CN103248122B - Power failure active reporting system - Google Patents
Power failure active reporting system Download PDFInfo
- Publication number
- CN103248122B CN103248122B CN201310152049.4A CN201310152049A CN103248122B CN 103248122 B CN103248122 B CN 103248122B CN 201310152049 A CN201310152049 A CN 201310152049A CN 103248122 B CN103248122 B CN 103248122B
- Authority
- CN
- China
- Prior art keywords
- power information
- power
- user side
- information
- information acquisition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000008439 repair process Effects 0.000 claims abstract description 25
- 230000015556 catabolic process Effects 0.000 claims abstract description 23
- 238000000034 method Methods 0.000 claims abstract description 12
- 230000008569 process Effects 0.000 claims abstract description 8
- 230000005611 electricity Effects 0.000 claims description 11
- 230000005540 biological transmission Effects 0.000 claims description 9
- 239000013307 optical fiber Substances 0.000 claims description 5
- 230000003287 optical effect Effects 0.000 claims description 3
- 238000003745 diagnosis Methods 0.000 abstract description 4
- 238000012423 maintenance Methods 0.000 abstract description 2
- 238000004891 communication Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000002457 bidirectional effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention provides a kind of power failure active reporting system, this system comprises: power marketing management information system, and it receives and essential information, facility information, the electric topology information of managing power user; Breakdown repair management system, its real-time reception customer incident, when comprising fault message and trigger fault repairing operation in customer incident, and reports to power marketing management information system; Power information acquisition system, it gathers user side power information respectively, and processes the user side power information gathered, and produces customer incident and is uploaded to breakdown repair management system.The present invention is provided with terminal failure diagnosis system, achieve electric network terminal On-line Fault and automatically diagnose, nonproductive poll or dispatcher carry out the quick anticipation of fault, accurately locate, improve the analysis efficiency of electric network failure diagnosis, reduce and repeat to send work situation, alleviate on-site terminal maintenance workload.
Description
Technical field
The present invention relates to a kind of intelligent meter meter and electric network fault rushes to repair management domain, be specifically related to a kind of power failure information reporting system based on intelligent meter meter.
Background technology
Utilities Electric Co.'s breakdown repair management system (TCM), that power failure rushes to repair the indispensable application system of Business Processing, by integrated electrical network acquisition system and PMS low pressure interconnecting application, can realize the through of schedule information and marketing message, realize fast registration for high-voltage fence fault, affect customer analysis, work order merger, provide foundation for the quick response of fault and very first time merger Marketing-side issue homology fault ticket; And for the electric network fault that a large amount of resident's faults or phone channel are known, need 95598 electric service center personnel register error information and send to hold inquiry, or reconnoitre scene by holding the repairing people asking appointment, confirm that laggard the robbing of fault message is repaiied, or turn and scheduling assistedly carry out fault restoration, fail the fault anticipation realizing reporting for repairment prior to user at present.How to promote fault discovery efficiency, turning passive type breakdown repair pattern is the active breakdown repair that active obtaining fault message carries out Treatment Analysis, and improving fault intervention level, is business department's problem demanding prompt solution.
Meanwhile, from domestic current situation, along with the continuous propelling of State Grid Corporation of China's intelligent grid engineering, intelligent electric meter has collected extensive use in user side metering.Intelligent electric meter possesses the electricity consumption situation of collection, supervisory user, and can in time by these information reporting power information acquisition systems.Power information acquisition system derives from automatic coppying meter system in the past, not only can realize outside the basic functions such as remote meter reading, can also realize the bidirectional information communication between electric power enterprise and all kinds of power consumer, effectively detects token ruuning situation.Current intelligent electric meter information upload is only around power marketing data such as user's electricity, loads, for the real time information of reaction operation of power networks, intelligent electric meter all fails to realize uploading of user side fault message, the user that current user side electric network fault depends on 95598 electric service hot lines reports for repairment, fails to realize the fault anticipation of reporting for repairment prior to user.Along with the continuous propelling of intelligent grid engineering, how these information are accessed breakdown repair management system in real time, realizing shared in breakdown repair information system of power information is a problem demanding prompt solution.
Rely on TCM system, the electricity consumption Information Monitoring that intelligent meter meter provides is accessed, thus grasp user side electricity consumption situation, nonproductive poll or dispatcher carry out the quick anticipation of fault, accurately locate, and carry out automatic information access to repairing procedural information, can increase work efficiency and breakdown repair speed, reduce and repeat to send work situation, improving power supply reliability and customer satisfaction, is the effective support to breakdown repair management, can comprehensive lifting Utilities Electric Co. breakdown repair working level.
Summary of the invention
The invention provides a kind of power failure active reporting system, active obtaining user outage information can be passed through accurately and rapidly, report real time information fast based on user side intelligent meter meter, realize the quick position to power failure and response.
For achieving the above object, the invention provides a kind of power failure active reporting system, be characterized in, this system comprises:
Power marketing management information system, it receives and essential information, facility information, the electric topology information of managing power user;
Breakdown repair management system, its real-time reception customer incident, when comprising fault message and trigger fault repairing operation in customer incident, and reports to power marketing management information system;
Power information acquisition system, it gathers user side power information respectively, and processes the user side power information gathered, and produces customer incident and is uploaded to breakdown repair management system.
Above-mentioned power information acquisition system comprises:
Power information acquisition system event server, it receives and stores user side power information, and processes power information, produces customer incident and reports;
Power information acquisition system front end processor, it is collected user side information and is uploaded to power information acquisition system event server;
Electric quantity acquisition module, it gathers each user side power information respectively and is uploaded to power information acquisition system front end processor.
Above-mentioned electric quantity acquisition module comprises:
Concentrator, it is concentrated and receives user side power information and be uploaded to power information acquisition system front end processor;
Collector, it gathers user side power information and is uploaded to concentrator;
Intelligent electric meter, it detects user side electricity consumption situation in real time, and exports user side power information to collector.
Some above-mentioned concentrators connect power information acquisition system front end processor respectively;
Some collectors are connected with under each above-mentioned concentrator;
Some intelligent electric meters are connected with under each above-mentioned collector;
Above-mentioned power information acquisition system front end processor, concentrator, collector, intelligent electric meter composition topological structure.
Realized the transmission of data message by optical fiber or short-range transmission technique between above-mentioned electric quantity acquisition module and power information acquisition system front end processor.
Above-mentioned collector adopts active optical network unit.
Above-mentioned intelligent electric meter and collector also circuit are connected with uninterrupted power supply, by this uninterrupted power supply access power supply.
Above-mentioned collector connects described concentrator by 485 buses.
Power failure active reporting system of the present invention is compared with the electric quantity acquisition technology of prior art, its advantage is, the present invention is provided with terminal failure diagnosis system, achieve electric network terminal On-line Fault and automatically diagnose, nonproductive poll or dispatcher carry out the quick anticipation of fault, accurately locate, improve the analysis efficiency of electric network failure diagnosis, reduce and repeat to send work situation, alleviate on-site terminal maintenance workload;
The present invention relies on intelligent meter meter systems, and power information is uploaded electricity consumption acquisition system by intelligent meter meter, grasps user side electricity consumption situation.
Accompanying drawing explanation
Fig. 1 is the general structure schematic diagram of power failure active reporting system of the present invention;
Fig. 2 is the topological diagram of power failure active reporting system charge acquisition module of the present invention;
Fig. 3 is the winding diagram of power failure active reporting system charge acquisition module of the present invention;
Fig. 4 is the winding diagram of power failure active reporting system charge acquisition module of the present invention access uninterrupted power supply.
Embodiment
Below gather accompanying drawing, further illustrate specific embodiments of the invention.
As shown in Figure 1, the present invention discloses a kind of power failure active reporting system, this system comprises power marketing management information system 1, the breakdown repair management system 2 be connected with this power marketing management information system 1 communication, and the power information acquisition system 3 be connected with this breakdown repair management system 2 communication.
Power marketing management information system 1(CMS) for receiving and essential information, facility information, the electric topology information of managing power user.CMS system is current topmost marketing application system, this system covers user basic information, facility information, the topology information such as electric, meet the business demand of power supply enterprise's sales department operating level preferably, improve efficiency and the standardized level of marketing work, the integrality of user profile and accuracy have reached suitable level.
Breakdown repair management system 2(TCM) real-time reception customer incident, when comprising fault message and trigger fault repairing operation in customer incident, generating repairing work order, and reporting to power marketing management information system 1.Breakdown repair management system is on original PMS, CMS basis, the unified breakdown repair application message platform towards troublshooting and repairing Whole Course Management integrating that breakdown repair management related application function sets up, has realized the unification to client failure, electric network fault handling process.
Power information acquisition system 3 for gathering user side power information respectively, and processes the user side power information gathered, and produces customer incident and is uploaded to breakdown repair management system 2.User profile acquisition system 33 mainly comprises acquisition terminal (as: electric energy meter, concentrator), communication mode and main station system.Gather user side power information by front end terminal installation, realized the transmission of data message by optical fiber or short-range transmission technique, and be responsible for processing data by main station system.
Power information acquisition system 3 comprises: electric quantity acquisition module 33, communication connects the power information acquisition system front end processor 32 of this electric quantity acquisition module 33 output, and communicates to connect the power information acquisition system event server 31 of this power information acquisition system front end processor 32.Realized the transmission of data message by optical fiber or short-range transmission technique between electric quantity acquisition module 33 and power information acquisition system front end processor 32.
Electric quantity acquisition module 33 for gathering each user side power information respectively, organizing events message, and is uploaded to power information acquisition system front end processor 32 by optical-fibre communications.
Power information acquisition system front end processor 32 is collected user side information and is uploaded to power information acquisition system event server 31.
Power information acquisition system event server 31 receives and stores user side power information, and processes power information, produces customer incident and reports to breakdown repair management system 2 by network (Web service).Power information acquisition system event server 31 is connected with power information acquisition system database 34, for storing user side power information.
As Fig. 2 and shown in composition graphs 1, electric quantity acquisition module 33 comprises: intelligent electric meter 333, collector 332, concentrator 331.In the present embodiment, some concentrators 331 are connected to power information acquisition system front end processor 32 respectively, and each concentrator is connected with some collectors 332 for 331 times, and each collector is connected with some intelligent electric meters 333 for 332 times.Power information acquisition system front end processor 32, concentrator 331, collector 332, intelligent electric meter 333 form topological structure.
Intelligent electric meter 333 detects user side electricity consumption situation in real time, and exports user side power information to collector 332.Intelligent electric meter 333 comprises ammeter access module, stipulations parsing module and power information acquisition system application service module.The running status word displacement logout of intelligent electric meter 333 generates corresponding state word according to dead electricity event type and is uploaded to concentrator 331 by collector 332.
Collector 332 gathers user side power information and is uploaded to concentrator 331.Collector 332 adopts active optical network unit (ONU).
The user side power information receiving collector 332 and export concentrated by concentrator 331, organizing events message, and is uploaded to power information acquisition system front end processor 32.
As shown in Figure 3, in the present embodiment, the wiring of electric quantity acquisition module is as follows: intelligent electric meter 333 circuit is connected in the power circuit of user, and collector 332 adopts ONU directly to connect power supply.Collector 332 connects concentrator 331 by 485 buses.Intelligent electric meter 333 is connected with communication before collector 332, real-time Transmission user power utilization situation.
As shown in Figure 4, intelligent electric meter 333 and collector 332 are gone back circuit and are connected with uninterrupted power supply 334, by this uninterrupted power supply 334(UPS) access power supply, ensure that outage information can be uploaded rapidly by ammeter in short-time loss of power supply situation.
After user loses power supply, the running status word displacement logout of intelligent electric meter 333 generates corresponding state word according to dead electricity event type and is uploaded to concentrator 331 in power information acquisition system, in power information acquisition system, concentrator 331 to collect after customer incident organizing events message immediately, and reports to power information acquisition system front end processor 32 and power information acquisition system event server 31.After power information acquisition system 3 Communications service receives this event, immediately information is sent to Event Service, and stored in power information acquisition system database 34.Customer incident is pushed to breakdown repair management system 2 by network communication by Event Service, and trigger fault repairing management system also generates repairing work order.
Although content of the present invention has done detailed introduction by above preferred embodiment, will be appreciated that above-mentioned description should not be considered to limitation of the present invention.After those skilled in the art have read foregoing, for multiple amendment of the present invention and substitute will be all apparent.Therefore, protection scope of the present invention should be limited to the appended claims.
Claims (5)
1. a power failure active reporting system, is characterized in that, this system comprises:
Power marketing management information system (1), it receives and essential information, facility information, the electric topology information of managing power user;
Breakdown repair management system (2), its real-time reception customer incident, when comprising fault message and trigger fault repairing operation in customer incident, and reports to described power marketing management information system (1);
Power information acquisition system (3), it gathers user side power information respectively, and processes the user side power information gathered, and produces customer incident and is uploaded to described breakdown repair management system (2);
Described power information acquisition system (3) comprises:
Power information acquisition system event server (31), it receives and stores user side power information, and processes power information, produces customer incident and reports;
Power information acquisition system front end processor (32), it is collected user side power information and is uploaded to described power information acquisition system event server (31);
Electric quantity acquisition module (33), it gathers each user side power information respectively and is uploaded to power information acquisition system front end processor (32);
Realized the transmission of data message by optical fiber or short-range transmission technique between described electric quantity acquisition module (33) and power information acquisition system front end processor (32);
Described electric quantity acquisition module (33) comprises:
Concentrator (331), it is concentrated and receives user side power information and be uploaded to described power information acquisition system front end processor (32);
Collector (332), it gathers user side power information and is uploaded to described concentrator (331);
Intelligent electric meter (333), it detects user side electricity consumption situation in real time, and exports user side power information to collector (332).
2. power failure active reporting system as claimed in claim 1, is characterized in that, some described concentrators (331) connect described power information acquisition system front end processor (32) respectively;
Some collectors (332) are connected with under each described concentrator (331);
Some intelligent electric meters (333) are connected with under each described collector (332);
Described power information acquisition system front end processor (32), concentrator (331), collector (332), intelligent electric meter (333) composition topological structure.
3. power failure active reporting system as claimed in claim 2, is characterized in that, described collector (332) adopts active optical network unit.
4. power failure active reporting system as claimed in claim 3, is characterized in that, described intelligent electric meter (333) and collector (332) are gone back circuit and be connected with uninterrupted power supply, by this uninterrupted power supply (334) access power supply.
5. power failure active reporting system as claimed in claim 3, it is characterized in that, described collector (332) connects described concentrator (331) by 485 buses.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310152049.4A CN103248122B (en) | 2013-04-27 | 2013-04-27 | Power failure active reporting system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310152049.4A CN103248122B (en) | 2013-04-27 | 2013-04-27 | Power failure active reporting system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103248122A CN103248122A (en) | 2013-08-14 |
CN103248122B true CN103248122B (en) | 2015-09-16 |
Family
ID=48927420
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310152049.4A Active CN103248122B (en) | 2013-04-27 | 2013-04-27 | Power failure active reporting system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103248122B (en) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103760874B (en) * | 2014-01-28 | 2016-09-14 | 国家电网公司 | Check meter source of trouble localization method in a kind of low-voltage platform area |
CN105429290B (en) * | 2014-09-23 | 2018-08-03 | 国网河南省电力公司周口供电公司 | A kind of electric power rapid rush-repair automatic dispatching system |
CN104320388A (en) * | 2014-10-13 | 2015-01-28 | 杭州海兴电力科技股份有限公司 | S-FSK carrier based active alarming method |
CN104330700B (en) * | 2014-11-06 | 2017-12-08 | 国网河南省电力公司平顶山供电公司 | A kind of dispatching method of power failure rapid rush-repair |
CN105025107A (en) * | 2015-07-28 | 2015-11-04 | 国网北京市电力公司 | Power failure information processing method, client and server |
CN105610622A (en) * | 2015-12-31 | 2016-05-25 | 国网浙江奉化市供电公司 | Safety accident prevention method and system |
CN106680667A (en) * | 2016-12-09 | 2017-05-17 | 国网北京市电力公司 | Power equipment monitoring method, power equipment monitoring device and power equipment monitoring system |
CN108512716B (en) * | 2018-02-07 | 2020-07-28 | 深圳壹账通智能科技有限公司 | Method, system, computer device and storage medium for reporting device information |
CN108303670A (en) * | 2018-03-28 | 2018-07-20 | 合肥云智物联科技有限公司 | A kind of electric field terminal fault error comprehensive diagnosis method |
CN108809736A (en) * | 2018-07-26 | 2018-11-13 | 深圳市共进电子股份有限公司 | Method for diagnosing faults, apparatus and system |
CN109215330B (en) * | 2018-09-11 | 2021-03-02 | 国网江苏省电力有限公司电力科学研究院 | Power failure reporting system and method |
CN109742854A (en) * | 2018-12-27 | 2019-05-10 | 国网吉林省电力有限公司电力科学研究院 | It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing |
CN111382564B (en) * | 2020-03-23 | 2023-06-30 | 北京用尚科技股份有限公司 | Network topology-based power grid monitoring alarm event analysis and pushing method |
CN113298359A (en) * | 2021-04-30 | 2021-08-24 | 国家电网有限公司 | Electrical power rush-repair system with personnel positioning and work order moving operation functions |
CN113203919A (en) * | 2021-04-30 | 2021-08-03 | 国家电网有限公司 | Power supply fault analysis system |
CN114065975A (en) * | 2022-01-17 | 2022-02-18 | 国网山东省电力公司泰安供电公司 | Active first-aid repair system and method for power consumer |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101354408A (en) * | 2008-07-31 | 2009-01-28 | 南京能瑞自动化设备有限公司 | Electric energy acquisition and operation management system and method based on platform zone centralized service terminal |
CN202159369U (en) * | 2011-06-08 | 2012-03-07 | 上海市电力公司 | Information processing device for improving fault repairing work order merging rate of electrical power system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4964311B2 (en) * | 2010-01-26 | 2012-06-27 | 三菱電機株式会社 | Power management system |
-
2013
- 2013-04-27 CN CN201310152049.4A patent/CN103248122B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101354408A (en) * | 2008-07-31 | 2009-01-28 | 南京能瑞自动化设备有限公司 | Electric energy acquisition and operation management system and method based on platform zone centralized service terminal |
CN202159369U (en) * | 2011-06-08 | 2012-03-07 | 上海市电力公司 | Information processing device for improving fault repairing work order merging rate of electrical power system |
Also Published As
Publication number | Publication date |
---|---|
CN103248122A (en) | 2013-08-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103248122B (en) | Power failure active reporting system | |
CN201757929U (en) | Fully wireless networked power consumer power consumption information acquisition system | |
CN203596099U (en) | Electricity utilization information collection system | |
CN103091602B (en) | Power line carrier wave online fault detection device | |
CN107064672A (en) | A kind of low voltage failure on-line monitoring system | |
CN201859537U (en) | Multifunctional bandwidth power carrier concentrator | |
CN112994239A (en) | Smart power grids low pressure distribution station district monitored control system | |
CN202550669U (en) | Data acquisition system for power equipment | |
CN103066693A (en) | Intelligent terminal for power distribution network | |
CN102338835B (en) | Power quality dynamic monitoring system | |
CN204906004U (en) | Distributed intelligent regional power grid of network layering | |
CN102956096A (en) | Ethernet passive optical network (EPON) and wireless ad hoc network technology-based electricity consumption information acquisition system | |
CN201860163U (en) | Data center intelligent power supply control system | |
CN111157838A (en) | Intelligent management system for big data of running state of railway power distribution network | |
CN105006136A (en) | Remote electric quantity automatic acquisition system | |
CN103475091A (en) | Electric-energy metering and managing system of power grid gateway | |
CN101661058A (en) | IEC 61850 digital distance electric power data collecting method and apparatus thereof | |
CN205176932U (en) | Data collection and transmission system for intelligence measurement platform | |
CN203102591U (en) | Electric energy information collecting device of power consumers | |
CN202855064U (en) | Remote electric energy metering management system | |
CN102867405A (en) | Real time remote optical fiber meter reading system | |
CN202275503U (en) | Intelligent terminal of distribution network | |
CN203071650U (en) | Integrated electric energy management platform | |
CN208674966U (en) | Grid operating monitoring intelligent management device | |
CN114726086A (en) | Integrated management system for power monitoring and diagnosis of transformer area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |