CN205367521U - Novel intelligent hoist and mount system of super high -rise building core section of thick bamboo component - Google Patents
Novel intelligent hoist and mount system of super high -rise building core section of thick bamboo component Download PDFInfo
- Publication number
- CN205367521U CN205367521U CN201620067525.1U CN201620067525U CN205367521U CN 205367521 U CN205367521 U CN 205367521U CN 201620067525 U CN201620067525 U CN 201620067525U CN 205367521 U CN205367521 U CN 205367521U
- Authority
- CN
- China
- Prior art keywords
- crane beam
- lift
- rise building
- novel intelligent
- thick bamboo
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620067525.1U CN205367521U (en) | 2016-01-22 | 2016-01-22 | Novel intelligent hoist and mount system of super high -rise building core section of thick bamboo component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620067525.1U CN205367521U (en) | 2016-01-22 | 2016-01-22 | Novel intelligent hoist and mount system of super high -rise building core section of thick bamboo component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205367521U true CN205367521U (en) | 2016-07-06 |
Family
ID=56274385
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620067525.1U Active CN205367521U (en) | 2016-01-22 | 2016-01-22 | Novel intelligent hoist and mount system of super high -rise building core section of thick bamboo component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205367521U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108373102A (en) * | 2018-02-02 | 2018-08-07 | 中建钢构有限公司 | Lift-on/Lift-off System in enclosure space |
CN111675111A (en) * | 2020-06-18 | 2020-09-18 | 湖北省工业建筑集团安装工程有限公司 | Boiler hoisting sling in closed plant area and construction method |
CN114134993A (en) * | 2021-12-16 | 2022-03-04 | 中国能源建设集团安徽电力建设第一工程有限公司 | Installation method for basement steel structure |
-
2016
- 2016-01-22 CN CN201620067525.1U patent/CN205367521U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108373102A (en) * | 2018-02-02 | 2018-08-07 | 中建钢构有限公司 | Lift-on/Lift-off System in enclosure space |
CN111675111A (en) * | 2020-06-18 | 2020-09-18 | 湖北省工业建筑集团安装工程有限公司 | Boiler hoisting sling in closed plant area and construction method |
CN114134993A (en) * | 2021-12-16 | 2022-03-04 | 中国能源建设集团安徽电力建设第一工程有限公司 | Installation method for basement steel structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205367521U (en) | Novel intelligent hoist and mount system of super high -rise building core section of thick bamboo component | |
CN102230381B (en) | Hollow needle beam lining trolley | |
CN208413709U (en) | A kind of unit glass curtain wall ring rail Lift-on/Lift-off System | |
CN110258352A (en) | The steel reinforced concrete combined bridge construction method that two bridgings are done | |
CN205367454U (en) | Large -size formwork hoisting machine constructs | |
CN102363512A (en) | Portable heavy electrical equipment carrier | |
CN201933415U (en) | Highway and railway twin-girder bridge erection machine | |
CN205330690U (en) | Cloth welding platform truck is hung to tunnel water proofing board | |
CN204625045U (en) | A kind of steel structure hoisting door shaped stent formula hanging apparatus | |
CN205764526U (en) | For welding the dolly of clamping-rail trolley conductor bracket | |
CN209619866U (en) | A kind of overhead section tensioning mud jacking job platform of track girder | |
CN208501523U (en) | It is a kind of novel for setting up the Bridge Erector for spelling wide beam | |
CN105603882A (en) | Continuous beam mid-span closure construction method achieving uninterrupted power of contact line and structure of method | |
CN207209826U (en) | A kind of derrick crane | |
CN202415024U (en) | Crane capable of climbing over beam-arch, climbing up slope and climbing down slope | |
CN202936737U (en) | Continuous beam cradle hoisting structure for corrugated steel webs | |
CN106592444B (en) | A kind of novel single-beam type Bridge Erector | |
CN205838259U (en) | The indirect jack-up system of a kind of hydraulic elevator and corresponding hydraulic elevator | |
CN205711767U (en) | Bridge Erector for Prestressed Concrete Bridges prefabricated subsection construction of splicing span by span | |
CN201647844U (en) | Beam lifting station without abutments | |
CN204980736U (en) | Dedicated pair of cage elevator of building site construction | |
CN104591002B (en) | A kind of low clearance double girder overhead crane | |
CN209618693U (en) | A kind of encircling type single-beam operation trolley | |
CN202465115U (en) | Double main beam gantry crane | |
CN202429915U (en) | Large-tonnage lifting hook overhead crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Novel intelligent hoist and mount system of super high -rise building core section of thick bamboo component Effective date of registration: 20180129 Granted publication date: 20160706 Pledgee: Bank of Beijing Limited by Share Ltd. Shenzhen branch Pledgor: China Construction Steel Structure Corp.,Ltd. Registration number: 2018440020010 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
CP03 | Change of name, title or address |
Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province Patentee after: China Construction Engineering Group Co.,Ltd. Address before: 518040 Guangdong city of Shenzhen province Futian District Che Kung Temple tipping building 17 layer Patentee before: China Construction Steel Structure Corp.,Ltd. |
|
CP03 | Change of name, title or address | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20221207 Granted publication date: 20160706 Pledgee: Bank of Beijing Limited by Share Ltd. Shenzhen branch Pledgor: China Construction Steel Structure Corp.,Ltd. Registration number: 2018440020010 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |