CN109742854A - It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing - Google Patents

It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing Download PDF

Info

Publication number
CN109742854A
CN109742854A CN201811616555.3A CN201811616555A CN109742854A CN 109742854 A CN109742854 A CN 109742854A CN 201811616555 A CN201811616555 A CN 201811616555A CN 109742854 A CN109742854 A CN 109742854A
Authority
CN
China
Prior art keywords
power failure
area
data
power
repairment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811616555.3A
Other languages
Chinese (zh)
Inventor
唐伟宁
郭云峰
时文东
周力威
宋春娟
刘鑫
马群
陈志忠
朱大铭
安英海
朱佳祥
闫铭
赵建军
白云峰
张晔
王泽坤
秦绪华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changchun Xianghecheng Technology Co Ltd
Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd
State Grid Jilin Electric Power Corp
Original Assignee
Changchun Xianghecheng Technology Co Ltd
Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd
State Grid Jilin Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Xianghecheng Technology Co Ltd, Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd, State Grid Jilin Electric Power Corp filed Critical Changchun Xianghecheng Technology Co Ltd
Priority to CN201811616555.3A priority Critical patent/CN109742854A/en
Publication of CN109742854A publication Critical patent/CN109742854A/en
Pending legal-status Critical Current

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

Method is actively reported for repairment based on intelligent electric meter data processing the present invention relates to a kind of, belongs to after Distribution Network Equipment power-off event occurs and carries out the technical field studied and judged and actively reported for repairment that has a power failure.By the interference of intelligent electric meter power failure data filtering, the processing of power failure runing time analysis in short-term, calls survey together and the links such as study and judge, it obtains to have a power failure and studies and judges information, it works electric service and decision support is provided, when client does not report for repairment, it initiatively arranges service restoration and client to inform in advance, realizes and actively report for repairment.This invention ensures that having a power failure studies and judges the availability for actively reporting function for repairment.The area active repair reporting system Zhong Tai, route number statistical analysis are studied and judged by power failure, pointedly the multiple platform area that has a power failure, route weak link are administered, effectively improve equipment dependability and power supply quality.

Description

It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing
Technical field
The technical field studied and judged and actively reported for repairment that has a power failure, tool are carried out after occurring the present invention relates to Distribution Network Equipment power-off event Body is related to a kind of analysis based on intelligent electric meter power failure data and handles and realize that electric service has a power failure in no client to report situation for repairment When implement the actively method reported for repairment.
Background technique
With the large-scale application of power supply enterprise's intelligent electric meter, electricity consumption is uploaded to using the outage information of intelligent electric meter and is acquired System can be managed power distribution network operation conditions with auxiliary power supply enterprise.But it is done because the power failure data of intelligent electric meter acquisition exist It disturbs wrong report, line fault reclosing, the method for operation that has a power failure in short-term such as send by force manually, cause intelligent electric meter outage information in power supply visitor Occur having a power failure when the field practical application of family service and study and judge the problems such as accuracy is low, some Distribution Network Equipments power failures study and judge system because Various power failures operation in short-term and abnormal interference data processing are bad, and wrong report data volume is excessive, studies and judges reporting for repairment for result arrangement by it Treatment people sky is run often, be not able to satisfy after power supply enterprise analyzes and researches to outage information initiatively to it is abnormal have a power failure into The actual needs of row processing, affects horizontal promotion of taking the initiative in offering a hand to client.
Summary of the invention
The present invention provide it is a kind of method is actively reported for repairment based on intelligent electric meter data processing, had a power failure data by intelligent electric meter Interference filtering, the processing of power failure runing time analysis in short-term, call survey together and the links such as study and judge, obtain to have a power failure and study and judge information, power supply is taken It works and offer decision support is provided, when client does not report for repairment, initiatively arrange service restoration and client to inform in advance, it is real It now actively reports for repairment, improves power supply quality, reduce customer complaint.
The technical solution adopted by the present invention is that: include the following steps:
Step 1: rely on power supply enterprise's electricity consumption acquisition system to establish the power failure data information library of platform area intelligent electric meter upload, it will The power failure data that intelligent electric meter uploads, including platform area, time carry out acquisition storage in real time;
Step 2: carrying out power-off event scanning by the period of certain time, circulatory monitoring intelligent electric meter active reporting newly stops Electric event data, and carry out data filtering, the method is as follows:
(1) to the platform area for occurring reporting power failure data compared with the outage information historical information in this area, if its history It is defined as the area power failure data reliability Di Tai in data evaluation, its power failure data filtering is fallen;
(2) power failure data are compared with power failure plan in system, by the power failure data filtering of plan interval range that has a power failure Fall;
Power failure data set in platform area is formed after (1), (2) step, field includes affiliated unit, line name, power supply class Group, platform area device name, power off time;
Step 3: the voltage for carrying out platform area and user to the platform area power-off event determined by step 2 calls survey together, will prolong the time Power-off event calls scaffold tower area and the voltage data of user together for a period of time afterwards, and the area Ruo Tai, which calls together, measures voltage data, then judges non-power failure, Power supply is normal;Platform area no-voltage data if it exists, user have voltage data to be then determined as that the voltage measurement of platform area is abnormal, and platform area does not have Have a power failure;The area Ruo Tai, with no-voltage data per family, it is possible to determine that this area has a power failure, and generates power-off event, and lead to this area It is dynamic to report for repairment;
Step 4: after determining that platform area has a power failure by step 3, while this area is counted in the frequency of power cut in nearly period, Above-mentioned data are automatically pushed to person on duty by the power failure result that the judgement of active repair reporting system interface display is studied and judged in distribution power failure.
In step 2 of the present invention, the scan period is 10-30 seconds/time;
In step 2 of the present invention, the scan period is 20 seconds/time;
In (1) of step 2 of the present invention, with a low credibility area's condition: periphery interference is big or meter reliability is low, history On deposit the platform area for uploading a large amount of power failure data within a certain period of time;Power failure data reliability evaluation is monthly carried out, will be gone out in one day It now uploads power failure data mostly and non-genuine radio area of stopping is evaluated as the area power failure data reliability Di Tai;
In step 3 of the present invention, will delay power-off event the time and call survey together for a period of time is 30 seconds.
The beneficial effects of the present invention are:
The present invention is filtered by the interference of intelligent electric meter power failure data, power failure runing time analysis in short-term is handled, calls survey together grinds The links such as sentence, obtains to have a power failure and studies and judges information, work electric service and decision support is provided, when client does not report for repairment, It initiatively arranges service restoration and client to inform in advance, realizes and actively report for repairment;
It is filtered by platform area intelligent meter power failure reported data, called together in certain period of time progress platform area or user's voltage It surveys, excludes intelligent meter and interfere, repeat the erroneous judgement of the brings such as combined floodgate, earthing wire-selecting in operation, improve the power failure based on intelligent electric meter Order of accuarcy is studied and judged, makes actively to report realization high efficiency for repairment, increase customer satisfaction degree.
The time coordination relationship of the existing intelligent meter and the power distribution network method of operation that find in practice, ensure that master is studied and judged in power failure The dynamic availability for reporting function for repairment.The area active repair reporting system Zhong Tai, route number statistical analysis are studied and judged by power failure, pointedly The multiple platform area that has a power failure, route weak link are administered, equipment dependability and power supply quality are effectively improved.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Specific embodiment
Include the following steps:
Step 1: rely on power supply enterprise's electricity consumption acquisition system to establish the power failure data information library of platform area intelligent electric meter upload, it will The power failure data that intelligent electric meter uploads, including platform area, time carry out acquisition storage in real time;
Step 2: carry out power-off event scanning by the period of certain time, be ok in 10-30 seconds/time, with 20 seconds for compared with Good, the time is short, consumes the area computer resource Duo Tai fluctuation of service, upper when overlong time then influences the area Duo Tai while having a power failure It passes, by practice, uses 20 seconds, the power failure uplink time in the area general line outage Shi Getai is in two cycle periods in practice It is interior to upload completion, the new power-off event data of circulatory monitoring intelligent electric meter active reporting, and data filtering is carried out, method is such as Under:
(1) to the platform area for occurring reporting power failure data compared with the outage information historical information in this area, if its history It is defined as the area power failure data reliability Di Tai in data evaluation, its power failure data filtering is fallen;With a low credibility area's condition: periphery Interference is big or meter reliability is low, deposits the platform area for uploading a large amount of power failure data within a certain period of time in history;Monthly have a power failure Data reliability evaluation will occur uploading more than power failure data in one day and non-genuine radio area of stopping be evaluated as power failure data reliability The area Di Tai;
(2) power failure data are compared with power failure plan in system, by the power failure data filtering of plan interval range that has a power failure Fall;
Power failure data set in platform area is formed after (1), (2) step, field includes affiliated unit, line name, power supply class Group, platform area device name, power off time;
Step 3: the voltage for carrying out platform area and user to the platform area power-off event determined by step 2 calls survey together, will prolong the time Power-off event calls scaffold tower area and the voltage data of user together for a period of time afterwards, and through practical exploration, platform area prolongs 30 seconds and calls survey, this time together Main reclosure time, line-to-ground hunting time after considering route protection movement, wherein circuit re-switching and primary ground connection choosing Achievable in line 3 seconds, earthing wire-selecting is achievable after 30 seconds, avoids accidentally studying and judging such outage information into power failure, the area Ruo Tai It calls together and measures voltage data, then judge that non-power failure, power supply are normal;Platform area no-voltage data, user have voltage data then to sentence if it exists It is abnormal to be set to the voltage measurement of platform area, platform area does not have a power failure;The area Ruo Tai, with no-voltage data per family, it is possible to determine that this area has a power failure, Power-off event is generated, and this area actively report for repairment;
Step 4: after determining that platform area has a power failure by step 3, while this area is counted in the frequency of power cut in nearly period, General 90 days, frequency of power cut is distinguished with color, can set 1 display yellow, 2 display pink colours, 3 times or more Be displayed in red;
Above-mentioned data are automatically pushed to by the power failure result that the judgement of active repair reporting system interface display is studied and judged in distribution power failure Person on duty;
Route where person on duty can put channel selection area in systems is checked, to the line for stopping radio area number 5 or more Road can determine line outage range;
Situations such as diagnosing line outage, the power failure of circuit pack platform area, the power failure of platform area, operator on duty, which starts to have a power failure, actively to report for repairment Work order arranges related teams and groups to be handled, while notifying the client of respective range, informs and has a power failure, and monitors power failure treatment progress, Feedback safety at power cut and service restoration time are recorded after the completion of processing.
Active repair reporting system is studied and judged by power failure, platform area periodically more to frequency of power cut, route are for statistical analysis, right Device systems weak link is administered, and system power supply reliability and service quality are improved.

Claims (5)

1. a kind of actively report method for repairment based on intelligent electric meter data processing, characterized in that it comprises the following steps:
Step 1: rely on power supply enterprise's electricity consumption acquisition system to establish the power failure data information library of platform area intelligent electric meter upload, it will be intelligent The power failure data that ammeter uploads, including platform area, time carry out acquisition storage in real time;
Step 2: carrying out power-off event scanning, the new power failure thing of circulatory monitoring intelligent electric meter active reporting by the period of certain time Number of packages evidence, and carry out data filtering, the method is as follows:
(1) to the platform area for occurring reporting power failure data compared with the outage information historical information in this area, if its historical data It is defined as the area power failure data reliability Di Tai in evaluation, its power failure data filtering is fallen;
(2) power failure data are compared with power failure plan in system, and the power failure data filtering of power failure plan interval range is fallen;
Power failure data set in platform area is formed after (1), (2) step, field includes affiliated unit, line name, power supply teams and groups, platform Area's device name, power off time;
Step 3: the voltage for carrying out platform area and user to the platform area power-off event determined by step 2 calls survey together, will delay the time and stop Electric event calls scaffold tower area and the voltage data of user together for a period of time, and the area Ruo Tai, which calls together, measures voltage data, then judges non-power failure, power supply Normally;Platform area no-voltage data if it exists, user have voltage data to be then determined as that the voltage measurement of platform area is abnormal, and platform area does not stop Electricity;The area Ruo Tai, with no-voltage data per family, it is possible to determine that this area has a power failure, and generates power-off event, and carry out actively to this area It reports for repairment;
Step 4: after determining that platform area has a power failure by step 3, while this area is counted in the frequency of power cut in nearly period, it is above-mentioned Data are automatically pushed to person on duty by the power failure result that the judgement of active repair reporting system interface display is studied and judged in distribution power failure.
A kind of method is actively reported for repairment based on intelligent electric meter data processing 2. according to claim 1, it is characterised in that: institute It states in step 2, the scan period is 10-30 seconds/time.
A kind of method is actively reported for repairment based on intelligent electric meter data processing 3. according to claim 2, it is characterised in that: institute It states in step 2, the scan period is 20 seconds/time.
A kind of method is actively reported for repairment based on intelligent electric meter data processing 4. according to claim 1, it is characterised in that: institute State in (1) of step 2, with a low credibility area's condition: periphery interference is big or meter reliability is low, deposits in history within a certain period of time Upload the platform area of a large amount of power failure data;Power failure data reliability evaluation is monthly carried out, it is more will to occur upload power failure data in one day And non-genuine radio area of stopping is evaluated as the area power failure data reliability Di Tai.
A kind of method is actively reported for repairment based on intelligent electric meter data processing 5. according to claim 1, it is characterised in that: institute It states in step 3, will delay power-off event the time and call survey together for a period of time is 30 seconds.
CN201811616555.3A 2018-12-27 2018-12-27 It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing Pending CN109742854A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811616555.3A CN109742854A (en) 2018-12-27 2018-12-27 It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811616555.3A CN109742854A (en) 2018-12-27 2018-12-27 It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing

Publications (1)

Publication Number Publication Date
CN109742854A true CN109742854A (en) 2019-05-10

Family

ID=66361520

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811616555.3A Pending CN109742854A (en) 2018-12-27 2018-12-27 It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing

Country Status (1)

Country Link
CN (1) CN109742854A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110058126A (en) * 2019-05-29 2019-07-26 国网北京市电力公司 Distribution network failure judgment method and device
CN110673079A (en) * 2019-08-23 2020-01-10 北京中电飞华通信股份有限公司 Platform district end sensing system and method
CN110954777A (en) * 2019-10-25 2020-04-03 国网浙江平湖市供电有限公司 Intelligent fault repair and judgment method for low-voltage distribution network
CN111142047A (en) * 2019-12-31 2020-05-12 国网河北省电力有限公司 Automatic studying and judging method based on power distribution internet of things power failure
CN111562460A (en) * 2020-03-24 2020-08-21 广东电网有限责任公司广州供电局 Power distribution network power failure event detection research and judgment method, device, computer equipment and medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103248122A (en) * 2013-04-27 2013-08-14 国家电网公司 Active reporting system for power failure
CN103679556A (en) * 2013-12-16 2014-03-26 广东电网公司佛山供电局 System and method for intelligently diagnosing distribution transform terminal power failure warning
CN104766185A (en) * 2015-05-06 2015-07-08 国网山东省电力公司 Regional power grid power outage information studying and judging system and method based on power grid power outage characteristics
CN107748315A (en) * 2017-09-14 2018-03-02 国家电网公司 A kind of Distribution Network Failure active forewarning method
CN108448726A (en) * 2018-04-17 2018-08-24 宁波三星医疗电气股份有限公司 A kind of report method of electric system power-off event

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103248122A (en) * 2013-04-27 2013-08-14 国家电网公司 Active reporting system for power failure
CN103679556A (en) * 2013-12-16 2014-03-26 广东电网公司佛山供电局 System and method for intelligently diagnosing distribution transform terminal power failure warning
CN104766185A (en) * 2015-05-06 2015-07-08 国网山东省电力公司 Regional power grid power outage information studying and judging system and method based on power grid power outage characteristics
CN107748315A (en) * 2017-09-14 2018-03-02 国家电网公司 A kind of Distribution Network Failure active forewarning method
CN108448726A (en) * 2018-04-17 2018-08-24 宁波三星医疗电气股份有限公司 A kind of report method of electric system power-off event

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110058126A (en) * 2019-05-29 2019-07-26 国网北京市电力公司 Distribution network failure judgment method and device
CN110673079A (en) * 2019-08-23 2020-01-10 北京中电飞华通信股份有限公司 Platform district end sensing system and method
CN110673079B (en) * 2019-08-23 2021-12-14 北京中电飞华通信股份有限公司 Platform district end sensing system and method
CN110954777A (en) * 2019-10-25 2020-04-03 国网浙江平湖市供电有限公司 Intelligent fault repair and judgment method for low-voltage distribution network
CN111142047A (en) * 2019-12-31 2020-05-12 国网河北省电力有限公司 Automatic studying and judging method based on power distribution internet of things power failure
CN111562460A (en) * 2020-03-24 2020-08-21 广东电网有限责任公司广州供电局 Power distribution network power failure event detection research and judgment method, device, computer equipment and medium

Similar Documents

Publication Publication Date Title
CN109742854A (en) It is a kind of that method is actively reported for repairment based on intelligent electric meter data processing
CN105785201B (en) A kind of power distribution network fault analysis method and study and judge system
CN104360208A (en) Acquisition failure analyzing and processing method of electricity utilization information acquisition operating and maintaining system
CN110289682A (en) A kind of distribution repairing aid decision and intelligent managing and control system
CN103874122A (en) Special transformer terminal network signal collecting system and method
US11740266B2 (en) Systems and methods for monitoring energy-related data in an electrical system
CN104539051A (en) Online evaluation system of secondary equipment of intelligent substation
CN104730458A (en) Method for monitoring state of generator excitation system
CN103325019A (en) Event-driven power grid fault information judgment method
CN111934424B (en) Intelligent fault studying and judging system and method for power distribution network
CN107272572B (en) A method of crane efficiency/efficiency is analyzed by MHCIMS
CN104821789A (en) Method for detecting reliability of photovoltaic power generation system
Herath et al. Power quality (PQ) survey reporting: discrete disturbance limits
CN115760073A (en) Transformer substation equipment maintenance system and method based on BIM model
EP3200306B1 (en) Control device for hvdc system and method of operating the same
CN114035466B (en) Control system of duplex position magnetic sheet arrangement machine
CN103279520B (en) Power substation secondary system failure reconnaissance method
CN108933482B (en) Power distribution terminal equipment off-line reason analysis method based on wireless signal intensity
CN108695974B (en) Method for judging power failure of 10 KV line trunk line
CN110501963B (en) Intelligent energy management system
CN103053144B (en) The method and apparatus of communication system traffic distribution
CN113030562A (en) Environment-friendly facility power consumption monitoring system
CN113098046A (en) Offshore shore power flexible direct current converter valve monitoring system
Okozi et al. Reliability assessment of Nigerian power systems case study of 330kv transmission lines in Benin sub–region
CN111008787A (en) Planned power failure active monitoring and scheduling method based on metering terminal alarm technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190510