CN108843334A - A kind of method of reinforcing building lower section rich water soft soil layer service channel - Google Patents

A kind of method of reinforcing building lower section rich water soft soil layer service channel Download PDF

Info

Publication number
CN108843334A
CN108843334A CN201810628517.3A CN201810628517A CN108843334A CN 108843334 A CN108843334 A CN 108843334A CN 201810628517 A CN201810628517 A CN 201810628517A CN 108843334 A CN108843334 A CN 108843334A
Authority
CN
China
Prior art keywords
service channel
freezing
soil layer
rich water
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810628517.3A
Other languages
Chinese (zh)
Inventor
黄明峰
何剑光
马永刚
周琴
李秋霜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Xiamen Engineering Co Ltd
Original Assignee
CCCC First Highway Xiamen Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Xiamen Engineering Co Ltd filed Critical CCCC First Highway Xiamen Engineering Co Ltd
Priority to CN201810628517.3A priority Critical patent/CN108843334A/en
Publication of CN108843334A publication Critical patent/CN108843334A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/04Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Soil Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention belongs to service channel technical fields, and in particular to a kind of method of reinforcing building lower section rich water soft soil layer service channel comprises the steps of:(1)It drills at service channel excavated section, forms several freezing channels through service channel, and carry out Freezing Station installation;(2)Freezing pipe is installed in freezing channel and starts to freeze, completion is actively freezed and safeguard to freeze after thermometric;The present invention is at low cost, saves manpower, safe and efficient.

Description

A kind of method of reinforcing building lower section rich water soft soil layer service channel
Technical field
The invention belongs to service channel technical fields, and in particular to a kind of reinforcing building lower section rich water soft soil layer contact The method in channel.
Background technique
In city rail project, section or so line one service channel of standing meter as life-saving emergency contact channel, channel Construction method generallys use shallow mining method.Compared to mountain tunnel, service channel stratum is generally V grades of country rocks or even VI grades are enclosed Rock, soil layer intensity is low, and boring construction risk is big.Therefore stratum consolidation method is generallyd use before excavating and carries out soil to range stratum is excavated Body is reinforced, and soil layer intensity and impervious coefficient reach certain numerical value rear and excavated.
Since city rail project construction place many places are in building dense area, service channel has building when excavating point top In the presence of, and stratum is fast changing, when local layer soil body is weak soil and rich water, conventional stratum reinforcement means not can guarantee boring construction Subsidence value in the process will affect and cover building existing for earth's surface, thereby increases and it is possible to soil body cave-in accident occurs, in addition, existing Excavation service channel mode be the section part needed from service channel, first excavate the top of service channel, then to excavate contact logical The lower section in road needs manpower to excavate, increases duration and manpower significantly since space is smaller when excavating above service channel Cost, therefore the prior art needs further improve.
Summary of the invention
It is safe and efficient to reinforce rich water below building the purpose of the present invention is to provide a kind of at low cost, saving manpower The method of soft soil layer service channel.
Based on above-mentioned purpose, the present invention is adopted the following technical scheme that:
A kind of method of reinforcing building lower section rich water soft soil layer service channel, comprises the steps of:
(1)It drills at service channel excavated section, forms several freezing channels through service channel, and carry out Freezing Station peace Dress;
(2)Freezing pipe is installed in freezing channel and starts to freeze, completion is actively freezed and safeguard to freeze after thermometric;
(3)Mini-valve tube is set in surface buildings basal perimeter, the mini-valve tube is located at the top of service channel;
(4)Service channel opening sets up interim pre-loaded support struts, and brine freezing liquid is filled in freezing pipe, and Freezing Station makes freezing pipe In freezing liquid persistently cool down, to service channel full face tunneling, formed and excavate channel.
Further, the step(1)The length direction of middle freezing channel and the length direction of service channel are identical.
Further, the step(1)In several freezing channels enclose circular passage, step(4)In excavation it is logical Road is set in circular passage.
Further, the brine freezing liquid minimum temperature is -10 DEG C to -28 DEG C.
Further, the step(3)Middle mini-valve tube reinforced radius is 1.5m, spacing 2m, and mini-valve tube sets position With building gathering 1-2m, the angle of the perpendicular bisector of the length direction and earth's surface of mini-valve tube is 15 °.
Construction period of the invention is short, minimizes shield receives risk, quality is easy to guarantee, construction investment economical rationality, this Invention also avoids ground in the case of covering building from reinforcing existing equipment and the conflicting situation of building;It can also minimize The Mining Method of rich water soft soil layer excavates risk, what the Sand that may occur when avoiding construction or even end soil body collapsed It may;The present invention saves construction cost using salt water as freezing liquid, and soil strength and impervious coefficient are high after freezing, make to construct Quality is protected.
Detailed description of the invention
Fig. 1 is the location diagram of freezing channel and track;
Fig. 2 is the location diagram for excavating channel and circular passage;
Fig. 3 is the location diagram of building and mini-valve tube;
Fig. 4 is the location diagram of building and service channel.
Specific embodiment
The method of rich water soft soil layer service channel 2, feature exist below a kind of reinforcing building as shown in Figs 1-4 In comprising the steps of:
(1)It drills at 2 excavated section of service channel, forms several freezing channels 1 through service channel 2, and freezed It stands installation, the length direction of the freezing channel 1 is identical as the length direction of service channel 2, and several freezing channels 1 enclose Circular passage, service channel 2 is between two tracks 3;
(2)Freezing pipe is installed in freezing channel 1 and starts to freeze, completion is actively freezed and safeguard to freeze after thermometric;
(3)Mini-valve tube 5 is set in 7 building of earth's surface, 6 basal perimeter, the mini-valve tube 5 is located at 2 top of service channel, described 5 reinforced radius of mini-valve tube be 1.5m, spacing 2m, mini-valve tube 5 sets position and 6 gathering 1-2m of building, the length of mini-valve tube 5 The angle for spending the perpendicular bisector of direction and earth's surface 7 is 15 °;
(4)2 opening of service channel sets up interim pre-loaded support struts, and brine freezing liquid, the salt water cooling are filled in freezing pipe Freezing liquid minimum temperature is -10 DEG C to -28 DEG C, and Freezing Station cools down the freezing liquid in freezing pipe persistently, to 2 tunneling boring of service channel It excavates, is formed and excavate channel 4, excavate channel 4 and be set in circular passage.

Claims (5)

1. a kind of method for reinforcing rich water soft soil layer service channel below building, which is characterized in that comprise the steps of:
(1)It drills at service channel excavated section, forms several freezing channels through service channel, and carry out Freezing Station peace Dress;
(2)Freezing pipe is installed in freezing channel and starts to freeze, completion is actively freezed and safeguard to freeze after thermometric;
(3)Mini-valve tube is set in surface buildings basal perimeter, the mini-valve tube is located at the top of service channel;
(4)Service channel opening sets up interim pre-loaded support struts, and brine freezing liquid is filled in freezing pipe, and Freezing Station makes freezing pipe In freezing liquid persistently cool down, to service channel full face tunneling, formed and excavate channel.
2. the method according to claim 1 for reinforcing rich water soft soil layer service channel below building, which is characterized in that The step(1)The length direction of middle freezing channel and the length direction of service channel are identical.
3. the method according to claim 1 for reinforcing rich water soft soil layer service channel below building, which is characterized in that The step(1)In several freezing channels enclose circular passage, step(4)In excavation channel be set in circular passage It is interior.
4. the method according to claim 1 for reinforcing rich water soft soil layer service channel below building, which is characterized in that The brine freezing liquid minimum temperature is -10 DEG C to -28 DEG C.
5. the method according to claim 1 for reinforcing rich water soft soil layer service channel below building, which is characterized in that The step(3)Middle mini-valve tube reinforced radius is 1.5m, spacing 2m, and mini-valve tube sets position and building gathering 1-2m, The angle of the perpendicular bisector of the length direction and earth's surface of mini-valve tube is 15 °.
CN201810628517.3A 2018-06-19 2018-06-19 A kind of method of reinforcing building lower section rich water soft soil layer service channel Withdrawn CN108843334A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810628517.3A CN108843334A (en) 2018-06-19 2018-06-19 A kind of method of reinforcing building lower section rich water soft soil layer service channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810628517.3A CN108843334A (en) 2018-06-19 2018-06-19 A kind of method of reinforcing building lower section rich water soft soil layer service channel

Publications (1)

Publication Number Publication Date
CN108843334A true CN108843334A (en) 2018-11-20

Family

ID=64202630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810628517.3A Withdrawn CN108843334A (en) 2018-06-19 2018-06-19 A kind of method of reinforcing building lower section rich water soft soil layer service channel

Country Status (1)

Country Link
CN (1) CN108843334A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612533A (en) * 2018-05-04 2018-10-02 淮南矿业(集团)有限责任公司 Dial the construction method in gate segment tunnel
CN110454170A (en) * 2019-08-19 2019-11-15 中铁十二局集团有限公司 Tunnel connection channel construction method based on freezing process

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104806257A (en) * 2015-04-27 2015-07-29 中国水利水电第七工程局有限公司 Sandy gravel stratum shield construction cap-type ground advance reinforcement structure and sandy gravel stratum shield construction cap-type ground advance reinforcement method
CN106089214A (en) * 2016-06-21 2016-11-09 中铁十局集团第三建设有限公司 Service channel manual pipe jacking reinforced construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104806257A (en) * 2015-04-27 2015-07-29 中国水利水电第七工程局有限公司 Sandy gravel stratum shield construction cap-type ground advance reinforcement structure and sandy gravel stratum shield construction cap-type ground advance reinforcement method
CN106089214A (en) * 2016-06-21 2016-11-09 中铁十局集团第三建设有限公司 Service channel manual pipe jacking reinforced construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张晓锋: "富水圆砾地层联络通道加固选型及应用", 《石家庄铁道大学学报》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612533A (en) * 2018-05-04 2018-10-02 淮南矿业(集团)有限责任公司 Dial the construction method in gate segment tunnel
CN110454170A (en) * 2019-08-19 2019-11-15 中铁十二局集团有限公司 Tunnel connection channel construction method based on freezing process

Similar Documents

Publication Publication Date Title
CN107676097B (en) A kind of high hydraulic pressure soft soil layer HFE composite shield originating method
CN108194102B (en) The dismounting of limit section and safe stress check calculation construction method are invaded in Tunnel deformation
CN106437726B (en) Shallow-depth-excavation tunnel crosses ground fissure crushed zone construction method
CN104278993B (en) A kind of bias voltage Skew Tunnel enters the constructional method in hole
CN110685714B (en) Micro-step reserved core soil construction structure and method for shallow-buried bias tunnel under phyllite geology
CN106907164A (en) A kind of water-bed combination of mine shield tunnel docking structure form and its construction method
CN105240024B (en) A kind of method of parallel shield method enlarging construction subway station
CN102518470B (en) Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel
CN106837357B (en) A kind of no-dig technique pipe-roof method using curve pipe canopy
CN209444350U (en) Shield launching wears existing shield tunnel barrel vault advanced support structure under being
CN106837389B (en) A kind of Underground Subway Station vertical shaft and transverse passage-way freeze water-stopping method
Tonon ADECO full-face tunnel excavation of two 260 m2 tubes in clays with sub-horizontal jet-grouting under minimal urban cover
CN107091101A (en) Mine shield handing-over tunnel folded type joint design and construction method in the middle part of marine site
CN107524459A (en) A kind of Underground Subway Station vertical shaft and transverse passage-way freeze water sealing structure and method
CN205975649U (en) Freezing pipe curtain steel pipe supporting construction
CN108979659A (en) The ruggedized construction and method of structures are worn under weak soil rich water large cross-section tunnel group
CN112647956B (en) Construction method for short-distance underpass subway station of water-rich composite stratum shield
CN108843328A (en) A kind of Metro Connection Passage excavation construction support construction method
CN108825247B (en) External inclination side wall horizontal bottom-making basin-shaped freezing water stop construction method for 8 pilot tunnel PBA construction method
CN206888992U (en) A kind of water-bed mine shield tunnel combination docking structure form
CN107620600A (en) A kind of MJS engineering methods and pipe-roof method combined supporting big cross section small interval tunneling engineering method
CN104675405B (en) Rectangular pipe jacking machine tunnel entering auxiliary structure and construction method
CN110374657A (en) The Mining Method Subway Tunnel ventilating shaft and its construction method of " well after first shield "
CN109296371A (en) MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station
CN108843334A (en) A kind of method of reinforcing building lower section rich water soft soil layer service channel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181120