CN108732977A - A kind of collecting method and system - Google Patents

A kind of collecting method and system Download PDF

Info

Publication number
CN108732977A
CN108732977A CN201811003584.2A CN201811003584A CN108732977A CN 108732977 A CN108732977 A CN 108732977A CN 201811003584 A CN201811003584 A CN 201811003584A CN 108732977 A CN108732977 A CN 108732977A
Authority
CN
China
Prior art keywords
electric energy
target data
energy meter
data
terminal equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811003584.2A
Other languages
Chinese (zh)
Inventor
阮正平
吴彦勇
左正强
李军
刘秋辉
唐冬来
胡江
杨俏
颜涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN ZHONGDIAN VENUS INFORMATION TECHNOLOGY Co Ltd
State Grid Information and Telecommunication Co Ltd
Original Assignee
SICHUAN ZHONGDIAN VENUS INFORMATION TECHNOLOGY Co Ltd
State Grid Information and Telecommunication Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN ZHONGDIAN VENUS INFORMATION TECHNOLOGY Co Ltd, State Grid Information and Telecommunication Co Ltd filed Critical SICHUAN ZHONGDIAN VENUS INFORMATION TECHNOLOGY Co Ltd
Priority to CN201811003584.2A priority Critical patent/CN108732977A/en
Publication of CN108732977A publication Critical patent/CN108732977A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0428Safety, monitoring
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2612Data acquisition interface

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of collecting methods, are first depending on predefined rule and are grouped multiple electric energy meters;Then real time polling obtains the target data of electric energy meter in each group, i.e., can disposably obtain the related data of multiple electric energy meters in each group;Finally a pair target data corresponding with the default freeze-off time point of end-terminal equipment carries out freezing to handle, and the target data that will freeze that treated is sent to distribution transformer terminals equipment and stores, wherein, keep the consistency of clock to ensure that the default freeze-off time point of each end-terminal equipment is consistent by clock synchronization mechanism between distribution transformer terminals equipment and each end-terminal equipment.This method, compared with traditional related data that can only once obtain an electric energy meter, acquisition takes frequency and success rate height short, and that acquire each electric energy meter data, and then the freeze-off time error of user's side line electric energy meter data can be reduced, improve abnormality processing timeliness.In addition, the invention also discloses a kind of data collecting system, effect is as above.

Description

A kind of collecting method and system
Technical field
The present invention relates to electric power application field, more particularly to a kind of collecting method and system.
Background technology
With the rapid promotion of the development of social economy, the expansion of power distribution network scale and Distribution Network Equipment quality requirement, Information collection and application to all kinds of controller switching equipments in power distribution network are particularly important.For a long time, grid company is to all kinds of The rolling inspection work of distribution net equipment depends on manpower to complete, not only inefficiency, but also need to expend a large amount of manpowers, financial resources, The malfunction elimination processing of all kinds of distribution net equipments also is difficult to accomplish closed loop management and effectively tracking.Especially to the recessiveness event of omission The investigation difficulty higher of barrier investigates the improper operation that may influence equipment, even causes serious accident.
It is main to acquire user's information about power at present to user side data acquisition modes mainly by Telemetry Data Acquisition, The electric flux indicating value of daily 0 user's electric energy meter is carried out freezing to store using the freezing function of electric energy meter itself, passes through concentration The collector of device subordinate is polled acquisition, and acquisition instructions are uniformly issued to each electric energy meter by concentrator, are then adopted by user Collecting system carries out day line loss calculation displaying.This data acquisition modes own since collector itself can only be used as transmission equipment Acquisition instructions are issued by concentrator, and concentrator can only once obtain the related data of an electric energy meter, acquisition take compared with It is long, and time-consuming, frequency is low, one-time success rate is not high for acquisition, cannot achieve the high frequency acquisition to user side information about power, together When, can not user side line anomalies be accomplished with the precision management of more time-effectiveness.
It can be seen that how to overcome traditional data acquisition modes due to acquisition time-consuming and acquisition time-consuming, frequency Low and primary acquisition success rate is low, and the freeze-off time error of user side electric energy meter data is big caused by and abnormality processing The low problem of timeliness is those skilled in the art's urgent problem to be solved.
Invention content
The embodiment of the present application provides a kind of collecting method and system, is adopted with the data for solving traditional in the prior art Mode set due to acquisition time-consuming and acquisition time-consuming, frequency is low and primary acquisition success rate is low, the user caused by The problem that the freeze-off time error of side electric energy meter data is big and abnormality processing timeliness is low.
In order to solve the above technical problems, the present invention provides a kind of collecting methods, including:
Multiple electric energy meters are grouped according to predefined rule;
Real time polling obtains the target data of electric energy meter described in each group;
It pair carries out freezing to handle with the corresponding target data of default freeze-off time point of end-terminal setting, and by the jelly Treated that target data is sent to distribution transformer terminals equipment is stored for knot;
Wherein, clock is kept by clock synchronization mechanism between the distribution transformer terminals equipment and each end-terminal equipment Consistency to ensure that the default freeze-off time point of each end-terminal equipment is consistent.
Preferably, the target data of electric energy meter described in the real time polling acquisition each group is specially:
The target data is obtained by RS485 communication modes real time pollings.
Preferably,
After the real time polling obtains the target data of electric energy meter described in each group, further include:
Judge after continuous acquisition preset times, if can successfully obtain the target data of the same current electric energy meter;
If it is not, then the characterization current electric energy meter is abnormal, and corresponding exception information is sent to the distribution transforming Terminal device;
If it is, the characterization current electric energy meter no exceptions, and enter the real time polling and obtain institute in each group The step of stating the target data of electric energy meter.
Preferably, after judging the preset times described in continuous acquisition, the same current electricity is not obtained successfully Can table target data, further include:
Show warning message.
Preferably, the target data includes the voltage, electric current and positive active energy amount of each electric energy meter.
In order to solve the above technical problems, the present invention also provides a kind of corresponding data collecting system of collecting method, Including:
Distribution transformer terminals equipment, multiple end-terminal equipment and communication module, the distribution transformer terminals equipment pass through the communication Module is connect with each end-terminal equipment, and each end-terminal equipment is connect with multiple electric energy meters;
The end-terminal equipment obtains the target data of each electric energy meter in each group for real time polling, and will be with oneself The corresponding target data of default freeze-off time point of body setting carries out freezing to handle;
The distribution transformer terminals equipment is for storing target data of freezing that treated;
Wherein, clock is kept by clock synchronization mechanism between the distribution transformer terminals equipment and each end-terminal equipment Consistency to ensure that the default freeze-off time point of each end-terminal equipment is consistent.
Preferably, it is communicated especially by RS485 agreements between the end-terminal equipment and each electric energy meter.
Preferably, the end-terminal equipment specifically includes:Processor, data acquisition module and monitoring modular, the place Reason device is connect with the data acquisition module and the monitoring modular respectively.
Preferably, the communication module is specially GPRS module and/or bandwidth carrier communication module.
Compared with the prior art, a kind of collecting method provided by the present invention, being first depending on predefined rule will be more A electric energy meter is grouped;Then real time polling obtains the target data of electric energy meter in each group, that is to say, that can disposably obtain Take the related data of multiple electric energy meters in each group;Finally pair number of targets corresponding with the default freeze-off time point of end-terminal setting According to carrying out freezing to handle, and the target data that will freeze that treated is sent to distribution transformer terminals equipment and stores, wherein distribution transforming is whole Keep the consistency of clock to ensure that each end-terminal is set by clock synchronization mechanism between end equipment and each end-terminal equipment Standby default freeze-off time point is consistent.It can be seen that this method, with the phase that can only once obtain an electric energy meter in the prior art It closes data to compare, acquisition takes frequency and success rate height short, and that acquire each electric energy meter data, and then can reduce user's side line The freeze-off time error of electric energy meter data improves abnormality processing timeliness.In addition, the present invention also provides a kind of data acquisition systems System, effect are as above.
Description of the drawings
A kind of collecting method flow chart that Fig. 1 is provided by the embodiment of the present invention;
A kind of data collecting system composition schematic diagram that Fig. 2 is provided by the embodiment of the present invention.
Specific implementation mode
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art obtained without making creative work it is all its Its embodiment, shall fall within the protection scope of the present invention.
Core of the invention is to provide a kind of collecting method and system, can solve data traditional in the prior art Acquisition mode due to acquisition time-consuming and acquisition time-consuming, frequency is low and primary acquisition success rate is low, used caused by The problem that the freeze-off time error of family side electric energy meter data is big and abnormality processing timeliness is low.
In order to make those skilled in the art more fully understand the solution of the present invention, below in conjunction with the accompanying drawings and specific embodiment party The present invention is described in further detail for formula.
A kind of collecting method flow chart that Fig. 1 is provided by the embodiment of the present invention, as shown in Figure 1, the data acquire Method includes:
S101:Multiple electric energy meters are grouped according to predefined rule.
Particularly as being to determine out that an end-terminal equipment needs to be correspondingly connected with several electric energy meters, and then realize to multiple electricity The grouping of energy table.
S102:Real time polling obtains the target data of electric energy meter in each group.
In the prior art, when obtaining the related data of each electric energy meter, typically send instructions under concentrator unification, then further The related data (such as electric current, voltage, user power consumption) of the multiple electric energy meters connected under one acquisition, that is to say, that obtain first The related data of a electric energy meter and then the related data for removing to obtain second electric energy meter, until having obtained all electric energy meters Related data.This acquisition modes, obtain first electric energy meter related data and the last one electric energy meter related data it Between freezing data time error it is big, that is to say, that be that single-point freezes in the prior art, one-to-one acquisition electric energy meter data. For example, end-terminal equipment is connected with down 10 electric energy meters in total, it is denoted as the first electric energy meter, the second electric energy meter, third electric energy respectively Table to the tenth electric energy meter, acquisition modes in the prior art are to be obtained in the period at one, it is relevant first to obtain the first electric energy meter Data, then go to obtain the relevant data of the second electric energy meter, and so on, the tenth relevant data of electric energy meter are finally obtained again, i.e., The data for once obtaining an electric energy meter need to obtain 10 times in total.
Collecting method provided by the embodiments of the present application is in a polling cycle, and disposable acquisition is more after being grouped The target data of a electric energy meter is illustrated by taking 10 electric energy meters above as an example, it is assumed that 10 electric energy meters are divided into 2 groups, Every group of 5 electric energy meters, i.e. an end-terminal equipment connect 5 electric energy meters, and the embodiment of the present application is set by two end-terminals The standby target data that can once obtain 10 electric energy meters.After a cycle completion, with same in next cycle Mode obtained.Assuming that connecting 20 electric energy meters under each end-terminal equipment, the target data of each electric energy meter is acquired Time be 2 seconds, acquire the target data of 20 electric energy maximum it is time-consuming be 40 seconds, jelly can be reduced to the greatest extent in this way Tie the time error of data.Preferably embodiment, target data include that the voltage, electric current and forward direction of each electric energy meter are active Electric flux, certainly, target data item are not limited to voltage, electric current and positive active energy amount.
S103:It pair carries out freezing to handle with the corresponding target data of default freeze-off time point of end-terminal setting, and will Target data of freezing that treated is sent to distribution transformer terminals equipment and is stored.
Wherein, the consistency of clock is kept between distribution transformer terminals equipment and each end-terminal equipment by clock synchronization mechanism Default freeze-off time point to ensure each end-terminal equipment is consistent
In practical applications, the target data of electric energy meter can be obtained by end-terminal equipment real time polling in each group, In getting each group after the target data of electric energy meter, when the target data that poll is got meets freeze-off time setting requirements Shi Jinhang freezes to handle, i.e., carries out freezing to handle by target data corresponding with the default freeze-off time point that end-terminal is arranged, And the target data that will freeze that treated is sent to distribution transformer terminals equipment and stores, that is to say, that electric energy meter in each group of acquisition If target data time it is identical with default freeze-off time point when, just the target data is carried out freezing to handle, and will freeze Treated that target data is sent to distribution transformer terminals equipment is stored for knot.In practical applications, each end-terminal equipment is pre- If freeze-off time point is issued from distribution transformer terminals equipment to each end-terminal equipment freezes instruction realization, distribution transformer terminals equipment and each end It holds and passes through the consistency that clock synchronization mechanism keeps clock between terminal device, it is ensured that when each end-terminal equipment default is freezed Between put freeze-off time consistency that is consistent, and then ensuring each electric energy meter target data in every group obtained.For example, default when freezing Between be 10:00-10:02, the time will be just obtained 10:00-10:The target data of each electric energy meter carries out in 02 section corresponding every group Freeze to handle, and the target data that will freeze that treated is sent to distribution transformer terminals equipment and stores, and can be deposited in xml format Storage facilitates acquisition to read.In practical applications, default freeze-off time has multiple, can be carried out for an interval with 20 minutes Setting, i.e., next default freeze-off time are just 10:20-10:22, and so on.Default freeze-off time and with how long Can determines according to actual conditions for an interval setting freeze-off time, the present invention is simultaneously not construed as limiting, when a collection period terminates it Afterwards, it repeats and executes above step.
Preferably embodiment, the target data that real time polling obtains electric energy meter in each group are specially:Pass through RS485 Communication modes real time polling obtains target data.Each electricity that end-terminal equipment connects under being acquired in real time by RS485 communication modes The target data (voltage, electric current, zero-sequence current and positive active energy amount etc.) of energy table, will be real-time by presetting freeze-off time The target data being polled to closest to default freeze-off time carries out freezing to handle, in each complete polling cycle, only to end The target data of each electric energy meter connected under the terminal device of end is polled acquisition, ensures each electric energy meter target data in every group Freeze-off time error, be sent to intelligent distribution transformer terminals equipment in the target data that will freeze that treated and carry out file storage.Due to RS485 communication modes only support the serial polling mode of more equipment to acquire, to adopting for the same target data item of each electric energy meter Collect the time generally in 2 seconds.Survey overlong time is called together after can solving electric energy meter itself freezing data and does not support freezing function Electric energy meter carry out high-frequency data the problem of freezing.Certainly, other than obtaining target data item using RS485 communication modes, Data acquisition can also be carried out by other satisfactory communication modes, details are not described herein.
In the embodiment of the present application, data acquisition is transmitted, together using 101 agreements of state's network mark standard by 4G high speed private networks When freeze file and carry out high compression ratio compression, ensure also to can guarantee the safety of user data while data transmission efficiency.This Apply for the collecting method that embodiment provides, the grouping to multiple electric energy meters can be realized by end-terminal equipment, is passed through RS485 polling modes acquire the voltage of the electric energy meter connected below, electric current, zero-sequence current, positive active energy amount indicating value in real time, By the clock synchronization mechanism of distribution transformer terminals equipment and end-terminal equipment, by electric energy meter in the form of end-terminal device packets It carries out data acquisition to freeze to handle, the data of each freeze-off time node are stored in the distribution transformer terminals on upper layer with minimal error Equipment.This method calls survey overlong time together after can solving electric energy meter itself freezing data and the electric energy meter of freezing function is not supported to carry out The problem of high-frequency data freezes.
A kind of collecting method provided by the present invention, a kind of collecting method provided by the present invention, first according to Multiple electric energy meters are grouped according to predefined rule;Then real time polling obtains the target data of electric energy meter in each group, also It is to say the related data that can disposably obtain multiple electric energy meters in each group;When finally pair freezing with end-terminal setting default Between put corresponding target data and carry out freezing to handle, and will freeze that treated target data is sent to the progress of distribution transformer terminals equipment Storage, wherein between distribution transformer terminals equipment and each end-terminal equipment by clock synchronization mechanism keep clock consistency with Ensure that the default freeze-off time point of each end-terminal equipment is consistent.It can be seen that this method, and can only once obtain in the prior art The related data of an electric energy meter is taken to compare, acquisition takes frequency and success rate height short, and that acquire each electric energy meter data, in turn The freeze-off time error of user's side line electric energy meter data can be reduced, improve abnormality processing timeliness.
In order to find in time and handling failure, on the basis of the above embodiments, preferably embodiment, real-time In poll acquisition each group after the target data of electric energy meter, further include:
Judge after continuous acquisition preset times, if can successfully obtain the target data of the same current electric energy meter;
It is abnormal if it is not, then characterizing current electric energy meter, and corresponding exception information is sent to distribution transformer terminals equipment;
If it is, characterizing current electric energy meter no exceptions, and enter the mesh that real time polling obtains electric energy meter in each group The step of marking data.
Specifically, it is exactly not get the target of the same current electric energy meter successfully after continuous acquisition preset times Current electric energy meter is then labeled as abnormality by data, is at this moment just needed corresponding exception information being sent to distribution terminal and is set It is standby, the problem of can not knowing in time after can breaking down or have a power failure to avoid electric energy meter, provides for base fortune inspection personnel and more may be used The malfunction elimination foundation leaned on.If after continuous acquisition preset times, the target of the same current electric energy meter can be successfully got Current electric energy meter is then labeled as normal condition, illustrates that corresponding current electric energy meter is normal, continue to execute step S102 i.e. by data It can.Preset times can be set according to actual conditions, be could be provided as 3 times, adopted in preset times in the embodiment of the present application The target data of collection can be same data item.Certainly, the class of preset times and the target data acquired in preset times Type can't influence the realization of the embodiment of the present application.
When detecting that current electric energy meter is abnormal, in order to remind the relevant personnel in time, on the basis of above-described embodiment On, preferably mode does not obtain the same current electric energy meter successfully after judging in continuous acquisition preset times After target data, further include:Show warning message.Failure can be found in time, and can shorten malfunction elimination and solution Time, promoted user experience.
It is described in detail above for a kind of embodiment of collecting method, based on above-described embodiment description Collecting method, the embodiment of the present invention additionally provide a kind of system corresponding with this method.Due to the embodiment of components of system as directed It is corresponded with the embodiment of method part, therefore the embodiment of components of system as directed please refers to the embodiment description of method part, this In repeat no more.
A kind of data collecting system composition schematic diagram that Fig. 2 is provided by the embodiment of the present invention, as shown in Fig. 2, the data Acquisition system includes:Distribution transformer terminals equipment 101, end-terminal equipment 102 and communication module 103, distribution transformer terminals equipment 101 pass through Communication module 103 is connect with end-terminal equipment 102, and end-terminal equipment 102 is connect with multiple electric energy meters 104;End-terminal Equipment 102 obtains the target data of each electric energy meter in each group, and the default freeze-off time being arranged with itself for real time polling The corresponding target data of point carries out freezing to handle;Distribution transformer terminals equipment 101 for storing target data of freezing that treated, In, keep the consistency of clock to ensure each end by clock synchronization mechanism between distribution transformer terminals equipment and each end-terminal equipment Hold the default freeze-off time point of terminal device consistent, that is to say, that when each end-terminal equipment 102 in Fig. 2 default is freezed Between point dependent instruction issued by distribution transformer terminals equipment 101 be configured, and the default of each end-terminal equipment 102 is freezed Time point is consistent, can be in the same default freeze-off time point to multiple electric energy meters of each 102 second line of a couplet of end-terminal equipment 104 data are freezed, in practical applications, distribution transformer terminals equipment 101 can also send instructions down, will be sent in relevant information to Main station system.Connect three electric energy meters 104 under the end-terminal equipment 102 illustrated in Fig. 2, in practical applications, not necessarily Each end-terminal equipment 102 only connects three electric energy meters 104.Each end-terminal equipment 102 specifically needs to connect multiple electric energy Table 102 can be determines according to actual conditions.Multiple electric energy meters are grouped by increasing the realization of end-terminal equipment 102.
Distribution transformer terminals equipment 101 is connect by communication module 103 with end-terminal equipment 102, and communication module 103 includes GPRS transmission module and/or bandwidth carrier communication module, GPRS transmission module and/or bandwidth carrier communication module are for managing end The communication between 101 yuan of terminal device 102 and distribution transformer terminals equipment is held, acquisition instructions are received and uploads acquisition information or issues ginseng Number and instruction etc..In practical applications, distribution transformer terminals equipment 101 further includes having memory module, for storing the mesh for needing to acquire Mark data item (fixed-point datas such as voltage, electric current, electricity);Clock synchronization module sets distribution transformer terminals equipment 101 with end-terminal Time system between standby 102 synchronizes, and can periodically or when issuing school either manually or by main website order and be calibrated.In reality In, end-terminal equipment 102 is mounted to electricity box 10.Multiple electric energy meters 104 are connected under end-terminal equipment 102.This Apply for that the data collecting system that embodiment provides further includes main website, main website is mainly used for the management to taiwan area side apparatus, to equipment It increased newly, edited, deleted, inquired.Coding, manufacturer, logical address including equipment, installation addresses, equipment state, institute Belong to circuit, O&M unit, the incidence relation with levels equipment.Data collecting system provided by the embodiments of the present application can basis It is the three-phase voltage of acquisition, three-phase current, total and three phases active power, total and three phase reactive power, total and three-phase activity coefficient, humorous Wave number evidence, positive active energy amount etc., carry out curve monitoring, circuit line loss monitoring, the measuring equipment malfunction monitoring of relevant device. Freeze the hour that electric quantity acquisition carries out two layers of three-level by the hour to low-pressure side taiwan area table, 10 corresponding electric energy meter 104 of electricity box Grade line loss calculation carries out early warning to line loss anomalous line, electricity box user, realizes that user measures dress by being grouped freezing technology The fault pre-alarming set.Management is grouped to equipment, the measuring point information of required acquisition, difference is realized in such a way that survey is called in grouping together Data item presses the needs of different frequency acquisition, realizes the flexible management of acquisition tasks, while supporting the concurrently acquisition of large number of equipment Task.
A kind of data collecting system provided by the present invention, including distribution transformer terminals equipment, end-terminal equipment and communication mould Block, distribution transformer terminals equipment are connect by communication module with end-terminal equipment, and end-terminal equipment is connect with multiple electric energy meters;End Hold terminal device for real time polling obtain each group in each electric energy meter target data, and by be arranged with itself it is default freeze when Between put corresponding target data and carry out freezing to handle;Distribution transformer terminals equipment is for storing target data of freezing that treated, wherein Keep the consistency of clock to ensure each end by clock synchronization mechanism between distribution transformer terminals equipment and each end-terminal equipment The default freeze-off time point of terminal device is consistent.It can be seen that the system, and an electric energy can only be once obtained in the prior art The related data of table is compared, and acquisition takes frequency and success rate height short, and that acquire each electric energy meter data, and then can reduce use The freeze-off time error of family side line electric energy meter data improves abnormality processing timeliness.
On the basis of the above embodiments, preferably embodiment, end-terminal equipment 102 and each electric energy meter 104 Between communicated especially by RS485 agreements.
On the basis of the above embodiments, preferably embodiment, end-terminal equipment 102 specifically include:Processing Device, data acquisition module and monitoring modular, processor are connect with data acquisition module and monitoring modular respectively.
End-terminal equipment 102 specifically includes:Processor, data acquisition module and monitoring modular, may be implemented to taiwan area Management, monitoring, the early warning of side apparatus may finally reach timely discovery and the timely processing of failure.
On the basis of the above embodiments, preferably embodiment, communication module 103 be specially GPRS module and/ Or bandwidth carrier communication module.
Bandwidth carrier communication module can ensure the promptness and accuracy of data communication, while can also meet more equipment Concurrent transmission.Certainly, other than both modes, other qualified communication modules 103 can also be selected, the present invention is not It is construed as limiting.
A kind of data capture method provided by the present invention and system are described in detail above.It uses herein several Principle and implementation of the present invention are described for a example, the explanation of above example, is merely used to help understand this The method and its core concept of invention;Meanwhile for those of ordinary skill in the art, according to the thought of the present invention, specific There will be changes in embodiment and application range, in conclusion the content of the present specification should not be construed as to the present invention's Limitation, those skilled in the art to the modification of the invention made, equivalent replacement, change under the premise of no creative work Into etc., it should be included in the application.
It should also be noted that, in the present specification, relational terms such as first and second and the like be used merely to by One operation is distinguished with another operation, without necessarily requiring or implying there are any between these entities or operation This actual relationship or sequence.Moreover, the similar word such as term " comprising " so that unit, equipment including a series of elements Or system includes not only those elements, but also include other elements that are not explicitly listed, or further include for this list Member, equipment or the intrinsic element of system.

Claims (9)

1. a kind of collecting method, which is characterized in that including:
Multiple electric energy meters are grouped according to predefined rule;
Real time polling obtains the target data of electric energy meter described in each group;
Pair target data corresponding with the default freeze-off time point of each end-terminal equipment carries out freezing to handle, and freezes described Target data that treated is sent to distribution transformer terminals equipment and is stored;
Wherein, between the distribution transformer terminals equipment and each end-terminal equipment the one of clock is kept by clock synchronization mechanism Cause property is to ensure that the default freeze-off time point of each end-terminal equipment is consistent.
2. collecting method according to claim 1, which is characterized in that the real time polling obtains electricity described in each group Can the target data of table be specially:
The target data is obtained by RS485 communication modes real time pollings.
3. collecting method according to claim 1, which is characterized in that obtained described in each group in the real time polling After the target data of electric energy meter, further include:
Judge after continuous acquisition preset times, if can successfully obtain the target data of the same current electric energy meter;
If it is not, then the characterization current electric energy meter is abnormal, and corresponding exception information is sent to the distribution transformer terminals Equipment;
If it is, the characterization current electric energy meter no exceptions, and enter the real time polling and obtain electricity described in each group The step of target data of energy table.
4. collecting method according to claim 3, which is characterized in that secondary when judging to preset described in continuous acquisition After number, after the target data for not obtaining the same current electric energy meter successfully, further include:
Show warning message.
5. collecting method according to claim 1, which is characterized in that the target data includes each electric energy meter Voltage, electric current and positive active energy amount.
6. a kind of data collecting system, which is characterized in that including:
Distribution transformer terminals equipment, multiple end-terminal equipment and communication module, the distribution transformer terminals equipment pass through the communication module It is connect with each end-terminal equipment, each end-terminal equipment is connect with multiple electric energy meters;
The end-terminal equipment obtains the target data of each electric energy meter in each group for real time polling, and will be set with itself The corresponding target data of default freeze-off time point set carries out freezing to handle;
The distribution transformer terminals equipment is for storing target data of freezing that treated;
Wherein, between the distribution transformer terminals equipment and each end-terminal equipment the one of clock is kept by clock synchronization mechanism Cause property is to ensure that the default freeze-off time point of each end-terminal equipment is consistent.
7. data collecting system according to claim 6, which is characterized in that the end-terminal equipment and each electric energy It is communicated especially by RS485 agreements between table.
8. data collecting system according to claim 6, which is characterized in that the end-terminal equipment specifically includes:Place Device, data acquisition module and monitoring modular are managed, the processor connects with the data acquisition module and the monitoring modular respectively It connects.
9. data collecting system according to claim 6, which is characterized in that the communication module is specially GPRS module And/or bandwidth carrier communication module.
CN201811003584.2A 2018-08-30 2018-08-30 A kind of collecting method and system Pending CN108732977A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811003584.2A CN108732977A (en) 2018-08-30 2018-08-30 A kind of collecting method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811003584.2A CN108732977A (en) 2018-08-30 2018-08-30 A kind of collecting method and system

Publications (1)

Publication Number Publication Date
CN108732977A true CN108732977A (en) 2018-11-02

Family

ID=63941759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811003584.2A Pending CN108732977A (en) 2018-08-30 2018-08-30 A kind of collecting method and system

Country Status (1)

Country Link
CN (1) CN108732977A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110222002A (en) * 2019-06-17 2019-09-10 青岛依爱通信设备有限公司 A kind of display parameter of display screen poll acquisition method and system based on RS485 serial communication
CN111239675A (en) * 2020-02-24 2020-06-05 云南电网有限责任公司电力科学研究院 Multi-meter parallel traversal test method and system for multi-core module electric energy meter minute freezing
CN111737253A (en) * 2020-05-25 2020-10-02 清远博依特智能科技有限公司 Method and device for identifying interruption data of regional meter
CN112332909A (en) * 2020-12-21 2021-02-05 国网浙江省电力有限公司信息通信分公司 Satellite Internet of things data transmission method and device based on polling scheduling
CN112445805A (en) * 2019-08-29 2021-03-05 北京国双科技有限公司 Data query method and device
CN113014620A (en) * 2021-01-26 2021-06-22 江阴长仪集团有限公司 Method for synchronizing minute freezing data of electric energy meter in Internet of things
CN113533832A (en) * 2021-06-11 2021-10-22 中国电力科学研究院有限公司 Power failure sensing method and system for platform area users based on intelligent Internet of things agent
CN116032974A (en) * 2023-02-15 2023-04-28 易电务(北京)科技有限公司 Distributed edge system data acquisition method and subsystem

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101944284A (en) * 2010-09-21 2011-01-12 河南省电力公司开封供电公司 Low voltage resident centralized meter reading management system
CN102693615A (en) * 2012-04-16 2012-09-26 南京拓诺传感网络科技有限公司 Gatherer device of wireless ad-hoc network meter reading system, and operation method
CN103247157A (en) * 2012-02-10 2013-08-14 北京成立科技有限公司 Electric quantity data wireless acquisition device and electric quantity data acquisition system
CN203300035U (en) * 2013-04-25 2013-11-20 国家电网公司 Acquirer and power utilization information acquiring system
CN103604962A (en) * 2013-12-03 2014-02-26 国家电网公司 S9 multi-module energy meter collecting terminal
CN104219315A (en) * 2014-09-10 2014-12-17 国家电网公司 Operation monitoring system for electricity consumption information acquisition system and monitoring method thereof
CN105915398A (en) * 2016-06-24 2016-08-31 广西电网有限责任公司南宁供电局 Rapid fault detection and power recovery system based on rural power network, and concentrator detection method thereof
CN106408920A (en) * 2016-10-21 2017-02-15 国网上海市电力公司 Low-voltage grid meter reading data collecting method based on HomePlug AV
CN107464412A (en) * 2017-08-09 2017-12-12 国网浙江省电力公司 A kind of electric energy meter event information copy reading method
CN107967801A (en) * 2017-12-25 2018-04-27 东华理工大学 A kind of energy measurement data online acquisition and monitoring method and system
CN108257375A (en) * 2017-12-29 2018-07-06 南昌市科陆智能电网科技有限公司 A kind of power grid meter register method and system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101944284A (en) * 2010-09-21 2011-01-12 河南省电力公司开封供电公司 Low voltage resident centralized meter reading management system
CN103247157A (en) * 2012-02-10 2013-08-14 北京成立科技有限公司 Electric quantity data wireless acquisition device and electric quantity data acquisition system
CN102693615A (en) * 2012-04-16 2012-09-26 南京拓诺传感网络科技有限公司 Gatherer device of wireless ad-hoc network meter reading system, and operation method
CN203300035U (en) * 2013-04-25 2013-11-20 国家电网公司 Acquirer and power utilization information acquiring system
CN103604962A (en) * 2013-12-03 2014-02-26 国家电网公司 S9 multi-module energy meter collecting terminal
CN104219315A (en) * 2014-09-10 2014-12-17 国家电网公司 Operation monitoring system for electricity consumption information acquisition system and monitoring method thereof
CN105915398A (en) * 2016-06-24 2016-08-31 广西电网有限责任公司南宁供电局 Rapid fault detection and power recovery system based on rural power network, and concentrator detection method thereof
CN106408920A (en) * 2016-10-21 2017-02-15 国网上海市电力公司 Low-voltage grid meter reading data collecting method based on HomePlug AV
CN107464412A (en) * 2017-08-09 2017-12-12 国网浙江省电力公司 A kind of electric energy meter event information copy reading method
CN107967801A (en) * 2017-12-25 2018-04-27 东华理工大学 A kind of energy measurement data online acquisition and monitoring method and system
CN108257375A (en) * 2017-12-29 2018-07-06 南昌市科陆智能电网科技有限公司 A kind of power grid meter register method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邹炜: "现代化电力系统电量计量采集方式对比及分析", 《华北电力技术》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110222002A (en) * 2019-06-17 2019-09-10 青岛依爱通信设备有限公司 A kind of display parameter of display screen poll acquisition method and system based on RS485 serial communication
CN112445805A (en) * 2019-08-29 2021-03-05 北京国双科技有限公司 Data query method and device
CN111239675A (en) * 2020-02-24 2020-06-05 云南电网有限责任公司电力科学研究院 Multi-meter parallel traversal test method and system for multi-core module electric energy meter minute freezing
CN111239675B (en) * 2020-02-24 2022-04-12 云南电网有限责任公司电力科学研究院 Multi-meter parallel traversal test method and system for multi-core module electric energy meter minute freezing
CN111737253B (en) * 2020-05-25 2023-07-14 清远博依特智能科技有限公司 Regional meter break data identification method and device
CN111737253A (en) * 2020-05-25 2020-10-02 清远博依特智能科技有限公司 Method and device for identifying interruption data of regional meter
CN112332909A (en) * 2020-12-21 2021-02-05 国网浙江省电力有限公司信息通信分公司 Satellite Internet of things data transmission method and device based on polling scheduling
CN112332909B (en) * 2020-12-21 2022-07-22 国网浙江省电力有限公司信息通信分公司 Satellite Internet of things data transmission method and device based on polling scheduling
CN113014620A (en) * 2021-01-26 2021-06-22 江阴长仪集团有限公司 Method for synchronizing minute freezing data of electric energy meter in Internet of things
CN113533832A (en) * 2021-06-11 2021-10-22 中国电力科学研究院有限公司 Power failure sensing method and system for platform area users based on intelligent Internet of things agent
CN113533832B (en) * 2021-06-11 2024-05-14 中国电力科学研究院有限公司 Intelligent Internet of things agent-based power outage sensing method and system for users in platform
CN116032974A (en) * 2023-02-15 2023-04-28 易电务(北京)科技有限公司 Distributed edge system data acquisition method and subsystem
CN116032974B (en) * 2023-02-15 2023-11-28 易电务(北京)科技有限公司 Distributed edge system data acquisition method and subsystem

Similar Documents

Publication Publication Date Title
CN108732977A (en) A kind of collecting method and system
CN101534021B (en) Multimode data acquisitions and processing method applied to power automation system
CN103091602B (en) Power line carrier wave online fault detection device
CN103248122B (en) Power failure active reporting system
CN102043115B (en) Network on-line live line measurement method for line parameter of power system
CN101673457A (en) Method and system of data acquisition from data acquisition terminal
CN201789341U (en) Monitoring system of intelligent micro-grid
CN104123134A (en) Intelligent electricity use data management method and system based on AMI and J2EE
CN105134493B (en) A kind of information gathering and storage method based on wind turbine control system
CN105141037B (en) A kind of energy storage monitor system
CN101951024B (en) Digital data acquisition device
CN201859537U (en) Multifunctional bandwidth power carrier concentrator
CN107832946A (en) A kind of power energy monitoring and controlling for workshop and management method and system
CN102142717B (en) Model of electric energy quality monitoring device based on international electro-technical commission (IEC) 61850
CN101807820A (en) Transformer platform electrical energy data acquisition terminal and data acquisition implementing method applying same
CN101378206B (en) Distribution terminal, and method and system for obtaining distribution data thereof
CN110018437A (en) A kind of the Electric Energy Tariff Point Metering Device on-line monitoring method and system of branch inspection
CN202870598U (en) Enterprise heat-supply network monitoring system employing industrial wireless WIA technology
CN107819613A (en) A kind of energy-consumption monitoring system of green building
CN110568258A (en) Intelligent metering terminal
CN205103308U (en) Alarm system is compared to pass electric quantity
CN213484587U (en) Intelligent sensor for monitoring low-voltage power distribution network
CN104333016A (en) Dispersing type reactive compensation system for low-voltage power distribution network
CN113242164B (en) Gateway bus balancing system and electric energy data acquisition and transmission method thereof
CN205720421U (en) Remote power measurement monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181102

RJ01 Rejection of invention patent application after publication