CN108894335A - A kind of steel plate built-in fitting construction method and steel plate pre-embedded device - Google Patents

A kind of steel plate built-in fitting construction method and steel plate pre-embedded device Download PDF

Info

Publication number
CN108894335A
CN108894335A CN201810818603.0A CN201810818603A CN108894335A CN 108894335 A CN108894335 A CN 108894335A CN 201810818603 A CN201810818603 A CN 201810818603A CN 108894335 A CN108894335 A CN 108894335A
Authority
CN
China
Prior art keywords
steel plate
shearing
anchoring piece
resistant member
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810818603.0A
Other languages
Chinese (zh)
Inventor
丁党盛
巫鹏
廖杰新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201810818603.0A priority Critical patent/CN108894335A/en
Publication of CN108894335A publication Critical patent/CN108894335A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention provides a kind of steel plate built-in fitting construction methods, anchoring piece, shearing-resistant member and steel plate are mutually indepedent, first anchoring piece and shearing-resistant member positioning are fixed between the gap of building iron, and it is poured a concrete, it will be in the concrete of pre-buried to one time of the bottom end of anchoring piece and shearing-resistant member, the positional relationship of the anchoring piece and shearing-resistant member that are positioned is measured, corresponding position opens up anchor hole and shearing resistance hole to positional relationship on the steel plate accordingly;Placing steel plate is inserted into anchoring piece and shearing-resistant member in corresponding hole, and is welded and fixed, then second coagulation soil is poured into the gap between lower surface of steel plate and a concrete upper surface, completes the setting of built-in fitting.This scheme changes erection sequence, again with Interal fixation after the position of anchoring piece and shearing-resistant member determines, can disposably realize assembly, avoids generating interference between the anchor fluke on large area pre-embedded steel slab and reinforcing bar main body, accelerates installation speed.The present invention also provides a kind of steel plate pre-embedded devices, and identical technical effect may be implemented.

Description

A kind of steel plate built-in fitting construction method and steel plate pre-embedded device
Technical field
The present invention relates to technical field of building construction, further relate to a kind of steel plate built-in fitting construction method.Furthermore.This Invention further relates to a kind of steel plate pre-embedded device.
Background technique
In building construction process, after the completion of reinforcing bar main structure, it is also necessary to which pre-buried steel is set at Vierendeel girder, column position Anchor fluke is welded and fixed on the bottom surface of pre-embedded steel slab in plate, for pre-embedded steel slab biggish for area, anchor fluke it is large number of, and And anchor fluke needs the corresponding gap location being inserted between reinforcing bar;But the size of reinforcing bar main structure and position have determined can not be more Change, the position between anchor fluke and steel plate immobilizes, therefore large number of anchor fluke is difficult to whole accurate alignments between reinforcing bar Gap in, interference may be generated with a few reinforcing bars, it is necessary to these anchor flukes for generating interference be cut and be welded on again New position increases the amount of labour to avoid the reinforcing bar for generating interference.
For those skilled in the art, how to avoid between the anchor fluke on large area pre-embedded steel slab and reinforcing bar main body Interference is generated, is the current technical issues that need to address.
Summary of the invention
The present invention provides a kind of steel plate built-in fitting construction method, can be avoided and generates interference between anchor fluke and building iron, Concrete scheme is as follows:
A kind of steel plate built-in fitting construction method, including:
According to the size of steel plate and pre-buried position, by anchoring piece and shearing-resistant member positioning be fixed on building iron gap it Between;
It is poured a concrete to building iron, the bottom end of the anchoring piece and the shearing-resistant member is pre-buried to described primary In concrete, the top of the anchoring piece and the shearing-resistant member exposes to the upper surface of a concrete;
Measure the positional relationship of the anchoring piece and the shearing-resistant member;
According to the positional relationship, corresponding position opens up anchor hole and shearing resistance hole on the steel plate;
The steel plate is placed, the anchor hole is inserted on the top of the anchoring piece, the top of the shearing-resistant member is inserted into The shearing resistance hole;And the anchoring piece and the steel plate, the shearing-resistant member and the steel plate are welded and fixed;
Second coagulation soil is poured into the gap between the lower surface of steel plate and a concrete upper surface.
Optionally, the positional relationship of the measurement anchoring piece and the shearing-resistant member, including:
Geomery extruded sheet identical with the steel plate is placed in the top of the anchoring piece and the shearing-resistant member simultaneously Pressing, the anchoring piece and the shearing-resistant member extrude the position marking on the extruded sheet;
According to the positional relationship, corresponding position opens up anchor hole and shearing resistance hole on the steel plate, including:
The extruded sheet is aligned with the steel plate, the anchor hole and the shearing resistance hole are cut on the steel plate.
Optionally, described according to the positional relationship, corresponding position opens up anchor hole and shearing resistance hole on the steel plate, also wraps It includes:
Weld positioning bar on the bottom surface of the steel plate, the positioning bar protrude from the height of the steel plate bottom surface with it is described The thickness of second coagulation soil is equal.
Optionally, described according to the positional relationship, corresponding position opens up anchor hole and shearing resistance hole on the steel plate, also wraps It includes:
The plug hole for being poured the second coagulation soil is opened up near the apex angle of the steel plate;It is opened on the steel plate If gas vent.
Optionally, it is poured in the gap to the lower surface of steel plate between a concrete upper surface secondary Concrete, including:
In the surrounding supporting module of the steel plate, the second coagulation soil is poured by the plug hole, until the row Until slurry is discharged in stomata.
Optionally, described to be poured a concrete to building iron, including, vibration is constantly smash in casting process, is removed Bubble;
Second coagulation soil is poured in the gap to the lower surface of steel plate between a concrete upper surface, Wherein, the second coagulation soil is high-strength grout.
Optionally, described that anchoring piece and shearing-resistant member positioning are fixed between the gap of building iron, including:
The anchoring piece and the shearing-resistant member are welded on the building iron.
The present invention also provides a kind of steel plate pre-embedded devices, including the anchoring piece, shearing-resistant member and steel plate being independently arranged;
The anchoring piece and the shearing-resistant member are mutually fixed for being inserted into the gap of building iron with building iron, and The top of the anchoring piece and the shearing-resistant member protrudes from the upper surface of a concrete;
Open up that present position is opposite in a concrete with the anchoring piece and the shearing-resistant member on the steel plate The anchor hole answered and shearing resistance hole, the anchoring piece is inserted into being welded and fixed in the anchor hole and with the steel plate, described anti- Part is cut to be inserted into being welded and fixed in the shearing resistance hole and with the steel plate.
Optionally, positioning bar is welded at the lower surface edge of the steel plate, the positioning bar protrudes from the steel plate bottom surface Height it is equal with the thickness of the second coagulation soil;
Plug hole for being poured the second coagulation soil is opened up on the steel plate respectively and for the gas vent of exhaust.
Optionally, the tapered hole of taper is arranged in one end around the anchor hole, positioned at the upper surface of steel plate.
The present invention provides a kind of steel plate built-in fitting construction methods, and anchoring piece, shearing-resistant member and steel plate are mutually indepedent, first by anchor Firmware and shearing-resistant member positioning are fixed between the gap of building iron, and are poured a concrete, by anchoring piece and shearing-resistant member In the concrete of pre-buried to one time of bottom end, the positional relationship of the anchoring piece and shearing-resistant member that are positioned is measured, positional relationship is in steel accordingly Corresponding position opens up anchor hole and shearing resistance hole on plate;Placing steel plate is inserted into anchoring piece and shearing-resistant member in corresponding hole, and welds Fixation is connect, then is poured second coagulation soil into the gap between lower surface of steel plate and a concrete upper surface, completes built-in fitting Setting.This scheme changes erection sequence, can be primary again with Interal fixation after the position of anchoring piece and shearing-resistant member determines Property realize assembly, avoid between the anchor fluke on large area pre-embedded steel slab and reinforcing bar main body generate interference, accelerate installation speed.
The present invention also provides a kind of steel plate pre-embedded devices will including the anchoring piece, shearing-resistant member and steel plate being independently arranged Originally the built-in fitting being fixed to each other is changed to three mutually independent structures, is filled by above-mentioned steel plate built-in fitting construction method Match, identical technical effect may be implemented.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the flow chart of steel plate built-in fitting construction method of the present invention;
Fig. 2 is the top view of steel plate pre-embedded device;
Fig. 3 is the sectional view in the direction A-A in Fig. 2.
Include in figure:
Anchoring piece 1, shearing-resistant member 2, steel plate 3, positioning bar 31, plug hole 32, gas vent 33, a Concretes, second coagulation Native B.
Specific embodiment
Core of the invention is to provide a kind of steel plate built-in fitting construction method, can be avoided between anchor fluke and building iron Generate interference.
In order to make those skilled in the art more fully understand technical solution of the present invention, below in conjunction with attached drawing and specifically Embodiment, explanation is described in detail to steel plate built-in fitting construction method and steel plate pre-embedded device of the invention.
The present invention provides a kind of steel plate built-in fitting construction methods, as shown in Figure 1, being steel plate built-in fitting construction party of the present invention The flow chart of method comprising following steps:
Anchoring piece 1 and shearing-resistant member 2 are positioned the seam for being fixed on building iron by S1, the size according to steel plate 3 and pre-buried position Between gap;Anchoring piece 1 and the setting of shearing-resistant member 2 are independent component, and when installation is separated from each other with steel plate 3;Anchoring piece 1 and shearing-resistant member 2 are respectively set multiple, and respective position is relatively evenly arranged according to design requirement, respectively solely due to anchoring piece 1 and shearing-resistant member 2 It halts position, each anchoring piece 1 and shearing-resistant member 2 can be accurately inserted into the gap of building iron, and opposite with building iron solid It is fixed, keep the position of anchoring piece 1 and shearing-resistant member 2 constant.
S2, it is poured a concrete to building iron, by pre-buried to one time of the bottom end of anchoring piece 1 and shearing-resistant member 2 concrete In, the top of anchoring piece 1 and shearing-resistant member 2 exposes to the upper surface of a concrete;After fixed anchors 1 and shearing-resistant member 2, pass through Casting is embedded in a concrete, is completely fixed anchoring piece 1 and shearing-resistant member 2 after a concrete setting.
S3, the positional relationship for measuring anchoring piece 1 and shearing-resistant member 2;After anchoring piece 1 and shearing-resistant member 2 are fixed by concrete, position It sets and just no longer changes, the position of the anchoring piece 1 and shearing-resistant member 2 that are embedded in concrete is measured with this, obtains dimension data.
S4, according to positional relationship, corresponding position opens up anchor hole and shearing resistance hole on steel plate 3;It determines anchoring piece 1 and resists After the positional relationship for cutting part 2, anchor hole and shearing resistance hole are processed on steel plate 3 further according to positional relationship, is respectively used to for inserting Fill anchoring piece 1 and shearing-resistant member 2.
S5, steel plate 3 is placed, anchor hole is inserted on the top of anchoring piece 1, the top of shearing-resistant member 2 is inserted into shearing resistance hole;And it will Anchoring piece 1 is welded and fixed with steel plate 3, shearing-resistant member 2 and steel plate 3;By the above process, change traditional first by anchor fluke and steel plate phase The fixed structure type being inserted into building iron.After the completion of welding, the shearing-resistant member 2 and steel of 3 upper surface of steel plate can be will protrude above The cutting of 3 part of plate flushes.
S6, second coagulation soil is poured into the gap between 3 lower surface of steel plate and a concrete upper surface;Anchoring piece 1 After welding respectively with steel plate 3 with shearing-resistant member 2, inevitable there are gaps with a concrete surface, therefore are poured again into this gap Second coagulation soil, is embedded into steel plate 3 in building completely by second coagulation soil.It is poured before two concrete, needs pair The impurity of concrete surface is cleared up.
Steel plate built-in fitting construction party of the invention changes erection sequence, after the position of anchoring piece 1 and shearing-resistant member 2 determines It is fixed with steel plate 3 again, it can disposably realize assembly, avoid generating between anchor fluke and the reinforcing bar main body on large area pre-embedded steel slab Interference, accelerates installation speed.
On the basis of above scheme, the positional relationship of step S3, measurement anchoring piece 1 and shearing-resistant member 2 in the present invention, specifically Including:
Geomery extruded sheet identical with steel plate 3 is placed in top and the pressing of anchoring piece 1 and shearing-resistant member 2, is anchored Part 1 and shearing-resistant member 2 extrude the position marking on extruded sheet;Extruded sheet can be plastically deformed, by anchoring piece 1 and shearing-resistant member 2 Extruding after be recessed to form the marking in corresponding position, obtain the relative positional relationship of anchoring piece 1 and shearing-resistant member 2, it is not necessary to survey one by one The size positions for measuring each anchoring piece 1 and shearing-resistant member 2, accelerate construction process.
Step S4, according to positional relationship, corresponding position opens up anchor hole and shearing resistance hole on steel plate 3, specifically includes:
Extruded sheet is aligned with steel plate 3 and is bonded, anchor hole and shearing resistance are cut on steel plate 3 according to the marking on extruded sheet Hole, extruded sheet self-strength are lower, it is easy to be cut, therefore directly cut extrusion molding after extruded sheet and steel plate 3 are mutually aligned Plate and steel plate.
Further, step S4, according to positional relationship, corresponding position opens up anchor hole and shearing resistance hole on steel plate 3, also Include the following steps:
S41, positioning bar 31 is welded on the bottom surface of steel plate 3, the height that positioning bar 31 protrudes from 3 bottom surface of steel plate is mixed with secondary The thickness for coagulating soil is equal, and positioning bar 31 with the upper surface of a concrete for contacting, for limiting steel plate 3 and a concrete Between height, namely determine the casting thickness of second coagulation soil, positioning bar 31 is generally located on the edge or apex angle of steel plate 3 Place, general setting three or four.Certainly, split type cushion block can also be used in positioning bar 31, these specific structures should all By protection of the invention.
Further, step S4, according to positional relationship, corresponding position opens up anchor hole and shearing resistance hole on steel plate 3, also Include the following steps:
S42, plug hole 32 for being poured second coagulation soil is opened up near the apex angle of steel plate 3;The row of opening up on steel plate 3 Stomata 33, second coagulation soil enter in the gap between steel plate 3 and a concrete from plug hole 32, steel plate and a concrete Between air discharged from gas vent 33.
Step S6, second coagulation soil is poured into the gap between 3 lower surface of steel plate and a concrete upper surface, specifically Including:
In the surrounding supporting module of steel plate 3, second coagulation soil is poured by plug hole 32, until slurry is discharged in gas vent 33 Until material;The template of surrounding is bonded with the edge of steel plate 3, stops to limit by second coagulation soil surrounding by template, certainly, If supporting module is also possible in a wider context, or in the downwardly projecting setting side wall of surrounding of steel plate 3, mixes for stopping Solidifying soil.
Step S2, it is poured a concrete to building iron, the bottom end of anchoring piece 1 and shearing-resistant member 2 is pre-buried to primary mixed In solidifying soil, specifically include:
Vibration is constantly smash in casting process, removes bubble removing, guarantees the Forming Quality of a concrete.
Step S6, second coagulation soil is poured into the gap between 3 lower surface of steel plate and a concrete upper surface, In, second coagulation soil is high-strength grout, no longer smashes vibration when being poured second coagulation soil.
Step S1, according to the size of steel plate 3 and pre-buried position, anchoring piece 1 and the positioning of shearing-resistant member 2 are fixed on building iron Gap between, specifically include:Anchoring piece 1 and shearing-resistant member 2 are welded on building iron, make anchoring piece 1 and shearing-resistant member 2 by one Secondary concrete is fully wrapped around, and gap is not stayed in inside.
The present invention also provides a kind of steel plate pre-embedded devices, as shown in Fig. 2, being the top view of steel plate pre-embedded device;Fig. 3 is figure The sectional view in the direction A-A in 2;Including the anchoring piece 1, shearing-resistant member 2 and steel plate 3 being independently arranged, A indicates a coagulation Soil, B indicate second coagulation soil.The bottom end of anchoring piece 1 and shearing-resistant member 2 is for being inserted into the gap of building iron, and and building iron Muscle is mutually fixed, and the top of anchoring piece 1 and shearing-resistant member 2 protrudes from the upper surface of a concrete.
The corresponding anchor hole in the position in a concrete and shearing resistance are opened up with anchoring piece 1 and shearing-resistant member 2 on steel plate 3 Hole, anchoring piece 1 are inserted into being welded and fixed in anchor hole and with steel plate 3, shearing-resistant member 2 be inserted into shearing resistance hole and with steel plate 3 It is welded and fixed.Steel plate pre-embedded device of the invention can be assembled by above-mentioned steel plate built-in fitting construction method, can avoid tradition The problems such as interfering when anchor fluke is set on the steel plate in advance with the obstruction that building iron generates.Anchoring piece 1 can be cylindrical reinforcing bar, Shearing-resistant member 2 can be made of angle steel.
Positioning bar 31 is welded at the lower surface edge of steel plate 3, the height that positioning bar 31 protrudes from 3 bottom surface of steel plate is mixed with secondary The thickness for coagulating soil is equal, for limiting steel plate 3 with a concrete upper surface at a distance from, namely the thickness of determination second coagulation soil Degree.
The plug hole 32 for being poured second coagulation soil and the gas vent 33 for exhaust are opened up on steel plate 3 respectively, it is secondary Concrete enters in the gap between steel plate 3 and a concrete from plug hole 32, the air between steel plate and a concrete It is discharged from gas vent 33, in order to avoid generate aeration second coagulation soil property amount.Gas vent 33 is arranged multiple, equably divides On steel plate 3, plug hole 32 is arranged near the apex angle of steel plate 3 cloth, and the opening diameter of plug hole 33 is greater than gas vent.
As shown in figure 3, one end around anchor hole, positioned at 3 upper surface of steel plate is arranged the tapered hole of taper, bellmouth it is straight Diameter is tapered from the top down, and anchoring piece 1 is welded and fixed with steel plate 3.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, this hair It is bright to be not intended to be limited to the embodiments shown herein, and be to fit to and the principles and novel features disclosed herein phase Consistent widest scope.

Claims (10)

1. a kind of steel plate built-in fitting construction method, which is characterized in that including:
According to the size of steel plate (3) and pre-buried position, anchoring piece (1) and shearing-resistant member (2) positioning are fixed on to the seam of building iron Between gap;
It is poured a concrete to building iron, by the bottom end pre-buried to described one of the anchoring piece (1) and the shearing-resistant member (2) In secondary concrete, the top of the anchoring piece (1) and the shearing-resistant member (2) exposes to the upper surface of a concrete;
Measure the positional relationship of the anchoring piece (1) and the shearing-resistant member (2);
According to the positional relationship, corresponding position opens up anchor hole and shearing resistance hole on the steel plate (3);
The steel plate (3) are placed, the anchor hole are inserted on the top of the anchoring piece (1), the top of the shearing-resistant member (2) is inserted Enter to the shearing resistance hole;And the anchoring piece (1) and the steel plate (3), the shearing-resistant member (2) and the steel plate (3) are welded It is fixed;
Second coagulation soil is poured into the gap between the steel plate (3) lower surface and a concrete upper surface.
2. steel plate built-in fitting construction method according to claim 1, which is characterized in that the measurement anchoring piece (1) With the positional relationship of the shearing-resistant member (2), including:
Geomery and the steel plate (3) identical extruded sheet are placed in the top of the anchoring piece (1) and the shearing-resistant member (2) It holds and presses, the anchoring piece (1) and the shearing-resistant member (2) extrude the position marking on the extruded sheet;
According to the positional relationship, corresponding position opens up anchor hole and shearing resistance hole on steel plate (3), including:
The extruded sheet is aligned with the steel plate (3), the anchor hole and the shearing resistance hole are cut on the steel plate (3).
3. steel plate built-in fitting construction method according to claim 1, which is characterized in that it is described according to the positional relationship, Corresponding position opens up anchor hole and shearing resistance hole on steel plate (3), further includes:
Positioning bar (31) are welded on the bottom surface of the steel plate (3), the positioning bar (31) protrudes from the steel plate (3) bottom surface Height is equal with the thickness of the second coagulation soil.
4. steel plate built-in fitting construction method according to claim 1, which is characterized in that it is described according to the positional relationship, Corresponding position opens up anchor hole and shearing resistance hole on steel plate (3), further includes:
The plug hole (32) for being poured the second coagulation soil is opened up near the apex angle of the steel plate (3);In the steel plate (3) gas vent (33) are opened up on.
5. steel plate built-in fitting construction method according to claim 4, which is characterized in that described to the steel plate (3) following table Second coagulation soil is poured in gap between face and a concrete upper surface, including:
In the surrounding supporting module of the steel plate (3), it is poured the second coagulation soil by the plug hole (32), until described In gas vent (33) until discharge slurry.
6. steel plate built-in fitting construction method according to claim 1, which is characterized in that described primary to building iron casting Concrete, including, vibration is constantly smash in casting process, removes bubble removing;
Second coagulation soil is poured in the gap between the steel plate (3) lower surface and a concrete upper surface, Wherein, the second coagulation soil is high-strength grout.
7. steel plate built-in fitting construction method according to claim 1, which is characterized in that described by anchoring piece (1) and shearing resistance Part (2) positioning is fixed between the gap of building iron, including:
The anchoring piece (1) and the shearing-resistant member (2) are welded on the building iron.
8. a kind of steel plate pre-embedded device, which is characterized in that including the anchoring piece (1), shearing-resistant member (2) and steel plate being independently arranged (3);
The anchoring piece (1) and the shearing-resistant member (2) are mutually fixed for being inserted into the gap of building iron with building iron, And the top of the anchoring piece (1) and the shearing-resistant member (2) protrudes from the upper surface of a concrete;
The present position in a concrete is opened up with the anchoring piece (1) and the shearing-resistant member (2) on the steel plate (3) Corresponding anchor hole and shearing resistance hole, the anchoring piece (1) are inserted into the anchor hole and weld with the steel plate (3) solid Fixed, the shearing-resistant member (2) is inserted into the shearing resistance hole and is welded and fixed with the steel plate (3).
9. steel plate pre-embedded device according to claim 8, which is characterized in that welded at the lower surface edge of the steel plate (3) It connects positioning bar (31), the positioning bar (31) protrudes from the height of the steel plate (3) bottom surface and the thickness of the second coagulation soil It is equal;
Plug hole (32) for being poured the second coagulation soil is opened up on the steel plate (3) respectively and for the gas vent of exhaust (33)。
10. steel plate pre-embedded device according to claim 9, which is characterized in that around the anchor hole, be located at the steel The tapered hole of taper is arranged in one end of plate (3) upper surface.
CN201810818603.0A 2018-07-24 2018-07-24 A kind of steel plate built-in fitting construction method and steel plate pre-embedded device Pending CN108894335A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810818603.0A CN108894335A (en) 2018-07-24 2018-07-24 A kind of steel plate built-in fitting construction method and steel plate pre-embedded device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810818603.0A CN108894335A (en) 2018-07-24 2018-07-24 A kind of steel plate built-in fitting construction method and steel plate pre-embedded device

Publications (1)

Publication Number Publication Date
CN108894335A true CN108894335A (en) 2018-11-27

Family

ID=64351568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810818603.0A Pending CN108894335A (en) 2018-07-24 2018-07-24 A kind of steel plate built-in fitting construction method and steel plate pre-embedded device

Country Status (1)

Country Link
CN (1) CN108894335A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110777840A (en) * 2019-10-26 2020-02-11 上海二十冶建设有限公司 Construction method of equipment foundation embedded part at dense position of reinforcing steel bar
CN113802697A (en) * 2021-08-31 2021-12-17 中冶(上海)钢结构科技有限公司 Machining and embedding method for steel structure embedded part in dense steel bar area

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02300443A (en) * 1989-12-28 1990-12-12 Sekisui House Ltd Mounting method for frame material for building
CN101672038A (en) * 2009-09-18 2010-03-17 天津二十冶建设有限公司 Method for fixing embedded part of large foundation side wall
CN201896365U (en) * 2010-06-25 2011-07-13 国网直流工程建设有限公司四川工程建设部 Installing and fixing device for flat plate pre-embedded piece on surface of concrete
CN102296813A (en) * 2010-06-25 2011-12-28 贵阳铝镁设计研究院有限公司 Construction method for steel column base and steel column base structure thereof
CN103388343A (en) * 2013-07-31 2013-11-13 天津二十冶建设有限公司 Super-long and large horizontal embedded part reverse construction method
CN203879041U (en) * 2014-04-17 2014-10-15 中国建筑第八工程局有限公司 Embedded plate positioning support frame
CN106968347A (en) * 2017-04-13 2017-07-21 青岛建设集团有限公司 A kind of wall heavy steel plate built-in fitting construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02300443A (en) * 1989-12-28 1990-12-12 Sekisui House Ltd Mounting method for frame material for building
CN101672038A (en) * 2009-09-18 2010-03-17 天津二十冶建设有限公司 Method for fixing embedded part of large foundation side wall
CN201896365U (en) * 2010-06-25 2011-07-13 国网直流工程建设有限公司四川工程建设部 Installing and fixing device for flat plate pre-embedded piece on surface of concrete
CN102296813A (en) * 2010-06-25 2011-12-28 贵阳铝镁设计研究院有限公司 Construction method for steel column base and steel column base structure thereof
CN103388343A (en) * 2013-07-31 2013-11-13 天津二十冶建设有限公司 Super-long and large horizontal embedded part reverse construction method
CN203879041U (en) * 2014-04-17 2014-10-15 中国建筑第八工程局有限公司 Embedded plate positioning support frame
CN106968347A (en) * 2017-04-13 2017-07-21 青岛建设集团有限公司 A kind of wall heavy steel plate built-in fitting construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110777840A (en) * 2019-10-26 2020-02-11 上海二十冶建设有限公司 Construction method of equipment foundation embedded part at dense position of reinforcing steel bar
CN113802697A (en) * 2021-08-31 2021-12-17 中冶(上海)钢结构科技有限公司 Machining and embedding method for steel structure embedded part in dense steel bar area

Similar Documents

Publication Publication Date Title
CN104695557B (en) Steel structure building construction method for one-step pre-burying of foundation bolts
CN105908977B (en) Joint bar constructing structure and method
CN105040970A (en) High formwork system of comprehensive gymnasium and construction method thereof
CN205857530U (en) Joint bar positioner
CN108894335A (en) A kind of steel plate built-in fitting construction method and steel plate pre-embedded device
CN107130628A (en) The construction method of embedding anchor bolts flange and embedding anchor bolts
CN106245770B (en) Expanded letter variable cross-section annular stiffness beam construction method
KR20090008715A (en) Underground tunnel formation infrastructure establishment method
CN106149878B (en) Concrete frame structure prefabricated post and the connection structure and method at beam slab node
CN218437540U (en) Embedded joint bar component for cast-in-situ layer
CN112458905A (en) Splicing adjustment method for prefabricated capping beam and prefabricated stand column
CN104947707B (en) Horizontal embedded part installation method
CN104196248A (en) Reverse building method rear-inserting steel pipe column vertical positioning device and construction method thereof
JP6478837B2 (en) Grout injection method
CN208586639U (en) Equipment mounting tool
CN207296429U (en) A kind of cast-in-situ floor thickness control instrument
JP2017014766A (en) Grout injection method
CN207794321U (en) Monoblock type fills walling steel tie bar embedded part
CN105643791B (en) Precast wall body grout sleeve strip solid matter exposed steel bar accurate positioning die
CN205857745U (en) Joint bar constructing structure
CN109944271B (en) Equipment foundation construction method
CN109440652B (en) Full-scale model of fabricated bent cap pier pile and crack pouring construction process using full-scale model
KR20190083898A (en) Method for constructing continuous retaining wall having overlap array structure
CN110206321A (en) A kind of concrete vibrating auxiliary tool
KR20120078217A (en) Block out construction method for apparatus base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181127

RJ01 Rejection of invention patent application after publication