CN108919682A - A kind of field operation electronization working method - Google Patents
A kind of field operation electronization working method Download PDFInfo
- Publication number
- CN108919682A CN108919682A CN201810758138.6A CN201810758138A CN108919682A CN 108919682 A CN108919682 A CN 108919682A CN 201810758138 A CN201810758138 A CN 201810758138A CN 108919682 A CN108919682 A CN 108919682A
- Authority
- CN
- China
- Prior art keywords
- test
- debugging
- examination
- report
- task
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 60
- 238000012360 testing method Methods 0.000 claims abstract description 225
- 238000010998 test method Methods 0.000 claims abstract description 24
- 230000004048 modification Effects 0.000 claims description 4
- 238000012986 modification Methods 0.000 claims description 4
- 230000008439 repair process Effects 0.000 claims 1
- 230000008569 process Effects 0.000 abstract description 19
- 230000008901 benefit Effects 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 description 8
- 238000007726 management method Methods 0.000 description 8
- 230000008859 change Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000012550 audit Methods 0.000 description 3
- 238000013523 data management Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 235000013399 edible fruits Nutrition 0.000 description 3
- 230000003319 supportive effect Effects 0.000 description 3
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000002474 experimental method Methods 0.000 description 2
- 238000013100 final test Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000013475 authorization Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000012804 iterative process Methods 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000007639 printing Methods 0.000 description 1
- 238000004886 process control Methods 0.000 description 1
- 238000009418 renovation Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Automation & Control Theory (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Debugging And Monitoring (AREA)
Abstract
The embodiment of the present invention provides a kind of field operation electronization working method, and this method includes:Debugging test program is generated according to pilot project;Blank test report is debugged according to the debugging test Program Generating;According to the debugging test task that the debugging blank test report is formulated, and the debugging test task is sent to mobile terminal, receives the updated debugging test task that the mobile terminal is sent;According to updated debugging test task, debugging test report is generated.The present invention uses current multimedia tool, and combine the resource-sharing of internet platform, dynamic, the advantage easily extended, provide a kind of field operation electronization working method, in the overall processes such as test procedure editor, examination & approval, test report editor examination & approval, test process and test report final version, complete documentation revises operation information, realizes and the overall process of test report is recorded and tracked.
Description
Technical field
The present embodiments relate to field operation intelligent work method and technology field more particularly to a kind of field operation electronics
Change working method.
Background technique
It, not only will be according to stringent debugging in the debugging stage of Nuclear power project due to the particular/special requirement of nuclear safety
What test procedure executed, it is necessary to the implementation process of complete documentation debugging test, to ensure the trackability of test result.
In the prior art, the stage is debugged in engineering, various design alterations can occurs at any time, the equipment for being partially installed on scene
Real data the case where not being inconsistent with initial designs file also happen occasionally, during debugging test, the test of test procedure
Method, design parameter, facility information, acceptance criteria all change frequent occurrence, therefore test director generally requires to hold in test
Row order section modifies to test procedure;Since the process of debugging is exactly constantly to test, noting abnormalities, handling, testing again
Iterative process, for test director there may be multiple test data during debugging test, preciseness requires test
Responsible person must be all under complete documentation in test report record, generated including clerical mistake and its amendment, test of many times more
Secondary record.
Although final test report still only shows final test result, all process records all must be protected completely
It stays.In the current debugging stage both domestic and external, test data is filled in using the test procedure of papery, in test implementation procedure, institute
Some revision process records can be recorded verily in such a way that thick stick changes.The recording mode of papery version is not able to satisfy modern nuclear power
The demand of debugging business, mainly has the disadvantage that:1) paper record can not control program revisions, not can guarantee revision
Quality;2) during revising, need to realize the audit calibration of different departments, papery mode has seriously affected examination & approval efficiency;3)
Papery mode, each Document History can not be shown, are unfavorable for revision and recalled, are unfavorable for the tracking of revision version;4) papery is reported,
Be unfavorable for it is for statistical analysis to PognM-epo, data utilization it is very low, big data analysis can not be carried out.
Summary of the invention
For the deficiency of existing papery debugging test report, the embodiment of the present invention provides a kind of field operation electronization work
Method.
The embodiment of the present invention provides a kind of field operation electronization working method, and this method includes:
S1 generates debugging test program according to pilot project;
S2 debugs blank test report according to the debugging test Program Generating;
S3 according to the debugging test task that the debugging blank test report is formulated, and the debugging test task is sent out
It send to mobile terminal, receives the updated debugging test task that the mobile terminal is sent;
S4 generates debugging test report according to updated debugging test task.
The embodiment of the present invention also provides a kind of field operation electronization working method, including:
S1 receives the debugging test task that server is sent;
S2 obtains updated tune according to the test data of the debugging test task and acquisition nuclear power plant's test apparatus
Try test mission;
S3 carries out self-test to updated debugging test task;
Updated debugging test task is sent to server if self-test passes through by S4.
A kind of field operation electronization working method provided in an embodiment of the present invention, with current multimedia tool, and
In conjunction with the resource-sharing of internet platform, dynamic, the easily advantage that extends, a kind of field operation electronization working method is provided,
It is complete to remember in the overall processes such as test procedure editor, examination & approval, test report editor examination & approval, test process and test report final version
Record revision operation information, realizes and the overall process of test report is recorded and tracked.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair
Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root
Other attached drawings are obtained according to these attached drawings.
A kind of process of field operation electronization working method when being executing subject that Fig. 1 is server of the embodiment of the present invention
Figure;
A kind of process of field operation electronization working method when being executing subject that Fig. 2 is mobile terminal of the embodiment of the present invention
Figure;
Fig. 3 is the architecture diagram that the embodiment of the present invention realizes a kind of field operation electronization working method;
Fig. 4 is the system structure diagram that the embodiment of the present invention realizes a kind of field operation electronization working method;
Fig. 5 is a kind of flow chart of field operation electronization working method of one embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art
Every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
The executing subject of the embodiment of the present invention is server, which is all suitable for all field operations, is
It is convenient for description and explanation, is illustrated by taking the field operation of nuclear power plant's debugging as an example, Fig. 1 is that server of the embodiment of the present invention is
A kind of flow chart of field operation electronization working method when executing subject, as shown in Figure 1, this method includes:
S1 generates debugging test program according to pilot project;
S2 debugs blank test report according to the debugging test Program Generating;
S3 according to the debugging test task that the debugging blank test report is formulated, and the debugging test task is sent out
It send to mobile terminal, receives the updated debugging test task that the mobile terminal is sent;
S4 generates debugging test report according to updated debugging test task.
This method includes that server, the end PC and mobile terminal composition, server end undertake system entirety industry in the process of implementation
Business, information management function, the end PC loads flow operations relevant to server, and realizes that the programming at the end PC, program are repaired
Order, data record and report publish, mobile terminal be responsible for debugging test data and with server carry out data it is synchronous.
Server end and mobile terminal are communicated by wireless network mode, realize that debugging test cooperation service process is turned round
Turn.
Server end includes database server, application server, client browser, printer etc..
The structured storage management of database server supportive test relevant information, including pilot project library, test parameters
The multi-dimensional associations management such as library, test apparatus library, test procedure, report template library, algorithms library, quality planning database and
The multimedias storage management such as text, picture, table, video.It is checked convenient for user and the intelligence computation function of test data is real
It is existing.
Application server provides system function service for user, timely responds to the service request of client browser, to number
According to library server calls user requested data, feeds back to client and be shown.
Pc client browser is the man-machine interactive platform of user and system, and user can inquire debugging examination by client
Test all relevant informations and debugging test implementation progress;Can to the basic informations such as pilot project, test apparatus, test parameters into
Row management;Examination & approval test procedure, test report can be edited;It can formulate, examine content of the test and supportive test data intelligence
The functions such as energy calculating.
Printer is used for test procedure, test report printing function as system peripheral.
Mobile terminal is made of several mobile plates.Installation and debugging test report and intelligence computation system in all mobile devices
Mobile APP program.
Mobile terminal mainly executes the i.e. debugging test data collection task of debugging test content.Debugging test content is tried with blank
It tests report form and is issued to specified test the held mobile device of executor from server end, commissioning staff's networking tries pending debugging
The task of testing downloads in mobile device, mobile device supportive test content look facility.
Debugging test content carries out tissue by modular unit of pilot project.Debugging test implementation procedure is exactly to set in movement
The process of standby upper typing test parameters value.Support the multimedias typing modes such as numerical value, text, picture, audio, video.Test people
Member can carry out test of many times, finally select and oneself think accurate battery of tests record as test result.
Mobile device supports off-line testing operation, after content of the test downloading, commissioning staff can with server without logical
Test Data Collecting work is completed under the conditions of news.But it after the test, needs to establish wireless telecommunications with server and connect, to complete
The upload of test data.
On the basis of the above embodiments, specifically, step S1 is specifically included:
S11 generates test procedure according to the pilot project;
S12 revises the test procedure, and carries out editor's examination & approval to revised test procedure;
S13 is corrected examination & approval to revised test procedure if examination & approval pass through;
S14 generates the debugging test program if examination & approval pass through.
Selection experiment project automatically generates test procedure content first, revises to program, and to revised program
It is edited and is examined, if examination & approval do not pass through, program is revised again, until examination & approval pass through;If examination & approval pass through, right
Program carries out a liter version, and examines again to the program after liter version, does not pass through if examined at this time, rises again to program
Version, the program examination & approval after liter version pass through;If examination & approval pass through, debugging test program is generated, and export papery program.
Specifically, step S2 is specifically included:
S21 is reported according to the debugging test Program Generating blank test;
S22 revises blank test report, and carries out editor's examination & approval to revised blank test report;
S23 generates the debugging blank test report if examination & approval pass through.
After generating debugging test program, blank test report is automatically generated, abbreviation CFA, blank examination are reported in blank test
Testing report is generated according to test report format module, is conveniently managed.Then blank test report is revised, and
And the complete record modification information in revision process, editor's examination & approval are carried out to revised test report, if examination & approval are obstructed
It crosses, test report is revised again, until examination & approval pass through, if examination & approval pass through, generate debugging blank test report, may be used also
Papery test report is exported with selection as needed.
Specifically, step S3 is specifically included:
S31, according to it is described debugging blank test report formulate debugging test task, and to the debugging test task into
Row examination & approval;
The debugging test task is sent to mobile terminal if examination & approval pass through by S32;
S33 receives the updated debugging test task that the mobile terminal is sent.
According to debugging blank test report, debugging test task is formulated, debugging test task is examined, if examination & approval
Do not pass through, reformulate debugging test task, pass through until examining, if examination & approval pass through, debugging test task is sent to shifting
Moved end after mobile terminal receives the debugging test task formulated, according to the specific requirement of debugging test task, acquires nuclear power plant's instrument
The relevant parameter of equipment executes test mission according to these relevant parameters, and carries out self-test to test mission, if self-test
Pass through, the test mission together with relevant parameter is updated, and sends server end for updated test mission.
The updated test mission of received server-side, and audited.
Specifically, step S4 is specifically included:
S41 generates debugging test report according to updated debugging test task, and reports the debugging test and carry out
Revision;
S42 carries out editor's examination & approval to the report of revised debugging test;
S43 reports the report of revised debugging test as final debugging test if examination & approval pass through.
If audit passes through, test data is filled, and debugging test report automatically generates, and is reported debugging test and is carried out
Revision, edlin of going forward side by side examination & approval are again revised debugging test report, are passed through until examining, such as if examination & approval do not pass through
Fruit examination & approval pass through, and generate debugging test report.
The executing subject of the embodiment of the present invention is mobile terminal, and Fig. 2 is mobile terminal of the embodiment of the present invention one when being executing subject
The flow chart of kind field operation electronization working method, as shown in Fig. 2, this method includes:
S1 receives the debugging test task that server is sent;
S2 obtains updated tune according to the test data of the debugging test task and acquisition nuclear power plant's test apparatus
Try test mission;
S3 records the data to updated debugging test task execution;
The result of updated debugging test task is sent to server by S4.
Server end is formulated debugging test task, is examined to debugging test task according to debugging blank test report,
If examination & approval do not pass through, debugging test task is reformulated, until examination & approval pass through, if examination & approval pass through, by debugging test task
It is sent to mobile terminal, after mobile terminal receives the debugging test task formulated, according to the specific requirement of debugging test task, acquires core
The relevant parameter of power plant's instrument and equipment executes test mission according to these relevant parameters, will be newest after executing test mission
The result of debugging test task is uploaded onto the server end.
Fig. 3 is the architecture diagram that the embodiment of the present invention realizes a kind of field operation electronization working method, and Fig. 4 is this hair
Bright embodiment realizes a kind of system structure diagram of field operation electronization working method, as shown in Figure 3 and Figure 4, nuclear power plant
The revision control solution website end that electronic debugging test reporting process summarizes uses advanced executing model drive structure (MDA)
The B/S framework of technology, is typical three-layer distributed architecture, and client layer is supported to use using plug-in part technology and reusable frame
The interface requirements of family close friend and operation need;Service layer building follows SOA system specification, is wanted according to the realization that collection services in pairs
It asks, the specific implementation of model service uses J2EE technology.Model service frame is based on Spring framework establishment, realizes the solution of service
Coupling and flexibly assembly.Data Layer uses for reference leading data object thought, provides model and data access for platform, uses in the application
It family can be according to the definition and expansion system for respectively needing to carry out system function.
(1), data service layer
Data include metadata needed for system and business datum, and business datum includes two partial data sources, first is that
The debugging test data that mobile device directly acquires, such as:Adjusting instrument information, test parameters value and Multimedia Attachments etc..Second is that
The data extracted from ims database by standard data interface, these data can according to need or are saved in system data
In the server of library, or operation layer is directly provided and is used.
(2), application service layer
This layer includes the business service of test data management system, also includes all public services:Security service, data
Management service, customization service, standard criterion service etc..Security service mainly includes data and system backup service, user authentication
Service, user's authorization service;Data management service mainly include data import and export service, data storage service, data are adopted
Collection service, data-interface service, data quality management.
(3), presentation layer
The displaying of this layer only responsible business datum, different role-securities is assigned for different user groups, and take not
With the mode of visual presentation, content of the test is provided and formulates, examine, the functions such as test procedure, report editing batch.SOA is by information exhibition
Show, business realizing, information service component three separation, is supported using different technologies, passes through the association of standard each other
View realizes the cooperative system of weak coupling, this is the best mode of current enterprise grade application system platform construction.
Fig. 5 is a kind of flow chart of field operation electronization working method of one embodiment of the present invention, as shown in figure 5,
This method includes:
Server Selection experiment project automatically generates test procedure content first, revises to program, and to revision after
Program edited and examined, if examination & approval do not pass through, program is revised again, until examination & approval pass through;If examination & approval
Pass through, a liter version is carried out to program, and examine again to the program after liter version, do not passed through if examined at this time, again to program
A liter version is carried out, the program examination & approval after liter version pass through;If examination & approval pass through, debugging test program is generated, and export papery journey
Sequence.
After server generates debugging test program, blank test report is automatically generated, abbreviation CFA is reported in blank test,
Blank test report is generated according to test report format module, is conveniently managed.Then blank test is reported and is carried out
Revision, and the complete record modification information in revision process, carry out editor's examination & approval to revised test report, if examined
It criticizes and does not pass through, test report is revised again, until examination & approval pass through, if examination & approval pass through, generate debugging blank test report
It accuses, export papery test report can also be selected as needed.
Server is formulated debugging test task, is examined to debugging test task, such as according to debugging blank test report
Fruit examination & approval do not pass through, and reformulate debugging test task, pass through until examining, if examination & approval pass through, debugging test task is sent out
It send to mobile terminal, after mobile terminal receives the debugging test task formulated, according to the specific requirement of debugging test task, acquires nuclear power
The relevant parameter of factory's instrument and equipment executes test mission, by the result of newest debugging test task according to these relevant parameters
It uploads onto the server end.
The updated test mission of received server-side, and audited.
If audit passes through, test data is filled, and debugging test report automatically generates, and is reported debugging test and is carried out
Revision, edlin of going forward side by side examination & approval are again revised debugging test report, are passed through until examining, such as if examination & approval do not pass through
Fruit examination & approval pass through, and generate debugging test report.
The embodiment of the present invention has the beneficial effect that:
(1), comprehensive debugging test report test procedure editor of the present invention, examination & approval --- CFA blank test report generation is examined
Criticize automation circulation and mistake that --- debugging test execution --- TR test report writes entire debugging test multilayer permit business
Cheng Zhiliang is controlled in integrated service platform.Each functional unit is set to be provided simultaneously with capacity of working on one's own and full-range execution and change
Into ability, applied to debugging test work can effectively push debugging efforts Informatization Development and renovation technique Continuous optimization more
Newly.
(2), operability is good, can forcibly retain all Document Histories, the test procedure in table, test
Data can also retain the record of revision front and back.
(3), the multiple revision that can consult a content succinctly can completely see revision in final printed report
The complete informations such as initial information and final result, revision people, date, foundation.
(4), for the revision of important tests step, it not only can be only seen the information of revision front and back, additionally it is possible to by examining
It criticizes stream to be controlled, and retains the editing batch record of revision.
(5), Internet technology has been incorporated, server and software spending can be reduced, using Internet technology convenient for flexibly opening up
The characteristics of opening up, being able to achieve on-demand and Resource dynamic allocation solves traditionally on paper specification and is unable to fully realize environmental protection
Potentiality also can solve product reformation service caused by lacking effectively and rapidly service transacting mode and promote difficult ask
Topic.
(6), intelligentized concept is taken, traditional electrical file form is extended to more matchmakers such as video, animation, voice
The display form of body form, specification is converted into corresponding multimedia mode by traditional paper document form, can also be in platform
On to field personnel carry out debugging operations in terms of guidance and training, increase the diversity and intelligence of test report with this
Change.
(7), the revision control program in the nuclear power plant's electronization debugging test reporting process constructed passes through intelligent movable end
End and information management platform, which are realized, obtains the standardization record that debugging test is reported with intelligent, realizes that debugging test has been reported
Whole process control and management.And the standard by continuing to optimize and improving debugging test report, utmostly excavate project
Environmentally friendly potentiality and running skill, comprehensive realization improve control to the circulation that debugging test is reported.
(8), decentralised control is taken, makes each service module of platform that can independently serve different works by priority assignation
Make personnel, improves the efficiency that debugging efforts are carried out.
(9), the diversification of the thought for taking webpage office, debugging test report of being more convenient for is formulated, and realizes figure number one
It causes, What You See Is What You Get, provides convenience by the application of related plug-in unit for the formulation of test report.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that:It still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;
And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and
Range.
Claims (9)
1. a kind of field operation electronization working method, which is characterized in that including:
S1 generates debugging test program according to pilot project;
S2 debugs blank test report according to the debugging test Program Generating;
S3 according to the debugging test task that the debugging blank test report is formulated, and the debugging test task is sent to
Mobile terminal receives the updated debugging test task that the mobile terminal is sent;
S4 generates debugging test report according to updated debugging test task.
2. method according to claim 1, which is characterized in that step S1 is specifically included:
S11 generates test procedure according to the pilot project;
S12 revises the test procedure, and carries out editor's examination & approval to revised test procedure;
S13 is corrected examination & approval to revised test procedure if examination & approval pass through;
S14 generates the debugging test program if examination & approval pass through.
3. method according to claim 1, which is characterized in that step S2 is specifically included:
S21 is reported according to the debugging test Program Generating blank test;
S22 revises blank test report, and carries out editor's examination & approval to revised blank test report;
S23 generates the debugging blank test report if examination & approval pass through.
4. method according to claim 1, which is characterized in that step S3 is specifically included:
S31 according to the debugging test task that the debugging blank test report is formulated, and examines the debugging test task
Batch;
The debugging test task is sent to mobile terminal if examination & approval pass through by S32;
S33 receives the updated debugging test task that the mobile terminal is sent.
5. method according to claim 1, which is characterized in that step S4 is specifically included:
S41 generates debugging test report according to updated debugging test task, and repairs to debugging test report
It orders;
S42 carries out editor's examination & approval to the report of revised debugging test;
S43 reports the report of revised debugging test as final debugging test if examination & approval pass through.
6. method according to claim 2, which is characterized in that further include after step S12:
According to the test procedure after revised test procedure and correction, complete modification information is recorded.
7. method according to claim 3, which is characterized in that further include after step S22:
Record the modification information reported the blank test.
8. method according to claim 4, which is characterized in that further include after step S33:
Updated debugging test task is audited.
9. a kind of field operation electronization working method, which is characterized in that including:
S1 receives the debugging test task that server is sent;
S2 obtains updated debugging examination according to the test data of the debugging test task and acquisition nuclear power plant's test apparatus
Test task;
S3 records the data to updated debugging test task execution;
The result of updated debugging test task is sent to server by S4.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810758138.6A CN108919682A (en) | 2018-07-11 | 2018-07-11 | A kind of field operation electronization working method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810758138.6A CN108919682A (en) | 2018-07-11 | 2018-07-11 | A kind of field operation electronization working method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108919682A true CN108919682A (en) | 2018-11-30 |
Family
ID=64412236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810758138.6A Pending CN108919682A (en) | 2018-07-11 | 2018-07-11 | A kind of field operation electronization working method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108919682A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109800387A (en) * | 2019-01-25 | 2019-05-24 | 武汉瑞莱保能源技术有限公司 | A method of generating test report |
CN109858792A (en) * | 2019-01-23 | 2019-06-07 | 中广核工程有限公司 | A kind of nuclear power station debugging test task management method and system based on test procedure |
CN109978495A (en) * | 2019-03-05 | 2019-07-05 | 中广核工程有限公司 | A kind of nuclear power station debugging test Report workout method and system |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104459385A (en) * | 2014-11-25 | 2015-03-25 | 国家电网公司 | Relay protection automatic testing method |
CN104715347A (en) * | 2015-04-09 | 2015-06-17 | 山东中实易通集团有限公司 | Comprehensive data processing system for debugging work of nuclear power station |
-
2018
- 2018-07-11 CN CN201810758138.6A patent/CN108919682A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104459385A (en) * | 2014-11-25 | 2015-03-25 | 国家电网公司 | Relay protection automatic testing method |
CN104715347A (en) * | 2015-04-09 | 2015-06-17 | 山东中实易通集团有限公司 | Comprehensive data processing system for debugging work of nuclear power station |
Non-Patent Citations (4)
Title |
---|
刘伟: "红沿河核电站调试阶段质量管理研究", 《中国优秀硕士学位论文全文数据库经济与管理科学辑》 * |
唐必辉 等: "《核电厂调试试验程序和报告编写规范》", 1 March 2013 * |
方友文 等;: "核电工程调试试验报告移动应用方案", 《2015电力行业信息化年会论文集》 * |
王志军: "调试管理系统在中广核集团项目建设中的实践", 《2008电力行业信息化年会会议论文集》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109858792A (en) * | 2019-01-23 | 2019-06-07 | 中广核工程有限公司 | A kind of nuclear power station debugging test task management method and system based on test procedure |
CN109800387A (en) * | 2019-01-25 | 2019-05-24 | 武汉瑞莱保能源技术有限公司 | A method of generating test report |
CN109978495A (en) * | 2019-03-05 | 2019-07-05 | 中广核工程有限公司 | A kind of nuclear power station debugging test Report workout method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104123227A (en) | Method for automatically generating testing cases | |
CN108919682A (en) | A kind of field operation electronization working method | |
CN104615617A (en) | Dispatch monitoring information processing system for substation equipment | |
Boring et al. | Digital full-scope mockup of a conventional nuclear power plant control room, Phase 1: installation of a utility simulator at the Idaho national laboratory | |
CN102306122A (en) | Automated testing method and equipment | |
Ahmed-Kristensen et al. | A model for reusing service knowledge based on an empirical case | |
CN109636142A (en) | A kind of technique head detecting method and device based on MES | |
Yeo | Strategy for risk management through problem framing in technology acquisition | |
Furumo et al. | The importance of social structure in implementing ERP systems: A case study using adaptive structuration theory | |
Arends et al. | Smart grids, smart network companies | |
CN117272684B (en) | Method and device for constructing production equipment operation management and control information model | |
US20210166827A1 (en) | Apparatus for expressing and utilizing intelligent general arrangement drawing of atomic power plant | |
Srinivasan et al. | 'State of the Art'in Using Agile Methods for Embedded Systems Development | |
Pinto et al. | From requirements to prototyping: Application of human-system integration methodology to digital twin design | |
CN112529217A (en) | Power equipment information query method, system, device, equipment and storage medium | |
Levine et al. | Causal Pathways Leading to Human Failure Events in Information-Gathering System Response Activities | |
CN116383061A (en) | Method and related device for testing basic platform interface of substation control system | |
Hall et al. | Digitalization Guiding Principles and Method for Nuclear Industry Work Processes | |
Joshi et al. | Industrial Automation: Learn the current and leading-edge research on SCADA security | |
CN109523199B (en) | Visual external damage management and control system based on interactive distribution network GIS platform | |
Kopácsi et al. | Ambient intelligence as enabling technology for modern business paradigms | |
Kovesdi et al. | Demonstration and Evaluation of an Advanced Integrated Operations Concept for Hybrid Control Rooms | |
Pomè et al. | Is digitalization worth the hassle? Two cases of innovation building operation and maintenance | |
Zack et al. | IEA Wind Task 36: Practical Application Examples from the Recommended Practices for Forecast Solution Selection | |
Jin et al. | A method for the acquisition of users requirements in discrete manufacturing cell systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181130 |