CN108919682A - A kind of field operation electronization working method - Google Patents

A kind of field operation electronization working method Download PDF

Info

Publication number
CN108919682A
CN108919682A CN201810758138.6A CN201810758138A CN108919682A CN 108919682 A CN108919682 A CN 108919682A CN 201810758138 A CN201810758138 A CN 201810758138A CN 108919682 A CN108919682 A CN 108919682A
Authority
CN
China
Prior art keywords
test
debugging
examination
report
task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810758138.6A
Other languages
Chinese (zh)
Inventor
曾兵
黄思旭
郭江
宋玲玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN RUILAIBAO ENERGY TECHNOLOGY CO LTD
Original Assignee
WUHAN RUILAIBAO ENERGY TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN RUILAIBAO ENERGY TECHNOLOGY CO LTD filed Critical WUHAN RUILAIBAO ENERGY TECHNOLOGY CO LTD
Priority to CN201810758138.6A priority Critical patent/CN108919682A/en
Publication of CN108919682A publication Critical patent/CN108919682A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Automation & Control Theory (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Debugging And Monitoring (AREA)

Abstract

The embodiment of the present invention provides a kind of field operation electronization working method, and this method includes:Debugging test program is generated according to pilot project;Blank test report is debugged according to the debugging test Program Generating;According to the debugging test task that the debugging blank test report is formulated, and the debugging test task is sent to mobile terminal, receives the updated debugging test task that the mobile terminal is sent;According to updated debugging test task, debugging test report is generated.The present invention uses current multimedia tool, and combine the resource-sharing of internet platform, dynamic, the advantage easily extended, provide a kind of field operation electronization working method, in the overall processes such as test procedure editor, examination & approval, test report editor examination & approval, test process and test report final version, complete documentation revises operation information, realizes and the overall process of test report is recorded and tracked.

Description

A kind of field operation electronization working method
Technical field
The present embodiments relate to field operation intelligent work method and technology field more particularly to a kind of field operation electronics Change working method.
Background technique
It, not only will be according to stringent debugging in the debugging stage of Nuclear power project due to the particular/special requirement of nuclear safety What test procedure executed, it is necessary to the implementation process of complete documentation debugging test, to ensure the trackability of test result.
In the prior art, the stage is debugged in engineering, various design alterations can occurs at any time, the equipment for being partially installed on scene Real data the case where not being inconsistent with initial designs file also happen occasionally, during debugging test, the test of test procedure Method, design parameter, facility information, acceptance criteria all change frequent occurrence, therefore test director generally requires to hold in test Row order section modifies to test procedure;Since the process of debugging is exactly constantly to test, noting abnormalities, handling, testing again Iterative process, for test director there may be multiple test data during debugging test, preciseness requires test Responsible person must be all under complete documentation in test report record, generated including clerical mistake and its amendment, test of many times more Secondary record.
Although final test report still only shows final test result, all process records all must be protected completely It stays.In the current debugging stage both domestic and external, test data is filled in using the test procedure of papery, in test implementation procedure, institute Some revision process records can be recorded verily in such a way that thick stick changes.The recording mode of papery version is not able to satisfy modern nuclear power The demand of debugging business, mainly has the disadvantage that:1) paper record can not control program revisions, not can guarantee revision Quality;2) during revising, need to realize the audit calibration of different departments, papery mode has seriously affected examination & approval efficiency;3) Papery mode, each Document History can not be shown, are unfavorable for revision and recalled, are unfavorable for the tracking of revision version;4) papery is reported, Be unfavorable for it is for statistical analysis to PognM-epo, data utilization it is very low, big data analysis can not be carried out.
Summary of the invention
For the deficiency of existing papery debugging test report, the embodiment of the present invention provides a kind of field operation electronization work Method.
The embodiment of the present invention provides a kind of field operation electronization working method, and this method includes:
S1 generates debugging test program according to pilot project;
S2 debugs blank test report according to the debugging test Program Generating;
S3 according to the debugging test task that the debugging blank test report is formulated, and the debugging test task is sent out It send to mobile terminal, receives the updated debugging test task that the mobile terminal is sent;
S4 generates debugging test report according to updated debugging test task.
The embodiment of the present invention also provides a kind of field operation electronization working method, including:
S1 receives the debugging test task that server is sent;
S2 obtains updated tune according to the test data of the debugging test task and acquisition nuclear power plant's test apparatus Try test mission;
S3 carries out self-test to updated debugging test task;
Updated debugging test task is sent to server if self-test passes through by S4.
A kind of field operation electronization working method provided in an embodiment of the present invention, with current multimedia tool, and In conjunction with the resource-sharing of internet platform, dynamic, the easily advantage that extends, a kind of field operation electronization working method is provided, It is complete to remember in the overall processes such as test procedure editor, examination & approval, test report editor examination & approval, test process and test report final version Record revision operation information, realizes and the overall process of test report is recorded and tracked.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
A kind of process of field operation electronization working method when being executing subject that Fig. 1 is server of the embodiment of the present invention Figure;
A kind of process of field operation electronization working method when being executing subject that Fig. 2 is mobile terminal of the embodiment of the present invention Figure;
Fig. 3 is the architecture diagram that the embodiment of the present invention realizes a kind of field operation electronization working method;
Fig. 4 is the system structure diagram that the embodiment of the present invention realizes a kind of field operation electronization working method;
Fig. 5 is a kind of flow chart of field operation electronization working method of one embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
The executing subject of the embodiment of the present invention is server, which is all suitable for all field operations, is It is convenient for description and explanation, is illustrated by taking the field operation of nuclear power plant's debugging as an example, Fig. 1 is that server of the embodiment of the present invention is A kind of flow chart of field operation electronization working method when executing subject, as shown in Figure 1, this method includes:
S1 generates debugging test program according to pilot project;
S2 debugs blank test report according to the debugging test Program Generating;
S3 according to the debugging test task that the debugging blank test report is formulated, and the debugging test task is sent out It send to mobile terminal, receives the updated debugging test task that the mobile terminal is sent;
S4 generates debugging test report according to updated debugging test task.
This method includes that server, the end PC and mobile terminal composition, server end undertake system entirety industry in the process of implementation Business, information management function, the end PC loads flow operations relevant to server, and realizes that the programming at the end PC, program are repaired Order, data record and report publish, mobile terminal be responsible for debugging test data and with server carry out data it is synchronous.
Server end and mobile terminal are communicated by wireless network mode, realize that debugging test cooperation service process is turned round Turn.
Server end includes database server, application server, client browser, printer etc..
The structured storage management of database server supportive test relevant information, including pilot project library, test parameters The multi-dimensional associations management such as library, test apparatus library, test procedure, report template library, algorithms library, quality planning database and The multimedias storage management such as text, picture, table, video.It is checked convenient for user and the intelligence computation function of test data is real It is existing.
Application server provides system function service for user, timely responds to the service request of client browser, to number According to library server calls user requested data, feeds back to client and be shown.
Pc client browser is the man-machine interactive platform of user and system, and user can inquire debugging examination by client Test all relevant informations and debugging test implementation progress;Can to the basic informations such as pilot project, test apparatus, test parameters into Row management;Examination & approval test procedure, test report can be edited;It can formulate, examine content of the test and supportive test data intelligence The functions such as energy calculating.
Printer is used for test procedure, test report printing function as system peripheral.
Mobile terminal is made of several mobile plates.Installation and debugging test report and intelligence computation system in all mobile devices Mobile APP program.
Mobile terminal mainly executes the i.e. debugging test data collection task of debugging test content.Debugging test content is tried with blank It tests report form and is issued to specified test the held mobile device of executor from server end, commissioning staff's networking tries pending debugging The task of testing downloads in mobile device, mobile device supportive test content look facility.
Debugging test content carries out tissue by modular unit of pilot project.Debugging test implementation procedure is exactly to set in movement The process of standby upper typing test parameters value.Support the multimedias typing modes such as numerical value, text, picture, audio, video.Test people Member can carry out test of many times, finally select and oneself think accurate battery of tests record as test result.
Mobile device supports off-line testing operation, after content of the test downloading, commissioning staff can with server without logical Test Data Collecting work is completed under the conditions of news.But it after the test, needs to establish wireless telecommunications with server and connect, to complete The upload of test data.
On the basis of the above embodiments, specifically, step S1 is specifically included:
S11 generates test procedure according to the pilot project;
S12 revises the test procedure, and carries out editor's examination & approval to revised test procedure;
S13 is corrected examination & approval to revised test procedure if examination & approval pass through;
S14 generates the debugging test program if examination & approval pass through.
Selection experiment project automatically generates test procedure content first, revises to program, and to revised program It is edited and is examined, if examination & approval do not pass through, program is revised again, until examination & approval pass through;If examination & approval pass through, right Program carries out a liter version, and examines again to the program after liter version, does not pass through if examined at this time, rises again to program Version, the program examination & approval after liter version pass through;If examination & approval pass through, debugging test program is generated, and export papery program.
Specifically, step S2 is specifically included:
S21 is reported according to the debugging test Program Generating blank test;
S22 revises blank test report, and carries out editor's examination & approval to revised blank test report;
S23 generates the debugging blank test report if examination & approval pass through.
After generating debugging test program, blank test report is automatically generated, abbreviation CFA, blank examination are reported in blank test Testing report is generated according to test report format module, is conveniently managed.Then blank test report is revised, and And the complete record modification information in revision process, editor's examination & approval are carried out to revised test report, if examination & approval are obstructed It crosses, test report is revised again, until examination & approval pass through, if examination & approval pass through, generate debugging blank test report, may be used also Papery test report is exported with selection as needed.
Specifically, step S3 is specifically included:
S31, according to it is described debugging blank test report formulate debugging test task, and to the debugging test task into Row examination & approval;
The debugging test task is sent to mobile terminal if examination & approval pass through by S32;
S33 receives the updated debugging test task that the mobile terminal is sent.
According to debugging blank test report, debugging test task is formulated, debugging test task is examined, if examination & approval Do not pass through, reformulate debugging test task, pass through until examining, if examination & approval pass through, debugging test task is sent to shifting Moved end after mobile terminal receives the debugging test task formulated, according to the specific requirement of debugging test task, acquires nuclear power plant's instrument The relevant parameter of equipment executes test mission according to these relevant parameters, and carries out self-test to test mission, if self-test Pass through, the test mission together with relevant parameter is updated, and sends server end for updated test mission.
The updated test mission of received server-side, and audited.
Specifically, step S4 is specifically included:
S41 generates debugging test report according to updated debugging test task, and reports the debugging test and carry out Revision;
S42 carries out editor's examination & approval to the report of revised debugging test;
S43 reports the report of revised debugging test as final debugging test if examination & approval pass through.
If audit passes through, test data is filled, and debugging test report automatically generates, and is reported debugging test and is carried out Revision, edlin of going forward side by side examination & approval are again revised debugging test report, are passed through until examining, such as if examination & approval do not pass through Fruit examination & approval pass through, and generate debugging test report.
The executing subject of the embodiment of the present invention is mobile terminal, and Fig. 2 is mobile terminal of the embodiment of the present invention one when being executing subject The flow chart of kind field operation electronization working method, as shown in Fig. 2, this method includes:
S1 receives the debugging test task that server is sent;
S2 obtains updated tune according to the test data of the debugging test task and acquisition nuclear power plant's test apparatus Try test mission;
S3 records the data to updated debugging test task execution;
The result of updated debugging test task is sent to server by S4.
Server end is formulated debugging test task, is examined to debugging test task according to debugging blank test report, If examination & approval do not pass through, debugging test task is reformulated, until examination & approval pass through, if examination & approval pass through, by debugging test task It is sent to mobile terminal, after mobile terminal receives the debugging test task formulated, according to the specific requirement of debugging test task, acquires core The relevant parameter of power plant's instrument and equipment executes test mission according to these relevant parameters, will be newest after executing test mission The result of debugging test task is uploaded onto the server end.
Fig. 3 is the architecture diagram that the embodiment of the present invention realizes a kind of field operation electronization working method, and Fig. 4 is this hair Bright embodiment realizes a kind of system structure diagram of field operation electronization working method, as shown in Figure 3 and Figure 4, nuclear power plant The revision control solution website end that electronic debugging test reporting process summarizes uses advanced executing model drive structure (MDA) The B/S framework of technology, is typical three-layer distributed architecture, and client layer is supported to use using plug-in part technology and reusable frame The interface requirements of family close friend and operation need;Service layer building follows SOA system specification, is wanted according to the realization that collection services in pairs It asks, the specific implementation of model service uses J2EE technology.Model service frame is based on Spring framework establishment, realizes the solution of service Coupling and flexibly assembly.Data Layer uses for reference leading data object thought, provides model and data access for platform, uses in the application It family can be according to the definition and expansion system for respectively needing to carry out system function.
(1), data service layer
Data include metadata needed for system and business datum, and business datum includes two partial data sources, first is that The debugging test data that mobile device directly acquires, such as:Adjusting instrument information, test parameters value and Multimedia Attachments etc..Second is that The data extracted from ims database by standard data interface, these data can according to need or are saved in system data In the server of library, or operation layer is directly provided and is used.
(2), application service layer
This layer includes the business service of test data management system, also includes all public services:Security service, data Management service, customization service, standard criterion service etc..Security service mainly includes data and system backup service, user authentication Service, user's authorization service;Data management service mainly include data import and export service, data storage service, data are adopted Collection service, data-interface service, data quality management.
(3), presentation layer
The displaying of this layer only responsible business datum, different role-securities is assigned for different user groups, and take not With the mode of visual presentation, content of the test is provided and formulates, examine, the functions such as test procedure, report editing batch.SOA is by information exhibition Show, business realizing, information service component three separation, is supported using different technologies, passes through the association of standard each other View realizes the cooperative system of weak coupling, this is the best mode of current enterprise grade application system platform construction.
Fig. 5 is a kind of flow chart of field operation electronization working method of one embodiment of the present invention, as shown in figure 5, This method includes:
Server Selection experiment project automatically generates test procedure content first, revises to program, and to revision after Program edited and examined, if examination & approval do not pass through, program is revised again, until examination & approval pass through;If examination & approval Pass through, a liter version is carried out to program, and examine again to the program after liter version, do not passed through if examined at this time, again to program A liter version is carried out, the program examination & approval after liter version pass through;If examination & approval pass through, debugging test program is generated, and export papery journey Sequence.
After server generates debugging test program, blank test report is automatically generated, abbreviation CFA is reported in blank test, Blank test report is generated according to test report format module, is conveniently managed.Then blank test is reported and is carried out Revision, and the complete record modification information in revision process, carry out editor's examination & approval to revised test report, if examined It criticizes and does not pass through, test report is revised again, until examination & approval pass through, if examination & approval pass through, generate debugging blank test report It accuses, export papery test report can also be selected as needed.
Server is formulated debugging test task, is examined to debugging test task, such as according to debugging blank test report Fruit examination & approval do not pass through, and reformulate debugging test task, pass through until examining, if examination & approval pass through, debugging test task is sent out It send to mobile terminal, after mobile terminal receives the debugging test task formulated, according to the specific requirement of debugging test task, acquires nuclear power The relevant parameter of factory's instrument and equipment executes test mission, by the result of newest debugging test task according to these relevant parameters It uploads onto the server end.
The updated test mission of received server-side, and audited.
If audit passes through, test data is filled, and debugging test report automatically generates, and is reported debugging test and is carried out Revision, edlin of going forward side by side examination & approval are again revised debugging test report, are passed through until examining, such as if examination & approval do not pass through Fruit examination & approval pass through, and generate debugging test report.
The embodiment of the present invention has the beneficial effect that:
(1), comprehensive debugging test report test procedure editor of the present invention, examination & approval --- CFA blank test report generation is examined Criticize automation circulation and mistake that --- debugging test execution --- TR test report writes entire debugging test multilayer permit business Cheng Zhiliang is controlled in integrated service platform.Each functional unit is set to be provided simultaneously with capacity of working on one's own and full-range execution and change Into ability, applied to debugging test work can effectively push debugging efforts Informatization Development and renovation technique Continuous optimization more Newly.
(2), operability is good, can forcibly retain all Document Histories, the test procedure in table, test Data can also retain the record of revision front and back.
(3), the multiple revision that can consult a content succinctly can completely see revision in final printed report The complete informations such as initial information and final result, revision people, date, foundation.
(4), for the revision of important tests step, it not only can be only seen the information of revision front and back, additionally it is possible to by examining It criticizes stream to be controlled, and retains the editing batch record of revision.
(5), Internet technology has been incorporated, server and software spending can be reduced, using Internet technology convenient for flexibly opening up The characteristics of opening up, being able to achieve on-demand and Resource dynamic allocation solves traditionally on paper specification and is unable to fully realize environmental protection Potentiality also can solve product reformation service caused by lacking effectively and rapidly service transacting mode and promote difficult ask Topic.
(6), intelligentized concept is taken, traditional electrical file form is extended to more matchmakers such as video, animation, voice The display form of body form, specification is converted into corresponding multimedia mode by traditional paper document form, can also be in platform On to field personnel carry out debugging operations in terms of guidance and training, increase the diversity and intelligence of test report with this Change.
(7), the revision control program in the nuclear power plant's electronization debugging test reporting process constructed passes through intelligent movable end End and information management platform, which are realized, obtains the standardization record that debugging test is reported with intelligent, realizes that debugging test has been reported Whole process control and management.And the standard by continuing to optimize and improving debugging test report, utmostly excavate project Environmentally friendly potentiality and running skill, comprehensive realization improve control to the circulation that debugging test is reported.
(8), decentralised control is taken, makes each service module of platform that can independently serve different works by priority assignation Make personnel, improves the efficiency that debugging efforts are carried out.
(9), the diversification of the thought for taking webpage office, debugging test report of being more convenient for is formulated, and realizes figure number one It causes, What You See Is What You Get, provides convenience by the application of related plug-in unit for the formulation of test report.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that:It still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features; And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (9)

1. a kind of field operation electronization working method, which is characterized in that including:
S1 generates debugging test program according to pilot project;
S2 debugs blank test report according to the debugging test Program Generating;
S3 according to the debugging test task that the debugging blank test report is formulated, and the debugging test task is sent to Mobile terminal receives the updated debugging test task that the mobile terminal is sent;
S4 generates debugging test report according to updated debugging test task.
2. method according to claim 1, which is characterized in that step S1 is specifically included:
S11 generates test procedure according to the pilot project;
S12 revises the test procedure, and carries out editor's examination & approval to revised test procedure;
S13 is corrected examination & approval to revised test procedure if examination & approval pass through;
S14 generates the debugging test program if examination & approval pass through.
3. method according to claim 1, which is characterized in that step S2 is specifically included:
S21 is reported according to the debugging test Program Generating blank test;
S22 revises blank test report, and carries out editor's examination & approval to revised blank test report;
S23 generates the debugging blank test report if examination & approval pass through.
4. method according to claim 1, which is characterized in that step S3 is specifically included:
S31 according to the debugging test task that the debugging blank test report is formulated, and examines the debugging test task Batch;
The debugging test task is sent to mobile terminal if examination & approval pass through by S32;
S33 receives the updated debugging test task that the mobile terminal is sent.
5. method according to claim 1, which is characterized in that step S4 is specifically included:
S41 generates debugging test report according to updated debugging test task, and repairs to debugging test report It orders;
S42 carries out editor's examination & approval to the report of revised debugging test;
S43 reports the report of revised debugging test as final debugging test if examination & approval pass through.
6. method according to claim 2, which is characterized in that further include after step S12:
According to the test procedure after revised test procedure and correction, complete modification information is recorded.
7. method according to claim 3, which is characterized in that further include after step S22:
Record the modification information reported the blank test.
8. method according to claim 4, which is characterized in that further include after step S33:
Updated debugging test task is audited.
9. a kind of field operation electronization working method, which is characterized in that including:
S1 receives the debugging test task that server is sent;
S2 obtains updated debugging examination according to the test data of the debugging test task and acquisition nuclear power plant's test apparatus Test task;
S3 records the data to updated debugging test task execution;
The result of updated debugging test task is sent to server by S4.
CN201810758138.6A 2018-07-11 2018-07-11 A kind of field operation electronization working method Pending CN108919682A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810758138.6A CN108919682A (en) 2018-07-11 2018-07-11 A kind of field operation electronization working method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810758138.6A CN108919682A (en) 2018-07-11 2018-07-11 A kind of field operation electronization working method

Publications (1)

Publication Number Publication Date
CN108919682A true CN108919682A (en) 2018-11-30

Family

ID=64412236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810758138.6A Pending CN108919682A (en) 2018-07-11 2018-07-11 A kind of field operation electronization working method

Country Status (1)

Country Link
CN (1) CN108919682A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109800387A (en) * 2019-01-25 2019-05-24 武汉瑞莱保能源技术有限公司 A method of generating test report
CN109858792A (en) * 2019-01-23 2019-06-07 中广核工程有限公司 A kind of nuclear power station debugging test task management method and system based on test procedure
CN109978495A (en) * 2019-03-05 2019-07-05 中广核工程有限公司 A kind of nuclear power station debugging test Report workout method and system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104459385A (en) * 2014-11-25 2015-03-25 国家电网公司 Relay protection automatic testing method
CN104715347A (en) * 2015-04-09 2015-06-17 山东中实易通集团有限公司 Comprehensive data processing system for debugging work of nuclear power station

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104459385A (en) * 2014-11-25 2015-03-25 国家电网公司 Relay protection automatic testing method
CN104715347A (en) * 2015-04-09 2015-06-17 山东中实易通集团有限公司 Comprehensive data processing system for debugging work of nuclear power station

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘伟: "红沿河核电站调试阶段质量管理研究", 《中国优秀硕士学位论文全文数据库经济与管理科学辑》 *
唐必辉 等: "《核电厂调试试验程序和报告编写规范》", 1 March 2013 *
方友文 等;: "核电工程调试试验报告移动应用方案", 《2015电力行业信息化年会论文集》 *
王志军: "调试管理系统在中广核集团项目建设中的实践", 《2008电力行业信息化年会会议论文集》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109858792A (en) * 2019-01-23 2019-06-07 中广核工程有限公司 A kind of nuclear power station debugging test task management method and system based on test procedure
CN109800387A (en) * 2019-01-25 2019-05-24 武汉瑞莱保能源技术有限公司 A method of generating test report
CN109978495A (en) * 2019-03-05 2019-07-05 中广核工程有限公司 A kind of nuclear power station debugging test Report workout method and system

Similar Documents

Publication Publication Date Title
CN104123227A (en) Method for automatically generating testing cases
CN108919682A (en) A kind of field operation electronization working method
CN104615617A (en) Dispatch monitoring information processing system for substation equipment
Boring et al. Digital full-scope mockup of a conventional nuclear power plant control room, Phase 1: installation of a utility simulator at the Idaho national laboratory
CN102306122A (en) Automated testing method and equipment
Ahmed-Kristensen et al. A model for reusing service knowledge based on an empirical case
CN109636142A (en) A kind of technique head detecting method and device based on MES
Yeo Strategy for risk management through problem framing in technology acquisition
Furumo et al. The importance of social structure in implementing ERP systems: A case study using adaptive structuration theory
Arends et al. Smart grids, smart network companies
CN117272684B (en) Method and device for constructing production equipment operation management and control information model
US20210166827A1 (en) Apparatus for expressing and utilizing intelligent general arrangement drawing of atomic power plant
Srinivasan et al. 'State of the Art'in Using Agile Methods for Embedded Systems Development
Pinto et al. From requirements to prototyping: Application of human-system integration methodology to digital twin design
CN112529217A (en) Power equipment information query method, system, device, equipment and storage medium
Levine et al. Causal Pathways Leading to Human Failure Events in Information-Gathering System Response Activities
CN116383061A (en) Method and related device for testing basic platform interface of substation control system
Hall et al. Digitalization Guiding Principles and Method for Nuclear Industry Work Processes
Joshi et al. Industrial Automation: Learn the current and leading-edge research on SCADA security
CN109523199B (en) Visual external damage management and control system based on interactive distribution network GIS platform
Kopácsi et al. Ambient intelligence as enabling technology for modern business paradigms
Kovesdi et al. Demonstration and Evaluation of an Advanced Integrated Operations Concept for Hybrid Control Rooms
Pomè et al. Is digitalization worth the hassle? Two cases of innovation building operation and maintenance
Zack et al. IEA Wind Task 36: Practical Application Examples from the Recommended Practices for Forecast Solution Selection
Jin et al. A method for the acquisition of users requirements in discrete manufacturing cell systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181130