CN108951349A - A kind of pervious concrete structure and method for paving - Google Patents

A kind of pervious concrete structure and method for paving Download PDF

Info

Publication number
CN108951349A
CN108951349A CN201810817929.1A CN201810817929A CN108951349A CN 108951349 A CN108951349 A CN 108951349A CN 201810817929 A CN201810817929 A CN 201810817929A CN 108951349 A CN108951349 A CN 108951349A
Authority
CN
China
Prior art keywords
pervious concrete
surface layer
screed
plate
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810817929.1A
Other languages
Chinese (zh)
Inventor
陈超
黄劲
梅向福
彭剑
祁广广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaxin Cement Co Ltd
Original Assignee
Huaxin Cement Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaxin Cement Co Ltd filed Critical Huaxin Cement Co Ltd
Priority to CN201810817929.1A priority Critical patent/CN108951349A/en
Publication of CN108951349A publication Critical patent/CN108951349A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/22Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for consolidating or finishing laid-down unset materials
    • E01C19/30Tamping or vibrating apparatus other than rollers ; Devices for ramming individual paving elements
    • E01C19/34Power-driven rammers or tampers, e.g. air-hammer impacted shoes for ramming stone-sett paving; Hand-actuated ramming or tamping machines, e.g. tampers with manually hoisted dropping weight
    • E01C19/40Power-driven rammers or tampers, e.g. air-hammer impacted shoes for ramming stone-sett paving; Hand-actuated ramming or tamping machines, e.g. tampers with manually hoisted dropping weight adapted to impart a smooth finish to the paving, e.g. tamping or vibrating finishers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to ground pavement technical fields, refer in particular to a kind of pervious concrete structure and method for paving, including two be set on ground kerbstone spaced apart, the rubble stabilized zone being layed between two kerbstones, it is layed in the pervious concrete base of rubble stabilized zone upper surface and is layed in the pervious concrete surface layer of pervious concrete base upper surface, pervious concrete surface layer is tentatively levelling by floating rule progress ground, and complete ground it is preliminary it is levelling after pervious concrete surface layer upper surface place screed, plate compactor is placed above in screed, plate compactor drives screed vibration pressure pervious concrete surface layer, until the pervious concrete surface layer is flushed with two kerbstones.The present invention uses such structure setting, improves the planarization of pervious concrete surface layer, while driving screed vibration pressure by the vibration of plate compactor walking, greatly improves the mechanical property of pervious concrete.

Description

A kind of pervious concrete structure and method for paving
Technical field
The present invention relates to ground pavement technical field, a kind of pervious concrete structure and method for paving are refered in particular to.
Background technique
Permeable concrete ground, which is mated formation, often receives light method using finisher, and this method is past in large area permeable pavement Pressure of effectively shaking is not obtained toward the integral smoothness on ground not easy to control, and using pervious concrete when finisher receipts light method, Its mechanical property is greatly reduced, high-strength water-permeable concrete road surface demand cannot be better meet.
Summary of the invention
In view of the above problems, utilizing screed sheet the present invention provides a kind of pervious concrete structure and method for paving The flatness of body greatly improves the planarization of pervious concrete surface layer, while determining for pervious concrete surface layer can be effectively controlled Position height drives screed vibration pressure by the vibration walking of plate compactor, so that pervious concrete is obtained vibrating compacting, greatly improve The mechanical property of pervious concrete, and it is high-efficient to mat formation, and is suitble to large area permeable pavement.
To achieve the goals above, the technical solution that the present invention applies is as follows:
A kind of pervious concrete structure including two be set on ground kerbstone spaced apart, is layed in institute State the rubble stabilized zone between two kerbstones, the pervious concrete base for being layed in rubble stabilized zone upper surface and paving Pervious concrete surface layer set on pervious concrete base upper surface, at the beginning of pervious concrete surface layer carries out ground by floating rule Walk it is levelling, and complete ground it is preliminary it is levelling after pervious concrete surface layer upper surface place screed, screed is placed above flat Plate rams, and plate compactor drives screed vibration pressure pervious concrete surface layer, until the pervious concrete surface layer and two kerbstones are neat It is flat.
A kind of method for paving of pervious concrete structure, which comprises the following steps:
1) uniformly pave one layer of rubble stabilized zone between two be set on ground kerbstone spaced apart;
2) it uniformly paves one layer of pervious concrete base in the upper surface of rubble stabilized zone;
3) it uniformly paves one layer of pervious concrete surface layer in the upper surface of pervious concrete base;
4) tentatively levelling to pervious concrete surface layer progress ground by floating rule;
5) screed is placed in the pervious concrete surface layer after completion ground is tentatively levelling;
6) plate compactor is placed on screed;
7) plate compactor is opened, screed vibration pressure pervious concrete surface layer is driven by plate compactor, until with two kerbstones It flushes.
Furthermore, kerbstone described in step 1) uses curb steel plate or absolute altitude locating template.
Furthermore, floating rule described in step 4) uses plank, glued board, plastic plate, iron plate or is flat with side The plate in face.
Furthermore, the size of screed described in step 5) is arranged using that can cover two kerbstones.
Furthermore, screed described in step 5) using plank, glued board, plastic plate, iron plate or has certain rigid The surface plate of degree.
The invention has the advantages that:
The present invention uses such structure setting, greatly improves pervious concrete using the flatness of screed itself The planarization of surface layer, while the positioning height of pervious concrete surface layer can be effectively controlled, it is walked and is driven by the vibration of plate compactor Screed vibration pressure, makes pervious concrete obtain vibrating compacting, greatly improves the mechanical property of pervious concrete, and effect of mating formation Rate is high, is suitble to large area permeable pavement.
Detailed description of the invention
Fig. 1 is pervious concrete structure and permeable pavement equipment top view;
Fig. 2 is pervious concrete structure and permeable pavement equipment side view;
Fig. 3 is that floating rule carries out preliminary levelling schematic diagram to pervious concrete surface layer.
1. pervious concrete surface layer;2. kerbstone;3. screed;4. plate compactor;5. floating rule;6. pervious concrete base; 7. rubble stabilized zone.
Specific embodiment
Technical solution of the present invention is illustrated with embodiment with reference to the accompanying drawing.
As shown in Figure 1 to Figure 3, a kind of pervious concrete structure of the present invention, including spaced apart it is set to ground Two kerbstones 2 on face, are layed in 7 upper surface of rubble stabilized zone at the rubble stabilized zone 7 being layed between two kerbstones 2 Pervious concrete base 6 and be layed in the pervious concrete surface layer 1 of 6 upper surface of pervious concrete base, pervious concrete Surface layer 1 carries out that ground is tentatively levelling by floating rule 5, and complete ground it is preliminary it is levelling after 1 upper surface of pervious concrete surface layer put Screed 3 is set, plate compactor 4 is placed above in screed 3, and plate compactor 4 drives the vibration pressure pervious concrete surface layer 1 of screed 3, until institute It states pervious concrete surface layer 1 and flushes (or reaching positioning absolute altitude) with two kerbstones 2.The above constitutes the basic knot of the present invention Structure.
The present invention uses such structure setting, greatly improves permeable coagulation using the flatness of screed 3 itself The planarization of native surface layer 1, while the positioning height of pervious concrete surface layer 1 can be effectively controlled, it is walked by the vibration of plate compactor 4 The vibration pressure of screed 3 is driven, so that pervious concrete is obtained vibrating compacting, greatly improves the mechanical property of pervious concrete, and Mat formation high-efficient, is suitble to large area permeable pavement.
A kind of method for paving of pervious concrete structure, which comprises the following steps:
1) uniformly pave one layer of rubble stabilized zone 7 between two be set on ground kerbstone 2 spaced apart; Using such structure setting, lower layer's pedestal using rubble stabilized zone 7 as pervious concrete structure, while passing through two roads Kerb 2 limits the two sides of rubble stabilized zone 7.
2) it uniformly paves one layer of pervious concrete base 6 in the upper surface of rubble stabilized zone 7;It is set using such structure It sets, the middle layer pedestal using pervious concrete base 6 as pervious concrete structure.
3) it uniformly paves one layer of pervious concrete surface layer 1 in the upper surface of pervious concrete base 6;Using such structure Setting, the upper layer pedestal using pervious concrete surface layer 1 as pervious concrete structure.
4) tentatively levelling to the progress of pervious concrete surface layer 1 ground by floating rule 5;Using such structure setting, pass through Floating rule 5 carries out the surface of pervious concrete surface layer 1 to strike off processing, places screed 3 convenient for postorder.
5) screed 3 is placed in the pervious concrete surface layer 1 after completion ground is tentatively levelling;It is set using such structure It sets, greatly improves the planarization of pervious concrete surface layer 1 using the flatness of screed 3 itself.
6) plate compactor 4 is placed on screed 3;
7) plate compactor 4 is opened, the vibration pressure pervious concrete surface layer 1 of screed 3 is driven by plate compactor 4, until with two roads Kerb 2 flushes (or reaching positioning absolute altitude).Using such structure setting, the vibration pressure of screed 3 is driven by plate compactor 4, can be had The positioning height of effect control pervious concrete surface layer 1, while the vibration pressure of screed 3 is driven by plate compactor 4, obtain pervious concrete To vibrating compacting, the mechanical property of pervious concrete is greatly improved.
More specifically, traditional kerbstone or way station stone can be directly used in kerbstone 2 described in step 1), can also be with Using curb steel plate or locating template.
More specifically, floating rule 5 described in step 4) uses plank, glued board, plastic plate, iron plate or is flat with side The plate in face.In practical application, floating rule 5 need to be that the preliminary levelling of ground can be realized in the plate of plane using there is side, materials It is convenient, effectively save the cost of custom-made.
More specifically, the size of screed 3 described in step 5) is arranged using that can cover two kerbstones 2.It adopts With such structure setting, flushed convenient for controlling the positioning height of pervious concrete surface layer 1 with two kerbstones 2.
More specifically, screed 3 described in step 5) using plank, glued board, plastic plate, iron plate or has certain rigid The surface plate of degree.Using such structure setting, pervious concrete is greatly improved using the flatness of screed 3 itself The planarization of surface layer 1.
The embodiment of the present invention is described in conjunction with attached drawing above, but the invention is not limited to above-mentioned specific realities Mode is applied, the above mentioned embodiment is only schematical, rather than restrictive, and those skilled in the art exist Under enlightenment of the invention, without breaking away from the scope protected by the purposes and claims of the present invention, many shapes can be also made Formula, within these are all belonged to the scope of protection of the present invention.

Claims (6)

1. a kind of pervious concrete structure, it is characterised in that: including two be set on ground kerbstone spaced apart (2), it is layed in the rubble stabilized zone (7) between two kerbstones (2), is layed in rubble stabilized zone (7) upper surface Pervious concrete base (6) and be layed in the pervious concrete surface layer (1) of pervious concrete base (6) upper surface, The pervious concrete surface layer (1) carries out that ground is tentatively levelling by floating rule (5), and complete ground it is preliminary it is levelling after it is permeable mixed Screed (3) are placed in solidifying soil surface layer (1) upper surface, and the screed (3) is placed above plate compactor (4), plate compactor (4) band Dynamic screed (3) vibration pressure pervious concrete surface layer (1), until the pervious concrete surface layer (1) is neat with two kerbstones (2) It is flat.
2. a kind of method for paving of pervious concrete structure, which comprises the following steps:
1) uniformly pave one layer of rubble stabilized zone (7) between two be set on ground kerbstone (2) spaced apart;
2) it uniformly paves one layer of pervious concrete base (6) in the upper surface of rubble stabilized zone (7);
3) it uniformly paves one layer of pervious concrete surface layer (1) in the upper surface of pervious concrete base (6);
4) tentatively levelling to pervious concrete surface layer (1) progress ground by floating rule (5);
5) screed (3) are placed in the pervious concrete surface layer (1) after completion ground is tentatively levelling;
6) plate compactor (4) are placed on screed (3);
7) plate compactor (4) are opened, screed (3) vibration pressure pervious concrete surface layer (1) is driven by plate compactor (4), until with two Kerbstone (2) flushes.
3. a kind of method for paving of pervious concrete according to claim 2, it is characterised in that: kerbstone described in step 1) (2) curb steel plate or absolute altitude locating template are used.
4. a kind of method for paving of pervious concrete structure according to claim 2, it is characterised in that: scraped described in step 4) Ruler (5) use plank, glued board, plastic plate, iron plate or with side for the plate of plane.
5. a kind of method for paving of pervious concrete structure according to claim 2, it is characterised in that: whole described in step 5) The size of plate (3) is arranged using that can cover two kerbstones (2).
6. a kind of method for paving of pervious concrete structure according to claim 2, it is characterised in that: whole described in step 5) Plate (3) uses plank, glued board, plastic plate, iron plate or the surface plate with certain rigidity.
CN201810817929.1A 2018-07-23 2018-07-23 A kind of pervious concrete structure and method for paving Pending CN108951349A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810817929.1A CN108951349A (en) 2018-07-23 2018-07-23 A kind of pervious concrete structure and method for paving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810817929.1A CN108951349A (en) 2018-07-23 2018-07-23 A kind of pervious concrete structure and method for paving

Publications (1)

Publication Number Publication Date
CN108951349A true CN108951349A (en) 2018-12-07

Family

ID=64464075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810817929.1A Pending CN108951349A (en) 2018-07-23 2018-07-23 A kind of pervious concrete structure and method for paving

Country Status (1)

Country Link
CN (1) CN108951349A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101392484A (en) * 2008-10-10 2009-03-25 中国建筑股份有限公司 Stone texture-imitated pervious concrete ground and construction method thereof
CN201400841Y (en) * 2009-01-09 2010-02-10 长沙理工大学 Continuously reinforced concrete composite asphalt pavement structure
CN101718069A (en) * 2008-10-09 2010-06-02 深圳市海川实业股份有限公司 Permeable pavement structure
CN201713743U (en) * 2009-07-04 2011-01-19 商丘市豫东公路勘察设计有限公司 Asphalt concrete pavement structure of roads in Pingyuan County in Eastern Henan Province
CN202031003U (en) * 2010-07-29 2011-11-09 上海园林绿化建设有限公司 Pervious concrete park pavement layer structure
CN203977261U (en) * 2014-05-14 2014-12-03 黑龙江省龙建路桥第三工程有限公司 Rigid pavement paving and leveling tamping equipment
CN104695298A (en) * 2015-02-12 2015-06-10 广州市市政工程设计研究院 Complete permeable compound type road surface structure
CN204435179U (en) * 2015-01-06 2015-07-01 河北省交通建设监理咨询有限公司 A kind of automatic leveling head of laser and evener
CN105463967A (en) * 2015-11-19 2016-04-06 中建七局第二建筑有限公司 Water-permeable wear-resistant garden path and construction method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101718069A (en) * 2008-10-09 2010-06-02 深圳市海川实业股份有限公司 Permeable pavement structure
CN101392484A (en) * 2008-10-10 2009-03-25 中国建筑股份有限公司 Stone texture-imitated pervious concrete ground and construction method thereof
CN201400841Y (en) * 2009-01-09 2010-02-10 长沙理工大学 Continuously reinforced concrete composite asphalt pavement structure
CN201713743U (en) * 2009-07-04 2011-01-19 商丘市豫东公路勘察设计有限公司 Asphalt concrete pavement structure of roads in Pingyuan County in Eastern Henan Province
CN202031003U (en) * 2010-07-29 2011-11-09 上海园林绿化建设有限公司 Pervious concrete park pavement layer structure
CN203977261U (en) * 2014-05-14 2014-12-03 黑龙江省龙建路桥第三工程有限公司 Rigid pavement paving and leveling tamping equipment
CN204435179U (en) * 2015-01-06 2015-07-01 河北省交通建设监理咨询有限公司 A kind of automatic leveling head of laser and evener
CN104695298A (en) * 2015-02-12 2015-06-10 广州市市政工程设计研究院 Complete permeable compound type road surface structure
CN105463967A (en) * 2015-11-19 2016-04-06 中建七局第二建筑有限公司 Water-permeable wear-resistant garden path and construction method thereof

Similar Documents

Publication Publication Date Title
RU2014130130A (en) ROAD LAYING MACHINE
KR100778045B1 (en) Block equipped with drainage and ventilation function, its producing method, and block mult-layer formed from materialization of the blocks
CN105803922B (en) A kind of high embankment filled soil end of the bridge anti-settling structure
CN106283944A (en) Method for reinforcing shallow soft foundation by pressing and filling rubbles and/or blocks
CN108221533A (en) A kind of laying method in backroad face
CN212834888U (en) Sponge city permeable pavement paver working device
CN108951349A (en) A kind of pervious concrete structure and method for paving
CN209779417U (en) Spreading machine
KR101044745B1 (en) Boundary stone constructing apparatus and method enabling leveling and hardening
CN208362832U (en) A kind of spongeization road structure of cracking resistance
CN207878440U (en) A kind of reinforcement composite foundation structure suitable for soft soil foundation
CN207143685U (en) Mould for hardened verge of constructing
CN115787576A (en) Movable slope protection sand cushion paving compaction device and construction process
CN108316076A (en) A kind of closely knit making construction method of highway earth shoulder sliding formwork pressure
CN212561069U (en) Automatic cement stabilized macadam base course edge film covering device
CN203834313U (en) Impound strap for highway pavement
KR100963298B1 (en) The construction method of the paving layers having an elasticity
CN105603842A (en) Large-thickness sand filling construction technology for embankment
CN102518018B (en) Stacked structure of road pavement and construction method for stacked structure
CN206916560U (en) The road structure of soft clay area
CN1584209A (en) Block pavement constructing method
CN106544940B (en) A kind of garden road pile foundation type spit of fland step structure and construction technology
CN211772644U (en) Cement mortar laying device for road and bridge construction
CN216405369U (en) Composite foundation slope structure
JP4515677B2 (en) Artificial grass pavement method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207

RJ01 Rejection of invention patent application after publication