CN101661058A - IEC 61850 digital distance electric power data collecting method and apparatus thereof - Google Patents

IEC 61850 digital distance electric power data collecting method and apparatus thereof Download PDF

Info

Publication number
CN101661058A
CN101661058A CN200910152810A CN200910152810A CN101661058A CN 101661058 A CN101661058 A CN 101661058A CN 200910152810 A CN200910152810 A CN 200910152810A CN 200910152810 A CN200910152810 A CN 200910152810A CN 101661058 A CN101661058 A CN 101661058A
Authority
CN
China
Prior art keywords
data
electric energy
module
iec
digital remote
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910152810A
Other languages
Chinese (zh)
Inventor
朱炳铨
章立宋
金乃正
谢烽
马国梁
丁梁
章坚民
陈士云
蒋世挺
滕明茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG CREAWAY AUTOMATION ENGINEERING Co Ltd
Shaoxing Electric Power Bureau
State Grid Corp of China
Original Assignee
Zhejiang Creaway Automation Engineering Co ltd
Shaoxing Electric Power Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Creaway Automation Engineering Co ltd, Shaoxing Electric Power Bureau filed Critical Zhejiang Creaway Automation Engineering Co ltd
Priority to CN200910152810A priority Critical patent/CN101661058A/en
Publication of CN101661058A publication Critical patent/CN101661058A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本发明公开了一种基于IEC 61850数字化远方电能量数据采集方法,这种方法,通过配置工具对电能量数据进行建模配置,生成相应的配置文件,通信模块根据配置文件定义的数据内容和服务类型来完成数据采集,整个过程配置灵活,需要通信的数据内容可以根据实际传输需求来完成定制。本发明还公开了一种基于IEC 61850数字化远方电能量数据采集装置,包括主处理器模块、网卡模块、光纤转换器模块、接口模块和存储器模块,主处理器模块分别与网卡模块、光纤转换器模块、接口模块和存储器模块连接。本发明可以通过以太网接口采集数字化电能表并对数据进行存储、转发,使数据传输至变电站网络,实现信息共享。

Figure 200910152810

The invention discloses a method for collecting digital remote electric energy data based on IEC 61850. In this method, the electric energy data is modeled and configured through a configuration tool, and a corresponding configuration file is generated. The communication module defines data content and services according to the configuration file. Type to complete data collection, the whole process configuration is flexible, and the data content that needs to be communicated can be customized according to actual transmission requirements. The invention also discloses a digital remote electric energy data acquisition device based on IEC 61850, which includes a main processor module, a network card module, an optical fiber converter module, an interface module and a memory module. modules, interface modules, and memory modules are connected. The invention can collect the digital electric energy meter through the Ethernet interface and store and forward the data, so that the data can be transmitted to the substation network to realize information sharing.

Figure 200910152810

Description

基于IEC 61850数字化远方电能量数据采集方法及装置 Method and device for digital remote electric energy data acquisition based on IEC 61850

技术领域 technical field

本发明涉及一种数字化远方电能量采集方法及装置,具体涉及一种基于IEC 61850数字化远方电能量采集方法及装置。The invention relates to a method and device for collecting digital remote electric energy, in particular to a method and device for collecting digital remote electric energy based on IEC 61850.

背景技术 Background technique

IEC 61850标准的设计思想先进,代表了变电站自动化技术的发展方向,是实现数字化变电站的核心技术之一,对整个电力自动化技术都有深刻的影响。The design idea of IEC 61850 standard is advanced, which represents the development direction of substation automation technology. It is one of the core technologies to realize digital substation and has a profound impact on the entire power automation technology.

在IEC 61850标准推出之前,变电站数字化远方电能量采集终端普遍采用串行通信规约,而变电站自动化系统普遍采用以太网通信方式,使得数字化远方电能量采集终端无法直接接入到变电站自动化系统中,需要通过公用信息管理机等设备转接,即增加了可能的故障点,又增加了调试、维护工作量。Before the introduction of the IEC 61850 standard, digital remote electric energy collection terminals in substations generally used serial communication protocols, while substation automation systems generally used Ethernet communication methods, making it impossible for digital remote electric energy collection terminals to be directly connected to substation automation systems. Switching through equipment such as public information management machines not only increases possible failure points, but also increases the workload of debugging and maintenance.

发明内容 Contents of the invention

本发明要解决的技术问题是,提供一种基于IEC 61850数字化远方电能量数据采集方法及装置,该终端可直接接入到变电站自动化系统中。The technical problem to be solved by the present invention is to provide a method and device for digital remote electric energy data acquisition based on IEC 61850, and the terminal can be directly connected to the substation automation system.

本发明的一个技术方案,基于IEC 61850数字化远方电能量数据采集方法,包括如下步骤:A technical solution of the present invention, based on the IEC 61850 digital remote electric energy data acquisition method, comprises the following steps:

a)将电能表和数字化远方电能量采集终端之间需要通信的电能量数据进行IEC 61850的数据建模,确定其各个数据项成员定义;a) Perform IEC 61850 data modeling on the electric energy data that needs to be communicated between the electric energy meter and the digital remote electric energy collection terminal, and determine the member definitions of each data item;

b)利用IEC 61850标准里的数据集模型,把不同类型的数据归类到不同的数据集,根据配置文件来映射数据集名和数据类型的关系;b) Use the data set model in the IEC 61850 standard to classify different types of data into different data sets, and map the relationship between the data set name and the data type according to the configuration file;

c)选择IEC 61850通信服务里的报告控制块模型、日志控制块模型来作为电能量数据传输的服务载体,并重新补充阐述相关定义;c) Select the report control block model and log control block model in the IEC 61850 communication service as the service carrier for electric energy data transmission, and re-explain the relevant definitions;

d)通信模块根据以上定义配置的内容来完成数据采集。d) The communication module completes the data collection according to the content of the above defined configuration.

本发明的另一技术方案,基于IEC 61850数字化远方电能量数据采集装置,其特征在于包括主处理器模块、网卡模块、光纤转换器模块、接口模块和存储器模块,主处理器模块分别与网卡模块、光纤转换器模块、接口模块和存储器模块连接。Another technical solution of the present invention, based on the IEC 61850 digital remote electric energy data acquisition device, is characterized in that it includes a main processor module, a network card module, an optical fiber converter module, an interface module and a memory module, and the main processor module is connected with the network card module respectively. , optical fiber converter module, interface module and memory module connection.

本发明的有益效果为,基于IEC 61850数字化远方电能量数据采集方法及装置,可以通过以太网接口采集数字化电能表并对数据进行存储、转发,使数据传输至变电站网络,实现信息共享。The beneficial effect of the present invention is that, based on the IEC 61850 digitized remote electric energy data collection method and device, the digital electric energy meter can be collected through the Ethernet interface and the data can be stored and forwarded, so that the data can be transmitted to the substation network to realize information sharing.

附图说明 Description of drawings

图1为IEC 61850-7-2里面定义的报告模型和日志模型。Figure 1 shows the report model and log model defined in IEC 61850-7-2.

图2是本发明装置原理示意图;Fig. 2 is a schematic diagram of the device principle of the present invention;

图3是本发明装置在电网调度系统中应用示意图。Fig. 3 is a schematic diagram of the application of the device of the present invention in a power grid dispatching system.

具体实施方式 Detailed ways

以下结合说明书附图对本发明进行详细说明,并给出具体实施方式。The present invention will be described in detail below in conjunction with the accompanying drawings, and specific implementation methods will be given.

基于IEC 61850数字化远方电能量数据采集方法及装置所要通信的数据,主要包括如下数据:Based on the IEC 61850 digital remote electric energy data acquisition method and the data to be communicated by the device, it mainly includes the following data:

a)分钟数据(只有零点值为当日的冻结值、其它为某一时刻的实时值):a) Minute data (only the zero point value is the frozen value of the day, and the others are real-time values at a certain moment):

1.正相有功电能    5.一象限无功电能1. Positive-phase active energy 5. One-quadrant reactive energy

2.正相无功电能    6.二象限无功电能2. Positive-phase reactive energy 6. Two-quadrant reactive energy

3.反向有功电能    7.三象限无功电能3. Reverse active energy 7. Three-quadrant reactive energy

4.反向无功电能    8.四象限无功电能4. Reverse reactive power 8. Four-quadrant reactive power

b)日数据b) Daily data

1.正相有功四费率电能    5.正相有功需量1. Positive-phase active power four-rate electric energy 5. Positive-phase active power demand

2.正相无功四费率电能    6.正相无功需量2. Positive-phase reactive power four-rate electric energy 6. Positive-phase reactive power demand

3.反向有功四费率电能    7.反向有功需量3. Reverse active power four-rate electric energy 7. Reverse active power demand

4.反向无功四费率电能    8.反向无功需量4. Reverse reactive power four-rate electric energy 8. Reverse reactive power demand

c)月数据c) Monthly data

1.正相有功四费率电能    5.正相有功需量1. Positive-phase active power four-rate electric energy 5. Positive-phase active power demand

2.正相无功四费率电能    6.正相无功需量2. Positive-phase reactive power four-rate electric energy 6. Positive-phase reactive power demand

3.反向有功四费率电能    7.反向有功需量3. Reverse active power four-rate electric energy 7. Reverse active power demand

4.反向无功四费率电能    8.反向无功需量4. Reverse reactive power four-rate electric energy 8. Reverse reactive power demand

d)事件d) event

1.A相失流    7.A相失流复归1. Phase A loss of current 7. Phase A loss of current recovery

2.B相失流    8.B相失流复归2.B phase loss 8.B phase loss recovery

3.C相失流    9.C相失流复归3. Phase C loss of current 9. Phase C loss of current recovery

4.A相失压    10.A相失压复归4. Phase A voltage loss 10. Phase A voltage loss recovery

5.B相失压    11.B相失压复归5. B-phase loss of voltage 11. B-phase loss of voltage reset

6.C相失压    12.C相失压复归6. Phase C loss of voltage 12. Phase C loss of voltage reset

e)ERTU与电能表的通信状态e) Communication status between ERTU and energy meter

1.连接状态通    2.连接状态断1. The connection status is on 2. The connection status is off

注:四费率包括:尖、峰、平、谷;需量包括:冻结值、冻结时间。Note: Four tariffs include: peak, peak, flat, valley; demand includes: frozen value, frozen time.

对于以上数据需要进行IEC 61850的数据建模,也就是定义其在某一特定功能逻辑节点里的数据项,MMTR逻辑节点用于计算三相系统中电能量,适用于计费,但其定义的数据项不满足实际需要,为了能传输以上定义的数据,在这个基础类里进行数据项扩展,对于分钟数据、日数据、月数据新增数据项的数据类型为二进制计数器读数BCR。对于事件数据新增加数据项的数据类型为单点状态SPS。For the above data, IEC 61850 data modeling is required, that is, to define its data items in a specific functional logical node. The MMTR logical node is used to calculate the electric energy in the three-phase system, which is suitable for billing, but its defined The data item does not meet the actual needs. In order to transmit the data defined above, the data item is extended in this basic class. The data type of the new data item for minute data, daily data, and monthly data is binary counter reading BCR. The data type of the newly added data item for event data is single point state SPS.

按照数据分类不同,把上面定义的数据归类到不同数据集,实际情况中只能靠数据集名来区分数据类型,所以需要给出一份数据集和数据类型的映射表,以便数字化远方电能量数据采集装置的通信模块在数据通信时区分数据类型。如下表1According to different data classifications, the above-defined data is classified into different data sets. In actual situations, only the data set name can be used to distinguish the data type. Therefore, a mapping table between data sets and data types needs to be given to digitize remote telegrams. The communication module of the energy data acquisition device distinguishes data types during data communication. Table 1 below

表1Table 1

  数据类描述 Data class description   数据集名 Dataset name   分钟冻结数据 minutes to freeze data   ElecVal_Minute(可配置) ElecVal_Minute (configurable)   日数据的(1-4)四费率电能 (1-4) four-rate electric energy for daily data   FeeVal_Day(可配置) FeeVal_Day (configurable)   日数据的(5-8)需量 (5-8) demand for daily data   NeedVal_Day(可配置) NeedVal_Day (configurable)   月数据的(1-4)四费率电能 (1-4) four-rate electricity for monthly data   FeeVal_Month(可配置) FeeVal_Month (configurable)   月数据的(5-8)需量 (5-8) demand for monthly data   NeedVal_Month(可配置) NeedVal_Month (configurable)   事件 event   Event(可配置) Event (configurable)

传输上面所定义的这些数据,主要会用到IEC 61850-7-2里面定义的日志模型和报告模型(具体请参考IEC 61850-7-2第14节),如图1所示。To transmit the data defined above, the log model and report model defined in IEC 61850-7-2 are mainly used (for details, please refer to Section 14 of IEC 61850-7-2), as shown in Figure 1.

利用非缓存报告控制块URCB来实现周期值及突发事件信息的主动上送。Use the non-caching report control block URCB to realize the active sending of cycle value and emergency event information.

所谓周期值,就是电能表按某一特定的周期来上送数据,有分钟实时数据、日或月冻结数据,利用设置报告控制块里的完整性周期属性来让电能表周期数据做到主动上送:The so-called periodic value means that the electric energy meter sends data according to a specific period. There are minute real-time data, daily or monthly frozen data, and the periodic data of the electric energy meter can be actively uploaded by setting the integrity period attribute in the report control block. deliver:

而对于电能表的突发事件信息,采用报告里数据变位就触发上送的办法。As for the emergency information of the electric energy meter, the method of triggering and sending the data in the report is adopted.

综上所述,对报告控制块进行参数设置并改写使能参数RptEna后,报告就会按条件主动上送了。To sum up, after setting the parameters of the report control block and rewriting the enable parameter RptEna, the report will be automatically sent according to the conditions.

利用日志模型传输历史数据的思想和过程:The idea and process of using the log model to transmit historical data:

电能量数据通信引入历史数据的概念就是当在通信过程中有通信异常中断等原因,不至于数据丢失,提供了补召补救的措施。The concept of introducing historical data into electric energy data communication means that when there are reasons such as abnormal communication interruption during the communication process, data will not be lost, and remedial measures are provided.

日志是记录历史数据的载体,它是通过日志控制块来控制映射的,用户可以通过读写服务来操作日志控制块。The log is the carrier for recording historical data. It controls the mapping through the log control block. Users can operate the log control block through the read and write service.

对某个日志控制块进行使能(LogEna=true)操作后,与之关联的数据集成员有数据变化就开始存储相关日志条目,用户可以用相应接口来召唤日志,具体的过程如下:After a certain log control block is enabled (LogEna=true), the data set members associated with it will start to store related log entries if there is any data change, and the user can use the corresponding interface to call the log. The specific process is as follows:

通信模块利用以上模型产生的配置文件,进行相关的数据通信,电能表端为服务模块,数字化远方电能量采集终端ERTU为客户端模块。通信基于以太网ICP/IP协议,采用MMS(制造报文规约)规约进行。The communication module uses the configuration file generated by the above model to carry out relevant data communication. The energy meter terminal is the service module, and the digital remote electric energy collection terminal ERTU is the client module. The communication is based on the Ethernet ICP/IP protocol, which is carried out by using the MMS (Manufacturing Message Protocol) protocol.

本发明基于IEC 61850数字化远方电能量数据采集装置主要的功能是收集变电站内的电能表数据,进行本地数据转换,数据存储,对远方调度和变电站内监控系统提供数据服务。The present invention is based on the IEC 61850 digitized remote electric energy data acquisition device. The main function is to collect the electric energy meter data in the substation, perform local data conversion, data storage, and provide data services for the remote dispatching and substation internal monitoring system.

如图2所示,基于IEC 61850数字化远方电能量数据采集装置,包括主处理器模块、网卡模块、光纤转换器模块、人机界面模块、接口模块和存储器模块,主处理器模块分别与网卡模块、光纤转换器模块、人机界面模块、接口模块和存储器模块连接。As shown in Figure 2, the digital remote electric energy data acquisition device based on IEC 61850 includes a main processor module, a network card module, an optical fiber converter module, a man-machine interface module, an interface module and a memory module. , optical fiber converter module, man-machine interface module, interface module and memory module connection.

接口模块包括RS-232当地维护口、2路RS485接口和4个10M/100M以太网接口。RS485接口可支持不同的表计规约,且可支持多至60个表计。The interface module includes RS-232 local maintenance port, 2 RS485 ports and 4 10M/100M Ethernet ports. The RS485 interface can support different meter protocols and can support up to 60 meters.

主处理器模块内置看门狗,可消除特大干扰引起的软件死机。主处理器模块设置高精确的不掉电日历时钟,支持SNTP网络对时。The main processor module has a built-in watchdog, which can eliminate software crashes caused by excessive interference. The main processor module sets a high-precision non-power-off calendar clock, and supports SNTP network time synchronization.

人机界面模块由6.5寸640×480彩色LCD和8键键盘组成,可提供全中文菜单窗口,可以很方便地定义、查询、修改各种运行参数,显示各种事件记录数据等。The man-machine interface module consists of a 6.5-inch 640×480 color LCD and an 8-key keyboard. It can provide a full Chinese menu window, which can easily define, query, and modify various operating parameters, and display various event record data, etc.

光纤转换器模块中光纤接口为标准的SC接口,TX和发送口,RX为接收口,工作波长为1310nm,多模方式,传输距离2km。网络接口为10M/100M标准的RJ45接口。The optical fiber interface in the optical fiber converter module is a standard SC interface, TX and sending port, RX is the receiving port, the working wavelength is 1310nm, multi-mode mode, and the transmission distance is 2km. The network interface is a 10M/100M standard RJ45 interface.

电源模块由进口开关电源模块加上外围辅助器件组成。可实现交直流电源输入,自动切换,并提供DC+5V,DC+12V系统电源。The power supply module is composed of imported switching power supply modules and peripheral auxiliary devices. It can realize AC and DC power input, switch automatically, and provide DC+5V, DC+12V system power.

存储器模块采用大容量的CF卡,数据掉电后十年不丢失;表计电能量数据可以按5分钟、15分钟、30分钟或60分钟为单位任意分配存贮。存贮容量:2G字节。可以存贮峰、谷、平、尖峰等时段电能量、需量、表计状态。可以按IEC 61850数据模型转换贮存。支持IEC 60870-5-102标准转换。The memory module adopts a large-capacity CF card, and the data will not be lost for ten years after power failure; the meter electric energy data can be allocated and stored arbitrarily in units of 5 minutes, 15 minutes, 30 minutes or 60 minutes. Storage capacity: 2G bytes. It can store electric energy, demand, and meter status during peak, valley, flat, and peak periods. It can be converted and stored according to the IEC 61850 data model. Support IEC 60870-5-102 standard conversion.

如图3是本发明在电网调度系统中应用示意图,以太网接口数字化电度表与RS485接口传统电度表的数据,传输到基于IEC 61850数字化远方电能量采集终端,然后依次进入公共通讯网络、调度端电量系统、MIS系统和SCADA系统。Figure 3 is a schematic diagram of the application of the present invention in the power grid dispatching system. The data of the digital watt-hour meter with the Ethernet interface and the traditional watt-hour meter with the RS485 interface are transmitted to the digital remote electric energy collection terminal based on IEC 61850, and then enter the public communication network, Dispatching terminal power system, MIS system and SCADA system.

最后,还需要注意的是,以上列举的仅是本发明的具体实施例。显然,本发明不限于以上实施例,还可以有许多变形,本领域的普通技术人员能从本发明公开的内容直接或联想到的所有变形,均应认为是本发明的保护范围。Finally, it should also be noted that what is listed above are only specific embodiments of the present invention. Apparently, the present invention is not limited to the above embodiments, and many modifications can be made, and all modifications directly or associative to those skilled in the art from the content disclosed in the present invention should be considered as the protection scope of the present invention.

Claims (6)

1、基于IEC 61850数字化远方电能量数据采集方法,包括如下步骤:1. Based on the IEC 61850 digital remote electric energy data acquisition method, including the following steps: a)将电能表和数字化远方电能量采集终端之间需要通信的电能量数据进行IEC 61850的数据建模,确定其各个数据项成员定义;a) Perform IEC 61850 data modeling on the electric energy data that needs to be communicated between the electric energy meter and the digital remote electric energy collection terminal, and determine the member definitions of each data item; b)利用IEC 61850标准里的数据集模型,把不同类型的数据归类到不同的数据集,根据配置文件来映射数据集名和数据类型的关系;b) Use the data set model in the IEC 61850 standard to classify different types of data into different data sets, and map the relationship between the data set name and the data type according to the configuration file; c)选择IEC 61850通信服务里的报告控制块模型、日志控制块模型来作为电能量数据传输的服务载体,并重新补充阐述相关定义;c) Select the report control block model and log control block model in the IEC 61850 communication service as the service carrier for electric energy data transmission, and re-explain the relevant definitions; d)通信模块根据以上定义配置的内容来完成数据采集。d) The communication module completes the data collection according to the content of the above defined configuration. 2、基于IEC 61850数字化远方电能量数据采集装置,其特征在于包括主处理器模块、网卡模块、光纤转换器模块、接口模块和存储器模块,主处理器模块分别与网卡模块、光纤转换器模块、接口模块和存储器模块连接。2. Based on the IEC 61850 digitized remote electric energy data acquisition device, it is characterized in that it includes a main processor module, a network card module, an optical fiber converter module, an interface module and a memory module, and the main processor module is respectively connected with the network card module, the optical fiber converter module, The interface module is connected to the memory module. 3、根据权利要求2所述的基于IEC 61850数字化远方电能量数据采集装置,其特征在于所述接口模块包括RS-232当地维护口、RS485接口和以太网接口。3. The digital remote electric energy data acquisition device based on IEC 61850 according to claim 2, characterized in that the interface module includes an RS-232 local maintenance port, an RS485 interface and an Ethernet interface. 4、根据权利要求2所述的基于IEC 61850数字化远方电能量数据采集装置,其特征在于所述主处理器模块内置看门狗。4. The digital remote electric energy data acquisition device based on IEC 61850 according to claim 2, characterized in that the main processor module has a built-in watchdog. 5、根据权利要求2所述的基于IEC 61850数字化远方电能量数据采集装置,其特征在于还包括人机界面模块,主处理器模块与人机界面模块连接。5. The digital remote electric energy data acquisition device based on IEC 61850 according to claim 2, characterized in that it also includes a man-machine interface module, and the main processor module is connected with the man-machine interface module. 6、根据权利要求2所述的基于IEC 61850数字化远方电能量数据采集装置,其特征在于所述人机界面模块由彩色LCD和8键键盘组成。6. The digital remote electric energy data acquisition device based on IEC 61850 according to claim 2, characterized in that the man-machine interface module is composed of a color LCD and an 8-key keyboard.
CN200910152810A 2009-09-21 2009-09-21 IEC 61850 digital distance electric power data collecting method and apparatus thereof Pending CN101661058A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910152810A CN101661058A (en) 2009-09-21 2009-09-21 IEC 61850 digital distance electric power data collecting method and apparatus thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910152810A CN101661058A (en) 2009-09-21 2009-09-21 IEC 61850 digital distance electric power data collecting method and apparatus thereof

Publications (1)

Publication Number Publication Date
CN101661058A true CN101661058A (en) 2010-03-03

Family

ID=41789197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910152810A Pending CN101661058A (en) 2009-09-21 2009-09-21 IEC 61850 digital distance electric power data collecting method and apparatus thereof

Country Status (1)

Country Link
CN (1) CN101661058A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102044914A (en) * 2010-12-21 2011-05-04 航天科工深圳(集团)有限公司 Method and device capable of realizing simulation feeder terminal unit
CN102314765A (en) * 2011-08-22 2012-01-11 中国电力科学研究院 Plastic optical fiber network electricity checks meter system
CN102467364A (en) * 2010-11-03 2012-05-23 北京普源精电科技有限公司 Method and device for adaptively generating power supply upper computer interface
CN104377831A (en) * 2014-11-29 2015-02-25 国网河南省电力公司南阳供电公司 Intelligent substation automatic monitoring system and implementation method
CN104660709A (en) * 2015-03-12 2015-05-27 国家电网公司 Domestic data acquisition system based on IEC61850 and working method of domestic data acquisition system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102467364A (en) * 2010-11-03 2012-05-23 北京普源精电科技有限公司 Method and device for adaptively generating power supply upper computer interface
CN102467364B (en) * 2010-11-03 2016-08-10 北京普源精电科技有限公司 A kind of method and device of adaptive generation power supply host computer interface
CN102044914A (en) * 2010-12-21 2011-05-04 航天科工深圳(集团)有限公司 Method and device capable of realizing simulation feeder terminal unit
CN102044914B (en) * 2010-12-21 2012-11-21 航天科工深圳(集团)有限公司 Method and device capable of realizing simulation feeder terminal unit
CN102314765A (en) * 2011-08-22 2012-01-11 中国电力科学研究院 Plastic optical fiber network electricity checks meter system
CN104377831A (en) * 2014-11-29 2015-02-25 国网河南省电力公司南阳供电公司 Intelligent substation automatic monitoring system and implementation method
CN104660709A (en) * 2015-03-12 2015-05-27 国家电网公司 Domestic data acquisition system based on IEC61850 and working method of domestic data acquisition system
CN104660709B (en) * 2015-03-12 2017-10-31 国家电网公司 A kind of electricity consumption data acquisition system and its method of work based on IEC61850

Similar Documents

Publication Publication Date Title
CN201757929U (en) Fully wireless networked power consumer power consumption information acquisition system
CN201449661U (en) Remote electric power meter reading system
CN102638102A (en) Power supply system key information acquisition system and communication method based on Beidou satellite transmission and communication method thereof
CN105471109A (en) Intelligent power consumption management system facing household wind and solar energy mutual-complementing power station and management method thereof
CN104834297A (en) Household electrical appliance remote control system based on Internet-of-things smart meter and method thereof
CN102722786A (en) Intelligent scheduling support platform for power grid professional systems
CN101776702B (en) Optical fiber electric energy meter
CN106154999A (en) Water supply analysis and Control regulates monitoring and controlling system
CN104952155B (en) A kind of remote pre-payment is quick power transmission system and method thereof in short-term
CN102916489B (en) Virtual terminal automatic wiring method based on primary system structure of regional power grid
CN202737577U (en) Interaction system between intelligent power distribution network and users
CN204906004U (en) Distributed intelligent regional power grid of network layering
CN106816878A (en) A kind of demand response regulation device and method for being applied to drainage and irrigation hyelectric power facility
CN1929223A (en) Integrated automation converting station debugging apparatus
CN202120433U (en) Meter reading system
CN202034825U (en) Intelligent comprehensive device of medium-voltage switch
CN210924268U (en) A combined logic control circuit and sewage treatment system
CN201160282Y (en) A multifunctional automatic application server device
CN104616476A (en) Electric energy acquisition terminal based on Beidou short message communication
CN204423620U (en) A kind of electric energy acquisition terminal based on the communication of Big Dipper short message
CN208422100U (en) An electric energy meter collector with remote fault monitoring function
CN203606429U (en) Power acquisition system using communication manager
CN201819954U (en) 0.5-level single-phase electronic energy meter
CN106546814A (en) A kind of intelligent low pressure electric quantity monitoring system
CN212160928U (en) Electric energy collection cloud monitoring analysis system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhu Bingquan

Inventor after: Teng Mingmao

Inventor after: Zhang Lizong

Inventor after: Jin Naizheng

Inventor after: Xie Feng

Inventor after: Ma Guoliang

Inventor after: Ding Liang

Inventor after: Zhang Jianmin

Inventor after: Chen Shiyun

Inventor after: Jiang Shiting

Inventor before: Zhu Bingquan

Inventor before: Teng Mingmao

Inventor before: Zhang Lisong

Inventor before: Jin Naizheng

Inventor before: Xie Feng

Inventor before: Ma Guoliang

Inventor before: Ding Liang

Inventor before: Zhang Jianmin

Inventor before: Chen Shiyun

Inventor before: Jiang Shiting

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHU BINGQUAN ZHANG LISONG JIN NAIZHENG XIE FENG MA GUOLIANG DING LIANG ZHANG JIANMIN CHEN SHIYUN JIANG SHITING TENG MINGMAO TO: ZHU BINGQUAN ZHANG LIZONG JIN NAIZHENG XIE FENG MA GUOLIANG DING LIANG ZHANG JIANMIN CHEN SHIYUN JIANG SHITING TENG MINGMAO

DD01 Delivery of document by public notice

Addressee: Zhejiang SKYWORTH Automation Engineering Co., Ltd. Gao Min

Document name: Notification that Application Deemed to be Withdrawn

ASS Succession or assignment of patent right

Owner name: SHAOXING POWER BUREAU STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: SHAOXING POWER BUREAU

Effective date: 20130306

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130306

Address after: 3 building, building 1, building 7, 310012 West Road, Hangzhou, Zhejiang, Xihu District

Applicant after: Zhejiang Creaway Automation Engineering Co., Ltd.

Applicant after: Shaoxing Power Bureau

Applicant after: State Grid Corporation of China

Address before: 3 building, building 1, building 7, 310012 West Road, Hangzhou, Zhejiang, Xihu District

Applicant before: Zhejiang Creaway Automation Engineering Co., Ltd.

Applicant before: Shaoxing Power Bureau

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100303