CN108920820A - 一种地铁区间施工工法的信息模型表达方法 - Google Patents
一种地铁区间施工工法的信息模型表达方法 Download PDFInfo
- Publication number
- CN108920820A CN108920820A CN201810701533.0A CN201810701533A CN108920820A CN 108920820 A CN108920820 A CN 108920820A CN 201810701533 A CN201810701533 A CN 201810701533A CN 108920820 A CN108920820 A CN 108920820A
- Authority
- CN
- China
- Prior art keywords
- model
- component
- information
- finenesses
- different
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810701533.0A CN108920820B (zh) | 2018-06-29 | 2018-06-29 | 一种地铁区间施工工法的信息模型表达方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810701533.0A CN108920820B (zh) | 2018-06-29 | 2018-06-29 | 一种地铁区间施工工法的信息模型表达方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108920820A true CN108920820A (zh) | 2018-11-30 |
CN108920820B CN108920820B (zh) | 2023-01-10 |
Family
ID=64421282
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810701533.0A Active CN108920820B (zh) | 2018-06-29 | 2018-06-29 | 一种地铁区间施工工法的信息模型表达方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108920820B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113094785A (zh) * | 2021-04-06 | 2021-07-09 | 万翼科技有限公司 | 建筑模型构建方法及相关装置 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140200945A1 (en) * | 2013-01-11 | 2014-07-17 | Myongji University Industry And Academia Cooperation Foundation | System and method for creating building information modeling object breakdown structure |
CN106447116A (zh) * | 2016-10-10 | 2017-02-22 | 陕西铁路工程职业技术学院 | Bim技术在地铁铺轨施工中的应用 |
-
2018
- 2018-06-29 CN CN201810701533.0A patent/CN108920820B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140200945A1 (en) * | 2013-01-11 | 2014-07-17 | Myongji University Industry And Academia Cooperation Foundation | System and method for creating building information modeling object breakdown structure |
CN106447116A (zh) * | 2016-10-10 | 2017-02-22 | 陕西铁路工程职业技术学院 | Bim技术在地铁铺轨施工中的应用 |
Non-Patent Citations (2)
Title |
---|
唐维等: "基于Revit软件建模的BIM技术研究", 《公路交通科技(应用技术版)》 * |
翟世鸿等: "铁路矿山法隧道BIM建模标准研究", 《铁道标准设计》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113094785A (zh) * | 2021-04-06 | 2021-07-09 | 万翼科技有限公司 | 建筑模型构建方法及相关装置 |
CN113094785B (zh) * | 2021-04-06 | 2022-12-09 | 万翼科技有限公司 | 建筑模型构建方法及相关装置 |
Also Published As
Publication number | Publication date |
---|---|
CN108920820B (zh) | 2023-01-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112943364B (zh) | 基于Dynamo与Revit长大隧道参数化建模方法 | |
CN107480374B (zh) | 一种基于catia的桥梁bim模型创建方法 | |
CN111899343A (zh) | 一种基于bim技术在市政工程交通疏导方法 | |
CN109800536A (zh) | 一种基于Revit与Dynamo参数化隧道模型快速建模方法 | |
Biancardo et al. | Procedural Modeling‐Based BIM Approach for Railway Design | |
CN111814243B (zh) | 一种隧道设计图和三维模型自动生成方法 | |
CN108268715B (zh) | 一种基于bim技术的钢桥面铺装施工仿真模拟方法 | |
CN105781064A (zh) | 基于bim的地砖铺设施工方法 | |
CN112685816B (zh) | 基于模型及数据的设计成果在线交付系统及方法 | |
CN105608521A (zh) | 一种暗挖地铁车站区间隧道的施工工程量计算方法 | |
CN107704531B (zh) | 一种osm地图数据中路网交叉口节点自动合并方法 | |
CN110990919A (zh) | 城市轨道交通三维gis选线设计分析方法 | |
CN114021226A (zh) | 一种空间线性工程bim建模及整合方法 | |
CN109635485A (zh) | 基于ifc标准的隧道动态施工信息模型构件实体扩展方法 | |
CN115017569A (zh) | 一种二、三维联动的桥梁参数化建模、出图方法、装置、设备及介质 | |
CN108875167A (zh) | 一种基于bim技术的施工现场三维布置优化方法 | |
CN110909407A (zh) | 一种基于bim的山洞实验室及竖井bim模型创建方法 | |
CN112395671A (zh) | 一种基于bim的大跨度拱桥三维正向设计方法 | |
CN113177251A (zh) | 一种基于bim+gis平台的公路设计数据协同管理方法及管理系统 | |
CN107679332A (zh) | 基于Tekla平台的输电铁塔BIM模型构建方法 | |
CN108920820A (zh) | 一种地铁区间施工工法的信息模型表达方法 | |
CN109858160B (zh) | 一种基于bim技术的轨道交通地质信息模型的建模方法 | |
CN117034434A (zh) | 一种基于安全评价的道路模型快速生成方法 | |
CN110119596B (zh) | 一种基于Revit的场地编辑系统 | |
KR20060062255A (ko) | 3차원 객체와 일정을 연계한 토목공사 시설물의 4차원건설공사 공정관리시스템 및 그 구현방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 361000 Siming South Road, Xiamen, Fujian Province, No. 422 Applicant after: XIAMEN University Applicant after: CHINA RAILWAY SOUTHERN INVESTMENT GROUP Co.,Ltd. Address before: No.333513, Zhongtie South Road, Shenzhen Applicant before: CHINA RAILWAY SOUTHERN INVESTMENT GROUP Co.,Ltd. Applicant before: XIAMEN University |
|
CB02 | Change of applicant information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhou Hong Inventor after: Li Shunping Inventor after: Wu Songrong Inventor after: Chen Ping Inventor after: Li Hubo Inventor after: Tan Yelin Inventor before: Li Shunping Inventor before: Zhou Hong Inventor before: Wu Songrong Inventor before: Tan Yelin Inventor before: Chen Ping Inventor before: Li Hubo |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |