CN108910547A - A kind of rubbish method of operation - Google Patents

A kind of rubbish method of operation Download PDF

Info

Publication number
CN108910547A
CN108910547A CN201810974216.6A CN201810974216A CN108910547A CN 108910547 A CN108910547 A CN 108910547A CN 201810974216 A CN201810974216 A CN 201810974216A CN 108910547 A CN108910547 A CN 108910547A
Authority
CN
China
Prior art keywords
rubbish
discharging
bottom plate
operating case
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810974216.6A
Other languages
Chinese (zh)
Inventor
柴福良
黎明
胡寒
黎加财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Environmental Sanitation Group Co Ltd
Original Assignee
Chongqing Environmental Sanitation Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Environmental Sanitation Group Co Ltd filed Critical Chongqing Environmental Sanitation Group Co Ltd
Priority to CN201810974216.6A priority Critical patent/CN108910547A/en
Publication of CN108910547A publication Critical patent/CN108910547A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/23Devices for tilting and emptying of containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65FGATHERING OR REMOVAL OF DOMESTIC OR LIKE REFUSE
    • B65F3/00Vehicles particularly adapted for collecting refuse
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G67/00Loading or unloading vehicles
    • B65G67/02Loading or unloading land vehicles

Abstract

The invention discloses a kind of rubbish methods of operation, it is characterized in that, rubbish is first packed into the rubbish operating case that tail portion has discharge port, at the bottom four corners of the rubbish operating case and top four corners are each provided with a container angle, the rubbish operating case for loading two fully loaded rubbish simultaneously by container semi-trailer again transports refuse-unloading field, rubbish operating case is hung on lifting device for discharging using the crane being arranged in refuse-unloading field, it is finally by lifting device for discharging that rubbish operating case is integral inclined, the head of rubbish operating case is set to be higher than tail portion, complete discharging.The advantages that present invention has the rubbish useful load that can increase long-distance transport, reduces the accounting of vehicle body self weight, reduces rubbish long-distance transport cost.

Description

A kind of rubbish method of operation
Technical field
The present invention relates to garbage disposals to transport technical field, in particular to a kind of rubbish method of operation.
Background technique
With the economic development and improvement of people's living standards, city is higher and higher to environmental requirement, The Surroundings in Cities Health, not only reflects the civilization degree in city, but also directly affects the physical and mental health and social stability of resident, good city ring Border is the cardinal task concerning the people's livelihood concerning " urban civilization, people's health, social harmony, economic development ".Rubbish in city Rubbish processing is usually according to following below scheme:Garbage truck collects rubbish from being located in the garbage collections facilities such as the dustbin of city everywhere first Then the rubbish of collection is pooled to refuse transfer station by rubbish, be packed into waste transportation after refuse transfer station compresses rubbish Vehicle is transported to destructor plant and carries out the processing such as filling.
Currently, mainly compression dustbin is transported destructor plant and is unloaded using steel wire traction vehicle or hydraulic hook arm vehicle Material, since destructor plant is generally arranged at apart from urban district remote position, and steel wire traction vehicle and hydraulic hook arm vehicle are primary only A compression dustbin can be transported, carrying capacity is weaker, in addition, vehicle body is additionally provided with the hydraulic act for toppling over compression dustbin Device is risen, whole weight is increased, so that can additionally increase transportation cost in transit.
Summary of the invention
In view of the above shortcomings of the prior art, the technical problem to be solved by the present invention is to:How providing one kind can increase Add the rubbish useful load of long-distance transport, reduce the accounting of vehicle body self weight, reduces the rubbish method of operation of rubbish long-distance transport cost.
In order to solve the above-mentioned technical problem, present invention employs the following technical solutions:
A kind of rubbish method of operation, which is characterized in that rubbish is first packed into the rubbish operating case that tail portion has discharge port, the rubbish At the bottom four corners of rubbish operating case and top four corners are each provided with a container angle, then simultaneously by container semi-trailer The rubbish operating case for loading two fully loaded rubbish transports refuse-unloading field, will using the crane being arranged in refuse-unloading field Rubbish operating case is hung on lifting device for discharging, finally by lifting device for discharging that rubbish operating case is integral inclined, transports rubbish The head of turnning box is higher than tail portion, completes discharging.
Using the above structure, two rubbish operating cases are loaded by container semi-trailer simultaneously, are conducive to improve bicycle dress Carrying capacity improves transport capacity, avoids the loss of larger fuel oil caused by light weight accounting in transit, advantageously reduce transport at This.
Further, the crane includes two support main beams disposed in parallel, the lower section of the every support main beam It is provided with the rotary container spreader for lifting by crane the rubbish operating case, the rotary container spreader can be along institute The length direction for stating support main beam is mobile, and can rotate in the horizontal plane;The lifting device for discharging is abreast arranged in pairs In the side of the support main beam length direction of the crane, and it is located at the lower section of the support main beam;Two carrying masters The center of beam is loaded on the container semi-trailer away from the center with every a pair lifting device for discharging away from being equal to two The rubbish operating case center away from;When operation, while utilizing two rotary container spreaders by container semi-mounted Two rubbish operating cases on vehicle are sling, then by two rotary container spreaders in tandem along the carrying Girder is mobile, and after two rubbish operating cases misplace completely, two rotary container spreaders are rotated by 90 °, And be moved to above the pairs of lifting device for discharging, two rubbish operating cases are finally discharged into the lifting respectively On device for discharging.
For crane when lifting is compared with parcel, its own quality and cargo mass are larger, to guarantee safety operation, lifting Machine speed of service in lifting is slower.In this method, two support main beams and rotary container are set simultaneously on crane Suspender can be lifted and be discharged to two rubbish operating cases on a container semi-trailer simultaneously, only to same vehicle It needs once to lift, the lifting time is greatly saved, be conducive to improve operating efficiency.
Further, the crane further includes two tracks being arranged in parallel on the ground, under the support main beam For side's installation there are two the stabilizer blade being correspondingly arranged with the track, the lower end of the stabilizer blade is provided with can be along track rolling Idler wheel enables the crane to move integrally along the track;Length direction of the lifting device for discharging along the track It has been placed equidistant with multiple.
Further, the bottom plate of the lifting device for discharging to include whole be in rectangle, on the bottom plate tool there are four with institute State the discharging container twistlock that the container angle of rubbish operating case bottom is correspondingly arranged;It cuts with scissors the one end in the floor length direction It connects on the ground, elevating ram is provided between the other end and ground.
Using the above structure, rubbish operating case is hung on bottom plate, makes hinge of the tail portion of rubbish operating case towards bottom plate End is connect, the chamber door of discharge port is opened, discharging container twistlock is locked, bottom plate is rotated around hinged shaft using elevating ram, makes rubbish Operating case inclination, so that it may complete the discharging of rubbish operating case.
Further, it is provided with casting concrete ground below the bottom plate, it is pre-buried on the casting concrete ground There are four the pre-buried iron plate that the quadrangle with the bottom plate is correspondingly arranged, two positioned at floor length direction one end are described pre- The bearing block that coaxial arrangement is equipped on iron plate is buried, the bottom plate is hinged on the pre-buried iron plate by the bearing block;Separately The elevating ram is provided between two pre-buried iron plates and the bottom plate, the both ends of the elevating ram pass through hinged-support It is respectively hinged on the bottom plate and pre-buried iron plate.
Further, the two sides in the baseplate width direction respectively have an oil cylinder support frame, the oil cylinder support frame packet The crossbeam of the bottom plate setting is included higher than the bottom plate and is parallel to, the both ends of the crossbeam are mounted on the bottom by attachment beam The side of plate;The both ends of the elevating ram are respectively hinged on the crossbeam and the pre-buried iron plate.
Since crossbeam is higher than bottom plate, so that having certain space between crossbeam and pre-buried iron plate, facilitate installation lifting oil Cylinder.Moreover, elevating ram can be made to be integrally located at ground or more using the structure, facilitate the maintenance of hydraulic cylinder.
Further, the hinged end of the bottom plate also has the anti-dumping block along width setting, and the anti-dumping block is higher than The upper surface of the bottom plate, and can be in contact with the tail portion of rubbish operating case of the lock on bottom plate, make the discharging container Twistlock is located in the middle part of the lockhole of the container angle of the rubbish operating case.
Since the lockhole of container angle is strip, although the rubbish operating case after locking cannot be detached from bottom plate, During bottom plate is tumbled, container can glide along bottom plate, shock discharge container twistlock.It using the above structure, can be to prevent Only container further glides the impact to discharging container twistlock, is conducive to the service life for improving discharging container twistlock.
Further, there are two the anti-dumping block settings, the two sides in the baseplate width direction are located at.
Further, the bottom plate of each lifting device for discharging is arranged along the length direction of the support main beam, and Hinged end deviates from the crane.
Further, the spacing of two tracks is greater than the container semi-trailer width, and the lifting discharging fills Outside setting in two tracks, one end of the support main beam extends to the top of the lifting device for discharging.
In conclusion the present invention has the rubbish useful load that can increase long-distance transport, the accounting of vehicle body self weight, drop are reduced The advantages that low rubbish long-distance transport cost.
Detailed description of the invention
Fig. 1 is the schematic top plan view of refuse-unloading field.
Fig. 2 is the structural schematic diagram of crane.
Fig. 3 is the side structure schematic view of Fig. 2.
Fig. 4 is the structural schematic diagram for lifting device for discharging.
Specific embodiment
Below with reference to the embodiment of refuse-unloading field a kind of, the present invention is described in further detail.
When specific implementation:As shown in Fig. 1 ~ Fig. 4, when specific implementation:As shown in Fig. 1 ~ Fig. 4, a kind of refuse-unloading field, including The crane 1 of refuse-unloading field is set and is unloaded by the dump pit of refuse-unloading field and for realizing to refuse transfer box lifting The lifting device for discharging 3 of material, the crane 1 include two support main beams 11 set up in parallel, the every support main beam 11 On be provided with rotary container spreader 12 for lifting by crane rubbish operating case, the rotary container spreader 12 being capable of edge The length direction of the support main beam 11 is mobile, and can rotate in the horizontal plane;The lifting device for discharging 3 is pairs of abreast The side of 11 length direction of support main beam of the crane 1 is set, and is located at the lower section of the support main beam 11, lifting is unloaded The direction and support main beam length direction that material device is arranged side by side in pairs are vertical;The center of two support main beams 11 away from it is every The center of a pair of lifting device for discharging 3 is away from the center for being equal to the rubbish operating case that two are loaded on container semi-trailer Away from;The lower section of the crane 1 also has the runway along the length direction perforation setting perpendicular to the support main beam 11.
Using the above structure, the container semi-trailer for loading rubbish operating case drives under support main beam along runway Side, so that it may simultaneously be operated two rubbish on container semi-trailer using two rotary container spreaders on crane Case is lifted and is discharged, and only needs once to lift to same vehicle, the lifting time is greatly saved, and is conducive to improve and be made Industry efficiency.
When it is implemented, the rotary container spreader is integrally in rectangle, quadrangle is liftably suspended in midair by pulley Under the support main beam;The quadrangle of the rotary container spreader is each provided with one and the packaging at the top of rubbish operating case The suspender container twistlock that case corner fittings is correspondingly arranged.
When implementation, the crane 1 further includes two tracks being arranged in parallel on the ground 13, the track along perpendicular to The length direction of the support main beam is arranged;There are two be correspondingly arranged with the track 13 for the lower section installation of the support main beam 11 Stabilizer blade 14, the lower end of the stabilizer blade 14 be provided with can along the track 13 roll idler wheel 15, enable the crane 1 It is moved integrally along the track;The lifting device for discharging 3 has been placed equidistant with multipair along the length direction of the track 13;It is described Runway is located between two tracks 13.
In this way, arranging multipair lifting device for discharging in dumping ground, the processing capacity of refuse-unloading field can be increased.And it is above-mentioned Arrangement, which can use a crane, can cooperate multipair lifting device for discharging to work, and be conducive to save cost, realize equipment Maximally utilize.
When implementation, the lifting device for discharging 3 is located at outside two tracks 13, and one end of the support main beam 11 is prolonged Extend to the top of the lifting device for discharging 3.
In this way, the spacing between two supporting legs can be shortened, be conducive to the bending strength for increasing support main beam.Moreover, also It can use guide rail to separate runway and lifting device for discharging, avoid generating vehicle driving when lifting device for discharging work It influences.
When implementation, the runway at least has there are two lane.
Due to cooperating multipair lifting device for discharging work simultaneously using crane, and container semi-trailer at any time can be into Enter to dumping ground and carry out discharging, crane needs to run carry out lifting operation back and forth.In actual job, it may appear that be located behind Vehicle the case where first completing lifting, front vehicle needs to be driven out to dumping ground in advance, mentions for driving into for other container semi-trailers For parking space.Using at least two lanes, it is ensured that the vehicle being located behind smoothly is driven out to dumping ground.
When implementation, the lifting device for discharging 3 includes whole be in rectangle bottom plate 31, on the bottom plate 31 tool there are four with The discharging container twistlock 32 that the container angle of rubbish operating case bottom is correspondingly arranged;One end of 31 length direction of bottom plate It is hingedly provided with elevating ram 33 on the ground, between the other end and ground.
Using the above structure, rubbish operating case is hung on bottom plate, makes hinge of the tail portion of rubbish operating case towards bottom plate End is connect, the chamber door of discharge port is opened, discharging container twistlock is locked, bottom plate is rotated around hinged shaft using elevating ram, makes rubbish Operating case inclination, so that it may complete the discharging of rubbish operating case.
When implementation, the lower section of the bottom plate 31 is provided with casting concrete ground, pre-buried on the casting concrete ground There are four the pre-buried iron plates that the quadrangle with the bottom plate 31 is correspondingly arranged, two institutes positioned at described 31 length direction one end of bottom plate The bearing block that coaxial arrangement is equipped on pre-buried iron plate is stated, the bottom plate 31 is hinged on the pre-buried iron plate by the bearing block On;It is provided with the elevating ram 33 between pre-buried iron plate and the bottom plate 31 described in another two, the two of the elevating ram 33 End is respectively hinged on the bottom plate 31 and pre-buried iron plate by hinged-support.
The side length of the pre-buried iron plate is greater than 80cm, and thickness is greater than 3cm, in this way, the intensity of pre-buried iron plate can be improved, It prevents pre-buried iron plate from deforming and the overturning of bottom plate 31, is conducive to improve service life.
The bottom of the pre-buried iron plate is evenly equipped at least 20 foot nails, and the length of each foot nail is greater than 45cm.In this way, can To improve the bonding strength of pre-buried iron plate Yu casting concrete ground, be conducive to improve service life.
When implementation, the two sides of 31 width direction of bottom plate respectively have an oil cylinder support frame 34, the oil cylinder support frame 34 include being higher than the bottom plate 31 and being parallel to the crossbeam that the bottom plate 31 is arranged, and the both ends of the crossbeam pass through attachment beam and install In the side of the bottom plate 31;The both ends of the elevating ram 33 are respectively hinged on the crossbeam and the pre-buried iron plate.
Since crossbeam is higher than bottom plate, so that having certain space between crossbeam and pre-buried iron plate, facilitate installation lifting oil Cylinder.Moreover, elevating ram can be made to be integrally located at ground or more using the structure, facilitate the maintenance of hydraulic cylinder.
The elevating ram 33 is multi-stage oil cylinder.In this way, lifting can be shortened as far as possible in the case where meeting 31 overturning demand of bottom plate Length after the contraction of oil cylinder 33, convenient for the installation of oil cylinder.
When implementation, the hinged end of the bottom plate 31 also has the anti-dumping block 35 along width setting, the anti-dumping block 35 It higher than the upper surface of the bottom plate 31, and can be in contact with the tail portion of rubbish operating case of the lock on bottom plate 31, make described unload In the middle part of the lockhole for the container angle that material container twistlock 32 is located at rubbish operating case.
Since the lockhole of container angle is strip, although the rubbish operating case after locking cannot be detached from bottom plate, During bottom plate is tumbled, container can glide along bottom plate, shock discharge container twistlock.It using the above structure, can be to prevent Only container further glides the impact to discharging container twistlock, is conducive to the service life for improving discharging container twistlock.
When implementation, there are two the settings of anti-dumping block 35, is located at the two sides of 31 width direction of bottom plate.
When implementation, the bottom plate of each lifting device for discharging is arranged along the length direction of the support main beam, and cuts with scissors End is connect away from the crane.
When specific operation, rubbish is first packed into the rubbish operating case that tail portion has discharge port, the bottom of the rubbish operating case Portion's four corners and top four corners are each provided with a container angle, then load two simultaneously by container semi-trailer and be fully loaded with The rubbish operating case of rubbish transports refuse-unloading field, while utilizing two rotary container spreaders by container semi-mounted Two rubbish operating cases on vehicle are sling, then by two rotary container spreaders in tandem along the carrying Girder is mobile, and after two rubbish operating cases misplace completely, two rotary container spreaders are rotated by 90 °, And be moved to above the pairs of lifting device for discharging, two rubbish operating cases are finally discharged into the lifting respectively It is finally by lifting device for discharging that rubbish operating case is integral inclined on device for discharging, so that the head of rubbish operating case is higher than tail portion, Complete discharging.
Rotary container spreader is also known as rotary hanging tool, is a kind of collection that spreader body can be made to rotate in the horizontal plane Vanning suspender, its own structure belong to the mature prior art.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not limitation with the present invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of rubbish method of operation, which is characterized in that rubbish is first packed into the rubbish operating case that tail portion has discharge port, it is described At the bottom four corners of rubbish operating case and top four corners are each provided with a container angle, then same by container semi-trailer When load two fully loaded rubbish rubbish operating case transport refuse-unloading field, utilize the crane being arranged in refuse-unloading field Rubbish operating case is hung on lifting device for discharging, it is finally by lifting device for discharging that rubbish operating case is integral inclined, make rubbish The head of operating case is higher than tail portion, completes discharging.
2. rubbish method of operation as described in claim 1, which is characterized in that the crane includes two and disposed in parallel holds Girder is carried, the rotary container crane for lifting by crane the rubbish operating case is provided with below the every support main beam Tool, the rotary container spreader can be moved along the length direction of the support main beam, and can be rotated in the horizontal plane; The lifting device for discharging is arranged side by side at the side of the support main beam length direction of the crane in pairs, and is located at described The lower section of support main beam;The center of two support main beams is away from the center with every a pair lifting device for discharging away from being equal to The center of two rubbish operating cases being loaded on the container semi-trailer away from;When operation, while using described in two Rotary container spreader slings two rubbish operating cases on container semi-trailer, then by two rotary collection Vanning suspender is moved along the support main beam in tandem, after two rubbish operating cases misplace completely, by two institutes It states rotary container spreader to be rotated by 90 °, and is moved to above the pairs of lifting device for discharging, it finally will be described in two Rubbish operating case is discharged into respectively on the lifting device for discharging.
3. rubbish method of operation as claimed in claim 2, which is characterized in that the crane further includes two and is arranged in parallel in Track on ground, the stabilizer blade that there are two the lower section installations of the support main beam is correspondingly arranged with the track, the stabilizer blade Lower end is provided with the idler wheel that can be rolled along the track, and the crane is enable to move integrally along the track;The act Liter device for discharging has been placed equidistant with multiple along the length direction of the track.
4. rubbish method of operation as claimed in claim 2, which is characterized in that it is in rectangle that the lifting device for discharging, which includes whole, Bottom plate, there are four the discharging containers that the container angle with rubbish operating case bottom is correspondingly arranged for tool on the bottom plate Twistlock;The one end in the floor length direction hingedly on the ground, is provided with elevating ram between the other end and ground.
5. rubbish method of operation as claimed in claim 4, which is characterized in that be provided with casting concrete below the bottom plate Ground, the pre-buried iron plate that the pre-buried quadrangle there are four with the bottom plate is correspondingly arranged on the casting concrete ground, is located at institute The bearing block that coaxial arrangement is equipped on two pre-buried iron plates of floor length direction one end is stated, the bottom plate passes through described Bearing block is hinged on the pre-buried iron plate;The lifting oil is provided between pre-buried iron plate and the bottom plate described in another two The both ends of cylinder, the elevating ram are respectively hinged on the bottom plate and pre-buried iron plate by hinged-support.
6. rubbish method of operation as claimed in claim 4, which is characterized in that the two sides in the baseplate width direction respectively have one A oil cylinder support frame, the oil cylinder support frame include the crossbeam for being higher than the bottom plate and being parallel to the bottom plate setting, the cross The both ends of beam are mounted on the side of the bottom plate by attachment beam;The both ends of the elevating ram be respectively hinged at the crossbeam and On the pre-buried iron plate.
7. rubbish method of operation as claimed in claim 4, which is characterized in that the hinged end of the bottom plate also has to be set along width The anti-dumping block set, the anti-dumping block are higher than the upper surface of the bottom plate, and can be with rubbish operating case of the lock on bottom plate Tail portion be in contact, be located at the discharging container twistlock in the middle part of the lockhole of the container angle of the rubbish operating case.
8. rubbish method of operation as claimed in claim 7, which is characterized in that there are two the anti-dumping block settings, respectively position In the two sides in the baseplate width direction.
9. rubbish method of operation as claimed in claim 4, which is characterized in that the equal edge of bottom plate of each lifting device for discharging The length direction of the support main beam is arranged, and hinged end deviates from the crane.
10. rubbish method of operation as claimed in claim 4, which is characterized in that the spacing of two tracks is greater than the collection Vanning semi-mounted vehicle-width, and the lifting device for discharging is located at outside two tracks, one end of the support main beam extends to The top of the lifting device for discharging.
CN201810974216.6A 2018-08-24 2018-08-24 A kind of rubbish method of operation Pending CN108910547A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810974216.6A CN108910547A (en) 2018-08-24 2018-08-24 A kind of rubbish method of operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810974216.6A CN108910547A (en) 2018-08-24 2018-08-24 A kind of rubbish method of operation

Publications (1)

Publication Number Publication Date
CN108910547A true CN108910547A (en) 2018-11-30

Family

ID=64406988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810974216.6A Pending CN108910547A (en) 2018-08-24 2018-08-24 A kind of rubbish method of operation

Country Status (1)

Country Link
CN (1) CN108910547A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004083097A3 (en) * 2003-03-22 2005-02-17 Noell Crane Sys Gmbh Multi-trolley container crane
CN201068347Y (en) * 2007-08-16 2008-06-04 昆明董工机电设备有限公司 Fixative hydraulic tipping platform
CN201272634Y (en) * 2008-08-29 2009-07-15 贵州山水物流有限公司 Tipping platform and unloading system of dry bulk container
CN104085798A (en) * 2014-06-19 2014-10-08 湖南中铁五新重工有限公司 Rubber tire container gantry crane
CN105110200A (en) * 2015-09-23 2015-12-02 湖南中铁五新重工有限公司 Three-beam double-trolley rail type container portal crane
CN205274739U (en) * 2015-12-30 2016-06-01 北京大爱乾坤环卫设备有限公司 Rubbish is assisted and is emptyd device
CN205661941U (en) * 2016-06-06 2016-10-26 重庆市环卫控股(集团)有限公司 Domestic waste transfer compression zone arrangement structure
CN206013916U (en) * 2016-08-08 2017-03-15 陈本森 A kind of container unloading device for being easy to position

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004083097A3 (en) * 2003-03-22 2005-02-17 Noell Crane Sys Gmbh Multi-trolley container crane
CN201068347Y (en) * 2007-08-16 2008-06-04 昆明董工机电设备有限公司 Fixative hydraulic tipping platform
CN201272634Y (en) * 2008-08-29 2009-07-15 贵州山水物流有限公司 Tipping platform and unloading system of dry bulk container
CN104085798A (en) * 2014-06-19 2014-10-08 湖南中铁五新重工有限公司 Rubber tire container gantry crane
CN105110200A (en) * 2015-09-23 2015-12-02 湖南中铁五新重工有限公司 Three-beam double-trolley rail type container portal crane
CN205274739U (en) * 2015-12-30 2016-06-01 北京大爱乾坤环卫设备有限公司 Rubbish is assisted and is emptyd device
CN205661941U (en) * 2016-06-06 2016-10-26 重庆市环卫控股(集团)有限公司 Domestic waste transfer compression zone arrangement structure
CN206013916U (en) * 2016-08-08 2017-03-15 陈本森 A kind of container unloading device for being easy to position

Similar Documents

Publication Publication Date Title
WO2022040923A1 (en) Material boxing device and material feeding apparatus
WO2022047781A1 (en) System and method for transporting, loading and unloading container
CN112124987A (en) Container transportation loading and unloading system and method
CN103818671B (en) Put down into formula refuse transfer station and its operational method of clearing
CN106698016A (en) Cargo loading and unloading platform
CN203512812U (en) Container unloading device
CN208617227U (en) A kind of arragement construction of refuse-unloading field
CN218145478U (en) Gantry crane with prevent structure of toppling
CN108910547A (en) A kind of rubbish method of operation
CN108726057B (en) Combined garbage transportation method
CN203740433U (en) Flat-in flat-out type refuse transfer station
CN1676457A (en) Dual-dan container crane capable of hoisting dual 40-foot box
CN205972509U (en) Single track hangs container
CN214779378U (en) Industrial residue centralized storage system
JP2991156B2 (en) Cargo handling equipment using cranes
CN214985000U (en) Be applied to self-discharging formula carriage of trailer
CN202686080U (en) Girder transporting vehicle with automatic lifting device
CN206156413U (en) Accessible formula aggregate hole liquid accuse grid platform
CN210884377U (en) Train container ration loading device
CN205222632U (en) Manual hydraulic pressure container upset hoist
CN205468707U (en) Self -discharging carriage
CN201626716U (en) Bridge frame type mobile funnel
CN108750499B (en) Comprehensive garbage operation system
CN209426640U (en) It lands loading and unloading type and exchanges vehicle
CN213415578U (en) Material vanning equipment and loading attachment thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181130

RJ01 Rejection of invention patent application after publication