CN108867708A - The construction method of antiseep between a kind of underground exterior-protected structure and main body side wall - Google Patents

The construction method of antiseep between a kind of underground exterior-protected structure and main body side wall Download PDF

Info

Publication number
CN108867708A
CN108867708A CN201810433003.2A CN201810433003A CN108867708A CN 108867708 A CN108867708 A CN 108867708A CN 201810433003 A CN201810433003 A CN 201810433003A CN 108867708 A CN108867708 A CN 108867708A
Authority
CN
China
Prior art keywords
protected structure
underground exterior
main body
side wall
body side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810433003.2A
Other languages
Chinese (zh)
Inventor
陈昭福
范弘毅
郑玉明
鲍灵辉
张智斌
黄裕兴
鞠红达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
Third Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd
Original Assignee
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
Third Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Guangzhou Engineering Group Co Ltd CRECGZ, Third Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd filed Critical China Railway Guangzhou Engineering Group Co Ltd CRECGZ
Priority to CN201810433003.2A priority Critical patent/CN108867708A/en
Publication of CN108867708A publication Critical patent/CN108867708A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/16Restraining of underground water by damming or interrupting the passage of underground water by placing or applying sealing substances
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a kind of construction methods of antiseep between underground exterior-protected structure and main body side wall, are construction underground exterior-protected structure first, then clear up the medial surface of underground exterior-protected structure;Several Grouting Pipes are made, slurry outlet are set in the surrounding of each Grouting Pipe, then the inside of each Grouting Pipe embedment underground exterior-protected structure, the upper end of each Grouting Pipe protrudes from underground exterior-protected structure;In the inside of underground exterior-protected structure construction main body side wall;The upper end of each Grouting Pipe is connected to slip casting machine, completes slip casting work.By several Grouting Pipes pre-buried between underground exterior-protected structure and main body side wall, and slip casting work is completed, pre- anti-seep water in advance may be implemented, greatly reduce the expense of processing percolating water;After the medial surface deformation of underground exterior-protected structure generates cavity, this step of slip casting can also complete the work of dense packing effect, improve the stability of structure.The invention is used for the realm of building construction.

Description

The construction method of antiseep between a kind of underground exterior-protected structure and main body side wall
Technical field
The present invention relates to the realm of building construction, more particularly to antiseep between a kind of underground exterior-protected structure and main body side wall Construction method.
Background technique
Main body side wall:On foundation structure, receives, undertakes and transmit all upper loads and maintain the stabilization of structure Property.
Impermeable structure:The waterproofness of concrete itself.
Slip casting:By in curable slurries injection rock, soil, the crack of concrete or hole, pass through displacement, filling, extruding Etc. modes to improve the method for its physico-mechanical properties.
Existing tunnel water-proof system is essentially divided into two parts, and one is impermeable structure, and impermeable structure is waterproof The first line of defence plays an important role, but in reality, by project water price and geology, construction technology, method, level, The influence of the factors such as concrete material quality, pouring quality, maintenance quality is very easy to generate structural percolating water.Secondly For mode material waterproofing, it is laid with steel or flexible waterproof material, between tunnel main structure and enclosed structure to reach waterproof Effect.
If percolating water occurs for constructing tunnel, processing method is substantially to use outer brill injected hole in the place of discovery percolating water Leak stopping, or the material plastering leak stopping for using polyurethane, epoxy resin, dry cement to mix colloid etc.The shortcomings that prior art It is discovery percolating water reprocessing, no precautionary measures and expensive.
Summary of the invention
The purpose of the present invention is to provide a kind of at low cost, artificial less investment, material is simple and can handle cavity simultaneously The construction method of antiseep between the underground exterior-protected structure and main body side wall of problem.
The technical solution adopted by the present invention is that:
The construction method of antiseep, includes the following steps between a kind of underground exterior-protected structure and main body side wall:
A, then construction underground exterior-protected structure clears up the medial surface of underground exterior-protected structure;
B, several Grouting Pipes are made, slurry outlet is set in the surrounding of each Grouting Pipe, each Grouting Pipe is then embedded to underground The upper end of the inside of building enclosure, each Grouting Pipe protrudes from underground exterior-protected structure;
C, in the inside of underground exterior-protected structure construction main body side wall;
D, the upper end of each Grouting Pipe is connected to slip casting machine, completes slip casting work.
As an improvement of the above scheme, when making Grouting Pipe, the spacing of adjacent two slurry outlet is controlled in 25~30cm.
As an improvement of the above scheme, when built-in slip casting pipe, the spacing of adjacent two Grouting Pipe is controlled in 4~6m.
As an improvement of the above scheme, step c is before main body side wall of constructing, Grouting Pipe far from underground exterior-protected structure one Side is laid with waterproof layer.
As an improvement of the above scheme, the area that waterproof layer is laid with is equal to the medial surface area of underground exterior-protected structure.
As an improvement of the above scheme, waterproof layer is using rigid waterproof material.
As an improvement of the above scheme, waterproof layer uses waterproof material flexible.
Beneficial effects of the present invention:The construction method of antiseep passes through in underground between this underground exterior-protected structure and main body side wall Pre-buried several Grouting Pipes between building enclosure and main body side wall, and slip casting work is completed, pre- anti-seep water in advance, pole may be implemented The earth reduces the expense of processing percolating water;After the medial surface deformation of underground exterior-protected structure generates cavity, this step of slip casting can also To complete the work of dense packing effect, the stability of structure is improved.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is the schematic diagram of overall structure work progress.
Specific embodiment
Referring to Fig. 1 of side view, a kind of construction method of present invention antiseep between underground exterior-protected structure and main body side wall, packet Include following steps:
A, then construction underground exterior-protected structure 1 clears up the medial surface of underground exterior-protected structure 1, convenient for later step slip casting Slurries are bonded medial surface;
B, several Grouting Pipes 31 are made, slurry outlet are set in the surrounding of each Grouting Pipe 31, each Grouting Pipe 31 uses PVC material Material, the spacing of adjacent two slurry outlet is between 25~30cm, and the diameter of each slurry outlet is 15~20cm, then each Grouting Pipe 31 It is embedded to the inside of underground exterior-protected structure 1, the spacing between adjacent two Grouting Pipe 31 is between 4~6m, for subsequent connection slip casting The upper end of machine, each Grouting Pipe 31 protrudes from underground exterior-protected structure 1, only sees a Grouting Pipe 31 from seeing for Fig. 1;
C, in the inside of underground exterior-protected structure 1 construction main body side wall 2;
D, the upper end of each Grouting Pipe 31 is connected to slip casting machine, completes slip casting work, and what when slip casting used can be cement Slurry or dual slurry.
Slurry outlet is easily reduced grouting pressure too much, and correspondingly the spacing of adjacent two Grouting Pipe 31 will shorten, and leads to cost Rise;Slurry outlet is to reduce slip casting efficiency instead very little.The parameter designing of above-mentioned injected hole 32 and Grouting Pipe 31 can be in construction Various aspects factor controlling in more balanced level.
The construction method of antiseep passes through in underground exterior-protected structure 1 and main body side between this underground exterior-protected structure and main body side wall Pre-buried several Grouting Pipes 31 between wall 2, and slip casting work is completed, pre- anti-seep water in advance may be implemented, greatly reduce processing The expense of percolating water.Concrete structure is easy to shrink so that side is uneven, i.e., in the inside of underground exterior-protected structure 1 in molding After face deformation generates cavity 5, this step of slip casting can also complete the work of dense packing effect, improve the stability of structure.
As preferred embodiment, step c is before main body side wall 2 of constructing, in Grouting Pipe 31 far from underground exterior-protected structure 1 Side be laid with waterproof layer 4, waterproof layer 4 be laid with area be equal to underground exterior-protected structure 1 medial surface area.Waterproof layer 4 can be with Using waterproof material rigidity or flexible.The waterproof material such as cement, sandstone and additive and mixture of rigidity, it is flexible Waterproof material such as pitch, flexible web etc..Dual waterproofing design can further avoid unexpected leakage.
Certainly, the design creation is not limited to above embodiment, and the combination of the various embodiments described above different characteristic can also To reach good effect.Those skilled in the art can also make equivalent change on the premise of without prejudice to spirit of the invention Shape or replacement, these equivalent variation or replacement are all included in the scope defined by the claims of the present application.

Claims (7)

1. the construction method of antiseep between a kind of underground exterior-protected structure and main body side wall, it is characterised in that include the following steps:
A, it constructs underground exterior-protected structure (1), then clears up the medial surface of underground exterior-protected structure (1);
B, several Grouting Pipes (31) are made, slurry outlet are set in the surrounding of each Grouting Pipe (31), then each Grouting Pipe (31) It is embedded to the inside of underground exterior-protected structure (1), the upper end of each Grouting Pipe (31) protrudes from underground exterior-protected structure (1);
C, main body side wall (2) are constructed in the inside of underground exterior-protected structure (1);
D, the upper end of each Grouting Pipe (31) is connected to slip casting machine, completes slip casting work.
2. the construction method of antiseep between underground exterior-protected structure according to claim 1 and main body side wall, it is characterised in that: When making Grouting Pipe (31), the spacing of adjacent two slurry outlet is controlled in 25~30cm.
3. the construction method of antiseep between underground exterior-protected structure according to claim 2 and main body side wall, it is characterised in that: When built-in slip casting pipe (31), the spacing of adjacent two Grouting Pipe (31) is controlled in 4~6m.
4. the construction method of antiseep between underground exterior-protected structure according to claim 3 and main body side wall, it is characterised in that: Step c is constructing before main body side wall (2), is laid with waterproof layer (4) far from the side of underground exterior-protected structure (1) in Grouting Pipe (31).
5. the construction method of antiseep between underground exterior-protected structure according to claim 4 and main body side wall, it is characterised in that: The area that the waterproof layer (4) is laid with is equal to the medial surface area of underground exterior-protected structure (1).
6. the construction method of antiseep between underground exterior-protected structure according to claim 5 and main body side wall, it is characterised in that: The waterproof layer (4) is using rigid waterproof material.
7. the construction method of antiseep between underground exterior-protected structure according to claim 5 and main body side wall, it is characterised in that: The waterproof layer (4) uses waterproof material flexible.
CN201810433003.2A 2018-05-08 2018-05-08 The construction method of antiseep between a kind of underground exterior-protected structure and main body side wall Pending CN108867708A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810433003.2A CN108867708A (en) 2018-05-08 2018-05-08 The construction method of antiseep between a kind of underground exterior-protected structure and main body side wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810433003.2A CN108867708A (en) 2018-05-08 2018-05-08 The construction method of antiseep between a kind of underground exterior-protected structure and main body side wall

Publications (1)

Publication Number Publication Date
CN108867708A true CN108867708A (en) 2018-11-23

Family

ID=64326528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810433003.2A Pending CN108867708A (en) 2018-05-08 2018-05-08 The construction method of antiseep between a kind of underground exterior-protected structure and main body side wall

Country Status (1)

Country Link
CN (1) CN108867708A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3038524A1 (en) * 1980-10-11 1982-04-29 Leschus, geb. Putsch, Hildegard, 5600 Wuppertal Water bar or sealing strip for concrete joints - has integral grout tube for later injection of expanding grout to seal leaks
CN102392460A (en) * 2011-09-30 2012-03-28 广州市设计院 Basement external waterproof structure and construction method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3038524A1 (en) * 1980-10-11 1982-04-29 Leschus, geb. Putsch, Hildegard, 5600 Wuppertal Water bar or sealing strip for concrete joints - has integral grout tube for later injection of expanding grout to seal leaks
CN102392460A (en) * 2011-09-30 2012-03-28 广州市设计院 Basement external waterproof structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN102943466B (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN106320354B (en) The Seepage method on solution cavity development stratum under coating
CN105527384A (en) Grouting simulating test device and test method thereof
CN105386435B (en) It is a kind of to be used for the double-liquid grouting system and its construction technology of cement and water glass solution
CN104831705A (en) Ultra-deep hole grouting method during underground excavation of tunnel
CN102660952B (en) Controllable clay paste slurry grouting technique
CN201883435U (en) Preburied pipe pile grouting device
CN103046513A (en) Method for coating and sealing fracture of bed rock in uncovered heavy consolidation grouting
CN105649656A (en) Grouting system and method suitable for shield tunnel underwater karst stratum
CN104790982A (en) Enclosed mud for underground excavation tunnel ultra-deep hole grouting
CN107060821A (en) A kind of many lithology method for protecting support of face
CN109944236A (en) Root pile actively follows track delamination pour slurry system and construction method
CN107035389B (en) A kind of construction method for grouting reinforcement and earth's surface construction method
CN203161250U (en) Deep hole grouting reinforcing system for tunnel
CN112482415B (en) Consolidation grouting method for underground cavern under high external water pressure and flowing water condition
CN103469828A (en) Construction method of hydrophobic structure of post-cast strip of bottom plate of basement
CN105544547B (en) A kind of cover type segmentation strengthening fill and soft soil layer device and method
CN105604163A (en) Sewage pipeline internal plugging and external grouting construction method
CN206328766U (en) A kind of pipe well well-sealing device
CN108867708A (en) The construction method of antiseep between a kind of underground exterior-protected structure and main body side wall
CN204000836U (en) A kind of structure for the ground stabilization of shield end well surrounding building
CN203769790U (en) Shield tunneling machine with shield tail top provided with synchronous grouting device and synchronous grouting device
CN211973501U (en) Directional depthkeeping steel pipe slip casting reinforced structure
CN205314085U (en) A biliquid slip casting system that is used for cement and water glass solution
CN104278660B (en) The earth and rockfill dam of the direct fixed strengthening of the horizontal coiled pipe delamination pour slurry method of construction of building a dam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123