CN108951609A - One kind being suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall - Google Patents

One kind being suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall Download PDF

Info

Publication number
CN108951609A
CN108951609A CN201810998558.1A CN201810998558A CN108951609A CN 108951609 A CN108951609 A CN 108951609A CN 201810998558 A CN201810998558 A CN 201810998558A CN 108951609 A CN108951609 A CN 108951609A
Authority
CN
China
Prior art keywords
erratic boulder
ovum gravel
drilling
soft
boulder stratum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810998558.1A
Other languages
Chinese (zh)
Inventor
孟庆龙
姜美杰
蔡锐
曹跃
田凯
高健
姚艳峰
赵红然
常国栋
邢健
杨东宝
张秋芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201810998558.1A priority Critical patent/CN108951609A/en
Publication of CN108951609A publication Critical patent/CN108951609A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/187Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses one kind to be suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall, including softer ovum gravel erratic boulder stratum grooving, be drilled with perpendicular drilling, four steps of native grooving and construction of diaphragm wall are grabbed on harder ovum gravel erratic boulder stratum, after the softer ovum gravel erratic boulder stratum is hollowed out, directly grooving operation is carried out using chute forming machine, the perpendicular drilling of multiple extensions is bored applying at groove location, the entire depth of perpendicular drilling diaphram wall foundation trench along harder ovum gravel erratic boulder stratum extends;The present invention is by applying perpendicular drilling in chute forming machine grab bucket position, so that grab bucket can more easily enter harder ovum gravel erratic boulder stratum along perpendicular drilling, accelerate the grooving speed of ground-connecting-wall, reduce chute forming machine abrasion, reduce the construction cost of particular formation ground-connecting-wall, meanwhile perpendicular drilling can guide chute forming machine to carry out grooving operation, reduce ground-connecting-wall invades limit.

Description

One kind being suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall
Technical field
The present invention relates to construction of diaphragm wall fields, more specifically, it relates to which a kind of be suitable for soft or hard uneven ovum gravel Erratic boulder stratum construction method of underground continuous wall.
Background technique
The foundation pit of urban track traffic subway station and building typically belongs to the ground of " upper soft lower hard " when excavating Layer, due to stratum strength of hard rock height, continuous wall trench underground is difficult, and traditional chute forming machine hydraulic grab is difficult to direct grooving, needs Impact drill cooperates chute forming machine grooving.The problem of this construction method is often inefficient, schedule delays cannot solve always, increase Diaphram wall invades limit problem also very seriously while adding construction cost.
With the development of the times, base pit engineering quantity is more and more, and traditional continuous wall trench underground method is soft or hard in processing Construction period is often not achieved when uneven ovum gravel erratic boulder stratum, and precision cannot be guaranteed.There is an urgent need to a kind of new engineering methods To change the status that continuous wall trench underground falls behind.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of accelerate in hard soft or hard uneven ovum gravel drift The method that stone stratum construction of diaphragm wall progress and reduction diaphram wall invade limit.Construct diaphram wall foundation trench top compared with When soft ovum gravel erratic boulder stratum, directly constructed to solve the problems mentioned in the above background technology using chute forming machine.
To achieve the above object, the invention provides the following technical scheme:
One kind being suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall, including softer ovum gravel erratic boulder stratum Grooving, be drilled with perpendicular drilling, four steps of native grooving and construction of diaphragm wall are grabbed on harder ovum gravel erratic boulder stratum, it is suitable for soft or hard Uneven big partial size ovum gravel erratic boulder stratum underground connects the cutting method of wall, can significantly improve applying by this particular formation diaphragm wall Work speed, and ground-connecting-wall grooving precision can be greatly improved, that reduces ground-connecting-wall invades limit;After the construction compared with soft formation, When into harder ovum gravel erratic boulder, before grooving, first in chute forming machine two sides, grab bucket lower position applies two, brill perpendicular drillings, affiliated perpendicular drilling Entire depth along stratum ground-connecting-wall foundation trench extends.
After the perpendicular drilling construction, chute forming machine grab bucket is erected with drilling into harder ovum gravel erratic boulder respectively along described two Layer carries out grabbing native grooving.
Specific step is as follows for the above method:
Step 1 directly carries out grooving operation using chute forming machine in the softer ovum gravel erratic boulder stratum in diaphram wall top;
Step 2, construction stop grooving operation when arriving soft or hard strata interface, apply the perpendicular drilling of brill with rotary drilling rig, apply brill Bouncing of drilling tool construction is carried out in the process;
After the completion of brill is applied in step 3, perpendicular drilling, the grab bucket of chute forming machine two drills into harder ovum gravel erratic boulder respectively along adjacent erect It carries out grabbing native grooving operation in stratum;
Step 4, complete diaphram wall construction of foundation ditch after, complete the construction of diaphram wall.
As a further solution of the present invention, after the softer ovum gravel erratic boulder stratum being hollowed out, chute forming machine is directly utilized Grooving operation is carried out, bores the perpendicular drilling of multiple extensions applying at groove location, perpendicular drilling underground along harder ovum gravel erratic boulder stratum The entire depth of diaphragm wall foundation trench extends.
As a further solution of the present invention, the perpendicular drilling apply boring by rotary drilling rig forms.
As a further solution of the present invention, the perpendicular drilling all constructs to be formed using bouncing of drilling tool.
As a further solution of the present invention, 0.8 meter of the aperture of the perpendicular drilling, adjacent 2~3 meters of the perpendicular spacing of wells.
As a further solution of the present invention, the quantity of the perpendicular drilling is two and is located at chute forming machine two sides grab bucket lower section Position.
As a further solution of the present invention, the model LQ series continuous wall trench underground machine of the chute forming machine or XG360。
As a further solution of the present invention, model DR-100, XY-1 or KT-22 of the rotary drilling rig.
In conclusion compared with the prior art, the invention has the following beneficial effects:
The present invention by chute forming machine grab bucket position apply perpendicular drilling so that grab bucket can along it is perpendicular drilling be more easier into Enter harder ovum gravel erratic boulder stratum, accelerate the grooving speed of ground-connecting-wall, reduces chute forming machine abrasion, reduce particular formation ground-connecting-wall Construction cost, meanwhile, perpendicular drilling can guide chute forming machine carry out grooving operation, reduce ground-connecting-wall invades limit.
The perpendicular drilling of brill is applied before grooving, chute forming machine grab bucket drills into stratum along perpendicular, can significantly reduce chute forming machine entrance The difficulty on stratum, improves speed of application, reduces the abrasion of chute forming machine, and perpendicular drilling is capable of providing certain guiding function Can, reduce grooving stage ground-connecting-wall invades limit, reduces the construction cost of ground-connecting-wall.
In order to explain the structural features and functions of the invention more clearly, come with reference to the accompanying drawing with specific embodiment to this hair It is bright to be described in detail.
Detailed description of the invention
Fig. 1 is using floor map of the invention.
Fig. 2 is using diagrammatic cross-section of the invention.
Appended drawing reference: 1- erects drilling, the softer ovum gravel erratic boulder stratum 2-, the harder ovum gravel erratic boulder stratum 3-, the soft or hard stratum 4- point Interface, 5- diaphram wall foundation trench, 6- diaphram wall.
Specific embodiment
The following further describes the technical solution of the present invention in the following with reference to the drawings and specific embodiments.
Referring to Fig. 1-2, one kind being suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall, including softer ovum 2 grooving of gravel erratic boulder stratum is drilled with perpendicular drilling 1, native grooving is grabbed on harder ovum gravel erratic boulder stratum 3 and diaphram wall 6 is constructed four steps Suddenly.
Grooving operation directly will be carried out using chute forming machine after softer ovum gravel erratic boulder stratum 2 hollows out, applied at groove location bore it is more A to extend perpendicular drilling 1, the entire depth of the perpendicular diaphram wall foundation trench 5 along harder ovum gravel erratic boulder stratum 3 of drilling 1 extends.
In the present embodiment, the perpendicular drilling 1 carries out applying brill formation using rotary drilling rig, and perpendicular drilling 1 is all using bouncing of drilling tool What construction was formed, 0.8 meter of the aperture of the perpendicular drilling 1, adjacent perpendicular 2~3 meters of 1 spacing of drilling is (according to router grab bucket spacing It is fixed).The perpendicular drilling 1 is constructed by soft or hard strata interface 4, the diaphram wall base along harder ovum gravel erratic boulder stratum 3 The entire depth of slot 5 extends.
Preferably, in the present embodiment, the quantity of the perpendicular drilling 1 is two and is located at orientation under chute forming machine two sides are grabbed bucket It sets, the perpendicular drilling 1 extends along the entire depth of diaphram wall foundation trench 5.
Specific step is as follows for the above method:
Step 1 directly carries out grooving operation using chute forming machine in the softer ovum gravel erratic boulder stratum 2 in 6 top of diaphram wall;
Step 2, construction stop grooving operation when arriving soft or hard strata interface 4, apply the perpendicular drilling 1 of brill with rotary drilling rig, apply Bouncing of drilling tool construction is carried out during boring, and guarantees that the precision of perpendicular drilling 1 meets design requirement.
Apply the purpose for boring perpendicular drilling 1: chute forming machine being facilitated to enter harder ovum gravel erratic boulder stratum 3, the grooving stage, chute forming machine along What perpendicular 1 construction of drilling can reduce construction stage diaphram wall 6 invades limit.
After the completion of brill is applied in step 3, perpendicular drilling 1, the grab bucket of chute forming machine two enters harder ovum gravel respectively along adjacent perpendicular drilling 1 and floats It carries out grabbing native grooving operation in stone stratum 3;
Step 4, after the construction of foundation ditch for completing diaphram wall 6, complete diaphram wall 6 according to existing engineering method and apply Work.
Preferably, in the present embodiment, the chute forming machine model select LQ series continuous wall trench underground machine or XG360 can chute forming machine model be not limited to above-mentioned model.
Preferably, in the present embodiment, the model of the rotary drilling rig selects DR-100, XY-1 or KT-22, churning driven Type number is not limited to above-mentioned model.
The technical principle of the invention is described above in combination with a specific embodiment, is only the preferred embodiment of the present invention.This The protection scope of invention is not limited merely to above-described embodiment, and all technical solutions belonged under thinking of the present invention belong to the present invention Protection scope.Those skilled in the art, which does not need to pay for creative labor, can associate other specific realities of the invention Mode is applied, these modes will fall within the scope of protection of the present invention.

Claims (8)

1. one kind is suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall, including softer ovum gravel erratic boulder stratum (2) grooving, be drilled with perpendicular drilling (1), harder ovum gravel erratic boulder stratum (3) grabs native grooving and diaphram wall (6) is constructed four steps, It is characterized in that, specific step is as follows:
Step 1 directly carries out grooving operation using chute forming machine in the softer ovum gravel erratic boulder stratum (2) in diaphram wall (6) top;
Step 2, construction stop grooving operation when arriving soft or hard strata interface (4), apply the perpendicular drilling (1) of brill with rotary drilling rig, apply Bouncing of drilling tool construction is carried out during boring;
After the completion of step 3, perpendicular drilling (1) apply brill, the grab bucket of chute forming machine two enters harder ovum gravel respectively along adjacent perpendicular drilling (1) and floats It carries out grabbing native grooving operation in stone stratum (3);
Step 4, complete diaphram wall (6) construction of foundation ditch after, complete diaphram wall (6) construction.
2. one kind according to claim 1 is suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall, It is characterized in that, after the softer ovum gravel erratic boulder stratum (2) is hollowed out, directly grooving operation is carried out using chute forming machine, in grooving Position, which is applied, bores the perpendicular drilling (1) of multiple extensions, and the perpendicular drilling (1) is along the harder interior diaphram wall foundation trench of ovum gravel erratic boulder stratum (3) (5) entire depth extends.
3. one kind according to claim 2 is suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall, It is characterized in that, the perpendicular drilling (1) apply boring and be formed by rotary drilling rig.
4. one kind according to claim 2 is suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall, It is characterized in that, the perpendicular drilling (1) all is constructed to be formed using bouncing of drilling tool.
5. one kind according to claim 3 or 4 is suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall, It is characterized in that, 0.8 meter of the aperture of the perpendicular drilling (1), adjacent perpendicular 2~3 meters of (1) spacing of drilling.
6. one kind according to claim 5 is suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall, It is characterized in that, the quantity of the perpendicular drilling (1) is two and is located at chute forming machine two sides grab bucket lower position.
7. one kind according to claim 1 is suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall, It is characterized in that, the model LQ series continuous wall trench underground machine or XG360 of the chute forming machine.
8. one kind according to claim 1 is suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall, It is characterized in that, model DR-100, XY-1 or KT-22 of the rotary drilling rig.
CN201810998558.1A 2018-08-29 2018-08-29 One kind being suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall Pending CN108951609A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810998558.1A CN108951609A (en) 2018-08-29 2018-08-29 One kind being suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810998558.1A CN108951609A (en) 2018-08-29 2018-08-29 One kind being suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall

Publications (1)

Publication Number Publication Date
CN108951609A true CN108951609A (en) 2018-12-07

Family

ID=64474870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810998558.1A Pending CN108951609A (en) 2018-08-29 2018-08-29 One kind being suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall

Country Status (1)

Country Link
CN (1) CN108951609A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110159190A (en) * 2019-04-08 2019-08-23 中铁隧道集团二处有限公司 Continuous wall trench underground meets underground mixing pile and handles construction method
CN110306531A (en) * 2019-07-06 2019-10-08 中铁二十五局集团第五工程有限公司 High water level erratic boulder stratum construction of diaphragm wall technique

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836187A (en) * 2017-02-23 2017-06-13 中铁隧道集团有限公司 A kind of two brills one for strongly weathered sand-rock grab continuous wall trench underground construction method
CN106836349A (en) * 2017-03-31 2017-06-13 中国水电基础局有限公司 Stream plastic state Muddy Bottoms burning into sand stratum grooving method for correcting error
KR101858623B1 (en) * 2016-12-05 2018-05-24 강릉건설(주) Drilling machine with link drill unit and collumn wall contructing method by the same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101858623B1 (en) * 2016-12-05 2018-05-24 강릉건설(주) Drilling machine with link drill unit and collumn wall contructing method by the same
CN106836187A (en) * 2017-02-23 2017-06-13 中铁隧道集团有限公司 A kind of two brills one for strongly weathered sand-rock grab continuous wall trench underground construction method
CN106836349A (en) * 2017-03-31 2017-06-13 中国水电基础局有限公司 Stream plastic state Muddy Bottoms burning into sand stratum grooving method for correcting error

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宋福渊: "武汉秀场复杂条件下地下连续墙施工技术" *
林尚月: "泥砂岩地层的高铁车站地下连续墙施工技术研究" *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110159190A (en) * 2019-04-08 2019-08-23 中铁隧道集团二处有限公司 Continuous wall trench underground meets underground mixing pile and handles construction method
CN110306531A (en) * 2019-07-06 2019-10-08 中铁二十五局集团第五工程有限公司 High water level erratic boulder stratum construction of diaphragm wall technique

Similar Documents

Publication Publication Date Title
CN104153352B (en) Karst geology rotary-drilling bored concrete pile hole forming process
CN102296963B (en) Construction method for ultra-long deep-buried road tunnel
CN106759282B (en) A kind of mechanical hole building method of super-large diameter hard rock bored concrete pile half
CN103835729B (en) Deep distance roadway surrounding rock pre grouting from the surface reinforcement process
CN104947690A (en) Grooving construction method for embedding underground continuous wall into rock
CN101586340A (en) Preconditioning process of continuous wall for weak weathering terrane grooving construction
CN106988302A (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN110821497A (en) Excavation method of tunnel vertical shaft
CN109138023A (en) A kind of continuous wall trench underground method under complex geological condition
CN106381865B (en) A kind of brill milling combination engineering method applied to hard rock grooving
CN108978676A (en) A kind of construction method of foundation pit group and basic pile group
CN103774690A (en) Grabbing, drilling and punching combined underground continuous wall grooving construction method
CN109610439A (en) The construction method of underground obstacle ultra-deep underground continuous wall grooving
CN102777185A (en) Inclined well shaft construction technology
CN108951609A (en) One kind being suitable for soft or hard uneven ovum gravel erratic boulder stratum construction method of underground continuous wall
CN103967024A (en) United construction method for forming holes and grooves in deep sandy gravel stratum
CN112267887A (en) Excavation construction method for extra-large section tunnel with city gate hole
CN110984132A (en) Construction method for grooving underground diaphragm wall under complex geological condition
CN208981313U (en) One kind being suitable for soft or hard uneven ovum gravel erratic boulder stratum diaphram wall
CN110130321A (en) The processing method of rock in a kind of manual digging pile construction
CN115685336A (en) Comprehensive exploration method based on non-coring horizontal directional drilling process
CN109723450A (en) A kind of combined type TBM set of tunneling construction method
CN205100226U (en) Underground continuous wall goes into rock grooving construction equipment
CN208934599U (en) Rectangular punching drill bit of rotary drilling rig for large-section rectangular anchoring pile
CN207904910U (en) A kind of embedding lithotype steel cement mixing wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207

RJ01 Rejection of invention patent application after publication