CN108798739A - It is a kind of can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform - Google Patents
It is a kind of can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform Download PDFInfo
- Publication number
- CN108798739A CN108798739A CN201810783076.4A CN201810783076A CN108798739A CN 108798739 A CN108798739 A CN 108798739A CN 201810783076 A CN201810783076 A CN 201810783076A CN 108798739 A CN108798739 A CN 108798739A
- Authority
- CN
- China
- Prior art keywords
- support
- component
- stepping
- oil cylinder
- hydraulic pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 68
- 239000010959 steel Substances 0.000 title claims abstract description 68
- 238000009434 installation Methods 0.000 title claims abstract description 28
- 238000010276 construction Methods 0.000 claims abstract description 30
- 239000002689 soil Substances 0.000 claims abstract description 8
- 238000009412 basement excavation Methods 0.000 claims abstract description 5
- 239000000725 suspension Substances 0.000 claims description 10
- 238000004804 winding Methods 0.000 claims description 2
- 239000003921 oil Substances 0.000 claims 13
- 239000010720 hydraulic oil Substances 0.000 claims 1
- 239000000203 mixture Substances 0.000 claims 1
- 230000001429 stepping effect Effects 0.000 description 34
- 238000010586 diagram Methods 0.000 description 8
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 235000019082 Osmanthus Nutrition 0.000 description 1
- 241000333181 Osmanthus Species 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000002356 single layer Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/04—Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/08—Advancing mechanisms
- E21D23/081—Advancing mechanisms forming parts of the roof supports
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/16—Hydraulic or pneumatic features, e.g. circuits, arrangement or adaptation of valves, setting or retracting devices
- E21D23/18—Hydraulic or pneumatic features, e.g. circuits, arrangement or adaptation of valves, setting or retracting devices of advancing mechanisms
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/16—Hydraulic or pneumatic features, e.g. circuits, arrangement or adaptation of valves, setting or retracting devices
- E21D23/26—Hydraulic or pneumatic control
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Types And Forms Of Lifts (AREA)
Abstract
The invention discloses it is a kind of can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform, be used in big cross section boring construction, hydraulic pressure includes support component, stepping component, lifts component and lifting assembly from support platform is moved;Support component is supporting the soil pressure after the soil excavation of channel;Stepping component is mounted in support component, and after the Pin supports in support component install, by support platform, stepping is moved to the position that next Pin supports are installed to stepping component forward;Component is lifted in support component;Lifting assembly is mounted in support component, is coordinated with component is lifted, is lifted, promotion group supports to installation site the good first half.Reasonable design, easy operation improves working efficiency, ensure construction safety for big cross section boring construction can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform.
Description
Technical field
The invention belongs in big cross section boring construction field, and in particular to it is a kind of for big cross section boring construction can be quick
The hydraulic pressure of installation heavy section steel support moves support platform certainly.
Background technology
No. 14 line terminus of Shanghai rail transit osmanthus bridge station station body is two floor an island platform station of underground, the station south
100m crosses Cao Jiagou, Wang Jiaqiao, is three babinet single layer structures, and width 21.99m, height 7.2m are gone along with sb. to guard him plus freezed using pipe curtain
Sealing boring construction.The rectangle solid that structure is a 22.3m × 7.7m × 100m is excavated, is existed according to pipe curtain freezing zone
Vertical section is divided into tri- regions A.B.C and is excavated, and the excavation size in each region is 7.8 × 7.7 × 100m and 6.7 × 7.7
×100m.The type steel support of design is " L-type " formed steel construction for being welded into of the shaped steel of HM500 × 300, single-piece be size 3.9 ×
The triangle of 3.8m, weight about 1.3t, first half supported weight about 2.6t, lift height 7.2m, support do not have with excavated section
Marginal space does not have top lift space.It can not be installed by manpower and tradition machinery.
Invention content
The case where can not being constructed according to existing construction equipment and method, one kind is provided and solves safe construction and rapid construction
Contradiction, reasonable design, easy operation, improve working efficiency, ensure construction safety for big cross section boring construction can be fast
The hydraulic pressure of speed installation heavy section steel support moves support platform certainly.
The present invention is realized by following technical scheme:
It is a kind of can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform, be used in big cross section boring construction, hydraulic pressure
Include from support platform is moved:
Support component, to support the soil pressure after the soil excavation of channel;
Stepping component is mounted in the support component, after the Pin supports in support component install, stepping component
By support platform, stepping is moved to the position that next Pin supports are installed forward;
Component is lifted, is mounted in the support component;And
Lifting assembly is mounted in the support component, is lifted component cooperation with described, is lifted, promotion group is to good upper half
Portion is supported to installation site.
Preferably, the support component is by supporting frame, top oil cylinder, upper top beam, two groups of side oil cylinders and side joist structure
At;Support frame as described above body is welded double Pin " gate " steel constructions by shaped steel I and shaped steel II;The cylinder barrel of the top oil cylinder is installed
On supporting frame;The upper top beam lower plane that the shaped steel II is constituted is connect with the piston rod of top oil cylinder;The side oil cylinder
Cylinder barrel be mounted on supporting frame on, the shaped steel II constitute side joist inner plane connect with the piston rod of side oil cylinder.
Preferably, the stepping component pushes up boots structure by stepping frame body, hydraulic Step Cylinder, two groups of stepping side top oil cylinders and stepping side
At;The cylinder barrel of the hydraulic Step Cylinder is mounted on supporting frame, the stepping frame body that the shaped steel I and shaped steel II are welded and step
Piston rod into oil cylinder connects;The cylinder barrel of stepping side top oil cylinder is mounted on stepping frame body, and stepping side top boots are fixed
The piston rod end of oil cylinder is pushed up in stepping side.
Preferably, the component of lifting lifts oil cylinder, movable pulley by two groups, lifts fork, lifts fork guide rail and steel wire rope structure
At;It is fixed on supporting frame by the fork guide rail of lifting that shaped steel II is constituted, the fork of lifting, can edge mounted on lifting on fork guide rail
Fork guide rail is lifted to slide up and down;The cylinder barrel for lifting oil cylinder is mounted on supporting frame, lifts the piston rod upper end peace of oil cylinder
The dress movable pulley, lifts that steel wire rope one end is fixed on supporting frame, one end bypasses the piston rod for being mounted on and lifting oil cylinder
The movable pulley of upper end, which is fixed on, to be lifted on fork.
Preferably, the lifting assembly is made of four groups of drawing hoists, fixed pulley, suspension hook and steel wire rope;The prop drawing twists
Vehicle and fixed pulley are mounted on supporting frame, and the boom hoist cable of drawing hoist winding bypasses fixed pulley, and terminal installs suspension hook.
Preferably, four groups of drawing hoists carry out collection control by electric-control system, and the electric-control system is mounted on supporting rack
On body.
Preferably, further include hydraulic station and hydraulic valve bank;The hydraulic station, hydraulic valve bank are mounted on supporting frame, liquid
To control the expanding-contracting action of hydraulic cylinder in each component, the hydraulic station passes through automatically controlled on supporting frame pressure valve group
System power supply.
Preferably, the shaped steel I uses the shaped steel of HM500 × 300, the shaped steel II to use the shaped steel of HM300 × 300.
Advantageous effect of the present invention:
This for big cross section boring construction can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform, can be to lateral
Apply support force with top;Heavy section steel support can be easily installed(HM500×300);It can longitudinal stepping.Meet big
Apply support force, the support of installation heavy section steel and stepping when section boring construction from mobile to make, solves safe construction and quickly
The contradiction of construction, reasonable design, easy operation improve work efficiency, and ensure construction safety.It is a kind of current only solution
The construction equipment of problem above.
Description of the drawings
Fig. 1 is that the hydraulic pressure of the present invention moves the overall structure diagram of support platform certainly;
Fig. 2 is side view shown in FIG. 1;
Fig. 3 is the faces A-A shown in FIG. 1 schematic diagram;
Fig. 4 is the faces B-B shown in FIG. 1 schematic diagram;
Fig. 5 is the faces C-C shown in FIG. 1 schematic diagram;
Fig. 6 is the faces D-D shown in FIG. 1 schematic diagram;
Fig. 7 is the faces E-E shown in FIG. 1 schematic diagram;
Fig. 8 is the faces F-F shown in FIG. 1 schematic diagram;
Fig. 9 is the faces G-G shown in Fig. 2 schematic diagram.
In figure:Oil cylinder at the top of 1-, the upper top beams of 2-, 3- supporting frames, the sides 4- oil cylinder, the sides 5- joist, 6- electric-control systems,
7- movable pulleys, 8- lift oil cylinder, 9- lift fork guide rail, 10- lift fork, 11- fixed pulleys, 12- drawing hoists, 13- hydraulic stations,
Boots are pushed up in 14- suspension hooks, 15- hydraulic Step Cylinders, 16- steppings frame body, 17- steppings side top oil cylinder and 18- steppings side.
Specific implementation mode
Below in conjunction with attached drawing, technical solution of the present invention is described further by specific embodiment.
As shown in Figures 1 to 9, it is a kind of can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform, be used for big
In section boring construction, hydraulic pressure includes support component, stepping component, lifts component and lifting assembly from support platform is moved;Support
Component is supporting the soil pressure after the soil excavation of channel;Stepping component is mounted in support component, as one in support component
After Pin supports install, by support platform, stepping is moved to the position that next Pin supports are installed to stepping component forward;Lift group
Part is mounted in support component;Lifting assembly is mounted in support component, is coordinated with component is lifted, is lifted, promotion group is to good
The first half is supported to installation site.
Further, support component is by supporting frame 3, top oil cylinder 1,2, two groups of side oil cylinders 4 of upper top beam and 5 structure of side joist
At;Supporting frame 3 is welded double Pin " gate " steel constructions by the shaped steel of HM500 × 300 and the shaped steel of HM300 × 300;Top oil cylinder
1 cylinder barrel is mounted on supporting frame 3;The piston rod for upper top beam 2 lower plane and top oil cylinder 1 that the shaped steel of HM300 × 300 is constituted
Connection;The cylinder barrel of side oil cylinder 4 is mounted on supporting frame 3,5 inner plane of side joist and side that the shaped steel of HM300 × 300 is constituted
The piston rod of oil cylinder 4 connects.
Further, stepping component pushes up boots by stepping frame body 16,15, two groups of stepping side top oil cylinders 17 of hydraulic Step Cylinder and stepping side
18 are constituted;The cylinder barrel of hydraulic Step Cylinder 15 be mounted on supporting frame 3 on, the shaped steel of HM500 × 300 and the shaped steel of HM300 × 300 welding and
At stepping frame body 16 connect with the piston rod of hydraulic Step Cylinder 15;The cylinder barrel that oil cylinder 17 is pushed up in stepping side is mounted on stepping frame body 16
On, stepping side top boots 18 are fixed on the piston rod end of stepping side top oil cylinder 17.
Further, component is lifted to lift oil cylinder 8, movable pulley 7 by two groups, lift fork 10, lift fork guide rail 9 and steel wire rope structure
At;It is fixed on supporting frame 3 by the fork guide rail 9 of lifting that the shaped steel of HM300 × 300 is constituted, lifts fork 10 and be mounted on and lift fork and lead
On rail 9, it can be slided up and down along fork guide rail 9 is lifted;The cylinder barrel for lifting oil cylinder 8 is mounted on supporting frame 3, lifts the work of oil cylinder 8
The movable pulley 7 of stopper rod upper end installation lifts steel wire rope one end and is fixed on supporting frame 3, one end and bypasses to be mounted on and lifts oil cylinder 8
Piston rod upper end movable pulley 7 be fixed on lift fork 10 on.
Further, lifting assembly is made of four groups of drawing hoists 12, fixed pulley 11, suspension hook 14 and steel wire rope;Drawing hoist
12 and fixed pulley 11 be mounted on supporting frame 3 on, drawing hoist 12 wind boom hoist cable bypass fixed pulley 11, terminal installation
Suspension hook 14.
Four groups of drawing hoists 12 carry out collection control by electric-control system 6, and electric-control system 6 is mounted on supporting frame 3.Hydraulic station
13, hydraulic valve bank is mounted on supporting frame 3, and hydraulic valve bank is controlling the expanding-contracting action of hydraulic cylinder in each component, hydraulic pressure
13 are stood by the power supply of electric-control system 6 on supporting frame 3.
Installation process:
One, type steel support is installed
A, bottom two corners are just put using suspension hook, is assembled;
B, using suspension hook that bottom two corners are integrally in place;
C, using suspension hook and lift fork will top two corners just put, it is assembled;
D, fork is whole in place by top two corners, connect with bottom using lifting, and temporary support is closed cyclic.
Two, support platform stepping moves certainly
A, stepping component stretches out, and side top oil cylinder is held out against;
B, mobile roof supporting, side wall oil cylinder retraction, hydraulic Step Cylinder retraction, endless-walk is until in place.
Three, support platform applies support force
A, mobile roof supporting, side wall oil cylinder are held out against.
This for big cross section boring construction can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform, Ke Yixiang
Lateral and top applies support force;Heavy section steel support can be easily installed(HM500×300);It can longitudinal stepping.Meet
Apply support force, the support of installation heavy section steel and stepping in big cross section boring construction from mobile to make, solve safe construction and
The contradiction of rapid construction, reasonable design, easy operation improve work efficiency, and ensure construction safety.It is current only one kind
Solve the construction equipment of problem above.
It the above is only the preferred embodiment of the present invention, it should be pointed out that:Those skilled in the art are come
It says, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications also should be regarded as
Protection scope of the present invention.
Claims (8)
1. it is a kind of can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform, be used in big cross section boring construction,
It is characterized in that, hydraulic pressure includes from support platform is moved:
Support component, to support the soil pressure after the soil excavation of channel;
Stepping component is mounted in the support component, after the Pin supports in support component install, stepping component
By support platform, stepping is moved to the position that next Pin supports are installed forward;
Component is lifted, is mounted in the support component;And
Lifting assembly is mounted in the support component, is lifted component cooperation with described, is lifted, promotion group is to good upper half
Portion is supported to installation site.
2. it is according to claim 1 it is a kind of can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform, feature
It is:
The support component is by supporting frame(3), top oil cylinder(1), upper top beam(2), two groups of side oil cylinders(4)With side joist
(5)It constitutes;
Support frame as described above body(3)It is welded double Pin " gate " steel constructions by shaped steel I and shaped steel II;The top oil cylinder(1)'s
Cylinder barrel is mounted on supporting frame(3)On;
The upper top beam that the shaped steel II is constituted(2)Lower plane and top oil cylinder(1)Piston rod connection;
The side oil cylinder(4)Cylinder barrel be mounted on supporting frame(3)On, the side joist of the composition of the shaped steel II(5)Inner plane
With side oil cylinder(4)Piston rod connection.
3. it is according to claim 2 it is a kind of can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform, feature
It is:
The stepping component is by stepping frame body(16), hydraulic Step Cylinder(15), two groups of stepping sides push up oil cylinder(17)Boots are pushed up with stepping side
(18)It constitutes;
The hydraulic Step Cylinder(15)Cylinder barrel be mounted on supporting frame(3)On, stepping that the shaped steel I and shaped steel II are welded
Frame body(16)With hydraulic Step Cylinder(15)Piston rod connection;
Push up oil cylinder in the stepping side(17)Cylinder barrel be mounted on stepping frame body(16)On, boots are pushed up in the stepping side(18)It is fixed on step
Oil cylinder is pushed up into side(17)Piston rod end.
4. it is according to claim 2 it is a kind of can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform, feature
It is:
The component of lifting lifts oil cylinder by two groups(8), movable pulley(7), lift fork(10), lift fork guide rail(9)And steel wire rope
It constitutes;
Fork guide rail is lifted by what shaped steel II was constituted(9)It is fixed on supporting frame(3)On, it is described to lift fork(10)It is pitched mounted on lifting
Guide rail(9)On, it can be along lifting fork guide rail(9)It slides up and down;
It is described to lift oil cylinder(8)Cylinder barrel be mounted on supporting frame(3)On, lift oil cylinder(8)Piston rod upper end installation described in
Movable pulley(7), lift steel wire rope one end and be fixed on supporting frame(3), one end bypass be mounted on lift oil cylinder(8)Piston
The movable pulley of bar upper end(7)It is fixed on and lifts fork(10)On.
5. it is according to claim 2 it is a kind of can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform, feature
It is:
The lifting assembly is by four groups of drawing hoists(12), fixed pulley(11), suspension hook(14)It is constituted with steel wire rope;
The drawing hoist(12)And fixed pulley(11)Mounted on supporting frame(3)On, drawing hoist(12)The promotion steel of winding
Cord bypasses fixed pulley(11), terminal installation suspension hook(14).
6. it is according to claim 5 it is a kind of can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform, feature
It is:Four groups of drawing hoists(12)Pass through electric-control system(6)Carry out collection control, the electric-control system(6)Mounted on supporting rack
Body(3)On.
7. it is according to claim 2 it is a kind of can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform, feature
It is:
It further include hydraulic station(13)And hydraulic valve bank;
The hydraulic station(13), hydraulic valve bank be mounted on supporting frame(3)On, hydraulic valve bank is controlling hydraulic oil in each component
The expanding-contracting action of cylinder, the hydraulic station(13)By being mounted on supporting frame(3)On electric-control system(6)Power supply.
8. according to claim 2 to 7 any one of them it is a kind of can the support of Fast Installation heavy section steel hydraulic pressure it is flat from support is moved
Platform, it is characterised in that:
The shaped steel I uses the shaped steel of HM500 × 300, the shaped steel II to use the shaped steel of HM300 × 300.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810783076.4A CN108798739B (en) | 2018-07-17 | 2018-07-17 | Hydraulic self-moving supporting platform capable of rapidly installing large-scale steel support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810783076.4A CN108798739B (en) | 2018-07-17 | 2018-07-17 | Hydraulic self-moving supporting platform capable of rapidly installing large-scale steel support |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108798739A true CN108798739A (en) | 2018-11-13 |
CN108798739B CN108798739B (en) | 2024-04-26 |
Family
ID=64076780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810783076.4A Active CN108798739B (en) | 2018-07-17 | 2018-07-17 | Hydraulic self-moving supporting platform capable of rapidly installing large-scale steel support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108798739B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111550270A (en) * | 2020-05-20 | 2020-08-18 | 中铁隧道集团一处有限公司 | Ultra-large self-propelled tunnel multifunctional operation platform and tunnel steel bar waterproof board construction method |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4143991A (en) * | 1978-05-24 | 1979-03-13 | Frank Stafford | Mine roof support system |
US4192632A (en) * | 1977-07-16 | 1980-03-11 | Gewerkschaft Eisenhutte Westfalia | Support systems for mineral mining installations |
CN201627596U (en) * | 2010-01-21 | 2010-11-10 | 北京诚田恒业煤矿设备有限公司 | Transverse self-advancing combined suspension hydraulic support |
CN102022131A (en) * | 2010-09-29 | 2011-04-20 | 北京诚田恒业煤矿设备有限公司 | Strut type self advancing hydraulic support |
CN202673316U (en) * | 2012-06-26 | 2013-01-16 | 李信斌 | Step-shaped tunnel self-moving supporting shed |
CN202882972U (en) * | 2012-09-15 | 2013-04-17 | 中国煤炭科工集团太原研究院 | Along-groove stepping split type advanced hydraulic support frame group |
CN203022785U (en) * | 2012-12-04 | 2013-06-26 | 张要展 | Stepping type hydraulic shed lifting device |
CN103195458A (en) * | 2013-03-20 | 2013-07-10 | 徐州天能矿山机械有限责任公司 | Underground coal mine large channel end socket suspension hydraulic support |
CN103437782A (en) * | 2013-08-21 | 2013-12-11 | 中国长江三峡集团公司 | Hydraulic self-moving steel mould trolley and construction method thereof |
CN205189923U (en) * | 2015-12-03 | 2016-04-27 | 三门峡龙王庄煤业有限责任公司 | Lift canopy from formula advance support of moving |
CN207332922U (en) * | 2017-10-29 | 2018-05-08 | 王战朝 | Take a step from shifting interlinkage hydraulic pressure advanced stand device |
CN208650890U (en) * | 2018-07-17 | 2019-03-26 | 中煤隧道工程有限公司 | Can Fast Installation heavy section steel support it is hydraulic from move support platform |
-
2018
- 2018-07-17 CN CN201810783076.4A patent/CN108798739B/en active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4192632A (en) * | 1977-07-16 | 1980-03-11 | Gewerkschaft Eisenhutte Westfalia | Support systems for mineral mining installations |
US4143991A (en) * | 1978-05-24 | 1979-03-13 | Frank Stafford | Mine roof support system |
CN201627596U (en) * | 2010-01-21 | 2010-11-10 | 北京诚田恒业煤矿设备有限公司 | Transverse self-advancing combined suspension hydraulic support |
CN102022131A (en) * | 2010-09-29 | 2011-04-20 | 北京诚田恒业煤矿设备有限公司 | Strut type self advancing hydraulic support |
CN202673316U (en) * | 2012-06-26 | 2013-01-16 | 李信斌 | Step-shaped tunnel self-moving supporting shed |
CN202882972U (en) * | 2012-09-15 | 2013-04-17 | 中国煤炭科工集团太原研究院 | Along-groove stepping split type advanced hydraulic support frame group |
CN203022785U (en) * | 2012-12-04 | 2013-06-26 | 张要展 | Stepping type hydraulic shed lifting device |
CN103195458A (en) * | 2013-03-20 | 2013-07-10 | 徐州天能矿山机械有限责任公司 | Underground coal mine large channel end socket suspension hydraulic support |
CN103437782A (en) * | 2013-08-21 | 2013-12-11 | 中国长江三峡集团公司 | Hydraulic self-moving steel mould trolley and construction method thereof |
CN205189923U (en) * | 2015-12-03 | 2016-04-27 | 三门峡龙王庄煤业有限责任公司 | Lift canopy from formula advance support of moving |
CN207332922U (en) * | 2017-10-29 | 2018-05-08 | 王战朝 | Take a step from shifting interlinkage hydraulic pressure advanced stand device |
CN208650890U (en) * | 2018-07-17 | 2019-03-26 | 中煤隧道工程有限公司 | Can Fast Installation heavy section steel support it is hydraulic from move support platform |
Non-Patent Citations (1)
Title |
---|
张晓峰;: "新集煤矿顺槽工作面液压支架组装平台设计", 机电产品开发与创新, no. 05, 28 September 2006 (2006-09-28), pages 57 - 58 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111550270A (en) * | 2020-05-20 | 2020-08-18 | 中铁隧道集团一处有限公司 | Ultra-large self-propelled tunnel multifunctional operation platform and tunnel steel bar waterproof board construction method |
CN111550270B (en) * | 2020-05-20 | 2021-07-09 | 中铁隧道集团一处有限公司 | Ultra-large self-propelled tunnel multifunctional operation platform and tunnel steel bar waterproof board construction method |
Also Published As
Publication number | Publication date |
---|---|
CN108798739B (en) | 2024-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104533466A (en) | Multifunctional flexible traction type paving rack for waterproof board | |
CN103726421B (en) | Height and span adjustable track paver for metro construction | |
CN101734533B (en) | Renewal method of hydraulic elevator and rope type elevator renewed by said method | |
CN110130965B (en) | Advanced support bracket for comprehensive mechanized excavation and use method | |
CN112900281B (en) | Complicated curve beam upward jacking construction device and method | |
CN109236331A (en) | A kind of steel arch rack trolley suitable for the micro- bench cut method in tunnel | |
CN110002343B (en) | Self-driven urban underground prefabricated comprehensive pipe gallery laying hoisting machine and construction method | |
CN208650890U (en) | Can Fast Installation heavy section steel support it is hydraulic from move support platform | |
CN202989702U (en) | Track switch hoisting transportation operation device | |
CN108798739A (en) | It is a kind of can the support of Fast Installation heavy section steel hydraulic pressure from moving support platform | |
CN203684019U (en) | Height and span adjustable track laying machine for subway construction | |
CN205532651U (en) | Mining excavation formula loader platform frame shed structure | |
CN209835475U (en) | Self-climbing type heavy elevator | |
CN205367521U (en) | Novel intelligent hoist and mount system of super high -rise building core section of thick bamboo component | |
CN210713752U (en) | High-altitude operation construction hanging basket capable of moving in three-dimensional space | |
CN207632432U (en) | A kind of underground moving hydraulic support to supporting point device | |
CN204298743U (en) | Rope traction and the all-hydraulic deck unit erection gantry of lifting | |
CN211472166U (en) | Simple movable hanging basket vehicle for highway bridge construction | |
CN113279558A (en) | Self-climbing operation platform in vertical shaft | |
CN209567738U (en) | A kind of multiple spot lift for the rotary shaft excavation machine of method of sinking | |
CN209567749U (en) | A kind of single roller multiple spot lift for the method swing type shaft excavation machine that sinks | |
CN110984170B (en) | Semi-automatic foundation pit steel support installation method and steel support installation auxiliary device | |
CN209567730U (en) | A kind of small-sized lattice dead man steel construction | |
CN207581240U (en) | Pipeline conveying device | |
CN202031615U (en) | Automatic movable horizontal hydraulic beam lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |