CN108765021A - A kind of distribution of online film and ticket mend the method launched - Google Patents

A kind of distribution of online film and ticket mend the method launched Download PDF

Info

Publication number
CN108765021A
CN108765021A CN201810555557.XA CN201810555557A CN108765021A CN 108765021 A CN108765021 A CN 108765021A CN 201810555557 A CN201810555557 A CN 201810555557A CN 108765021 A CN108765021 A CN 108765021A
Authority
CN
China
Prior art keywords
standard
ticket
movie theatre
points
request slip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810555557.XA
Other languages
Chinese (zh)
Other versions
CN108765021B (en
Inventor
李陈忠
李娅梅
曹亮
白宝
蒲中超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shadow Core (beijing) Network Technology Co Ltd
Original Assignee
Shadow Core (beijing) Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shadow Core (beijing) Network Technology Co Ltd filed Critical Shadow Core (beijing) Network Technology Co Ltd
Priority to CN201810555557.XA priority Critical patent/CN108765021B/en
Publication of CN108765021A publication Critical patent/CN108765021A/en
Application granted granted Critical
Publication of CN108765021B publication Critical patent/CN108765021B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0202Market predictions or forecasting for commercial activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0207Discounts or incentives, e.g. coupons or rebates
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/04Billing or invoicing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0631Item recommendations

Landscapes

  • Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Development Economics (AREA)
  • Finance (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of distribution of online film and ticket to mend the method launched, including step:Publication project, generation request slip, setting active rule, setting Operations Requirements, movie theatre application ticket are mended, push ticket benefit, intelligent screening, detection up to standard, upload voucher, confirm voucher and appropriate ticket benefit.Online film distribution provided by the invention and ticket mend the method launched, viewing crowd demand is precisely held by big data, labeling is classified, its suitable spectators are selected for film, it instructs to be dealt into the links that ticket benefit issues from a surname, automation is realized comprehensively, reduce the manpower of each link, material resources, financial resources cost, it improves work efficiency, realize data visualization, it is follow-up traceable, marketing effectiveness can be assessed, the maximum commercial value obtained in the market to power-assisted film, simultaneously relevant data basis is accumulated for subsequent intellectual analysis and intelligent recommendation.

Description

A kind of distribution of online film and ticket mend the method launched
Technical field
The present invention relates to a kind of distribution of online film and ticket to mend the method launched.
Background technology
Traditional film distributor needs costly human time, monetary cost to be required with movie theatre negotiation screening, very much The movie theatre of remote districts is even more to touch to be not achieved, these inefficient film promotion conferences expend a very big expense for film distribution, Many human and material resources, time are wasted, delivery rate is also very low.In conjunction with this background, people can not only be saved by building intelligent publishing platform Power time cost is preferably solved by efficient, digitization, multiplex roles cooperation, the platform that the advantages such as popularization coexist by all kinds of means Movie theatre obtains ticket and mends, and issues more supports touched and obtain screening rate up to movie theatre.Disadvantage of the existing technology has:Because wanting and shadow The actual screening data of institute, movie theatre essential information (movie theatre coding, movie theatre year box office, movie theatre movie theater quantity, movie seat number, Cinema equipment) acquisitions of these data obtained by third company, the accuracys of data can not control, lead to some numbers According to occurring difference when system detects automatically.The lag that the essential information that movie theatre frequently changes also results in this system obtains It takes;The acquisition and comparison of data consume a large amount of cost of labor and time cost, and efficiency is also low, and data are huge, does not integrate, people Work need to be arranged and be counted, and error rate is high.
Invention content
For the above-mentioned prior art the problem of, the purpose of the present invention is to provide one kind can avoid above-mentioned skill occur The online film of art defect is issued and ticket mends the method launched.
In order to achieve the above-mentioned object of the invention, technical solution provided by the invention is as follows:
A kind of distribution of online film and ticket mend the method launched, including step:Publication project generates request slip, setting work Dynamic rule, setting Operations Requirements, movie theatre application ticket are mended, push ticket is mended, intelligent screening, detection up to standard, are uploaded voucher, confirmed voucher It is mended with ticket is appropriated.
Further, the Operations Requirements include:Play/screening rate after film is shown requires, during film presell Play/screening rate requirement;The requirement of movie theatre application ticket benefit is set:The quantity of the movie theatre movie theater of application, affiliated cinemas, affiliated shadow Throwing, year box office section, movie theatre movie theater quantity section, movie seat number section.
Further, active rule is set, and step includes:A variety of different rules are set, the different field in project side is met Scape demand;After the activities multiple to some item setup of project side, activity is arranged according to mutual exclusion rule or staircase rule;
Mutual exclusion rule ensures that movie theatre can only apply for one of activity when the conditions are met;Staircase rule is arranged more Kind of activity and movie theatre must satisfy all Operations Requirements just and can obtain ticket and mends when each activity is provided with after;Project side is to a certain After a multiple activities of item setup, activity is arranged by ladder principle, it is ensured that when the conditions are met, movie theatre can all be applied.
Further, the step of detection up to standard is:Application has received one request slip of successful project generation, request slip It is above-listed to have all movable relevant informations, it can same day progress system automatically scanning detection on a specified date according to the requirement of rule Whether rule is up to standard, and system will detect 3 days to activity not up to standard is continuous, if also not up to standard after three days, system is marked It is denoted as not up to standard, after all movable dates on request slip are all completed detection, determines whether that all activity dates are all up to standard, such as Fruit is that then this application list is up to standard, and otherwise, this application list is not up to standard.
Further, the step of detection up to standard is:23 points of movable date starts to detect for the first time, if detection is up to standard And state on the day of activity is changed to up to standard;If follow-up lasting detection not up to standard, 23 be consecutively detected after three days movable dates Point;If also below standard so active state is not up to standard;Whether all to detect the movable date all under each request slip There is state up to standard or not up to standard, if all activity dates are all stateful, and if request slip all up to standard is up to standard, such as It is not up to standard, the entire request slip end of scan that fruit, which has movable request slip not up to standard,.
Further, the method further includes request slip complaint:When movie theatre user generates matter to the testing result of request slip Doubt when, movie theatre with can by upload movie theatre screening picture upload in platform, the picture of upload must be true, then by project Side's audit, after the approval, the data up to standard of movie theatre can be changed to up to standard.
Further, the method further includes the steps that still appropriating:Examine the request slip after passing through, when below standard, item Money can be dialled and appropriated in real time to movie theatre by the button of " still appropriating " mesh side.
Further, a kind of reference frame being used as when the score value of the credit index screens movie theatre for publisher, if It establishes rules and is then:
When handling registration business, when mechanism moves in successfully and normally does business, score value 500;
When handling qualification certification business, when certification is completed, score value 50;
When handling bank account business, when opening account, when binding bank card and when head fills certification, score value is respectively 20;
According to frequency is logged in, it is 1 point to log in 1 score value, daily record 1 time, and calendar month highest 10 is divided;
Application ticket benefit activity is participated in, adds 10 points;
It detects up to standard, adds 20 points;
Below standard, 30 points of first time is detected, 40 points for the second time, 50 points of third time, n-th 50 is divided, N>3;Or according to another Outer set of rule:Below standard 20 points of button, second of 30 points of button, third time and later 40 points of button are detected for the first time;
Still it appropriates, 0 point;Task is cancelled, and deducts 10 points.
Online film distribution provided by the invention and ticket mend the method launched, and viewing crowd is precisely held by big data to be needed It asks, labeling is classified, and for its suitable spectators of film selection, guidance is dealt into ticket from a surname and mends the links issued, Automation is realized comprehensively, reduces human and material resources, the financial resources cost of each link, improves work efficiency, and realizes data visualization Change, follow-up traceable, marketing effectiveness can be assessed, to the maximum commercial value that power-assisted film obtains in the market, while after being Continuous intellectual analysis and intelligent recommendation accumulate relevant data basis, can meet the needs of practical application well.
Description of the drawings
Fig. 1 is the process flow diagram flow chart for including audit application single stage that project side participates in;
Fig. 2 is the process flow diagram flow chart for including push project step that project side participates in;
Fig. 3 be movie theatre participate in include etc. pending step process flow diagram flow chart;
Fig. 4 is the process flow diagram flow chart including receiving push step that movie theatre participates in;
Fig. 5 is overhaul flow chart up to standard.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with the accompanying drawings and specific implementation The present invention will be further described for example.It should be appreciated that described herein, specific examples are only used to explain the present invention, and does not have to It is of the invention in limiting.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, shall fall within the protection scope of the present invention.
A kind of distribution of online film and ticket mend the method launched, including step:Publication project generates request slip, setting work Dynamic rule, setting Operations Requirements, movie theatre application ticket are mended, push ticket is mended, intelligent screening, detection up to standard, are uploaded voucher, confirmed voucher With appropriate ticket mend etc..
System has two large user roles:Project side and movie theatre;System user provides associated person information, and enterprise's correlation qualification is logical It can become system user after crossing audit;User can bind multiple movie theatres when logging in, because of the warp as management movie theatre Battalion person usually several movie theatre good at managing.Project side participate in process steps and movie theatre participate in process steps please refer to Fig.1 and Shown in Fig. 2.
Publication project:Project side creates project in systems, and establishment project is to issue ticket by selection to mend movable shadow Piece, setting rule, project can issue success.
Generate request slip:Apply for that the rule of odd numbers is that (YYMMDD0000001 is incremental, such as:1712062098039).Application The generating resource there are two types of single, 1:After movie theatre application project, the request slip of generation, then examined by project side;2:Project side is by project After activity active push is to movie theatre, request slip is generated, then is received or is refused by movie theatre.
Active rule is set:A variety of different rules are set, the different scene demand in project side is met;Project side is to a certain After a multiple activities of item setup, activity can be arranged according to mutual exclusion rule or staircase rule;
Mutual exclusion rule ensures that movie theatre can only apply for one of activity when the conditions are met;Staircase rule is arranged more Kind of activity and movie theatre must satisfy all Operations Requirements just and can obtain ticket and mends when each activity is provided with after;Project side is to a certain After a multiple activities of item setup, activity is arranged by ladder principle, it is ensured that when the conditions are met, movie theatre can all be applied.
Operations Requirements are set:Play/screening rate after film is shown requires, and play/screening rate during film presell is wanted It asks;The requirement of movie theatre application ticket benefit is set:The quantity of the movie theatre movie theater of application, affiliated cinemas, the throwing of affiliated shadow, year box office section, Movie theatre movie theater quantity section, movie seat number section.The ticket of film benefit is directly pushed to movie theatre:Movie theatre is selected, ticket is set Mend the amount of money.
Movie theatre application ticket is mended:Successful project is set, and movie theatre can directly be applied in systems, after applying successfully, wait for project Side's audit.
Detection up to standard:Refering to what is shown in Fig. 3, application or having received successful project and will generate a request slip, on request slip All movable relevant informations including the movable date are shown, it can same day progress on a specified date according to the requirement of rule Whether system automatically scanning detected rule is up to standard, and system will detect 3 days to activity not up to standard is continuous, if do not reached also after three days Mark, then system is marked as not up to standard, after all movable dates on request slip are all completed detection, determines whether all work The dynamic date is all up to standard, if it is, this application list is up to standard, otherwise, this application list is not up to standard.User can upload during this period have been reached Target voucher, then audited by project side.Request slip after can get ticket and mend the amount of money in real time.The stream of detection process up to standard Journey figure is as shown in Figure 3.
Intelligent screening:By accurately digitized business, system background integrates the data resource of each industrial chain of industry, calculates Go out to meet actual screening data.Project side when the project of publication according to the screening data of guidance as reference.Setting option The Operations Requirements of purpose screening rate or play number.
Voucher proves:After the data of user are up to standard, need to upload corresponding voucher, voucher can upload paper invoice figure Piece, express delivery odd numbers, electronic invoice, film ticket stub picture any one.After project side confirms, ticket is mended the amount of money and is appropriated in real time to shadow Institute.
Still it appropriates:Examination & approval pass through after request slip, when below standard, project side can by the button of " still appropriating ", Money is dialled and is appropriated in real time to movie theatre.
Request slip is appealed:When movie theatre user generates query to the testing result of request slip, movie theatre with can be by upper Movie theatre screening picture is passed to upload in platform, the picture of upload must be true, then is audited by project side, after the approval, movie theatre Data up to standard i.e. can be changed to up to standard.
Screen and select credit index:Platform can there are one the credit marking systems to each movie theatre system.Credit index pair The credit index of movie theatre can be screened and be selected when issuing ticket benefit activity in distribution.
The ticket that movie theatre accepts or rejects the push of project side is mended:After the project that project side is set is pushed to movie theatre, movie theatre root Receive or refuse according to actual conditions according to the requirement of rule.
A kind of reference frame that the score value of the credit index is used as when screening movie theatre for publisher, the credit index Score value set rule as:
When handling registration business, when mechanism moves in successfully and normally does business, score value 500;
When handling qualification certification business, when certification is completed, score value 50;Qualification change subtracts score, and can not Shen Please ticket mend, examination & approval pass through add-back score;
When handling bank account business, when opening account, when binding bank card and when head fills certification, score value is respectively 20;
According to frequency is logged in, it is 1 point to log in 1 score value, daily record 1 time, and calendar month highest 10 is divided;Participate in application ticket Benefit activity adds 10 points;
It detects up to standard, adds 20 points;
Detect it is below standard, for the first time 30 points, second 40 points, third time 50 points, n-th obtains 50 points, N>3;Or Person is according to other set rule:Below standard 20 points of button, second of 30 points of button, third time and later 40 points of button are detected for the first time;
Still it appropriates, 0 point;Task is cancelled, and deducts 10 points.
Credit index score value is described as follows shown in table:
Detection detailed process citing up to standard:23 points of movable date starts to detect for the first time, if detection is up to standard and incites somebody to action Movable same day state is changed to up to standard.If follow-up lasting detection not up to standard, is consecutively detected at 23 points after three days movable dates (such as The movable date is January 1, then being exactly January 4 after three days).If also below standard so active state is not up to standard. With each scanning, can also detect the movable date all under each request slip whether all had it is up to standard or not up to standard State, if all activity dates are all stateful, and if request slip all up to standard is up to standard, if there is movable request slip not up to standard It is as not up to standard.At this point, the entire request slip end of scan.
It illustrates:
Project side is that certain distributing and releasing corporation issues a film, and the project of this film is issued in platform, and setting ticket mends rule: It is required that the scale (which cinemas is movie theater size, annual ticket house property amount, belong to, and belongs to which shadow core etc.) of movie theatre, this project only allows The period of 50 movie theatre applications, application is in the presell phase, and play number is 40%.When formally showing, the screening rate of prime time is 45%.
The scale of movie theatre A meets the setting condition of this movie theatre, you can applies for this project, after applying successfully, platform will be automatic Detection and formally shows the play number and screening rate in the phase at the presell phase, and after up to standard, platform indicates this request slip as " up to standard " simultaneously It is required that issuing invoice, after publisher's receipt of invoice, you can click is appropriated, and movie theatre can receive this ticket extra money.
Online film distribution provided by the invention and ticket mend the method launched, and viewing crowd is precisely held by big data to be needed It asks, labeling is classified, and for its suitable spectators of film selection, guidance is dealt into ticket from a surname and mends the links issued, Automation is realized comprehensively, reduces human and material resources, the financial resources cost of each link, improves work efficiency, and realizes data visualization Change, follow-up traceable, marketing effectiveness can be assessed, to the maximum commercial value that power-assisted film obtains in the market, while after being Continuous intellectual analysis and intelligent recommendation accumulate relevant data basis, can meet the needs of practical application well.
Embodiments of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but can not Therefore it is interpreted as the limitation to the scope of the claims of the present invention.It should be pointed out that for those of ordinary skill in the art, Without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection model of the present invention It encloses.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (8)

1. a kind of online film distribution and ticket mend the method launched, which is characterized in that including step:Publication project generates application Single, setting active rule, setting Operations Requirements, movie theatre application ticket are mended, push ticket is mended, intelligent screening, detection up to standard, upload with Demonstrate,prove, confirm voucher and appropriate ticket benefit.
2. online film distribution according to claim 1 and ticket mend the method launched, which is characterized in that the Operations Requirements Including:Play/screening rate after film is shown requires, the play during film presell/screening rate requirement;Movie theatre application ticket is set The requirement of benefit:The quantity of the movie theatre movie theater of application, affiliated cinemas, the throwing of affiliated shadow, year box office section, movie theatre movie theater quantity section, The section of movie seat number.
3. the method launched is mended in the online film distribution and ticket according to claim 1-2, which is characterized in that setting activity is advised Then, step includes:A variety of different rules are set, the different scene demand in project side is met;Project side sets some project After setting multiple activities, activity is arranged according to mutual exclusion rule or staircase rule;
Mutual exclusion rule ensures that movie theatre can only apply for one of activity when the conditions are met;A variety of work are arranged in staircase rule It is dynamic and movie theatre must satisfy all Operations Requirements just and can obtain ticket and mends when each activity is provided with after;Project side is to some After the multiple activities of mesh setting, activity is arranged by ladder principle, it is ensured that when the conditions are met, movie theatre can all be applied.
4. the method launched is mended in the online film distribution and ticket according to claim 1-3, which is characterized in that detection up to standard Step is:Application has received one request slip of successful project generation, and request slip is above-listed all movable relevant informations, root Carry out whether system automatically scanning detected rule is up to standard, and system will be to not up to standard on the day of requirement meeting on a specified date according to rule The continuous detection of activity 3 days, if also not up to standard after three days, system be marked as it is not up to standard, will be on request slip it is all After the movable date all completes detection, determine whether that all movable dates are all up to standard, if it is, this application list is up to standard, it otherwise, should Request slip is not up to standard.
5. film distributor according to claim 1-4 and ticket mend the method launched, which is characterized in that the step of detection up to standard For:23 points of movable date starts to detect for the first time, if detection is up to standard and is changed to state on the day of activity up to standard;If no Follow-up lasting detection up to standard, is consecutively detected at 23 points after three days movable dates;If also below standard so active state is It is not up to standard;Detect whether the movable date all under each request slip has all had state up to standard or not up to standard, if All activity dates are all stateful, and if request slip all up to standard is up to standard, if there is movable request slip not up to standard does not reach as Mark, the entire request slip end of scan.
6. film distributor according to claim 1-5 and ticket mend the method launched, which is characterized in that the method further includes Request slip is appealed:When movie theatre user generates query to the testing result of request slip, movie theatre is arranged with that can pass through upload movie theatre Piece picture uploads in platform, and the picture of upload must be true, then is audited by project side, after the approval, the number up to standard of movie theatre According to i.e. can be changed to up to standard.
7. film distributor according to claim 1-6 and ticket mend the method launched, which is characterized in that the method further includes Still the step of appropriating:The request slip after passing through is examined, when below standard, project side can be by the button of " still appropriating ", will Money is dialled and is appropriated in real time to movie theatre.
8. the film distributor and ticket according to claim 1-7 mend the method launched, which is characterized in that the credit index A kind of reference frame for being used as when score value screens movie theatre for publisher, set rule as:When handling registration business, when mechanism enters When firmly succeeding and normally doing business, score value 500;
When handling qualification certification business, when certification is completed, score value 50;
When handling bank account business, when opening account, when binding bank card and when head fills certification, score value is respectively 20;
According to frequency is logged in, it is 1 point to log in 1 score value, daily record 1 time, and calendar month highest 10 is divided;It participates in application ticket and mends work It is dynamic, add 10 points;
It detects up to standard, adds 20 points;
Below standard, 30 points of first time is detected, 40 points for the second time, 50 points of third time, n-th 50 is divided, N>3;Or according to other one Set rule:Below standard 20 points of button, second of 30 points of button, third time and later 40 points of button are detected for the first time;
Still it appropriates, 0 point;Task is cancelled, and deducts 10 points.
CN201810555557.XA 2018-06-01 2018-06-01 Method for on-line film distribution and ticket compensation release Active CN108765021B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810555557.XA CN108765021B (en) 2018-06-01 2018-06-01 Method for on-line film distribution and ticket compensation release

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810555557.XA CN108765021B (en) 2018-06-01 2018-06-01 Method for on-line film distribution and ticket compensation release

Publications (2)

Publication Number Publication Date
CN108765021A true CN108765021A (en) 2018-11-06
CN108765021B CN108765021B (en) 2021-05-18

Family

ID=64001753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810555557.XA Active CN108765021B (en) 2018-06-01 2018-06-01 Method for on-line film distribution and ticket compensation release

Country Status (1)

Country Link
CN (1) CN108765021B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110348982A (en) * 2019-05-21 2019-10-18 平安银行股份有限公司 Data verification method up to standard and device, electronic equipment and non-transient storage media

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030204375A1 (en) * 2002-04-29 2003-10-30 The Boeing Company Method and apparatus for comparing actual use data with contract data
JP2006211184A (en) * 2005-01-27 2006-08-10 Toshihide Kasahara System and program for distributing cinema
US20100222132A1 (en) * 2004-09-29 2010-09-02 Kirk Edward Sanford Systems for Enhancing Funding of Gaming
US20130046711A1 (en) * 2011-08-16 2013-02-21 Farelogix, Inc. System and Method to Determine Airline Baggage Allowance and Calculate Airline Baggage Fee
CN104573930A (en) * 2014-12-23 2015-04-29 北京光线影业有限公司 Operation and publication system for film trade
CN105321117A (en) * 2014-06-24 2016-02-10 中演票务通文化发展有限责任公司 Display system of culture performance venue
CN106210153A (en) * 2016-09-30 2016-12-07 上海冰穹网络科技有限公司 The method for pushing of a kind of resource information, system and electronic equipment thereof
CN106875322A (en) * 2016-12-21 2017-06-20 乐视控股(北京)有限公司 A kind of network lottery drawing method and device
CN107742352A (en) * 2017-09-20 2018-02-27 黄玉宇 Decentralization lot/queuing strategy and system based on block chain and intelligent contract

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030204375A1 (en) * 2002-04-29 2003-10-30 The Boeing Company Method and apparatus for comparing actual use data with contract data
US20100222132A1 (en) * 2004-09-29 2010-09-02 Kirk Edward Sanford Systems for Enhancing Funding of Gaming
JP2006211184A (en) * 2005-01-27 2006-08-10 Toshihide Kasahara System and program for distributing cinema
US20130046711A1 (en) * 2011-08-16 2013-02-21 Farelogix, Inc. System and Method to Determine Airline Baggage Allowance and Calculate Airline Baggage Fee
CN105321117A (en) * 2014-06-24 2016-02-10 中演票务通文化发展有限责任公司 Display system of culture performance venue
CN104573930A (en) * 2014-12-23 2015-04-29 北京光线影业有限公司 Operation and publication system for film trade
CN106210153A (en) * 2016-09-30 2016-12-07 上海冰穹网络科技有限公司 The method for pushing of a kind of resource information, system and electronic equipment thereof
CN106875322A (en) * 2016-12-21 2017-06-20 乐视控股(北京)有限公司 A kind of network lottery drawing method and device
CN107742352A (en) * 2017-09-20 2018-02-27 黄玉宇 Decentralization lot/queuing strategy and system based on block chain and intelligent contract

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
橙子游戏网: "《影核云会员app手机版v1.0》", <HTTPS://WWW.ORANGESGAME.COM/AZRJ/SHZL/187157.HTML> *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110348982A (en) * 2019-05-21 2019-10-18 平安银行股份有限公司 Data verification method up to standard and device, electronic equipment and non-transient storage media

Also Published As

Publication number Publication date
CN108765021B (en) 2021-05-18

Similar Documents

Publication Publication Date Title
US20190026838A1 (en) Method and system for processing data that disagrees
KR20170078533A (en) the smart reservation management system of hotel
CN103426068A (en) Network recruitment trading method and platform
CN103578002A (en) Tourism e-business system
Formoso et al. Client requirements management in social housing: A case study on the residential leasing program in Brazil
CN108648030B (en) Travel group grouping system and method and travel agency business processing device
CN109697660A (en) A kind of method and system that enterprise&#39;s income invoice data are carried out to tax based on electronics bottom account platform
US10467714B2 (en) Interactive building stacking plan user interface
CN108765021A (en) A kind of distribution of online film and ticket mend the method launched
EP1440423A2 (en) Method and device for the computer-implemented processing of electronic payment orders
CN107609837A (en) Affixed one&#39;s seal in a kind of project management the control method and system of examination & verification
KR102062644B1 (en) System and method for management of collective building
CN108694567A (en) Business approval flow configuration method
KR102121471B1 (en) point acquisition event program system
Ajaegbu Promoting foreign direct investment (FDI): The case of Uganda
CN107369002A (en) Engineering project information processing method and system
KR102297104B1 (en) Apparatus for Providing Loan Service by Investment and Driving Method Thereof
CN111160854A (en) Construction engineering management system
Achard et al. Public Private Partnerships: Strategic Assets and Managerial Models
WO2017111199A1 (en) Method and system for network marketing using crowdfunding
Virta Challenges of collaboration: The case of Mediapolis in Finland
Virta 12 Challenges of collaboration
Zovko-Cihlar et al. Application of the public-private partnership models in implementation of digital audio broadcast network infrastructure
Musioł-Urbańczyk et al. Projects of the implementation of e-administration in Poland
CN108470048A (en) A kind of construction project data display systems based on instrument board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant