CN205898136U - Settlement observation sign and settlement observation structure that marks based on settlement observation - Google Patents
Settlement observation sign and settlement observation structure that marks based on settlement observation Download PDFInfo
- Publication number
- CN205898136U CN205898136U CN201620687243.1U CN201620687243U CN205898136U CN 205898136 U CN205898136 U CN 205898136U CN 201620687243 U CN201620687243 U CN 201620687243U CN 205898136 U CN205898136 U CN 205898136U
- Authority
- CN
- China
- Prior art keywords
- settlement observation
- box part
- protecting box
- observing mark
- sedimentation observing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Control Of Vending Devices And Auxiliary Devices For Vending Devices (AREA)
Abstract
The utility model discloses a settlement observation sign and settlement observation structure that marks based on settlement observation, this settlement observation sign includes: protection box part, it is one and is arranged in the partial one side open structure who forms that goes along with sb. To guard him of the circumference of bottom by bottom and circumference, can install with opening and shutting in the protection lid of protection box part, install in the indium tile chi of protection box part bottom, in the settlement observation structure based on the settlement observation sign, this settlement observation sign is installed in the marble face brick of waiting to survey the thing lay. The utility model discloses this product solved subsided in the past the hook pleasing to the eye, stand that the chi is inconvenient, the problem of establishing the difficulty is mended to the later stage, and general survey crew can all operate, and safe, quick.
Description
Technical field
This utility model is related to field of measuring technique, especially relates to a kind of sedimentation observing mark and is based on settlement observation
The settlement observation structure of mark.
Background technology
In order to ensure the normal service life of buildings or structures and the safety of buildings or structures, current specifications specifies, high
Layer building, towering structure, important heritage buildings and continuous production equipment basis, Power-equipment Foundation etc. are intended to be settled
Observation.The form of sedimentation observing mark predominantly settles hook at present, buries in the lump during structure construction.
In actual operating process, significant component of facade is marble, and unit in charge of construction is attractive in appearance or it
His reason leakage has presence when setting the situation of sedimentation hook.And settle owner if detection unit benefit sets and typically will not agree to destroy outer standing
Face.
Utility model content
The purpose of this utility model is to provide a kind of sedimentation observing mark and the sedimentation based on sedimentation observing mark to see
Geodesic structure, it is easy for installation, easy to use.
For solving above-mentioned technical problem, embodiment of the present utility model provides a kind of sedimentation observing mark, comprising:
Protecting box part, it is one by bottom and the side hatch frame circumferentially gone along with sb. to guard him in the circumferential portion of bottom;
Can be opened and closed to be installed on the protection lid of described protecting box part;It is installed on the indium watt chi of protecting box section bottom.
Further, described indium watt chi is incorporated into the lower surface of described protecting box part by binding agent.
Further, described protection lid is installed on described protecting box part by articulated structure.
Further, described articulated structure is hinge.
Further, described protecting box part is used for installing the cavity of indium watt chi and is filled with indium watt chi is shielded saturating
Bright implant.
Based in the settlement observation structure of sedimentation observing mark, this sedimentation observing mark is installed on what thing to be observed was laid
Marble face brick.
Further, described sedimentation observing mark is incorporated into described marble face brick by binding agent.
Further, described sedimentation observing mark is embedded in described marble face brick.
Further, it is embedded in the protection lid of sedimentation observing mark in the marble face brick surface when being closed
Flush with marble tile surface.
Further, in described sedimentation observing mark: have and pass through magnetic with the protection lid of marble face brick identical suits
Attached structure and be adsorbed in protecting box part and realize close operation.
Compared with prior art, to have the advantages that this product solves conventional sedimentation hook not beautiful for this utility model
See, vertical chi is inconvenient, the later stage mends the problem setting difficulty, and general measure personnel can operate, and safety, quick.
Brief description
Fig. 1 is the settlement observation structure front view based on sedimentation observing mark;
Fig. 2 is the settlement observation structure side view based on sedimentation observing mark.
Specific embodiment
In order that technological means, creation characteristic, reached purpose and effect that this utility model is realized are easy to understand, under
Face in conjunction with specific embodiments, is expanded on further this utility model.
Embodiment of the present utility model provides a kind of sedimentation observing mark, comprising: protecting box part 2, indium watt chi (indium
Watt short chi) 3, protection lid 5.
Wherein, the protecting box part 2 of sedimentation observing mark is one by bottom and circumferentially in the circumferential portion of bottom
Divide the side hatch frame gone along with sb. to guard him, and the shape of protecting box part include but are not limited to rectangular configuration as depicted,
Can be the other shapes such as circle.Taking the protecting box part of rectangular configuration as a example, its flat base plate and be distributed in bottom
The left side wall of plate, right side wall, upper side wall and lower wall go along with sb. to guard him the structure constituting containing coffin jointly, and can be opened and closed to install
In described protecting box part protection lid 5 be then be installed on by such as articulated structure protecting box part left side wall it
On, protection lid is then the opening portion being covered in protecting box part, and therefore, the shape of protection lid is then and opening portion
The square structure joined, articulated structure herein can be hinge 4, and the reading element being used for observing then adopts indium watt chi 3, its peace
It is loaded on the backplate surface of protecting box part.
From the discussion above it is seen that, the sedimentation observing mark of this kind of structure just can without any work permit card
Carry out corresponding installation exercise, general survey crew can be carried out corresponding installation exercise.
In the present embodiment, described indium watt chi 3 is incorporated into the lower surface of described protecting box part, indium watt by binding agent
Chi 3 can be fixed among protecting box part for a long time by binding agent.
It is as to further improvement of this embodiment, described protecting box part is used for installing the cavity filling of indium watt chi
There is the transparent filling substance that indium watt chi is shielded, because indium watt chi and external environment condition are completely cut off by implant, it can be kept away
Exempting from indium watt chi suffers from external factor to occur damaging accordingly or destroying.
Embodiment of the present utility model additionally provides a kind of settlement observation structure based on sedimentation observing mark, referring to Fig. 2,
This sedimentation observing mark is installed on the marble face brick 1 that thing to be observed is laid, and it is not beautiful that this kind of structure solves conventional sedimentation hook
See, vertical chi is inconvenient, the later stage mends the problem setting difficulty.
Described sedimentation observing mark is embedded in described marble face brick 1, and marble face brick then need to dig one with
The shape of sedimentation observing mark external shape coupling, and the fixation side that the sedimentation observing mark being embedded in marble face brick adopts
Formula includes but are not limited to following manner: described sedimentation observing mark is incorporated into described marble face brick by binding agent.
In addition, the protection lid of the sedimentation observing mark being embedded in marble face brick when being closed surface with
Marble tile surface flushes, and the depth that this digs for marble face brick proposes corresponding requirement, is at least required to allow
The side wall energy of protecting box part is enough entirely embedded therein.
In the sedimentation observing mark of the present embodiment: have and pass through magnetic with the protection lid of marble face brick identical suits
Attached structure and be adsorbed in protecting box part and realize close operation, the mounting means of magnetic suck structure is: in protecting box part
Right side wall arranges adsorption magnet, and the metalwork mating with this adsorption magnet in protection lid right side edge setting, for example: ferrum
Plate, such that it is able to more easily protection lid be carried out closing operation, also convenient during unlatching, certainly, protection lid
Open and close structure includes but are not limited to above-mentioned situation, be also with lockset etc. come to realize protecting lid and protecting box part it
Between keying.
Sedimentation observing mark can be prefabricated with early stage, is attached to code requirement and lays settlement point during facade construction
Local.
It will be understood by those skilled in the art that the respective embodiments described above are to realize of the present utility model being embodied as
Example, and in actual applications, can to it, various changes can be made in the form and details, without departing from spirit of the present utility model
And scope.
Claims (10)
1. sedimentation observing mark it is characterised in that comprising:
Protecting box part, its be one by bottom and circumferentially in bottom circumferential portion go along with sb. to guard him one side opening knot
Structure;
Can be opened and closed to be installed on the protection lid of described protecting box part;
It is installed on the indium watt chi of protecting box section bottom.
2. sedimentation observing mark according to claim 1 is it is characterised in that described indium watt chi is incorporated into institute by binding agent
State the lower surface of protecting box part.
3. sedimentation observing mark according to claim 1 is it is characterised in that described protection lid is pacified by articulated structure
It is loaded on described protecting box part.
4. sedimentation observing mark according to claim 3 is it is characterised in that described articulated structure is hinge.
5. sedimentation observing mark according to claim 1 is it is characterised in that described protecting box part is used for installing indium watt chi
Cavity be filled with the transparent filling substance that indium watt chi is shielded.
6. a kind of settlement observation structure based on the arbitrary described sedimentation observing mark of such as claim 1-5 is it is characterised in that it wraps
Include the sedimentation observing mark as described in claim 1-5;
This sedimentation observing mark is installed on the marble face brick that thing to be observed is laid.
7. settlement observation structure according to claim 6 is it is characterised in that described sedimentation observing mark is tied by binding agent
Together in described marble face brick.
8. settlement observation structure according to claim 6 it is characterised in that described sedimentation observing mark be embedded in described big
In Gypsum Fibrosum face brick.
9. settlement observation structure according to claim 8 is it is characterised in that the settlement observation that is embedded in marble face brick
The protection lid of mark is flushed with marble tile surface on surface when being closed.
10. settlement observation structure according to claim 6 is it is characterised in that in described sedimentation observing mark: have with greatly
The protection lid of Gypsum Fibrosum face brick identical suits is adsorbed in protecting box part by magnetic suck structure and realizes closing operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620687243.1U CN205898136U (en) | 2016-07-01 | 2016-07-01 | Settlement observation sign and settlement observation structure that marks based on settlement observation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620687243.1U CN205898136U (en) | 2016-07-01 | 2016-07-01 | Settlement observation sign and settlement observation structure that marks based on settlement observation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205898136U true CN205898136U (en) | 2017-01-18 |
Family
ID=57770656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620687243.1U Active CN205898136U (en) | 2016-07-01 | 2016-07-01 | Settlement observation sign and settlement observation structure that marks based on settlement observation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205898136U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108151700A (en) * | 2018-01-26 | 2018-06-12 | 中铁第六勘察设计院集团有限公司 | A kind of portable multi-function indium steel ruler ruler covering device |
CN108827265A (en) * | 2018-08-31 | 2018-11-16 | 戴少武 | A kind of storage protective device identified based on building monitoring settlement observation |
-
2016
- 2016-07-01 CN CN201620687243.1U patent/CN205898136U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108151700A (en) * | 2018-01-26 | 2018-06-12 | 中铁第六勘察设计院集团有限公司 | A kind of portable multi-function indium steel ruler ruler covering device |
CN108827265A (en) * | 2018-08-31 | 2018-11-16 | 戴少武 | A kind of storage protective device identified based on building monitoring settlement observation |
CN108827265B (en) * | 2018-08-31 | 2021-01-08 | 周永国 | Storage protection device based on settlement observation identification for building monitoring |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205898136U (en) | Settlement observation sign and settlement observation structure that marks based on settlement observation | |
CN105926597B (en) | A kind of cement mixing pile processing method suitable for land making project | |
CN207551706U (en) | A kind of hanging apparatus of building prefabrication wallboard | |
CN109487818A (en) | A kind of construction method of pipe gallery combined joint | |
CN106759474A (en) | The construction method of flexible spigot-and-socket common pipe trench | |
CN110158974A (en) | A kind of complete interspersed construction method of high level assembled arthitecutral structure | |
CN206438528U (en) | Pre-cast sink well part and open caisson | |
CN205502086U (en) | Novel waterproof application system of basement bottom plate | |
PH12020551966A1 (en) | Concrete foundation structure and method for constructing same | |
GB2427882A (en) | Method for attaching a surface mountable unit | |
CN109706970A (en) | A kind of prefabricated square cable active well | |
CN206700559U (en) | Dry-hang stone with frame or ceramic tile metope Fire Hose door mounting structure | |
CN209179059U (en) | Feed inlet structure, opening and the system for blocking feed inlet structure | |
CN207878847U (en) | A kind of steel calcium plate facilitating combination | |
CN207405651U (en) | A kind of town road pipe protection structure | |
CN108137139A (en) | For encapsulating and toppling over the self-closing sheet material of lot of materials | |
CN205421348U (en) | Well lid chain joint structure | |
CN207437079U (en) | Single-point displacement meter grouting device suitable for tunnel engineering | |
CN208347244U (en) | A kind of metope structure identifying line alignment | |
CN202809641U (en) | High pressure anti-theft weigh box precast concrete foundation | |
CN205811494U (en) | Cable houses equipment | |
CN207999003U (en) | A kind of cracking structure for metope of slotting | |
CN209620106U (en) | A kind of prefabricated square cable active well bottom plate and borehole wall plate integral connecting structure | |
CN109989333A (en) | Fashioned iron trestle work structure and its installation method for concrete horizontal support | |
CN205577358U (en) | Pipe in water baffle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |