates to a kind of mixing plant, more particularly to a kind of intelligent building project monitor and control management system.
Background technology
Modern society is increasing to the demand of information, and information transmission speed is also increasingly faster, and 21st century is letter
The century of breathization, mainly information technology, biotechnology and the new material technology of promotion development of world economy, and wherein information skill
Art influences maximum to the economic of people, politics and social life, and information industry just progressively turns into the mainstay industry of society, the mankind
The progress of society is by the development and application dependent on information technology.
The development of electronic technology (especially computer technology) and the network communications technology, makes social advanced IT application, is building
Build inside thing, the high-tech of application message technology, ancient Building technology and modern times is combined, then produce " building intelligent
Change ".Intelligent building is that the equipment in building is automatically controlled using computer technology, and it is that Building technology is adapted to now
For the crystallization of social informatization requirement.
, it is necessary to which various scenes and various different monitoring systems are entered in building during building intelligent is automatically controlled
The different monitoring management of row, the monitoring management process completed in building of systematization is to improve the intelligent building efficiency of management, lifting
The important prerequisite of building safety coefficient.Therefore, a kind of it is proposed that intelligent building project monitor and control management system.
The content of the invention
It is a primary object of the present invention to provide a kind of intelligent building project monitor and control management system, the back of the body can be effectively solved
The problem of in scape technology.
To achieve the above object, the technical scheme taken of the present invention is:
A kind of intelligent building project monitor and control management system, including air-conditioning and ventilation monitoring system, plumbing monitoring system, elevator
Runtime, electric power supply system, comprehensive security system, illumination monitoring system and safety defense monitoring system, the air-conditioning and ventilation
Monitoring system includes set state control module, damp-warm syndrome induction module and air detection module, the plumbing monitoring system bag
Domestic water monitoring module, fire demand water monitoring module and sewage discharge monitoring module are included, the elevator runtime includes weight
Power induction module and fault warning module, the electric power supply system include high voltage power distribution monitoring module, low-voltage distribution monitoring mould
Block and transformer state monitoring module, the comprehensive security system include gate control system and public domain monitoring system, the door
Access control system includes identifying system and strange visitor's register system, and the illumination monitoring system includes public domain illuminator, private
People's area lighting system and emergency illuminator, the safety defense monitoring system include emergency monitoring system.
Further, air quality and damp-warm syndrome of air detection module and the damp-warm syndrome induction module to public space region
Degree carries out induction monitoring, and is transferred to set state administration module by data signal transmission wire road, and air-conditioner set is right in real time
Public domain carries out air extraction circulation and temperature and humidity regulation.
Further, the domestic water monitoring system, installing pressure measurement sensor, liquid in fire demand water monitoring system
Received shipment row monitoring module is all installed in three subsystems in position measuring sensor, the plumbing monitoring system.
Further, the gravity sensing module is carried out elevator operation and controlled, the fault alarm system pair event
Hinder elevator and carry out sound effect prompting and light efficiency prompting.
Further, the high voltage power distribution monitoring modular, Transformer's Condition Monitoring module and low voltage distribution monitoring mould
Block three independent connection hyper parameter alarm device, fault location module, fault logging module.
Further, the identification uses fingerprint recognition or access card identification method, and the gate control system installing is infrared to take the photograph
As supervising device, strange visitor's register system is acquired to visitor's identity information, electro-photographic information and finger print information,
The public domain monitoring system includes the infrared monitoring to saloon, stair, elevator and aisle.
Further, the public domain illuminator includes saloon illumination, stair illumination, elevator lighting, aisle
Illumination, the saloon illumination uses light-operated inductive lighting device, and the stair illumination, elevator lighting, aisle illumination are used
Infrared induction lighting device, the emergency illuminator uses independently-powered emergency lighting device to emergency case.
Further, emergency supervisory systems described in the fire-fighting includes broadcast control system, fire early-warning system, electricity
Terraced accident warning systems, earthquake early-warning system, broadcast control system is to fire early-warning system, elevator accident warning system, earthquake
The warning information that early warning system is sent is played in real time.
Compared with prior art, the present invention has the advantages that:The present invention is by the way that the difference in some scenes is filled
Put system and carry out corresponding monitoring management, the monitoring management process completed in building of systematization improves intelligent building management
Efficiency, improve building safety coefficient;And by data in each sensor real time reaction building, and Reasonable Regulation And Control is carried out, improve
User's moves in experience.
Brief description of the drawings
Fig. 1 is a kind of overall control schematic diagram of intelligent building project monitor and control management system of the invention.
Embodiment
To be easy to understand the technical means, the inventive features, the objects and the advantages of the present invention, with reference to
Embodiment, is expanded on further the present invention.
As shown in figure 1, a kind of intelligent building project monitor and control management system, including air-conditioning and ventilation monitoring system, discharge
Water monitoring system, elevator runtime, electric power supply system, comprehensive security system, illumination monitoring system and safety defense monitoring system,
The air-conditioning includes set state control module, damp-warm syndrome induction module and air detection module with ventilation monitoring system, described to give
Drainage monitoring system includes domestic water monitoring module, fire demand water monitoring module and sewage discharge monitoring module, the elevator
Runtime include gravity sensing module and fault warning module, the electric power supply system include high voltage power distribution monitoring module,
Low-voltage distribution monitoring module and transformer state monitoring module, the comprehensive security system includes gate control system and public domain is supervised
Control system, the gate control system includes identifying system and strange visitor's register system, and the illumination monitoring system includes public area
Area lighting system, private area illuminator and emergency illuminator, the safety defense monitoring system are supervised including emergency
Control system.
Wherein, air detection module and the damp-warm syndrome induction module enters to the air quality and wet temp in public space region
Row induction monitoring, and set state administration module is transferred to by data signal transmission wire road, air-conditioner set is in real time to public
Region carries out air extraction circulation and temperature and humidity regulation.
Wherein, the domestic water monitoring system, installing pressure measurement sensor, liquid level are surveyed in fire demand water monitoring system
Received shipment row monitoring module is all installed in three subsystems in quantity sensor, the plumbing monitoring system.
Wherein, the gravity sensing module is carried out elevator operation and controlled, and the fault alarm system is to failure electricity
Ladder carries out sound effect prompting and light efficiency prompting.
Wherein, the high voltage power distribution monitoring modular, Transformer's Condition Monitoring module and low voltage distribution monitoring module three
Person's independent connection hyper parameter alarm device, fault location module, fault logging module.
Wherein, the identification uses fingerprint recognition or access card identification method, the gate control system installing infrared photography prison
Device is controlled, strange visitor's register system is acquired to visitor's identity information, electro-photographic information and finger print information, described
Public domain monitoring system includes the infrared monitoring to saloon, stair, elevator and aisle.
Wherein, the public domain illuminator includes saloon illumination, stair illumination, elevator lighting, aisle illumination,
The saloon illumination uses light-operated inductive lighting device, and the stair illumination, elevator lighting, aisle illumination use infrared sense
Lighting device is answered, the emergency illuminator uses independently-powered emergency lighting device to emergency case.
Wherein, emergency supervisory systems described in the fire-fighting includes broadcast control system, fire early-warning system, elevator thing
Therefore warning system, earthquake early-warning system, broadcast control system is to fire early-warning system, elevator accident warning system, earthquake pre-warning
The warning information that system is sent is played in real time.
The general principle and principal character and advantages of the present invention of the present invention has been shown and described above.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally
The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (8)
1. a kind of intelligent building project monitor and control management system, it is characterised in that:Including air-conditioning and ventilation monitoring system, plumbing
Monitoring system, elevator runtime, electric power supply system, comprehensive security system, illumination monitoring system and safety defense monitoring system, institute
Stating air-conditioning and ventilation monitoring system includes set state control module, damp-warm syndrome induction module and air detection module, the discharge
Water monitoring system includes domestic water monitoring module, fire demand water monitoring module and sewage discharge monitoring module, the elevator fortune
Row system includes gravity sensing module and fault warning module, and the electric power supply system includes high voltage power distribution monitoring module, low
The electric monitoring module of press-fitting and transformer state monitoring module, the comprehensive security system includes gate control system and public domain is monitored
System, the gate control system includes identifying system and strange visitor's register system, and the illumination monitoring system includes public domain
Illuminator, private area illuminator and emergency illuminator, the safety defense monitoring system are monitored including emergency
System.
2. a kind of intelligent building project monitor and control management system according to claim 1, it is characterised in that:The air inspection
Survey module and damp-warm syndrome induction module and induction monitoring is carried out to the air quality and wet temp in public space region, and believed by data
Number transmission line is transferred to set state administration module, and air-conditioner set carries out air extraction circulation and temperature to public domain in real time
Humidity regulation.
3. a kind of intelligent building project monitor and control management system according to claim 2, it is characterised in that:The life is used
Pressure measurement sensor, BL, the plumbing monitoring are installed in water monitoring system, fire demand water monitoring system
Received shipment row monitoring module is all installed in three subsystems in system.
4. a kind of intelligent building project monitor and control management system according to claim 3, it is characterised in that:The gravity-feed tank
Answer module to carry out elevator operation to control, the fault alarm system carries out failure elevator sound effect prompting and light efficiency is carried
Show.
5. a kind of intelligent building project monitor and control management system according to claim 4, it is characterised in that:The height
It is press-fitted pyroelectric monitor module, Transformer's Condition Monitoring module and low voltage distribution monitoring module three independent connection hyper parameter alarm dress
Put, fault location module, fault logging module.
6. a kind of intelligent building project monitor and control management system according to claim 5, it is characterised in that:The identification is adopted
With fingerprint recognition or access card identification method, the gate control system installs infrared photography supervising device, strange visitor's registration
System is acquired to visitor's identity information, electro-photographic information and finger print information, the public domain monitoring system include pair
Saloon, stair, the infrared monitoring in elevator and aisle.
7. a kind of intelligent building project monitor and control management system according to claim 6, it is characterised in that:The public area
Area lighting system includes saloon illumination, stair illumination, elevator lighting, aisle illumination, and the saloon illumination uses light
Inductive lighting device is controlled, the stair illumination, elevator lighting, aisle illumination use infrared induction lighting device, the urgent thing
Part illuminator uses independently-powered emergency lighting device to emergency case.
8. a kind of intelligent building project monitor and control management system according to claim 7, it is characterised in that:The fire house
Stating emergency supervisory systems includes broadcast control system, fire early-warning system, elevator accident warning system, earthquake pre-warning system
System, the warning information that broadcast control system is sent to fire early-warning system, elevator accident warning system, earthquake early-warning system is carried out
Play in real time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710563183.1A CN107193267A (en) | 2017-07-11 | 2017-07-11 | A kind of intelligent building project monitor and control management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710563183.1A CN107193267A (en) | 2017-07-11 | 2017-07-11 | A kind of intelligent building project monitor and control management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107193267A true CN107193267A (en) | 2017-09-22 |
Family
ID=59882910
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710563183.1A Withdrawn CN107193267A (en) | 2017-07-11 | 2017-07-11 | A kind of intelligent building project monitor and control management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107193267A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107291028A (en) * | 2017-07-21 | 2017-10-24 | 合肥松雷信息科技有限公司 | A kind of intelligent building project monitor and control management system |
CN110427008A (en) * | 2019-08-30 | 2019-11-08 | 广州广电城市服务集团股份有限公司 | A kind of intelligent building system |
CN110471356A (en) * | 2019-08-30 | 2019-11-19 | 广州广电城市服务集团股份有限公司 | A kind of building system based on BIM 3D interaction technique |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103482452A (en) * | 2013-09-29 | 2014-01-01 | 哈尔滨工程大学 | Overpass lifting device by utilization of gravity |
CN204214094U (en) * | 2014-11-10 | 2015-03-18 | 武汉九升科技有限公司 | Energy-saving running environment intelligent controlling device |
CN104876084A (en) * | 2015-04-22 | 2015-09-02 | 中国计量学院 | Gravity detection based novel elevator operation prewarning device |
CN205204552U (en) * | 2015-10-27 | 2016-05-04 | 浙江元亨通信技术股份有限公司 | Wisdom elevator operation monitored control system |
CN106504390A (en) * | 2016-11-09 | 2017-03-15 | 北京小米移动软件有限公司 | Control method for door lock, apparatus and system |
CN106886203A (en) * | 2017-04-20 | 2017-06-23 | 安徽喜悦信息科技有限公司 | A kind of intelligent building project monitor and control management system |
-
2017
- 2017-07-11 CN CN201710563183.1A patent/CN107193267A/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103482452A (en) * | 2013-09-29 | 2014-01-01 | 哈尔滨工程大学 | Overpass lifting device by utilization of gravity |
CN204214094U (en) * | 2014-11-10 | 2015-03-18 | 武汉九升科技有限公司 | Energy-saving running environment intelligent controlling device |
CN104876084A (en) * | 2015-04-22 | 2015-09-02 | 中国计量学院 | Gravity detection based novel elevator operation prewarning device |
CN205204552U (en) * | 2015-10-27 | 2016-05-04 | 浙江元亨通信技术股份有限公司 | Wisdom elevator operation monitored control system |
CN106504390A (en) * | 2016-11-09 | 2017-03-15 | 北京小米移动软件有限公司 | Control method for door lock, apparatus and system |
CN106886203A (en) * | 2017-04-20 | 2017-06-23 | 安徽喜悦信息科技有限公司 | A kind of intelligent building project monitor and control management system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107291028A (en) * | 2017-07-21 | 2017-10-24 | 合肥松雷信息科技有限公司 | A kind of intelligent building project monitor and control management system |
CN110427008A (en) * | 2019-08-30 | 2019-11-08 | 广州广电城市服务集团股份有限公司 | A kind of intelligent building system |
CN110471356A (en) * | 2019-08-30 | 2019-11-19 | 广州广电城市服务集团股份有限公司 | A kind of building system based on BIM 3D interaction technique |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11600156B2 (en) | System and method for automating emergency egress advisement generation | |
CN104315473B (en) | A kind of intelligent evacuation emergency indicating system and indicating means | |
CN107193267A (en) | A kind of intelligent building project monitor and control management system | |
CN107659645A (en) | A kind of integrated intelligence community system based on Internet of Things | |
CN108803460A (en) | A kind of wisdom lavatory method for managing and monitoring and system | |
CN103779960B (en) | Intelligence switching station comprehensive monitoring system | |
CN108750854B (en) | Hospital elevator safety three-dimensional monitoring cloud platform, system and method thereof, and elevator system | |
CN110471356A (en) | A kind of building system based on BIM 3D interaction technique | |
CN109065135A (en) | A kind of management of Hospital Logistic life period of an equipment cloud platform, method and system | |
CN105117683B (en) | Detection and early warning method for dense crowd in public place | |
CN112488898B (en) | Emergency handling system and method based on intelligent building management and control | |
CN112578690B (en) | Intelligent building energy consumption management and control system and method | |
CN109264522A (en) | System for reporting life cycle, maintenance and measurement audit condition of building equipment | |
CN107291028A (en) | A kind of intelligent building project monitor and control management system | |
CN106886203A (en) | A kind of intelligent building project monitor and control management system | |
CN205792652U (en) | A kind of intelligence community based on Internet of Things management system | |
CN114545850A (en) | Internet of things intelligent management system for hospital water system | |
CN108831100A (en) | Building intelligent engineering monitoring management system | |
CN107450496A (en) | A kind of wisdom home services system based on Android platform | |
CN118466378B (en) | Intelligent comprehensive management and control system of electromechanical equipment based on intelligent hospital | |
CN105321125A (en) | Unattended substation supervision system | |
CN108958133A (en) | A kind of intelligent building project monitor and control management system | |
CN108931925A (en) | A kind of intelligent building project monitor and control management system | |
CN108828969A (en) | A kind of intelligent building project monitor and control management system | |
CN110427008A (en) | A kind of intelligent building system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20170922 |