CN109742854A - It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing - Google Patents
It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing Download PDFInfo
- Publication number
- CN109742854A CN109742854A CN201811616555.3A CN201811616555A CN109742854A CN 109742854 A CN109742854 A CN 109742854A CN 201811616555 A CN201811616555 A CN 201811616555A CN 109742854 A CN109742854 A CN 109742854A
- Authority
- CN
- China
- Prior art keywords
- power failure
- area
- data
- power
- repairment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000012545 processing Methods 0.000 title claims abstract description 14
- 238000001914 filtration Methods 0.000 claims abstract description 11
- 230000002159 abnormal effect Effects 0.000 claims description 5
- 230000005611 electricity Effects 0.000 claims description 5
- 238000011156 evaluation Methods 0.000 claims description 4
- 238000005259 measurement Methods 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 claims description 3
- 238000007619 statistical method Methods 0.000 abstract description 3
- 238000011157 data evaluation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Method is actively reported for repairment based on intelligent electric meter data processing the present invention relates to a kind of, belongs to after Distribution Network Equipment power-off event occurs and carries out the technical field studied and judged and actively reported for repairment that has a power failure.By the interference of intelligent electric meter power failure data filtering, the processing of power failure runing time analysis in short-term, calls survey together and the links such as study and judge, it obtains to have a power failure and studies and judges information, it works electric service and decision support is provided, when client does not report for repairment, it initiatively arranges service restoration and client to inform in advance, realizes and actively report for repairment.This invention ensures that having a power failure studies and judges the availability for actively reporting function for repairment.The area active repair reporting system Zhong Tai, route number statistical analysis are studied and judged by power failure, pointedly the multiple platform area that has a power failure, route weak link are administered, effectively improve equipment dependability and power supply quality.
Description
Technical field
The technical field studied and judged and actively reported for repairment that has a power failure, tool are carried out after occurring the present invention relates to Distribution Network Equipment power-off event
Body is related to a kind of analysis based on intelligent electric meter power failure data and handles and realize that electric service has a power failure in no client to report situation for repairment
When implement the actively method reported for repairment.
Background technique
With the large-scale application of power supply enterprise's intelligent electric meter, electricity consumption is uploaded to using the outage information of intelligent electric meter and is acquired
System can be managed power distribution network operation conditions with auxiliary power supply enterprise.But it is done because the power failure data of intelligent electric meter acquisition exist
It disturbs wrong report, line fault reclosing, the method for operation that has a power failure in short-term such as send by force manually, cause intelligent electric meter outage information in power supply visitor
Occur having a power failure when the field practical application of family service and study and judge the problems such as accuracy is low, some Distribution Network Equipments power failures study and judge system because
Various power failures operation in short-term and abnormal interference data processing are bad, and wrong report data volume is excessive, studies and judges reporting for repairment for result arrangement by it
Treatment people sky is run often, be not able to satisfy after power supply enterprise analyzes and researches to outage information initiatively to it is abnormal have a power failure into
The actual needs of row processing, affects horizontal promotion of taking the initiative in offering a hand to client.
Summary of the invention
The present invention provide it is a kind of method is actively reported for repairment based on intelligent electric meter data processing, had a power failure data by intelligent electric meter
Interference filtering, the processing of power failure runing time analysis in short-term, call survey together and the links such as study and judge, obtain to have a power failure and study and judge information, power supply is taken
It works and offer decision support is provided, when client does not report for repairment, initiatively arrange service restoration and client to inform in advance, it is real
It now actively reports for repairment, improves power supply quality, reduce customer complaint.
The technical solution adopted by the present invention is that: include the following steps:
Step 1: rely on power supply enterprise's electricity consumption acquisition system to establish the power failure data information library of platform area intelligent electric meter upload, it will
The power failure data that intelligent electric meter uploads, including platform area, time carry out acquisition storage in real time;
Step 2: carrying out power-off event scanning by the period of certain time, circulatory monitoring intelligent electric meter active reporting newly stops
Electric event data, and carry out data filtering, the method is as follows:
(1) to the platform area for occurring reporting power failure data compared with the outage information historical information in this area, if its history
It is defined as the area power failure data reliability Di Tai in data evaluation, its power failure data filtering is fallen;
(2) power failure data are compared with power failure plan in system, by the power failure data filtering of plan interval range that has a power failure
Fall;
Power failure data set in platform area is formed after (1), (2) step, field includes affiliated unit, line name, power supply class
Group, platform area device name, power off time;
Step 3: the voltage for carrying out platform area and user to the platform area power-off event determined by step 2 calls survey together, will prolong the time
Power-off event calls scaffold tower area and the voltage data of user together for a period of time afterwards, and the area Ruo Tai, which calls together, measures voltage data, then judges non-power failure,
Power supply is normal;Platform area no-voltage data if it exists, user have voltage data to be then determined as that the voltage measurement of platform area is abnormal, and platform area does not have
Have a power failure;The area Ruo Tai, with no-voltage data per family, it is possible to determine that this area has a power failure, and generates power-off event, and lead to this area
It is dynamic to report for repairment;
Step 4: after determining that platform area has a power failure by step 3, while this area is counted in the frequency of power cut in nearly period,
Above-mentioned data are automatically pushed to person on duty by the power failure result that the judgement of active repair reporting system interface display is studied and judged in distribution power failure.
In step 2 of the present invention, the scan period is 10-30 seconds/time;
In step 2 of the present invention, the scan period is 20 seconds/time;
In (1) of step 2 of the present invention, with a low credibility area's condition: periphery interference is big or meter reliability is low, history
On deposit the platform area for uploading a large amount of power failure data within a certain period of time;Power failure data reliability evaluation is monthly carried out, will be gone out in one day
It now uploads power failure data mostly and non-genuine radio area of stopping is evaluated as the area power failure data reliability Di Tai;
In step 3 of the present invention, will delay power-off event the time and call survey together for a period of time is 30 seconds.
The beneficial effects of the present invention are:
The present invention is filtered by the interference of intelligent electric meter power failure data, power failure runing time analysis in short-term is handled, calls survey together grinds
The links such as sentence, obtains to have a power failure and studies and judges information, work electric service and decision support is provided, when client does not report for repairment,
It initiatively arranges service restoration and client to inform in advance, realizes and actively report for repairment;
It is filtered by platform area intelligent meter power failure reported data, called together in certain period of time progress platform area or user's voltage
It surveys, excludes intelligent meter and interfere, repeat the erroneous judgement of the brings such as combined floodgate, earthing wire-selecting in operation, improve the power failure based on intelligent electric meter
Order of accuarcy is studied and judged, makes actively to report realization high efficiency for repairment, increase customer satisfaction degree.
The time coordination relationship of the existing intelligent meter and the power distribution network method of operation that find in practice, ensure that master is studied and judged in power failure
The dynamic availability for reporting function for repairment.The area active repair reporting system Zhong Tai, route number statistical analysis are studied and judged by power failure, pointedly
The multiple platform area that has a power failure, route weak link are administered, equipment dependability and power supply quality are effectively improved.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Specific embodiment
Include the following steps:
Step 1: rely on power supply enterprise's electricity consumption acquisition system to establish the power failure data information library of platform area intelligent electric meter upload, it will
The power failure data that intelligent electric meter uploads, including platform area, time carry out acquisition storage in real time;
Step 2: carry out power-off event scanning by the period of certain time, be ok in 10-30 seconds/time, with 20 seconds for compared with
Good, the time is short, consumes the area computer resource Duo Tai fluctuation of service, upper when overlong time then influences the area Duo Tai while having a power failure
It passes, by practice, uses 20 seconds, the power failure uplink time in the area general line outage Shi Getai is in two cycle periods in practice
It is interior to upload completion, the new power-off event data of circulatory monitoring intelligent electric meter active reporting, and data filtering is carried out, method is such as
Under:
(1) to the platform area for occurring reporting power failure data compared with the outage information historical information in this area, if its history
It is defined as the area power failure data reliability Di Tai in data evaluation, its power failure data filtering is fallen;With a low credibility area's condition: periphery
Interference is big or meter reliability is low, deposits the platform area for uploading a large amount of power failure data within a certain period of time in history;Monthly have a power failure
Data reliability evaluation will occur uploading more than power failure data in one day and non-genuine radio area of stopping be evaluated as power failure data reliability
The area Di Tai;
(2) power failure data are compared with power failure plan in system, by the power failure data filtering of plan interval range that has a power failure
Fall;
Power failure data set in platform area is formed after (1), (2) step, field includes affiliated unit, line name, power supply class
Group, platform area device name, power off time;
Step 3: the voltage for carrying out platform area and user to the platform area power-off event determined by step 2 calls survey together, will prolong the time
Power-off event calls scaffold tower area and the voltage data of user together for a period of time afterwards, and through practical exploration, platform area prolongs 30 seconds and calls survey, this time together
Main reclosure time, line-to-ground hunting time after considering route protection movement, wherein circuit re-switching and primary ground connection choosing
Achievable in line 3 seconds, earthing wire-selecting is achievable after 30 seconds, avoids accidentally studying and judging such outage information into power failure, the area Ruo Tai
It calls together and measures voltage data, then judge that non-power failure, power supply are normal;Platform area no-voltage data, user have voltage data then to sentence if it exists
It is abnormal to be set to the voltage measurement of platform area, platform area does not have a power failure;The area Ruo Tai, with no-voltage data per family, it is possible to determine that this area has a power failure,
Power-off event is generated, and this area actively report for repairment;
Step 4: after determining that platform area has a power failure by step 3, while this area is counted in the frequency of power cut in nearly period,
General 90 days, frequency of power cut is distinguished with color, can set 1 display yellow, 2 display pink colours, 3 times or more
Be displayed in red;
Above-mentioned data are automatically pushed to by the power failure result that the judgement of active repair reporting system interface display is studied and judged in distribution power failure
Person on duty;
Route where person on duty can put channel selection area in systems is checked, to the line for stopping radio area number 5 or more
Road can determine line outage range;
Situations such as diagnosing line outage, the power failure of circuit pack platform area, the power failure of platform area, operator on duty, which starts to have a power failure, actively to report for repairment
Work order arranges related teams and groups to be handled, while notifying the client of respective range, informs and has a power failure, and monitors power failure treatment progress,
Feedback safety at power cut and service restoration time are recorded after the completion of processing.
Active repair reporting system is studied and judged by power failure, platform area periodically more to frequency of power cut, route are for statistical analysis, right
Device systems weak link is administered, and system power supply reliability and service quality are improved.
Claims (5)
1. a kind of actively report method for repairment based on intelligent electric meter data processing, characterized in that it comprises the following steps:
Step 1: rely on power supply enterprise's electricity consumption acquisition system to establish the power failure data information library of platform area intelligent electric meter upload, it will be intelligent
The power failure data that ammeter uploads, including platform area, time carry out acquisition storage in real time;
Step 2: carrying out power-off event scanning, the new power failure thing of circulatory monitoring intelligent electric meter active reporting by the period of certain time
Number of packages evidence, and carry out data filtering, the method is as follows:
(1) to the platform area for occurring reporting power failure data compared with the outage information historical information in this area, if its historical data
It is defined as the area power failure data reliability Di Tai in evaluation, its power failure data filtering is fallen;
(2) power failure data are compared with power failure plan in system, and the power failure data filtering of power failure plan interval range is fallen;
Power failure data set in platform area is formed after (1), (2) step, field includes affiliated unit, line name, power supply teams and groups, platform
Area's device name, power off time;
Step 3: the voltage for carrying out platform area and user to the platform area power-off event determined by step 2 calls survey together, will delay the time and stop
Electric event calls scaffold tower area and the voltage data of user together for a period of time, and the area Ruo Tai, which calls together, measures voltage data, then judges non-power failure, power supply
Normally;Platform area no-voltage data if it exists, user have voltage data to be then determined as that the voltage measurement of platform area is abnormal, and platform area does not stop
Electricity;The area Ruo Tai, with no-voltage data per family, it is possible to determine that this area has a power failure, and generates power-off event, and carry out actively to this area
It reports for repairment;
Step 4: after determining that platform area has a power failure by step 3, while this area is counted in the frequency of power cut in nearly period, it is above-mentioned
Data are automatically pushed to person on duty by the power failure result that the judgement of active repair reporting system interface display is studied and judged in distribution power failure.
A kind of method is actively reported for repairment based on intelligent electric meter data processing 2. according to claim 1, it is characterised in that: institute
It states in step 2, the scan period is 10-30 seconds/time.
A kind of method is actively reported for repairment based on intelligent electric meter data processing 3. according to claim 2, it is characterised in that: institute
It states in step 2, the scan period is 20 seconds/time.
A kind of method is actively reported for repairment based on intelligent electric meter data processing 4. according to claim 1, it is characterised in that: institute
State in (1) of step 2, with a low credibility area's condition: periphery interference is big or meter reliability is low, deposits in history within a certain period of time
Upload the platform area of a large amount of power failure data;Power failure data reliability evaluation is monthly carried out, it is more will to occur upload power failure data in one day
And non-genuine radio area of stopping is evaluated as the area power failure data reliability Di Tai.
A kind of method is actively reported for repairment based on intelligent electric meter data processing 5. according to claim 1, it is characterised in that: institute
It states in step 3, will delay power-off event the time and call survey together for a period of time is 30 seconds.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811616555.3A CN109742854A (en) | 2018-12-27 | 2018-12-27 | It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811616555.3A CN109742854A (en) | 2018-12-27 | 2018-12-27 | It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109742854A true CN109742854A (en) | 2019-05-10 |
Family
ID=66361520
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811616555.3A Pending CN109742854A (en) | 2018-12-27 | 2018-12-27 | It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109742854A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110058126A (en) * | 2019-05-29 | 2019-07-26 | 国网北京市电力公司 | Distribution network failure judgment method and device |
CN110673079A (en) * | 2019-08-23 | 2020-01-10 | 北京中电飞华通信股份有限公司 | Platform district end sensing system and method |
CN110954777A (en) * | 2019-10-25 | 2020-04-03 | 国网浙江平湖市供电有限公司 | Intelligent fault repair and judgment method for low-voltage distribution network |
CN111142047A (en) * | 2019-12-31 | 2020-05-12 | 国网河北省电力有限公司 | Automatic studying and judging method based on power distribution internet of things power failure |
CN111562460A (en) * | 2020-03-24 | 2020-08-21 | 广东电网有限责任公司广州供电局 | Power distribution network power failure event detection research and judgment method, device, computer equipment and medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103248122A (en) * | 2013-04-27 | 2013-08-14 | 国家电网公司 | Active reporting system for power failure |
CN103679556A (en) * | 2013-12-16 | 2014-03-26 | 广东电网公司佛山供电局 | System and method for intelligently diagnosing distribution transform terminal power failure warning |
CN104766185A (en) * | 2015-05-06 | 2015-07-08 | 国网山东省电力公司 | Regional power grid power outage information studying and judging system and method based on power grid power outage characteristics |
CN107748315A (en) * | 2017-09-14 | 2018-03-02 | 国家电网公司 | A kind of Distribution Network Failure active forewarning method |
CN108448726A (en) * | 2018-04-17 | 2018-08-24 | 宁波三星医疗电气股份有限公司 | A kind of report method of electric system power-off event |
-
2018
- 2018-12-27 CN CN201811616555.3A patent/CN109742854A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103248122A (en) * | 2013-04-27 | 2013-08-14 | 国家电网公司 | Active reporting system for power failure |
CN103679556A (en) * | 2013-12-16 | 2014-03-26 | 广东电网公司佛山供电局 | System and method for intelligently diagnosing distribution transform terminal power failure warning |
CN104766185A (en) * | 2015-05-06 | 2015-07-08 | 国网山东省电力公司 | Regional power grid power outage information studying and judging system and method based on power grid power outage characteristics |
CN107748315A (en) * | 2017-09-14 | 2018-03-02 | 国家电网公司 | A kind of Distribution Network Failure active forewarning method |
CN108448726A (en) * | 2018-04-17 | 2018-08-24 | 宁波三星医疗电气股份有限公司 | A kind of report method of electric system power-off event |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110058126A (en) * | 2019-05-29 | 2019-07-26 | 国网北京市电力公司 | Distribution network failure judgment method and device |
CN110673079A (en) * | 2019-08-23 | 2020-01-10 | 北京中电飞华通信股份有限公司 | Platform district end sensing system and method |
CN110673079B (en) * | 2019-08-23 | 2021-12-14 | 北京中电飞华通信股份有限公司 | Platform district end sensing system and method |
CN110954777A (en) * | 2019-10-25 | 2020-04-03 | 国网浙江平湖市供电有限公司 | Intelligent fault repair and judgment method for low-voltage distribution network |
CN111142047A (en) * | 2019-12-31 | 2020-05-12 | 国网河北省电力有限公司 | Automatic studying and judging method based on power distribution internet of things power failure |
CN111562460A (en) * | 2020-03-24 | 2020-08-21 | 广东电网有限责任公司广州供电局 | Power distribution network power failure event detection research and judgment method, device, computer equipment and medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109742854A (en) | It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing | |
CN105785201B (en) | A kind of power distribution network fault analysis method and study and judge system | |
CN104360208A (en) | Acquisition failure analyzing and processing method of electricity utilization information acquisition operating and maintaining system | |
CN110289682A (en) | A kind of distribution repairing aid decision and intelligent managing and control system | |
CN103874122A (en) | Special transformer terminal network signal collecting system and method | |
US11740266B2 (en) | Systems and methods for monitoring energy-related data in an electrical system | |
CN104539051A (en) | Online evaluation system of secondary equipment of intelligent substation | |
CN104730458A (en) | Method for monitoring state of generator excitation system | |
CN103325019A (en) | Event-driven power grid fault information judgment method | |
CN111934424B (en) | Intelligent fault studying and judging system and method for power distribution network | |
CN107272572B (en) | A method of crane efficiency/efficiency is analyzed by MHCIMS | |
CN104821789A (en) | Method for detecting reliability of photovoltaic power generation system | |
Herath et al. | Power quality (PQ) survey reporting: discrete disturbance limits | |
CN115760073A (en) | Transformer substation equipment maintenance system and method based on BIM model | |
EP3200306B1 (en) | Control device for hvdc system and method of operating the same | |
CN114035466B (en) | Control system of duplex position magnetic sheet arrangement machine | |
CN103279520B (en) | Power substation secondary system failure reconnaissance method | |
CN108933482B (en) | Power distribution terminal equipment off-line reason analysis method based on wireless signal intensity | |
CN108695974B (en) | Method for judging power failure of 10 KV line trunk line | |
CN110501963B (en) | Intelligent energy management system | |
CN103053144B (en) | The method and apparatus of communication system traffic distribution | |
CN113030562A (en) | Environment-friendly facility power consumption monitoring system | |
CN113098046A (en) | Offshore shore power flexible direct current converter valve monitoring system | |
Okozi et al. | Reliability assessment of Nigerian power systems case study of 330kv transmission lines in Benin sub–region | |
CN111008787A (en) | Planned power failure active monitoring and scheduling method based on metering terminal alarm technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190510 |
|
RJ01 | Rejection of invention patent application after publication |