CN108797366A - 一种悬索桥主塔塔顶主索鞍吊装装置 - Google Patents

一种悬索桥主塔塔顶主索鞍吊装装置 Download PDF

Info

Publication number
CN108797366A
CN108797366A CN201810921822.1A CN201810921822A CN108797366A CN 108797366 A CN108797366 A CN 108797366A CN 201810921822 A CN201810921822 A CN 201810921822A CN 108797366 A CN108797366 A CN 108797366A
Authority
CN
China
Prior art keywords
track
frame
backward crossbeam
main cable
cable saddle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810921822.1A
Other languages
English (en)
Inventor
金强
孙玉喜
祝文斌
孙纯
付志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201810921822.1A priority Critical patent/CN108797366A/zh
Publication of CN108797366A publication Critical patent/CN108797366A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种悬索桥主塔塔顶主索鞍吊装装置,包括:塔柱,所述塔柱上部的前、后两端分别预制前、后横梁,前、后横梁的左端之间连接纵梁,前、后横梁的右端之间连接纵梁;所述前、后横梁的左端分别连接左三角支架,左三角支架上连接左贝雷架,所述前、后横梁的右端分别连接右三角支架,右三角支架上连接右贝雷架;所述左、右贝雷架的上部分别沿纵向均匀设置若干轨道枕木,轨道枕木上设置轨道,轨道的两端分别连接定位块;所述轨道上设置可纵向行走的行车,行车的上部安装起吊设备。本发明利用悬索桥塔柱作为承载体,对主索鞍进行稳定的吊装,保证了施工质量,提高了施工效率。

Description

一种悬索桥主塔塔顶主索鞍吊装装置
技术领域
本发明属于桥梁建设工程领域,尤其涉及一种悬索桥主塔塔顶主索鞍吊装装置。
背景技术
在悬索桥施工过程中,为了架设鞍体、主缆等永久性构件,需要一定范围的作业面,尤其是在安装主索鞍时,由于主索鞍重量较大,而塔顶施工作业面较小,常规意义上的吊装设备无法在塔顶进行施工以满足吊装主索鞍的作业要求,通常只能用船吊来进行作业,采用这种方法吊装的稳定性差,对船吊的吨位及相关装备要求较高,给吊装工作带来了一定的困难。
发明内容
为了解决上述存在的问题,本发明提出一种悬索桥主塔塔顶主索鞍吊装装置,该装置利用悬索桥塔柱作为承载体,对主索鞍进行稳定的吊装,保证了施工质量,提高了施工效率。
为了实现上述目的,本发明采用以下方案,包括:
塔柱,
所述塔柱上部的前、后两端分别预制前、后横梁,前、后横梁的左端之间连接纵梁,前、后横梁的右端之间连接纵梁;
所述前、后横梁的左端分别连接左三角支架,左三角支架上连接左贝雷架,所述前、后横梁的右端分别连接右三角支架,右三角支架上连接右贝雷架;
所述左、右贝雷架的上部分别沿纵向均匀设置若干轨道枕木,轨道枕木上设置轨道,轨道的两端分别连接定位块;
所述轨道上设置可纵向行走的行车,行车的上部安装起吊设备。
所述起吊设备为卷扬机。
吊装时,卷扬机吊起主索鞍,行车行走,使主索鞍到达预定位置,再将主索鞍落位即可。
本发明利用悬索桥塔柱作为承载体,对主索鞍进行稳定的吊装,保证了施工质量,提高了施工效率。
附图说明
图1是本发明主视结构示意图。
图2是图1的左视结构示意图。
具体实施方式
下面结合附图对本发明作进一步的详细说明,以利于本领域技术人员能够更加清楚的理解,如图1、图2所示,本发明采用以下方案,包括:
塔柱1,
所述塔柱1上部的前、后两端分别预制前、后横梁2、3,前、后横梁2、3的左端之间连接纵梁4,前、后横梁2、3的右端之间连接纵梁4;
所述前、后横梁2、3的左端分别连接左三角支架5,左三角支架5上连接左贝雷架6,所述前、后横梁2、3的右端分别连接右三角支架7,右三角支架7上连接右贝雷架8;
所述左、右贝雷架6、8的上部分别沿纵向均匀设置若干轨道枕木9,轨道枕木9上设置轨道10,轨道10的两端分别连接定位块11;
所述轨道10上设置可纵向行走的行车12,行车12的上部安装起吊设备。
所述起吊设备为卷扬机13。
吊装时,卷扬机13吊起主索鞍14,行车12行走,使主索鞍到达预定位置,再将主索鞍落位即可。
本发明利用悬索桥塔柱作为承载体,对主索鞍进行稳定的吊装,保证了施工质量,提高了施工效率。

Claims (2)

1.一种悬索桥主塔塔顶主索鞍吊装装置,包括塔柱(1),其特征在于:
所述塔柱(1)上部的前、后两端分别预制前、后横梁(2、3),前、后横梁(2、3)的左端之间连接纵梁(4),前、后横梁(2、3)的右端之间连接纵梁(4);
所述前、后横梁(2、3)的左端分别连接左三角支架(5),左三角支架(5)上连接左贝雷架(6),所述前、后横梁(2、3)的右端分别连接右三角支架(7),右三角支架(7)上连接右贝雷架(8);
所述左、右贝雷架(6、8)的上部分别沿纵向均匀设置若干轨道枕木(9),轨道枕木(9)上设置轨道(10),轨道(10)的两端分别连接定位块(11);
所述轨道(10)上设置可纵向行走的行车(12),行车(12)的上部安装起吊设备。
2.根据权利要求1所述吊装装置,其特征在于:所述起吊设备为卷扬机(13)。
CN201810921822.1A 2018-08-14 2018-08-14 一种悬索桥主塔塔顶主索鞍吊装装置 Pending CN108797366A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810921822.1A CN108797366A (zh) 2018-08-14 2018-08-14 一种悬索桥主塔塔顶主索鞍吊装装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810921822.1A CN108797366A (zh) 2018-08-14 2018-08-14 一种悬索桥主塔塔顶主索鞍吊装装置

Publications (1)

Publication Number Publication Date
CN108797366A true CN108797366A (zh) 2018-11-13

Family

ID=64080107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810921822.1A Pending CN108797366A (zh) 2018-08-14 2018-08-14 一种悬索桥主塔塔顶主索鞍吊装装置

Country Status (1)

Country Link
CN (1) CN108797366A (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205205674U (zh) * 2015-11-20 2016-05-04 中交二公局第一工程有限公司 塔顶吊装系统
CN205772893U (zh) * 2016-05-20 2016-12-07 中建三局基础设施工程有限公司 一种主塔顶多功能吊装牵引装置
CN206693061U (zh) * 2017-03-31 2017-12-01 中交二公局第二工程有限公司 一种用于悬索桥主索鞍吊装的吊具装置
CN207244454U (zh) * 2017-03-31 2018-04-17 中交二公局第二工程有限公司 超高塔主索鞍吊装系统

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205205674U (zh) * 2015-11-20 2016-05-04 中交二公局第一工程有限公司 塔顶吊装系统
CN205772893U (zh) * 2016-05-20 2016-12-07 中建三局基础设施工程有限公司 一种主塔顶多功能吊装牵引装置
CN206693061U (zh) * 2017-03-31 2017-12-01 中交二公局第二工程有限公司 一种用于悬索桥主索鞍吊装的吊具装置
CN207244454U (zh) * 2017-03-31 2018-04-17 中交二公局第二工程有限公司 超高塔主索鞍吊装系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
田小勇: ""主索鞍施工方案"", 《百度文库》 *

Similar Documents

Publication Publication Date Title
CN105421249B (zh) 一种拖吊结合式挂篮结构及施工方法
CN105569692A (zh) 一种隧道防水板挂布焊接台车
CN205223872U (zh) 一种拖吊结合式新型挂篮结构
CN104762882A (zh) 桥梁节段吊装装置及吊装方法
CN205330690U (zh) 一种隧道防水板挂布焊接台车
CN206309278U (zh) 反循环钻机
CN103318774B (zh) 卷扬自拆装装置及起重机、卷扬自拆装方法
CN104973517A (zh) 一种用于烧结机头部设备安装的电动龙门平台及其使用方法
CN102910532A (zh) 大型箱型井架空中对接起吊方法
CN201317627Y (zh) 双导梁架桥机
CN202465099U (zh) 一种单主梁龙门偏挂起重机
CN108797366A (zh) 一种悬索桥主塔塔顶主索鞍吊装装置
CN204661163U (zh) 一种多功能变压器套管吊装用支架
CN204416951U (zh) 一种低净空双梁桥式起重机
CN202465109U (zh) 一种电动双梁抓斗龙门起重机
CN204551280U (zh) 桥梁节段吊装装置
CN108708281A (zh) 一种多孔简支近似拱形钢桁梁架设方法
CN205171288U (zh) 一种磁浮轨排移动门吊
CN104591002B (zh) 一种低净空双梁桥式起重机
CN211521390U (zh) 桥梁人行道附属设施吊装设备
CN211645930U (zh) 隧道仰拱施工栈桥
CN209618693U (zh) 一种环抱式单梁运行起重小车
CN202429915U (zh) 一种大吨位吊钩桥式起重机
CN202465115U (zh) 一种双主梁龙门起重机
CN202731933U (zh) 全液压自行式栈桥台车

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181113