CN207143685U - Mould for hardened verge of constructing - Google Patents
Mould for hardened verge of constructing Download PDFInfo
- Publication number
- CN207143685U CN207143685U CN201720960964.XU CN201720960964U CN207143685U CN 207143685 U CN207143685 U CN 207143685U CN 201720960964 U CN201720960964 U CN 201720960964U CN 207143685 U CN207143685 U CN 207143685U
- Authority
- CN
- China
- Prior art keywords
- water
- adjustable plate
- plate
- mould
- side board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
A kind of mould for hardened verge of constructing is the utility model is related to, including:Located at the steady face of water and section formwork structure in a rectangular trapezoid, formwork structure has been internally formed casting space, and the side board bottom perpendicular with the steady face of water is vacantly installed with gap between the steady face of water on formwork structure;And telescopically it is connected to the adjustable plate of side board lateral surface, adjustable plate, which is attached at the lateral surface of side board and kept off, is located at gap, and the steady face of water is close to by the bottom of telescopic adjustment adjustable plate, so as to form the space that hardened verge is formed for casting concrete between formwork structure, adjustable plate and the steady face of water.In work progress, adjustable plate is moved up and down to bottom along side board according to the height condition of steady layer of water and is close to the steady face of water, ensure that the apical side height of formwork structure is consistent all the time, influence of the discrepancy in elevation of steady layer of water to hardened verge apical side height is eliminated, while prevents that leakage problems occur during casting concrete.
Description
Technical field
The realm of building construction is the utility model is related to, espespecially a kind of mould for hardened verge of constructing.
Background technology
Hardened verge is referred to adjacent with driveway and spread with the curb part with some strength pavement structure, including curb
Band." hardened verge " is the track marked on the right of highway with yellow line, and main function is to allow disabled vehicle to stop temporarily, and
During emergency, ambulance vehicles are facilitated to pass through.During using the mould construction hardened verge for hardened verge of constructing, by mould
Tool is positioned on the steady face of water, and the steady face of water refers to complete by being compacted using cement consolidation graded broken stone, because the steady face of water is uneven,
It is highly inconsistent, thus it is possible, on the one hand, space be present between the bottom of mould and the steady face of water, hold during casting concrete
Spillage problem easily occurs.On the other hand, the steady face of water is uneven, and the height for the mould being placed on the steady face of water is inconsistent, easily
The top surface for causing to pour the hardened verge to be formed influences the construction quality of hardened verge not on same absolute altitude.
Utility model content
The defects of the purpose of this utility model is to overcome prior art, there is provided a kind of mould for hardened verge of constructing,
Solve to easily cause top surface not the asking on same absolute altitude of spillage, hardened verge because the steady face of water is uneven in the prior art
Topic.
Realizing the technical scheme of above-mentioned purpose is:
The utility model provides a kind of mould for hardened verge of constructing, including:
Located at the steady face of water and section formwork structure in a rectangular trapezoid, the formwork structure has been internally formed casting space,
The side board bottom perpendicular with the steady face of the water is vacantly installed with gap between the steady face of the water on the formwork structure;And
The adjustable plate of the side board lateral surface is telescopically connected to, the adjustable plate is attached at the outer of the side board
Side simultaneously keeps off and be located at the gap, and is close to the steady face of the water by the bottom of the telescopic adjustment adjustable plate, so that
The space that hardened verge is formed for casting concrete is formed between the formwork structure, the adjustable plate and the steady face of the water.
Beneficial effect of the utility model for the mould for hardened verge of constructing:
The utility model be used for construct hardened verge mould by the steady face of water set section be right-angled trapezium template
Structure, formwork structure have been internally formed casting space, and the side board bottom perpendicular with the steady face of water be vacantly and water on formwork structure
Gap is installed between steady face, adjustable plate is telescopically connected to side board lateral surface and gear is located at gap, passes through telescopic adjustment
So that the steady face of water is close in the bottom of adjustable plate, casting concrete is supplied so as to be formed between formwork structure, adjustable plate and the steady face of water
Form the space of hardened verge.So in work progress, according to the height condition of steady layer of water by adjustable plate along above and below side board
It is moved to bottom and is close to the steady face of water, ensure that the apical side height of formwork structure is consistent all the time, eliminates the discrepancy in elevation of steady layer of water to hard
The influence of curb apical side height, solve causes the top surface of hardened verge is rugged to ask because the height relief in the steady face of water is uneven
Topic.The gap between the bottom of side board and the steady face of water is blocked simultaneously, prevents that seepage occurs during casting concrete
Problem, improve the construction quality of hardened verge.
The utility model be used to constructing the mould of hardened verge further improvement is that, in addition to multiple elastic connection knots
Structure, the side board is telescopically connected to by the elastic connection structure adjustable plate.
The utility model be used for construct the mould of hardened verge further improvement is that, the elastic connection structure includes:
It is fixed on the first connecting plate of the lateral surface of the adjustable plate;
It is fixed on the second connecting plate of the lateral surface of the side board;And
The elastic supporting bar being connected between first connecting plate and second connecting plate.
The utility model be used for construct the mould of hardened verge further improvement is that, the elastic supporting bar includes:
The spring being connected between first connecting plate and second connecting plate;And
The vertical rod being inserted in the spring.
The utility model be used to constructing the mould of hardened verge further improvement is that, in addition to be perpendicularly fixed at the side
Side plate and spaced limiting plate;
The top of the adjustable plate is provided with the limited impression corresponding to the limiting plate, by the way that the limiting plate is located at into institute
State in limited impression so as to carry out cross spacing to the adjustable plate.
The utility model be used to constructing the mould of hardened verge further improvement is that, in addition to be perpendicularly fixed at the limit
The baffle plate of position plate, lateral surface of the baffle plate gear located at the adjustable plate.
The utility model be used for construct the mould of hardened verge further improvement is that, the formwork structure also includes:
The cross form being laterally connected at the top of the side board;And
The oblique oblique side template for being connected to the cross form and being oppositely arranged with the side board.
Brief description of the drawings
Fig. 1 be the utility model be used for construct hardened verge mould construction when longitudinal sectional view.
Fig. 2 is side view of the utility model for the mould for hardened verge of constructing.
Fig. 3 is that the utility model shows for the connection of the formwork structure and limiting plate and baffle plate of the mould for hardened verge of constructing
It is intended to.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Refering to Fig. 1, it is shown that the utility model be used for construct hardened verge mould construction when longitudinal sectional view.With reference to
Shown in Fig. 1, the utility model includes for the mould for hardened verge of constructing:Located at the steady face 10 of water and section template in a rectangular trapezoid
Structure 20, formwork structure 20 have been internally formed casting space, side board 21 bottom perpendicular with the steady face of water on formwork structure 20
Vacantly gap is installed between face 10 steady with water;And telescopically it is connected to the adjustable plate 30 of the lateral surface of side board 21, adjustable plate
30 are attached at the lateral surface of side board 21 and keep off and are located at gap, and are close to water by the bottom of telescopic adjustment adjustable plate 30
Steady face 10, so as to form the space that hardened verge is formed for casting concrete between formwork structure 20, adjustable plate 30 and the steady face 10 of water.
So in work progress, according to the height condition telescopic adjustment adjustable plate of steady layer of water, adjustable plate is moved down along on side board
Move to bottom and be close to the steady face of water, ensure that the apical side height of formwork structure is consistent all the time, eliminate the discrepancy in elevation of steady layer of water to hard road
The influence of shoulder apical side height, solve causes the top surface of hardened verge is rugged to ask because the height relief in the steady face of water is uneven
Topic.The gap between the bottom of side board and the steady face of water is blocked simultaneously, prevents that seepage occurs during casting concrete
Problem, improve the construction quality of hardened verge.
Refering to Fig. 2, it is shown that side view of the utility model for the mould for hardened verge of constructing.With reference to Fig. 1 and Fig. 2 institutes
Show, as a better embodiment of the utility model for the mould for hardened verge of constructing, the utility model is used for hard road of constructing
The mould of shoulder also includes multiple elastic connection structures 40, is telescopically connected to by the adjustable plate 30 of elastic connection structure 40
Side board 21.It can be so close to according to the height change in the steady face 10 of water to adjust the position of adjustable plate 30 to the bottom of adjustable plate 30
The steady face 10 of water so that the height of the top surface of formwork structure 20 is always consistent, to ensure to obtain after final casting concrete
Hardened verge top surface height it is always consistent.Meanwhile the gap between the bottom of side board 21 and the steady face 10 of water is sealed
Block, prevent that leakage problems occur during casting concrete, improve the construction quality of hardened verge.
As a better embodiment of the utility model for the mould for hardened verge of constructing, elastic connection structure 40 wraps
Include:It is fixed on the first connecting plate 41 of the lateral surface of adjustable plate 30;It is fixed on the second connecting plate 42 of the lateral surface of side board 21;
And it is connected to the elastic supporting bar 43 between the first connecting plate 41 and the second connecting plate 42.The length of elastic supporting bar 43 can change
Become, change so as to drive positioned at the first connecting plate 41 of the end of elastic supporting bar 43 and the position of the second connecting plate 42, and then
The relative position between change adjustable plate 30 and side board 21 is driven, by the gap between the bottom of side board 21 and the steady face 10 of water
Block, so to ensure that in the case of the bottom of formwork structure 20 not spillage, the height of the top surface of formwork structure 20 is protected all the time
Hold unanimously, to obtain meeting the hardened verge for possessing certain mass requirement.
In the present embodiment, elastic supporting bar 43 includes:It is connected between the first connecting plate 41 and the second connecting plate 42
Spring 430;And it is inserted in the vertical rod 431 in spring 430.Spring 430 is scalable to change length, and vertical rod 431 plays support
The effect of spring 430, ensure that spring 430 is in vertical position and integrally-built stability, prevent spring 430 from arbitrarily inclining
Tiltedly, follow-up construction quality is influenceed.
Refering to Fig. 3, it is shown that formwork structure and limiting plate and gear of the utility model for the mould for hardened verge of constructing
The connection diagram of plate.With reference to shown in Fig. 1 to Fig. 3, as a preferable reality of the utility model for the mould for hardened verge of constructing
Mode is applied, the utility model also includes being perpendicularly fixed at side board 21 and spaced limit for the mould for hardened verge of constructing
Position plate 50;
The top of adjustable plate 30 is provided with the limited impression 31 corresponding to limiting plate 50, spacing recessed by the way that limiting plate 50 is located at
So as to the progress cross spacing of adjustable plate 30 in groove 31.So when adjusting the position of adjustable plate 30, because limiting plate 50 is limited
It is formed in limited impression 31, adjustable plate 30 can only move up and down along the direction of limited impression 31, and can not move left and right, so as to
Cross spacing can be carried out to the position of adjustable plate 30.
Further, the baffle plate that utility model also includes being perpendicularly fixed at limiting plate 50 for the mould for hardened verge of constructing
51, the gear of baffle plate 51 is located at the lateral surface of adjustable plate 30, and such baffle plate 51 can ensure adjustable plate 30 during regulation all the time
Side board 21 is attached at, prevents adjustable plate 30 from departing from side board 21 and spillage problem occurs.
As a better embodiment of the utility model for the mould for hardened verge of constructing, formwork structure 20 also includes:
It is laterally connected in the cross form 22 at the top of side board 21;And the oblique cross form 22 and relative with side board 21 of being connected to
The oblique side template 23 set, side board 21, cross form 22, oblique side template 23 enclose the structure that Formation cross-section is right-angled trapezium,
Formed so as to be formed between side board 21, cross form 22, oblique side template 23, adjustable plate 30 and the steady face 10 of water for casting concrete
The space of hardened verge.
The utility model has the beneficial effect that for the mould for hardened verge of constructing:
The utility model be used for construct hardened verge mould by the steady face of water set section be right-angled trapezium template
Structure, formwork structure have been internally formed casting space, and the side board bottom perpendicular with the steady face of water be vacantly and water on formwork structure
Gap is installed between steady face, adjustable plate is telescopically connected to side board lateral surface and gear is located at gap, passes through telescopic adjustment
So that the steady face of water is close in the bottom of adjustable plate, casting concrete is supplied so as to be formed between formwork structure, adjustable plate and the steady face of water
Form the space of hardened verge.So in work progress, according to the height condition of steady layer of water by adjustable plate along above and below side board
It is moved to bottom and is close to the steady face of water, ensure that the apical side height of formwork structure is consistent all the time, eliminates the discrepancy in elevation of steady layer of water to hard
The influence of curb apical side height, solve causes the top surface of hardened verge is rugged to ask because the height relief in the steady face of water is uneven
Topic.The gap between the bottom of side board and the steady face of water is blocked simultaneously, prevents that seepage occurs during casting concrete
Problem, improve the construction quality of hardened verge.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root
Many variations example is made to the utility model according to described above.Thus, some details in embodiment should not be formed to this practicality
New restriction, the utility model will be used as the scope of protection of the utility model using the scope that appended claims define.
Claims (7)
- A kind of 1. mould for hardened verge of constructing, it is characterised in that including:Located at the steady face of water and section formwork structure in a rectangular trapezoid, the formwork structure has been internally formed casting space, described The side board bottom perpendicular with the steady face of the water is vacantly installed with gap between the steady face of the water on formwork structure;AndThe adjustable plate of the side board lateral surface is telescopically connected to, the adjustable plate is attached at the lateral surface of the side board And keep off and be located at the gap, and the steady face of the water is close to by the bottom of the telescopic adjustment adjustable plate, so as to described The space that hardened verge is formed for casting concrete is formed between formwork structure, the adjustable plate and the steady face of the water.
- 2. the mould as claimed in claim 1 for hardened verge of constructing, it is characterised in that also including multiple elastic connection knots Structure, the side board is telescopically connected to by the elastic connection structure adjustable plate.
- 3. the mould as claimed in claim 2 for hardened verge of constructing, it is characterised in that the elastic connection structure includes:It is fixed on the first connecting plate of the lateral surface of the adjustable plate;It is fixed on the second connecting plate of the lateral surface of the side board;AndThe elastic supporting bar being connected between first connecting plate and second connecting plate.
- 4. the mould as claimed in claim 3 for hardened verge of constructing, it is characterised in that the elastic supporting bar includes:The spring being connected between first connecting plate and second connecting plate;AndThe vertical rod being inserted in the spring.
- 5. the mould as claimed in claim 1 for hardened verge of constructing, it is characterised in that also include being perpendicularly fixed at the side Side plate and spaced limiting plate;The top of the adjustable plate is provided with the limited impression corresponding to the limiting plate, by the way that the limiting plate is located at into the limit So as to adjustable plate progress cross spacing in the groove of position.
- 6. the mould as claimed in claim 5 for hardened verge of constructing, it is characterised in that also include being perpendicularly fixed at the limit The baffle plate of position plate, lateral surface of the baffle plate gear located at the adjustable plate.
- 7. the mould as claimed in claim 1 for hardened verge of constructing, it is characterised in that the formwork structure also includes:The cross form being laterally connected at the top of the side board;AndThe oblique oblique side template for being connected to the cross form and being oppositely arranged with the side board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720960964.XU CN207143685U (en) | 2017-08-03 | 2017-08-03 | Mould for hardened verge of constructing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720960964.XU CN207143685U (en) | 2017-08-03 | 2017-08-03 | Mould for hardened verge of constructing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207143685U true CN207143685U (en) | 2018-03-27 |
Family
ID=61673920
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720960964.XU Expired - Fee Related CN207143685U (en) | 2017-08-03 | 2017-08-03 | Mould for hardened verge of constructing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207143685U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114753216A (en) * | 2022-04-18 | 2022-07-15 | 中国十七冶集团有限公司 | Novel water-stable construction steel formwork supporting device and construction method |
CN114808992A (en) * | 2022-04-25 | 2022-07-29 | 中交第三航务工程局有限公司 | Design method of fan anchor bolt foundation grouting steel formwork |
-
2017
- 2017-08-03 CN CN201720960964.XU patent/CN207143685U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114753216A (en) * | 2022-04-18 | 2022-07-15 | 中国十七冶集团有限公司 | Novel water-stable construction steel formwork supporting device and construction method |
CN114753216B (en) * | 2022-04-18 | 2023-08-25 | 中国十七冶集团有限公司 | Water-stable construction steel template supporting device and construction method |
CN114808992A (en) * | 2022-04-25 | 2022-07-29 | 中交第三航务工程局有限公司 | Design method of fan anchor bolt foundation grouting steel formwork |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207143685U (en) | Mould for hardened verge of constructing | |
CN204491369U (en) | A kind of simple and easy spreader | |
CN113047137A (en) | Layered slip-form paving construction method for road shoulder | |
CN203755117U (en) | Equipment device for improving slip-form paver | |
EP3635176B1 (en) | Method for producing a paving area | |
DE1459670A1 (en) | Built-in machine for road construction | |
CN103821061B (en) | A kind of automobile safety collision test room is with drawing runway and construction in layer method thereof | |
CN109252434A (en) | A kind of asphalt pavement structure and its construction method | |
CN102518010A (en) | Combined device for laying and grouting ballastless track board | |
CN204266150U (en) | A kind of hard isolated column for old bridge dividing strip | |
CN108590680A (en) | A kind of construction method that launching shaft foundation pit vertical section pours | |
CN208293344U (en) | Kerbstone, gutter and the molding pavement structure of top course one-time-concreting | |
DE102010007798B4 (en) | Concrete paving stone | |
CN210910460U (en) | Water stable layer roadbed prefabricating device | |
CN207700643U (en) | Waterproof layer terrace template | |
CN207032777U (en) | For the template with waterproof layer terrace laying color separation abrasion-proof terrace | |
CN203188084U (en) | In-field shoulder-stone-free secondary concrete road | |
DE872959C (en) | Road paving made of blocks and their production | |
CN110295523A (en) | Road rigid pavement precast concrete block | |
DE3036234A1 (en) | DEVICE FOR LEVELING A CONCRETE COVER SURFACE AND METHOD FOR THEIR OPERATION | |
DE577604C (en) | Device for lining embankments with concrete | |
KR101544985B1 (en) | Socket type precast concrete panel and paving method using the same | |
DE644032C (en) | Metal plaster | |
CN207749379U (en) | Pavement structure at a kind of bus platform | |
DE1459670C3 (en) | Self-propelled road paver ABG-Werke GmbH, 3250 Hameln |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180327 |
|
CF01 | Termination of patent right due to non-payment of annual fee |