CN108952776A - A kind of method of the equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor - Google Patents

A kind of method of the equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor Download PDF

Info

Publication number
CN108952776A
CN108952776A CN201810979246.6A CN201810979246A CN108952776A CN 108952776 A CN108952776 A CN 108952776A CN 201810979246 A CN201810979246 A CN 201810979246A CN 108952776 A CN108952776 A CN 108952776A
Authority
CN
China
Prior art keywords
limestone
bottom plate
construction
concordant
main aperture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810979246.6A
Other languages
Chinese (zh)
Inventor
武善元
王凯
刘磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Qiu Ji Coal Mine Co Ltd
Original Assignee
Shandong Qiu Ji Coal Mine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Qiu Ji Coal Mine Co Ltd filed Critical Shandong Qiu Ji Coal Mine Co Ltd
Priority to CN201810979246.6A priority Critical patent/CN108952776A/en
Publication of CN108952776A publication Critical patent/CN108952776A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Civil Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of method of equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor, construction drill founds hole section and inclination section, adjusts orientation construction bottom plate main aperture and constructs forward into after bottom limestone along concordant in the middle part of limestone;After the completion of the construction of bottom plate main aperture, on the basis of bottom plate main aperture, basement rock suitable position adjusts orientation construction bottom plate branched hole, and protrusive grouting mode is taken to infuse single liquid cement slurry, construction other bottom plate branched holes of bottom plate in a similar manner, are transformed into water barrier for limestone aquifer;Bottom plate main aperture is all after construction, cleaning bottom of hole adjusts orientation construction top plate main aperture after going out the inclination section of second level casing again, into after the top limestone of coal seam, construction coal top plate limestone concordant top plate branched hole in a similar manner, protrusive high-pressure slip-casting technique infuses loess cement slurry, transform top plate limestone as aquitard.That the beneficial effects of the invention are as follows drilling project amounts is small, covering target zone range is wide, the unrestrained water of top plate is few.

Description

A kind of method of the equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor
Technical field
The invention belongs to technical field of coal exploitation, are related to a kind of equidistant horizontal orientation concordant bored grouting transformation roof and floor The method of dual limestone.
Background technique
Seat earth limestone pressure-bearing water harnessing more mature technical method in the country's is at present: passing through note using surface grout injection station Pipeline and working face in the pit injected hole are starched to bottom plate limestone pre-pouring grout, the Karst Fissures and water guide for filling bottom plate grieshoch water-bearing layer are split Feed channel of cutting off the water supply is replaced away and realized to gap the water in thin layer limestone, makes to be transformed by note water-bearing layer not aqueous Or aquitard, realize working face safe working, achieve preferable effect, but underground limited space, drilling construction apart from short, Construction work amount is big, and cost of ton coal is high, and safety coefficient is relatively low.
But for being pushed up, the coal seam that the dual limestone aquifer water damage of bottom plate threatens, since roof water and ash difficult to understand have waterpower connection System, it is difficult to which drainage, water drainage is costly, waste groundwater resources and economically unreasonable, is difficult to exploit always, causes resource not It can exploitation.Roof water is difficult to drainage in the prior art and effluent cost is high, destroys the ecological balance of underground water, water-bearing layer slip casting Range is indefinite to cause grouting amount big, increases grouting cost.
Summary of the invention
The purpose of the present invention is to provide a kind of equidistant horizontal orientation concordant bored grouting transformation dual limestones of roof and floor Method, that the beneficial effects of the invention are as follows drilling project amounts is small, covering target zone range is wide, the unrestrained water of top plate is few, prevention and treatment water conservancy project Work can carry out in advance, anti-comprehensive cost of harnessing the river substantially reduces.
The technical scheme adopted by the invention is that following the steps below:
Step 1: selecting suitable drill site position aperture construction drill to found hole section, since after level-one casing using non magnetic drill collar Construct inclination section, into basement rock after lower second level casing;
Step 2: orientation construction bottom plate main aperture is adjusted after drilling out inclination section, into after bottom limestone, along limestone Portion's concordant is constructed forward;
Step 3: after the completion of the construction of bottom plate main aperture, on the basis of bottom plate main aperture, basement rock suitable position adjusts orientation construction Bottom plate branched hole takes protrusive grouting mode to infuse single liquid cement slurry, other bottom plate branched holes of bottom plate of constructing in a similar manner will Limestone aquifer is transformed into water barrier;
Step 4: bottom plate main aperture is all after construction, then cleaning bottom of hole go out the inclination section of second level casing after adjust orientation construction top Plate main aperture, into after the top limestone of coal seam, construction coal top plate limestone concordant top plate branched hole in a similar manner, protrusive high pressure Grouting process infuses loess cement slurry, transform top plate limestone as aquitard.
Further, the vertical hole section that drills in step 1 uses ¢ 311mm level-one casing 80m;¢ 244mm second level set under inclination section Pipe.
Further, concordant is constructed forward 400-700m in the middle part of the limestone in step 2.
Further, concordant is constructed forward 400-700m in the middle part of the top limestone in step 4.
Detailed description of the invention
Fig. 1 is the dual limestone structural schematic diagram of roof and floor of the present invention;
Fig. 2 is bottom plate branched hole schematic diagram;
Fig. 3 is top plate branched hole schematic diagram.
In figure, 1. vertical hole sections, 2. inclination sections, 3. bottom plate main apertures, 301. bottom plate branched holes, 4. bottom limestones, 5. tops Plate main aperture, 501. top plate branched holes, 6. coal seam top limestones.
Specific embodiment
The present invention is described in detail With reference to embodiment.
The method of the equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor of the present invention is as shown in Figure 1 to Figure 3:
1, suitable drill site position aperture construction drill is selected to found hole section 1, using ¢ 311mm level-one casing 80m.From level-one set Start inclination section 2 of constructing using non magnetic drill collar (1-2 °) after pipe, into basement rock after lower ¢ 244mm second level casing.
2, orientation construction bottom plate main aperture 3 is adjusted after drilling out inclination section 2, into after bottom limestone 4, along limestone 4 Portion's concordant is constructed forward 400-700m.
3, after the completion of bottom plate main aperture 3 is constructed, on the basis of bottom plate main aperture 3, basement rock suitable position adjusts orientation construction bottom Plate branched hole 301 takes protrusive grouting mode to infuse single liquid cement slurry, other bottom plate branched holes of bottom plate of constructing in a similar manner 301.4 water-bearing layer of limestone is transformed into water barrier.
4, bottom plate main aperture 3 is all after construction, then cleaning bottom of hole go out the inclination section 2 of second level casing after adjust orientation construction top plate Main aperture 5 is constructed forward 400-700m into after coal seam top limestone 6 along 6 middle part concordant of limestone.Construction coal in a similar manner 6 concordant top plate branched hole 501 of top plate limestone, protrusive high-pressure slip-casting technique are infused loess cement slurry, top plate limestone 6 are transform as weak Water-bearing layer.
It is also an advantage of the present invention that:
(1) coal seam threatened by the dual limestone aquifer of roof and floor has successfully been liberated;
(2) it solves the problems, such as that roof water is difficult to drainage, realizes water-retaining production;
(3) limestone aquifer preservation range is clear, and slip casting effect is good, reduces grouting cost;
(4) the underground water ecological balance is protected.
(5) mine that this technology is equally applicable for that iron ore or nonmetallic ore etc. are threatened by the dual water damage of roof and floor realizes peace Complete economic water-retaining production.
The above is only not to make limit in any form to the present invention to better embodiment of the invention System, any simple modification that embodiment of above is made according to the technical essence of the invention, equivalent variations and modification, Belong in the range of technical solution of the present invention.

Claims (4)

1. a kind of method of the equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor, it is characterised in that according to following Step carries out:
Step 1: select suitable drill site position aperture construction drill to found hole section, since after level-one casing using non magnetic drill collar construct Inclination section, into basement rock after lower second level casing;
Step 2: orientation construction bottom plate main aperture is adjusted after drilling out inclination section, it is suitable in the middle part of limestone into after bottom limestone Layer is constructed forward;
Step 3: after the completion of the construction of bottom plate main aperture, on the basis of bottom plate main aperture, basement rock suitable position adjusts orientation construction bottom plate Branched hole takes protrusive grouting mode to infuse single liquid cement slurry, other bottom plate branched holes of bottom plate of constructing in a similar manner, by limestone Water-bearing layer is transformed into water barrier;
Step 4: bottom plate main aperture is all after construction, then cleaning bottom of hole go out the inclination section of second level casing after adjust orientation construction top plate master Hole, into after the top limestone of coal seam, construction coal top plate limestone concordant top plate branched hole in a similar manner, protrusive high-pressure slip-casting Technique infuses loess cement slurry, transform top plate limestone as aquitard.
2. according to a kind of method of equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor described in claim 1, It is characterized by: the vertical hole section that drills in the step 1 uses ¢ 311mm level-one casing 80m;¢ 244mm second level set under inclination section Pipe.
3. according to a kind of method of equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor described in claim 1, It is characterized by: concordant is constructed forward 400-700m in the middle part of the limestone in the step 2.
4. according to a kind of method of equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor described in claim 1, It is characterized by: concordant is constructed forward 400-700m in the middle part of the top limestone in the step 4.
CN201810979246.6A 2018-08-27 2018-08-27 A kind of method of the equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor Pending CN108952776A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810979246.6A CN108952776A (en) 2018-08-27 2018-08-27 A kind of method of the equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810979246.6A CN108952776A (en) 2018-08-27 2018-08-27 A kind of method of the equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor

Publications (1)

Publication Number Publication Date
CN108952776A true CN108952776A (en) 2018-12-07

Family

ID=64474149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810979246.6A Pending CN108952776A (en) 2018-08-27 2018-08-27 A kind of method of the equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor

Country Status (1)

Country Link
CN (1) CN108952776A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109899089A (en) * 2019-03-07 2019-06-18 中煤科工集团西安研究院有限公司 Goaf grouting method based on pinniform horizontal branch directional drilling technique
CN110469293A (en) * 2019-09-17 2019-11-19 中国煤炭地质总局水文地质局 A kind of mine EXIT POINT plugging technology
CN110486022A (en) * 2019-09-11 2019-11-22 中煤科工集团西安研究院有限公司 The advanced Regional pattern classification in seat earth water-bearing layer determines method
CN110566118A (en) * 2019-09-09 2019-12-13 中煤科工集团西安研究院有限公司 Advanced grouting transformation method for combined directional hole of underground deep-buried aquifer bottom plate of coal mine

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001032687A (en) * 1999-07-23 2001-02-06 Kajima Corp Water cut-off method for tail part of rectangular segment and device therefor
CN102877884A (en) * 2012-09-13 2013-01-16 山东能源集团有限公司 Method for modification and construction of top of Ordovician limestone of mine based on kilometer directional drilling technique
CN106703692A (en) * 2016-12-02 2017-05-24 淮北矿业股份有限公司 Method using surface orientation bedding drilling grouting to reinforce laminar limestone
CN106948843A (en) * 2017-03-21 2017-07-14 山东省邱集煤矿 A kind of double-deck multiple-limb concordant bored grouting transformation dual limestone aquifer method of roof and floor
CN107740701A (en) * 2017-11-27 2018-02-27 山东省邱集煤矿 A kind of method of the accurate grout transformation of top plate thin layer limestone aquifer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001032687A (en) * 1999-07-23 2001-02-06 Kajima Corp Water cut-off method for tail part of rectangular segment and device therefor
CN102877884A (en) * 2012-09-13 2013-01-16 山东能源集团有限公司 Method for modification and construction of top of Ordovician limestone of mine based on kilometer directional drilling technique
CN106703692A (en) * 2016-12-02 2017-05-24 淮北矿业股份有限公司 Method using surface orientation bedding drilling grouting to reinforce laminar limestone
CN106948843A (en) * 2017-03-21 2017-07-14 山东省邱集煤矿 A kind of double-deck multiple-limb concordant bored grouting transformation dual limestone aquifer method of roof and floor
CN107740701A (en) * 2017-11-27 2018-02-27 山东省邱集煤矿 A kind of method of the accurate grout transformation of top plate thin layer limestone aquifer

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109899089A (en) * 2019-03-07 2019-06-18 中煤科工集团西安研究院有限公司 Goaf grouting method based on pinniform horizontal branch directional drilling technique
CN110566118A (en) * 2019-09-09 2019-12-13 中煤科工集团西安研究院有限公司 Advanced grouting transformation method for combined directional hole of underground deep-buried aquifer bottom plate of coal mine
CN110566118B (en) * 2019-09-09 2021-03-26 中煤科工集团西安研究院有限公司 Advanced grouting transformation method for combined directional hole of underground deep-buried aquifer bottom plate of coal mine
CN110486022A (en) * 2019-09-11 2019-11-22 中煤科工集团西安研究院有限公司 The advanced Regional pattern classification in seat earth water-bearing layer determines method
CN110486022B (en) * 2019-09-11 2020-12-22 中煤科工集团西安研究院有限公司 Method for determining treatment mode classification of advanced region of coal seam floor aquifer
CN110469293A (en) * 2019-09-17 2019-11-19 中国煤炭地质总局水文地质局 A kind of mine EXIT POINT plugging technology

Similar Documents

Publication Publication Date Title
CN106948843B (en) A kind of bilayer multiple-limb concordant bored grouting transformation dual limestone aquifer method of roof and floor
CN108952776A (en) A kind of method of the equidistant horizontal orientation concordant bored grouting transformation dual limestone of roof and floor
CN104863629B (en) A kind of method taking out absciss layer gas and draining slip casting under overlying strata using combined drilling and counterboring
CN103498696B (en) A kind of method from roadway in the roof grouting filling compacting goaf filling body
CN106703692A (en) Method using surface orientation bedding drilling grouting to reinforce laminar limestone
CN110242301A (en) A kind of modified water-protection coal-mining method of two step slip casting of top plate water-bearing layer
CN102140901A (en) High pressure resistant drilled hole sealing method
CN112593853B (en) Construction method for coal mine waste filling and water-reducing mining
CN103306714B (en) Gas control method for drilling hole and hole three-purpose in close-range coal seam group bottom drainage roadway
CN103967507B (en) A kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff
CN103277120A (en) Post-unfreezing water burst prevention method of non-full-depth freezing vertical shaft
CN101608552A (en) The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process
CN105821830A (en) Permeation increase siphon drainage system for low-permeability soil slope
CN102787846A (en) Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone
CN102587859A (en) Technology for blocking mine water bursting through backflow grouting
CN203487528U (en) Underground river karst cave treatment structure for underwater pier drilled pile construction in beaded type karst area
CN109488370B (en) Underground limestone water exploration and drainage drilling construction method
CN103362117A (en) Full-section grouting method for grouting section
CN103256025A (en) Composite well net type coal bed gas mining method
CN106704123A (en) Geothermal exploitation system and construction method thereof
CN104895531A (en) Single thick coal seam ground mining well extraction process
CN106930764B (en) Multilayer sandstone-type uranium mineralization with respect separate zone production technique
CN107313743B (en) Method for repairing weak zone of coal seam floor water-resisting layer by utilizing coal seam gas well
CN110017155B (en) Grouting reinforcement water-proof method for water-rich gravel layer of top plate of coal face
CN107152309A (en) A kind of coal seam is the high water level and high-speed drainage water damage prevention and controls of Main aquifer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207

RJ01 Rejection of invention patent application after publication