CN207581240U - Pipeline conveying device - Google Patents
Pipeline conveying device Download PDFInfo
- Publication number
- CN207581240U CN207581240U CN201721762629.5U CN201721762629U CN207581240U CN 207581240 U CN207581240 U CN 207581240U CN 201721762629 U CN201721762629 U CN 201721762629U CN 207581240 U CN207581240 U CN 207581240U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- crossbeam
- conveying device
- lifting part
- support frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model is related to technical field of building construction, more particularly, to a kind of pipeline conveying device.Pipeline conveying device includes:Supporting rack and boom hoisting;There are two moving assemblies for setting on support frame as described above, and the boom hoisting is arranged on the top of support frame as described above, and the both ends of the boom hoisting can swing up and down with respect to the top of support frame as described above, for pipeline is lifted by crane.Alleviate it is in the prior art in the construction process lifting large diameter pipeline it is of high cost, efficiency is low the technical issues of.
Description
Technical field
The utility model is related to technical field of building construction, more particularly, to a kind of pipeline conveying device.
Background technology
Pipeline transportation is more universal at the construction field (site), and lifting pipeline transport is most of by crane at the construction field (site)
Machinery and trailer are completed, and sometimes single pipe transport can use fork truck, the working range of fork truck be limited in small-bore pipeline or
The smaller large diameter pipeline of person's length, when somewhere, construction needs replacing or increases by one section of longer large diameter pipeline, and position
It is higher using hoisting machinery and haulage vehicle cost setting in narrow road section, fork truck can not be completed again when.
Therefore how to solve low urgently to be resolved hurrily as those skilled in the art in lifting the of high cost of large diameter pipeline, efficiency
The problem of.
The information for being disclosed in the background technology part is merely intended to deepen the reason to the general background technology of the utility model
Solution, and be not construed as recognizing or to imply that the information is formed in any form known to those skilled in the art existing
Technology.
Utility model content
The purpose of this utility model is to provide a kind of pipeline conveying device, to alleviate in the prior art constructing
In the process lifting large diameter pipeline it is of high cost, efficiency is low the technical issues of.
A kind of pipeline conveying device provided by the utility model, including:Supporting rack and boom hoisting;
Moving assembly, the boom hoisting to be arranged on the top of support frame as described above there are two settings on support frame as described above, and
The both ends of the boom hoisting can swing up and down with respect to the top of support frame as described above, for pipeline is lifted by crane.
Further, the boom hoisting includes:First lifting part, the second lifting part and crossbeam;
The crossbeam is arranged on the top of support frame as described above, and the crossbeam can carry out the upper bottom with respect to support frame as described above
Dynamic, first lifting part and second lifting part are arranged on the both ends of the crossbeam, first lifting part and described the
Two lifting parts lift by crane pipeline for being connect with the both ends of pipeline.
Further, first lifting part includes hanging ring and suspender belt;
The hanging ring is arranged on one end of the crossbeam, and one end of the suspender belt is connect with the hanging ring, the suspender belt
The other end is used to lift by crane one end of pipeline.
Further, second lifting part includes suspension hook and chain block;
The suspension hook is arranged on the one end of the crossbeam far from the hanging ring, and the chain block connects with the suspension hook
It connects, and the chain block is used to lift by crane the other end of pipeline.
Further, the both ends of the crossbeam are additionally provided with push rod and cross-tie;
The push rod is positioned close to one end of first lifting part, and the cross-tie is positioned close to described second
One end of lifting part.
Further, the boom hoisting further includes:Reinforcing member;
The reinforcing member is arranged on the crossbeam close to one end of second lifting part, and the reinforcing member is used to improve institute
State the stability of crossbeam.
Further, the reinforcing member includes:Channel steel, connecting rod and brace;
The channel steel is vertically arranged with the connecting rod, and the brace is two, and two braces are symmetricly set on
The both sides of the channel steel, one end of the brace are connect with the channel steel, and the other end of the brace connects with the connecting rod
It connects, the connecting rod is arranged on the crossbeam upper end, and the connecting rod is mutually perpendicular to the crossbeam.
Further, support frame as described above includes girder and two auxiliary girders;
Two auxiliary girders are symmetricly set on the both ends of the girder, and the lower end of the auxiliary girder is provided with two door pillars, and
Two door pillars are arranged at intervals, and the moving assembly is arranged between two door pillars.
Further, the moving assembly includes bearing block and tire;
The bearing block is two, and two bearing blocks are separately positioned on two door pillars, and the tire is arranged on two
Between a bearing block.
Further, the auxiliary girder can relatively described girder stretch, with adjust two auxiliary girders between
Away from.
A kind of pipeline conveying device provided by the utility model, including:Supporting rack and boom hoisting;It is set on support frame as described above
Moving assembly there are two putting, the boom hoisting is arranged on the top of support frame as described above, and the both ends of the boom hoisting can
Top with respect to support frame as described above swings up and down, for pipeline is lifted by crane.Using above-mentioned scheme, moving tube is being needed
During road, due to being provided with two moving assemblies on supporting rack, whole transport device can be made to be moved to the place of pipeline
Position is approached being rocked to one end of boom hoisting with pipeline, is then lifted one end of pipeline, then by the another of boom hoisting
One end is rocked to the other end close proximity with pipeline, the other end of pipeline is lifted, and adjust the position of pipeline, makes lifting
Device restores balance, and movable supporting frame is by pipeline transportation to the position specified.Transporting pipeline by pipeline conveying device can save
Truck crane lifting, transport vehicle transport and hoisting machinery is gone to unload link, cost is reduced, improves one-pipe conevying efficiency, from
And alleviate it is in the prior art in the construction process lifting large diameter pipeline it is of high cost, efficiency is low the technical issues of.
Description of the drawings
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution of the prior art
Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below
In attached drawing be the utility model some embodiments, for those of ordinary skill in the art, do not paying creativeness
Under the premise of labour, other attached drawings are can also be obtained according to these attached drawings.
Fig. 1 is the structure diagram of pipeline conveying device that the utility model embodiment provides;
Fig. 2 is the side view of pipeline conveying device that the utility model embodiment provides;
Fig. 3 is the front view of the supporting rack of pipeline conveying device that the utility model embodiment provides;
Fig. 4 is the front view of the fixing piece of pipeline conveying device that the utility model embodiment provides.
Icon:100- supporting racks;200- boom hoistings;110- moving assemblies;120- girders;130- auxiliary girders;210- second
Lifting part;220- crossbeams;230- reinforcing members;The first lifting parts of 240-;111- tires;112- bearing blocks;131- door pillars;211- is hung
Hook;212- chain blocks;221- push rods;222- cross-ties;231- channel steels;232- connecting rods;233- braces;241- hanging rings;
242- suspender belts.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described
Embodiment is the utility model part of the embodiment, instead of all the embodiments.Based on the embodiment in the utility model, sheet
Field those of ordinary skill all other embodiments obtained without making creative work, belong to this practicality
Novel protected range.
In the description of the present invention, it should be noted that such as occur term " " center ", " on ", " under ", " left side ",
" right side ", " vertical ", " level ", " interior ", " outer " etc., indicated by orientation or position relationship be based on orientation shown in the drawings or
Position relationship is for only for ease of description the utility model and simplifies description rather than instruction or imply signified device or member
Part must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model.
In addition, such as there is term " first ", " second ", " third " are only used for description purpose, and it is not intended that instruction or implying opposite
Importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, such as there is term
" installation ", " connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or one
Connect to body;Can be mechanical connection or electrical connection;It can be directly connected, it can also be indirect by intermediary
It is connected, can is the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition
State concrete meaning of the term in the utility model.
Fig. 1 is the structure diagram of pipeline conveying device that the utility model embodiment provides.As shown in Figure 1, this practicality
A kind of pipeline conveying device of novel offer, including:Supporting rack 100 and boom hoisting 200;
Moving assembly 110, the boom hoisting 200 to be arranged on support frame as described above there are two settings on support frame as described above 100
100 top, and the both ends of the boom hoisting 200 can swing up and down with respect to the top of support frame as described above 100, with
It is lifted by crane in by pipeline.
Wherein, supporting rack 100 is preferably portal frame.
A kind of pipeline conveying device provided by the utility model, including:Supporting rack 100 and boom hoisting 200;The support
Moving assembly 110, the boom hoisting 200 to be arranged on the top of support frame as described above 100, and described there are two settings on frame 100
The both ends of boom hoisting 200 can swing up and down with respect to the top of support frame as described above 100, for pipeline is lifted by crane.It adopts
With above-mentioned scheme, when needing movement pipeline, due to being provided with two moving assemblies 110 on supporting rack 100, can make
Whole transport device is moved to the position at the place of pipeline, is approached being rocked to one end of boom hoisting 200 with pipeline, so
One end of pipeline is lifted, then the other end of boom hoisting 200 is rocked to the other end close proximity with pipeline, will managed afterwards
The other end lifting in road, and adjusts the position of pipeline, boom hoisting 200 is made to restore balance, and movable supporting frame 100 is by pipeline transportation
To the position specified.Truck crane lifting, transport vehicle transport and hoisting machinery can be saved by transporting pipeline by pipeline conveying device
Unload link, reduce cost, improve one-pipe conevying efficiency, so as to alleviate it is in the prior art in the construction process
Lift large diameter pipeline it is of high cost, efficiency is low the technical issues of.
Fig. 2 is the side view of pipeline conveying device that the utility model embodiment provides.As shown in Fig. 2, in above-mentioned implementation
On the basis of example, further, the boom hoisting 200 includes:First lifting part 240, the second lifting part 210 and crossbeam 220;
The crossbeam 220 is arranged on the top of support frame as described above 100, and the crossbeam 220 can be with respect to support frame as described above
100 swing up and down, and first lifting part 240 and second lifting part 210 are arranged on the both ends of the crossbeam 220,
First lifting part 240 and second lifting part 210 lift by crane pipeline for being connect with the both ends of pipeline.
Wherein, the first lifting part 240 will with the second lifting part 210 can structure it is identical, including driving motor, reel, tooth
Wheel and chain, driving motor, reel and gear are arranged at one end of crossbeam 220, and one end of chain is fixed at the tooth
On wheel or on crossbeam 220, the other end of chain is arranged on reel, and driving motor drives the spool turns so that reel and
The length of chain between gear shortens, so that chain can pass through the bottom end of pipeline, pipeline is lifted by crane.
Crossbeam 220 and the top of supporting rack 100 are hinged.
In the present embodiment, crossbeam 220 is arranged on the top of supporting rack 100, and can be carried out with respect to supporting rack 100 relatively
Swing, the extending direction of the extending direction and supporting rack 100 of crossbeam 220 is mutually perpendicular to, when lifting pipeline, first hung first
One end of piece installing 240 is rocked to close to one end of pipeline, one end of pipeline is lifted by crane, then the second lifting part 210 is rocked to pipe
The other end of pipeline is connected on the second lifting part 210 by the other end in road, realizes the lifting to pipeline.
On the basis of above-described embodiment, further, first lifting part 240 includes hanging ring 241 and suspender belt 242;
The hanging ring 241 is arranged on one end of the crossbeam 220, and one end of the suspender belt 242 connects with the hanging ring 241
It connects, the other end of the suspender belt 242 is used to lift by crane one end of pipeline.
Further, second lifting part 210 includes suspension hook 211 and chain block 212;
The suspension hook 211 is arranged on the one end of the crossbeam 220 far from the hanging ring 241, the chain block 212 with
The suspension hook 211 connects, and the chain block 212 is used to lift by crane the other end of pipeline.
In the present embodiment, in specifically lifting pipeline, paved in the large diameter pipeline for ensuring to transport, the height paved
Degree should not influence penetrating for the chain block 212 and suspender belt 242, supporting rack 100 is moved to right over large diameter pipeline, so
220 one end of crossbeam is pushed afterwards and is contacted with large diameter pipeline upper surface, then penetrates suspender belt 242 from large diameter pipeline bottom surface,
Since suspender belt 242 is fixed on hanging ring 241, and suspender belt 242 lifts one end of bigbore pipeline after passing through, then by hand
The chain of cucurbit 212 is drawn to be penetrated from large diameter pipeline other end bottom, chain block 212 is fixed on suspension hook 211, is then pulled
Large diameter pipeline is lifted up by chain block 212, makes large diameter pipeline is front and rear to keep balance, so as to complete to large diameter pipeline
Lifting.
On the basis of above-described embodiment, further, the both ends of the crossbeam 220 are additionally provided with push rod 221 and transverse direction
Pull rod 222;
The push rod 221 is positioned close to one end of first lifting part 240, and the cross-tie 222, which is arranged on, to be leaned on
One end of nearly second lifting part 210.
In the present embodiment, after large diameter pipeline lifting is completed, it will be supported by push rod 221 and cross-tie 222
Frame 100 is moved, and realizes the movement to big mouth pipeline.
Fig. 4 is the front view of the fixing piece of pipeline conveying device that the utility model embodiment provides.As shown in figure 4,
On the basis of above-described embodiment, further, the boom hoisting 200 further includes:Reinforcing member 230;
The reinforcing member 230 is arranged on the crossbeam 220 close to one end of second lifting part 210, the reinforcing member
230 are used to improve the stability of the crossbeam 220.
In the present embodiment, reinforcing member 230, reinforcing member 230 are provided with close to one end of the second lifting part 210 in crossbeam 220
Setting can improve stability during crossbeam 220 works, and convenient for the setting of cross-tie 222, improve the convenience of operation.
On the basis of above-described embodiment, further, the reinforcing member 230 includes:Channel steel 231, connecting rod 232 and oblique pull
Bar 233;
The channel steel 231 is vertically arranged with the connecting rod 232, and the brace 233 is two, two braces
233 are symmetricly set on the both sides of the channel steel 231, and one end of the brace 233 is connect with the channel steel 231, the oblique pull
The other end of bar 233 is connect with the connecting rod 232, and the connecting rod 232 is arranged on 220 upper end of crossbeam, and the connecting rod 232
It is mutually perpendicular to the crossbeam 220.
In this implementation, channel steel 231 is set perpendicular to connecting rod 232, and connecting rod 232 is vertical with crossbeam 220, i.e., channel steel 231 hangs down
Directly with the Z-direction of crossbeam 220, connecting rod 232 and crossbeam 220X are also provided with two to vertical between channel steel 231 and connecting rod 232
Oblique railing, two braces 233 are symmetricly set on the both sides of channel steel 231, in this way, can improve in 220 operating process of crossbeam
Stability reduces the possibility of appearance danger during use, improves the safety of user.
Fig. 3 is the front view of the supporting rack of pipeline conveying device that the utility model embodiment provides.As shown in figure 3,
On the basis of above-described embodiment, further, support frame as described above 100 includes girder 120 and two auxiliary girders 130;
Two auxiliary girders 130 are symmetricly set on the both ends of the girder 120, and the lower end of the auxiliary girder 130 is provided with two
Root door pillar 131, and two door pillars 131 are arranged at intervals, the moving assembly 110 is arranged between two door pillars 131.
Wherein, auxiliary girder 130 and girder 120 are posted sides pipeline.
In the present embodiment, two auxiliary girders 130 are symmetricly set on the both ends of girder 120, and are set in the lower end of each auxiliary girder 130
Two door pillars 131 are equipped with, moving assembly 110 is arranged between two door pillars 131, and moving assembly 110 is removably disposed in two
Between root door pillar 131, in specific movable supporting frame 100, the movement of moving assembly 110 can drive supporting rack 100 to move, from
And it realizes and moves the large diameter pipeline of the lifting on supporting rack 100.
On the basis of above-described embodiment, further, the moving assembly 110 includes bearing block 112 and tire 111;
The bearing block 112 is two, and two bearing blocks 112 are separately positioned on two door pillars 131, the tire
111 are arranged between two bearing blocks 112.
In the present embodiment, it is respectively provided on every door pillar 131 there are one the bearing hole passed through for bearing, and in each column
The position of bearing hole is identical, and bearing block 112 is arranged on the position of bearing hole, between tire 111 sets two columns of side, leads to
It crosses bearing tire 111 is arranged between two adjacent columns of side.
On the basis of above-described embodiment, further, the auxiliary girder 130 can relatively described girder 120 stretch,
To adjust the spacing between two auxiliary girders 130.
Wherein, it can be diversified forms that auxiliary girder 130 can carry out stretch mode with respect to girder 120, such as:Auxiliary girder 130
Diameter is less than the diameter of girder 120, and 120 inside both ends of girder are set two hydraulically extensible cylinders respectively, and two hydraulic pressure are stretched
Two output terminals of contracting cylinder are connected respectively with two auxiliary girders 130, by the flexible of hydraulically extensible cylinder, to adjust two auxiliary girders
Spacing between 130.
Further more, the protrusion or groove of multiple annulars can be provided at both ends with inside girder 120, in auxiliary girder 130 close to main
One end of beam 120 is provided with the annular groove or annular protrusion of protrusion or matching grooves, to realize girder 120 and auxiliary girder 130
Between position relative adjustment.
It is symmetrical arranged in addition, can be set inside girder 120 there are two slideway, the edge of auxiliary girder 130 is arranged on two cunnings
Between road, in this way, can be carried out between auxiliary girder 130 and girder 120 it is opposite slide, so as to fulfill adjust two auxiliary girders 130 it
Between spacing.
In the present embodiment, auxiliary girder 130 can stretch with respect to girder 120, when in face of limited road, can freely adjust
The width of whole supporting rack 100, flexibly own enforcement effectively transport pipeline to designated position, and transport is steady, safety, mobile
Flexibly.
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model rather than it is limited
System;Although the utility model is described in detail with reference to foregoing embodiments, those of ordinary skill in the art should
Understand:It can still modify to the technical solution recorded in foregoing embodiments either to which part or whole
Technical characteristic carries out equivalent replacement;And these modifications or replacement, this practicality that it does not separate the essence of the corresponding technical solution are new
The range of each embodiment technical solution of type.
Claims (10)
1. a kind of pipeline conveying device, which is characterized in that including:Supporting rack and boom hoisting;
Moving assembly, the boom hoisting to be arranged on the top of support frame as described above, and described there are two settings on support frame as described above
The both ends of boom hoisting can swing up and down with respect to the top of support frame as described above, for pipeline is lifted by crane.
2. pipeline conveying device according to claim 1, which is characterized in that the boom hoisting includes:First lifting part,
Second lifting part and crossbeam;
The crossbeam is arranged on the top of support frame as described above, and the crossbeam can swing up and down with respect to support frame as described above,
First lifting part and second lifting part are arranged on the both ends of the crossbeam, and first lifting part and described second hang
Piece installing lifts by crane pipeline for being connect with the both ends of pipeline.
3. pipeline conveying device according to claim 2, which is characterized in that first lifting part includes hanging ring and hangs
Band;
The hanging ring is arranged on one end of the crossbeam, and one end of the suspender belt is connect with the hanging ring, the suspender belt it is another
Hold one end for lifting by crane pipeline.
4. pipeline conveying device according to claim 3, which is characterized in that second lifting part includes suspension hook and pulls
Cucurbit;
The suspension hook is arranged on the one end of the crossbeam far from the hanging ring, and the chain block is connect with the suspension hook, and
The chain block is used to lift by crane the other end of pipeline.
5. pipeline conveying device according to claim 2, which is characterized in that the both ends of the crossbeam be additionally provided with push rod and
Cross-tie;
The push rod is positioned close to one end of first lifting part, and the cross-tie is positioned close to second lifting
One end of part.
6. pipeline conveying device according to claim 5, which is characterized in that the boom hoisting further includes:Reinforcing member;
The reinforcing member is arranged on the crossbeam close to one end of second lifting part, and the reinforcing member is used to improve the horizontal stroke
The stability of beam.
7. pipeline conveying device according to claim 6, which is characterized in that the reinforcing member includes:Channel steel, connecting rod and tiltedly
Pull rod;
The channel steel is vertically arranged with the connecting rod, and the brace is two, and two braces are symmetricly set on described
The both sides of channel steel, one end of the brace are connect with the channel steel, and the other end of the brace is connect with the connecting rod, institute
It states connecting rod and is arranged on the crossbeam upper end, and the connecting rod is mutually perpendicular to the crossbeam.
8. pipeline conveying device according to claim 1, which is characterized in that support frame as described above includes girder and two pairs
Beam;
Two auxiliary girders are symmetricly set on the both ends of the girder, and the lower end of the auxiliary girder is provided with two door pillars, and two
The door pillar is arranged at intervals, and the moving assembly is arranged between two door pillars.
9. pipeline conveying device according to claim 8, which is characterized in that the moving assembly includes bearing block and wheel
Tire;
The bearing block is two, and two bearing blocks are separately positioned on two door pillars, and the tire is arranged on two institutes
It states between bearing block.
10. pipeline conveying device according to claim 9, which is characterized in that the auxiliary girder can relatively described girder into
Row is flexible, to adjust the spacing between two auxiliary girders.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721762629.5U CN207581240U (en) | 2017-12-15 | 2017-12-15 | Pipeline conveying device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721762629.5U CN207581240U (en) | 2017-12-15 | 2017-12-15 | Pipeline conveying device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207581240U true CN207581240U (en) | 2018-07-06 |
Family
ID=62738202
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721762629.5U Active CN207581240U (en) | 2017-12-15 | 2017-12-15 | Pipeline conveying device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207581240U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109878561A (en) * | 2019-04-20 | 2019-06-14 | 徐州易尚饰家装饰工程有限责任公司 | Large-caliber pipe fittings translating device |
-
2017
- 2017-12-15 CN CN201721762629.5U patent/CN207581240U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109878561A (en) * | 2019-04-20 | 2019-06-14 | 徐州易尚饰家装饰工程有限责任公司 | Large-caliber pipe fittings translating device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105384094B (en) | The operating method and crane of crane | |
CN110155886B (en) | Adjustable construction crane | |
CN102303821B (en) | Luffing tower crane with balanced type suspension arm based on traction luffing of steel rope | |
IE42743B1 (en) | Apparatus for handling pipes or pipelines | |
CN207581240U (en) | Pipeline conveying device | |
CN202296907U (en) | Suspension arm balanced movable arm tower crane capable of luffing based on steel rope traction | |
CN104533461B (en) | A kind of tunnel construction trolley horizontal mobile device | |
CN207524855U (en) | A kind of crane lifting device | |
CN103482488A (en) | Automatic leveling telescoping boom engineering vehicle with fork head | |
CN101949169B (en) | Large pipeline sludge dredging machine | |
CN212608025U (en) | Pipeline grabbing and moving device | |
CN211226069U (en) | Hoisting machinery for pipeline construction | |
CN210597308U (en) | Steel-pipe pile extractor | |
CN209835475U (en) | Self-climbing type heavy elevator | |
CN204096935U (en) | Lifting mechanism and use the hoisting crane of this lifting mechanism | |
CN205932963U (en) | Many landing legs tire formula tracklaying crane | |
CN113137059B (en) | Cast-in-place concrete anti-collision wall movable formwork construction device | |
CN204897140U (en) | Guide -car's wheel is changed and is used hoisting accessory | |
CN210973587U (en) | Small-size removal hoisting machine | |
CN204000636U (en) | Walking-type bridge anti-collision wall formwork hoisting device | |
JPH11147690A (en) | Low head space reinforcing bar building-in device | |
CN206588506U (en) | A kind of large tank welds hoistable platform | |
CN113481972A (en) | Steel reinforcement cage material loading transportation and lower cage device | |
CN207862788U (en) | It is a kind of to be connected to the outstanding stretch-draw jack hanging apparatus filled on Hanging Basket | |
CN206174964U (en) | Template landing stage platform truck |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 250000 Industrial North Road 297, Licheng District, Jinan City, Shandong Province Patentee after: POWERCHINA NUCLEAR ENGINEERING Co.,Ltd. Address before: 250000 Industrial North Road 297, Licheng District, Jinan City, Shandong Province Patentee before: POWERCHINA NUCLEAR ENGINEERING Co. |
|
CP01 | Change in the name or title of a patent holder |