CN108827265B - Storage protection device based on settlement observation identification for building monitoring - Google Patents

Storage protection device based on settlement observation identification for building monitoring Download PDF

Info

Publication number
CN108827265B
CN108827265B CN201811017237.5A CN201811017237A CN108827265B CN 108827265 B CN108827265 B CN 108827265B CN 201811017237 A CN201811017237 A CN 201811017237A CN 108827265 B CN108827265 B CN 108827265B
Authority
CN
China
Prior art keywords
rod
protection device
leveling
magnet
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811017237.5A
Other languages
Chinese (zh)
Other versions
CN108827265A (en
Inventor
周永国
陶东新
陶敏
戴少武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhou Yongguo
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811017237.5A priority Critical patent/CN108827265B/en
Publication of CN108827265A publication Critical patent/CN108827265A/en
Application granted granted Critical
Publication of CN108827265B publication Critical patent/CN108827265B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/02Means for marking measuring points

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a storage protection device based on a settlement observation mark for building monitoring, which structurally comprises a protection device, a material blocking mechanism, a wall pasting plate and a clamping groove, wherein the protection device consists of an insertion rod, a circular groove, a leveling mechanism, an isolated inner tube, a sliding groove and a first magnet, the protection device is arranged in a settlement observation point on a high-rise and low-rise building column, the insertion rod is used for storing the leveling mechanism for protection, the material blocking mechanism attached to the upper end of the wall pasting plate is used for blocking materials from top to bottom, a semicircular operation plate on the leveling mechanism is prevented from being damaged, the clamping groove is formed in the wall pasting plate and used for attaching the semicircular operation plate, rainwater is prevented from permeating into the insertion rod, the structural design is reasonable, the operation is simple, the manufacturing cost is low, the storage protection device is suitable for mass production, and the settlement observation mark.

Description

Storage protection device based on settlement observation identification for building monitoring
Technical Field
The invention relates to the field of building monitoring, in particular to a storage protection device based on a settlement observation mark for building monitoring.
Background
The settlement observation point is used for monitoring whether the foundation of a high-rise building and a low-rise building deforms or not, the settlement observation point can be generally used for recording at fixed points by using a settlement observation mark, the settlement observation mark can be generally arranged at four corners of the building or multiple corners of the building after the high-rise building and the low-rise building finish the first floor, then the building is continuously built, whether obvious settlement occurs in the high-rise building or not is observed, and after the settlement observation mark is set, the building is still continuously constructed, so that the possibility that the set settlement observation mark is damaged exists, the settlement observation mark is damaged, and errors of measured data can be caused.
Disclosure of Invention
Aiming at the defects of the prior art, the invention is realized by the following technical scheme: a storage protection device based on a settlement observation mark for building monitoring structurally comprises a protection device, a stop mechanism, a wall attaching plate and a clamping groove, wherein the wall attaching plate is welded at the front end of the protection device through electric welding, the stop mechanism is vertically installed in the middle of the top end of the wall attaching plate, and the clamping groove is vertically formed in the surface of the wall attaching plate;
protection device constitute by inserting pole, circular recess, levelling mechanism, isolated inner tube, spout, first magnet, the pole surface of inserting on be equipped with the circular recess more than two, the pole inner wall of inserting on fixed mounting have isolated inner tube, isolated inner tube inner wall on be equipped with two opposite spouts, isolated inner tube in be equipped with levelling mechanism, isolated inner tube and levelling mechanism sliding fit, the inside left end of pole of inserting on be equipped with first magnet, the pole of inserting and first magnet glue and connect.
As the further optimization of this technical scheme, levelling mechanism constitute by second magnet, air level, semicircle operation panel, ball, slide bar, the air level left end on be equipped with second magnet, air level and second magnet glue and connect, the air level right-hand member have the semicircle operation panel through electric welding, the air level on the surface be equipped with the slide bar, air level and slide bar fixed connection, the slide bar on the surface install the ball.
As a further optimization of the technical scheme, the leveling rod further comprises a folding supporting plate, the right end of the leveling rod is provided with the folding supporting plate, the leveling rod is fixedly connected with one end of the folding supporting plate, and the other end of the folding supporting plate is installed on the surface of the wall pasting plate.
As a further optimization of the technical scheme, the insertion rod further comprises an annular limiting ring, the right side of the insertion rod is provided with the annular limiting ring, and the insertion rod is fixedly connected with the annular limiting ring.
As the further optimization of this technical scheme, stock stop constitute by pole setting, horizontal support bar, pivot, fender thing board, the pole setting on the surface have horizontal support bar through electric welding, the pole setting top on be equipped with the fender thing board, pole setting and fender thing board through pivot swing joint.
As a further optimization of the technical scheme, the object blocking plate also comprises an interface board, and the interface board is embedded in the groove on the surface of the object blocking plate.
As the further optimization of this technical scheme, the levelling rod adopt stainless steel material to make, prevent to rust.
As a further optimization of the technical solution, the first magnet and the second magnet are located on the same horizontal plane.
As a further optimization of the technical scheme, the length between the object blocking plate and the wall pasting plate is the same.
Advantageous effects
The invention relates to a storage protection device based on a settlement observation mark for building monitoring, which is characterized in that a settlement observation point is made on a column on a high-rise building and a low-rise building, a hole is drilled by impact, dust in the hole is cleaned, an insertion rod is inserted into the settlement observation point by using a bar-planting adhesive or a chemical anchor bolt, the insertion rod is tightly attached to the column surface by adhering to a wallboard, a circular groove is arranged on the surface of the insertion rod, the insertion rod can be better adhered to the column, in order to protect the settlement observation mark from being damaged, a leveling rod of the settlement observation point is stored into the protection device by using the insertion rod, when the leveling rod of the settlement observation point is used for measurement, a finger is used to hold a semicircular operation plate to be pulled out, a support plate is folded to be opened when the outermost end of the semicircular operation plate is pulled, a slide rod in the leveling rod enters an inner groove of an annular limit ring from a chute when the semicircular operation, the utility model discloses a horizontal pole is including fixing level pole, the horizontal pole is equipped with the horizontal support bar, the horizontal pole is used for supporting the fender thing board, and the fender thing board utilizes the horizontal support bar to hug closely the supporting role point of cylinder, come to keep out the material striking from top to bottom, protection semicircle operation panel that can be fine is not destroyed, when will accomodating the level pole, ninety degree back to semicircle operation panel anticlockwise rotation, loosen the finger, first magnet in the inserted bar utilizes magnetic force to inwards inhale second magnet, and the slide bar on the level pole utilizes the ball to accelerate the removal on the spout, let the level pole can be quick be inhaled, be equipped with isolated inner tube in the inserted bar, be used for reducing the magnetic force influence of first magnet and second magnet to the inserted bar.
Compared with the prior art, the invention has the beneficial effects that: install protection device in the settlement observation point on high low-rise building post, let insert the pole and accomodate levelling mechanism and protect, utilize the stock stop of pasting the wallboard upper end to keep out from top to bottom material, it receives the damage to avoid the semicircle operation panel on the levelling mechanism, and be equipped with the draw-in groove on the pasting board and be used for laminating semicircle operation panel, avoid in the rainwater infiltration inserts the pole, this structural design is reasonable, easy operation, and the cost is with low costs, be suitable for mass production, and can also effectually protect subsiding the observation sign.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic structural diagram of a storage protection device based on a settlement observation identifier for building monitoring.
Fig. 2 is a schematic structural view of a working state of the storage protection device based on the settlement observation mark for building monitoring.
Fig. 3 is a schematic structural view of a static state of the storage protection device based on the settlement observation mark for building monitoring.
Fig. 4 is a schematic front view of a storage protection device based on a settlement observation identifier for building monitoring.
In the figure: the device comprises a protection device-1, a material blocking mechanism-2, a wall pasting plate-3, a clamping groove-4, an insertion rod-101, a circular groove-102, a leveling mechanism-103, an isolated inner tube-104, a sliding groove-105, a first magnet-106, a second magnet-1031, a leveling rod-1032, a semicircular operation plate-1033, a ball-1034, a sliding rod-1035, a folding support plate-1032 a, an annular limit ring-101 a, a vertical rod-201, a transverse support bar-202, a rotating shaft-203, a stopper plate-204 and an address plate-204 a.
Detailed Description
In order to make the technical means, the original characteristics, the achieved purposes and the effects of the invention easy to understand, the following description and the accompanying drawings further illustrate the preferred embodiments of the invention.
Examples
Referring to fig. 1-4, the invention provides a storage protection device based on a settlement observation mark for building monitoring, which structurally comprises a protection device 1, a material blocking mechanism 2, a wall attaching plate 3 and a clamping groove 4, wherein the front end of the protection device 1 is welded with the wall attaching plate 3 through electric welding, the material blocking mechanism 2 is vertically arranged at the middle position of the top end of the wall attaching plate 3, the clamping groove 4 is vertically arranged on the surface of the wall attaching plate 3, the protection device 1 consists of an insertion rod 101, a circular groove 102, a leveling mechanism 103, an isolation inner tube 104, a sliding groove 105 and a first magnet 106, the surface of the insertion rod 101 is provided with more than two circular grooves 102, the inner wall of the insertion rod 101 is fixedly provided with the isolation inner tube 104, the inner wall of the isolation inner tube 104 is provided with two opposite sliding grooves 105, the isolation inner tube 104 is internally provided with the leveling mechanism 103, and the isolation inner tube 104 is in sliding fit with the leveling mechanism 103, the left end inside the insertion rod 101 is provided with a first magnet 106, and the insertion rod 101 is connected with the first magnet 106 through glue.
The leveling mechanism 103 comprises a second magnet 1031, a leveling rod 1032, a semicircular operation plate 1033, a ball 1034 and a sliding rod 1035, the second magnet 1031 is arranged at the left end of the leveling rod 1032, the leveling rod 1032 is connected with the second magnet 1031 through glue, the semicircular operation plate 1033 is welded at the right end of the leveling rod 1032 through electric welding, the sliding rod 1035 is arranged on the surface of the leveling rod 1032, the leveling rod 1032 is fixedly connected with the sliding rod 1035, and the ball 1034 is arranged on the surface of the sliding rod 1035.
The leveling rod 1032 further comprises a foldable support plate 1032a, a foldable support plate 1032a is disposed at the right end of the leveling rod 1032, one end of the leveling rod 1032 and the foldable support plate 1032a are fixedly connected, the other end of the foldable support plate 1032a is mounted on the surface of the wall panel 3,
the folding support plate 1032a is used for supporting the stop of the leveling rod, and is convenient for monitoring a settlement observation point.
The insertion rod 101 further comprises an annular limiting ring 101a, the right side of the insertion rod 101 is provided with the annular limiting ring 101a, the insertion rod 101 is fixedly connected with the annular limiting ring 101a,
the annular stop collar 101a is formed with an annular inner groove on the inner wall to limit the sliding movement of the slide bars 1035 on the level bar 1032.
The stock stop 2 comprises a vertical rod 201, a transverse support bar 202, a rotating shaft 203 and a blocking plate 204, the vertical rod 201 is welded with the transverse support bar 202 through electric welding on the surface, the blocking plate 204 is arranged on the top end of the vertical rod 201, the vertical rod 201 and the blocking plate 204 are movably connected through the rotating shaft 203,
the object blocking plate 204 utilizes the supporting action point of the lateral supporting bar 202 tightly attached to the cylindrical surface to block the impact of materials from top to bottom, so as to well protect the semicircular operation plate 1033.
The baffle plate 204 also comprises an address plate 204a, the address plate 204a is embedded on a groove on the surface of the baffle plate 204,
the boundary card 204a is used to record the mark of the observation point to avoid confusion.
The leveling rod 1032 is made of stainless steel materials to prevent rusting, the first magnet 106 and the second magnet 1031 are located on the same horizontal plane, and the lengths of the object blocking plate 204 and the wall pasting plate 3 are the same.
The principle of the invention is as follows: firstly, making a settlement observation point on a column on a high-rise building and a low-rise building, drilling a hole by impact, cleaning dust in the hole, inserting the insertion rod 101 into the settlement observation point by using bar-planting glue or a chemical anchor bolt, attaching the insertion rod to the wall plate 3 to cling to the column surface, arranging a circular groove 102 on the surface of the insertion rod 101, enabling the insertion rod 101 to be better adhered to the column, storing the leveling rod 1032 of the settlement observation point into the protection device 1 by using the insertion rod 101 in order to protect the settlement observation mark from being damaged, pinching the semicircular operation plate 1033 by fingers to be pulled outwards when measuring by using the leveling rod 1032 of the settlement observation point, folding the support plate 1032a to be stretched when pulling the outermost end, rotating the semicircular operation plate 1033 ninety degrees clockwise, enabling the slide bar 1035 on the leveling rod to enter the inner groove of the annular limiting ring 101a from the sliding groove 105, and limiting the inward movement of the leveling rod 1032, the leveling rod is placed on a folding supporting plate 1032a for fixed-point observation data, the transverse supporting strip 202 arranged on the upright 201 is used for supporting the blocking plate 204, the blocking plate 204 utilizes the supporting action point of the transverse supporting strip 202 tightly attached to the cylindrical surface to resist the collision of materials from top to bottom, the semicircular operating plate 1033 can be well protected from being damaged, when the leveling rod 1032 is to be stored, after the semicircular operating plate 1033 rotates ninety degrees anticlockwise, the fingers are loosened, the first magnet 106 inserted into the rod 101 absorbs the second magnet 1031 inwards by utilizing magnetic force, the sliding rod 1035 on the leveling rod 1032 utilizes the ball 1034 to accelerate the movement on the sliding groove 105, the leveling rod 1032 can be rapidly absorbed, the insertion rod 101 is internally provided with an isolation inner tube 104, and the influence of the first magnet 106 and the second magnet 1031 on the insertion rod 101 is reduced.
The invention solves the problem that the protection device 1 is arranged in a settlement observation point on a high-rise and low-rise building column, the inserting rod 101 is enabled to accommodate the leveling mechanism 103 for protection, the material stop mechanism 2 at the upper end of the wall pasting plate 3 is utilized to stop materials from top to bottom, the semicircular operating plate 1033 on the leveling mechanism 103 is prevented from being damaged, the wall pasting plate 3 is provided with a clamping groove 4 for being jointed with the semicircular operating plate 1033, rainwater is prevented from permeating into the inserting rod 101, the structural design is reasonable, the operation is simple, the manufacturing cost is low, the mass production is suitable, and the settlement observation mark can be effectively protected.
While there have been shown and described what are at present considered the fundamental principles of the invention, the essential features and advantages thereof, it will be understood by those skilled in the art that the present invention is not limited by the embodiments described above, which are merely illustrative of the principles of the invention, but rather, is capable of numerous changes and modifications in various forms without departing from the spirit or essential characteristics thereof, and it is intended that the invention be limited not by the foregoing descriptions, but rather by the appended claims and their equivalents.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (3)

1. The utility model provides a accomodate protection device based on sign is surveyed with subsiding to building monitoring, its structure includes protection device (1), stock stop (2), pastes wallboard (3), draw-in groove (4), protection device (1) front end have through electric welding and paste wallboard (3), stock stop (2) vertical installation in pasting wallboard (3) top intermediate position, pasting wallboard (3) on the surface vertical draw-in groove (4) that are equipped with, its characterized in that:
the protection device (1) comprises an insertion rod (101), a circular groove (102), a leveling mechanism (103), an isolation inner tube (104), a sliding groove (105) and a first magnet (106), wherein the surface of the insertion rod (101) is provided with more than two circular grooves (102), the inner wall of the insertion rod (101) is fixedly provided with the isolation inner tube (104), the inner wall of the isolation inner tube (104) is provided with two opposite sliding grooves (105), the isolation inner tube (104) is internally provided with the leveling mechanism (103), the isolation inner tube (104) is in sliding fit with the leveling mechanism (103), the left end inside the insertion rod (101) is provided with the first magnet (106), and the insertion rod (101) is connected with the first magnet (106) through glue;
the leveling mechanism (103) consists of a second magnet (1031), a leveling rod (1032), a semicircular operating plate (1033), a ball (1034) and a sliding rod (1035), the second magnet (1031) is arranged at the left end of the leveling rod (1032), the leveling rod (1032) is connected with the second magnet (1031) in a gluing mode, the semicircular operating plate (1033) is welded at the right end of the leveling rod (1032) through electric welding, the sliding rod (1035) is arranged on the surface of the leveling rod (1032), the leveling rod (1032) is fixedly connected with the sliding rod (1035), and the ball (1034) is arranged on the surface of the sliding rod (1035);
the leveling rod (1032) further comprises a folding support plate (1032 a), the right end of the leveling rod (1032) is provided with the folding support plate (1032 a), and one end of the leveling rod (1032) is fixedly connected with one end of the folding support plate (1032 a);
the insert rod (101) further comprises an annular limiting ring (101 a), the right side of the insert rod (101) is provided with the annular limiting ring (101 a), and the insert rod (101) is fixedly connected with the annular limiting ring (101 a).
2. The storage protection device based on the settlement observation mark for building monitoring as claimed in claim 1, wherein: striker (2) constitute by pole setting (201), horizontal support bar (202), pivot (203), fender thing board (204), pole setting (201) have horizontal support bar (202) through electric welding on the surface, pole setting (201) top on be equipped with fender thing board (204), pole setting (201) and fender thing board (204) through pivot (203) swing joint.
3. The storage protection device based on the settlement observation mark for building monitoring as claimed in claim 2, wherein: the baffle plate (204) also comprises an interface board (204 a), and the interface board (204 a) is embedded on a groove on the surface of the baffle plate (204).
CN201811017237.5A 2018-08-31 2018-08-31 Storage protection device based on settlement observation identification for building monitoring Active CN108827265B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811017237.5A CN108827265B (en) 2018-08-31 2018-08-31 Storage protection device based on settlement observation identification for building monitoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811017237.5A CN108827265B (en) 2018-08-31 2018-08-31 Storage protection device based on settlement observation identification for building monitoring

Publications (2)

Publication Number Publication Date
CN108827265A CN108827265A (en) 2018-11-16
CN108827265B true CN108827265B (en) 2021-01-08

Family

ID=64151876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811017237.5A Active CN108827265B (en) 2018-08-31 2018-08-31 Storage protection device based on settlement observation identification for building monitoring

Country Status (1)

Country Link
CN (1) CN108827265B (en)

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1558182A (en) * 2004-01-17 2004-12-29 湖北清江水布垭工程建设公司 Measuring system for faceplate deflection, internal horizontal and vertical deformation of dam body
CN201081672Y (en) * 2007-08-13 2008-07-02 太原市建筑工程总公司 Protective cover type settlement observation control point
CN101545271A (en) * 2009-03-21 2009-09-30 标力建设集团有限公司 Telescopic type settlement observer
CN202255397U (en) * 2011-10-31 2012-05-30 河北建设集团有限公司 Level mark for settlement observation
CN203274731U (en) * 2013-05-13 2013-11-06 温岭市宏达建筑工程有限公司 Telescopic settlement observation device
CN203605946U (en) * 2013-12-15 2014-05-21 山西四建集团有限公司 Protecting device of settlement observation points
CN205246081U (en) * 2015-10-29 2016-05-18 山东科技大学 Hidden stainless steel settlement observation point marks piece
CN205280079U (en) * 2015-12-09 2016-06-01 中交上航局航道建设有限公司 Subside guard box of device
CN205898136U (en) * 2016-07-01 2017-01-18 上海中测行工程检测咨询有限公司 Settlement observation sign and settlement observation structure that marks based on settlement observation
CN206683621U (en) * 2017-03-27 2017-11-28 中铁十七局集团第六工程有限公司 Settlement monitoring levelling rod adapter
CN107677240A (en) * 2017-11-08 2018-02-09 吴义锖 One kind building monitoring identifies protection device with settlement observation
CN207147469U (en) * 2017-09-08 2018-03-27 镇江八一四勘察测绘有限公司 Soil body deep soil settlement survey equipment
CN107860356A (en) * 2017-12-21 2018-03-30 湖南省第五工程有限公司 A kind of drawer type settlement observer
CN108195349A (en) * 2018-03-28 2018-06-22 南京蓉水水电自动化技术研究所有限责任公司 A kind of magnetic resistance electrical measurement sedimentometer
CN207528217U (en) * 2017-10-30 2018-06-22 安徽理工大学 Interior receipts formula building settlement observation nail

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4549360A (en) * 1984-07-19 1985-10-29 Algate Instrument Corp. Device for alignment of process equipment and method of use thereof
US4879815A (en) * 1988-10-13 1989-11-14 Adolph Coors Company Alignment apparatus
US6124935A (en) * 1995-04-05 2000-09-26 Matthews; David S. Pipe fitting alignment systems
JP5132325B2 (en) * 2008-01-09 2013-01-30 中国電力株式会社 Surveying instrument
KR101351549B1 (en) * 2013-07-04 2014-01-14 (주)인화엔지니어링 Apparatus for preventing shock of staff geodetic surveying
KR101342629B1 (en) * 2013-09-09 2013-12-20 삼아항업(주) Image drawing update system for real time editing photograph by inflected geographic feature

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1558182A (en) * 2004-01-17 2004-12-29 湖北清江水布垭工程建设公司 Measuring system for faceplate deflection, internal horizontal and vertical deformation of dam body
CN201081672Y (en) * 2007-08-13 2008-07-02 太原市建筑工程总公司 Protective cover type settlement observation control point
CN101545271A (en) * 2009-03-21 2009-09-30 标力建设集团有限公司 Telescopic type settlement observer
CN202255397U (en) * 2011-10-31 2012-05-30 河北建设集团有限公司 Level mark for settlement observation
CN203274731U (en) * 2013-05-13 2013-11-06 温岭市宏达建筑工程有限公司 Telescopic settlement observation device
CN203605946U (en) * 2013-12-15 2014-05-21 山西四建集团有限公司 Protecting device of settlement observation points
CN205246081U (en) * 2015-10-29 2016-05-18 山东科技大学 Hidden stainless steel settlement observation point marks piece
CN205280079U (en) * 2015-12-09 2016-06-01 中交上航局航道建设有限公司 Subside guard box of device
CN205898136U (en) * 2016-07-01 2017-01-18 上海中测行工程检测咨询有限公司 Settlement observation sign and settlement observation structure that marks based on settlement observation
CN206683621U (en) * 2017-03-27 2017-11-28 中铁十七局集团第六工程有限公司 Settlement monitoring levelling rod adapter
CN207147469U (en) * 2017-09-08 2018-03-27 镇江八一四勘察测绘有限公司 Soil body deep soil settlement survey equipment
CN207528217U (en) * 2017-10-30 2018-06-22 安徽理工大学 Interior receipts formula building settlement observation nail
CN107677240A (en) * 2017-11-08 2018-02-09 吴义锖 One kind building monitoring identifies protection device with settlement observation
CN107860356A (en) * 2017-12-21 2018-03-30 湖南省第五工程有限公司 A kind of drawer type settlement observer
CN108195349A (en) * 2018-03-28 2018-06-22 南京蓉水水电自动化技术研究所有限责任公司 A kind of magnetic resistance electrical measurement sedimentometer

Also Published As

Publication number Publication date
CN108827265A (en) 2018-11-16

Similar Documents

Publication Publication Date Title
CN108827265B (en) Storage protection device based on settlement observation identification for building monitoring
CN107246012A (en) A kind of obstacle cleaning plant in the peg hole based on impact drill
CN210770986U (en) Be used for prosthetic strutting arrangement of drainage pipe
CN114739299B (en) Plate thickness controller capable of continuously counting and accurately measuring plate thickness of cast-in-place concrete
CN103852380A (en) Method and device for detecting compressive strength of hill sand concrete through post-installed anchoring method
CN214583292U (en) Building safety inspection is with multi-functional straightness detection device that hangs down
CN211978261U (en) Curtain wall in-plane deformation performance detection device for housing construction engineering
CN203037534U (en) Compressive strength detector for hill sand concrete test block
CN209555905U (en) A kind of static sounding counter force system of mattess
CN108086315A (en) A kind of suspension roof support structure and its construction method that can be recycled completely
CN210830301U (en) Hydrology monitoring facilities with crashproof function
CN206019652U (en) Engineering detecting chi
CN211596723U (en) Foundation ditch horizontal displacement automatic monitoring device
CN201130457Y (en) Simple pendulum experimental machine
CN209354055U (en) A kind of drilling rig
CN206887960U (en) A kind of obstacle cleaning plant in the peg hole based on impact drill
CN208520380U (en) A kind of building subsidence observation point structure
CN207953775U (en) A kind of countryside portable mapping tool stand
CN202865849U (en) Counter-guiding control device for one-column-one-pile perpendicularity in frame reverse building method
JP3092117U (en) Horticultural strut driving tool
CN207203363U (en) A kind of detachable goal football of built-in type
CN217782175U (en) Protection device of sounding pipe
CN218770114U (en) Collector grounding pile
CN220524961U (en) Portable level
CN214460721U (en) Geotechnical engineering pile foundation quality detection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhou Yongguo

Inventor after: Tao Dongxin

Inventor after: Tao Min

Inventor after: Dai Shaowu

Inventor before: Dai Shaowu

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20201218

Address after: 14 / F, area D, Watson International Plaza, 1666 Jiangnan Road, Beilun District, Ningbo City, Zhejiang Province, 315821

Applicant after: Zhou Yongguo

Address before: No. 90, Xinzhuang, Fengtai District, Beijing

Applicant before: Dai Shaowu

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant