CN101944284A - Low voltage resident centralized meter reading management system - Google Patents

Low voltage resident centralized meter reading management system Download PDF

Info

Publication number
CN101944284A
CN101944284A CN2010102883947A CN201010288394A CN101944284A CN 101944284 A CN101944284 A CN 101944284A CN 2010102883947 A CN2010102883947 A CN 2010102883947A CN 201010288394 A CN201010288394 A CN 201010288394A CN 101944284 A CN101944284 A CN 101944284A
Authority
CN
China
Prior art keywords
electric energy
energy meter
data transmission
transmission channel
adopt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102883947A
Other languages
Chinese (zh)
Inventor
常强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kaifeng Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Kaifeng Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kaifeng Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Kaifeng Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN2010102883947A priority Critical patent/CN101944284A/en
Publication of CN101944284A publication Critical patent/CN101944284A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The invention relates to a meter reading system, particularly relating to a low-voltage resident centralized meter reading management system comprising four parts of an electric energy meter, a collector, a concentrator and a meter reading calculator; the concrete standard requirements of each part are as follows: an electric energy data transmission channel requires that a user electric energy meter needs to adopt a single-phase or three-phase four-line electronic type electric energy meter with a RS485 interface as required; a user check electric energy meter needs to adopt a three-phase four-line electronic type electric energy meter with the RS485 interface as required; each electric energy meter 485 transmission convention is required to satisfy the published 645 convention and the supplemented convention provided by our company; the requirements of a collector data transmission channel are as follows: the communication between the collector uplink and the concentrator needs to adopt a low-voltage electronic line as a data transmission channel; the communication between the collector downlink and the electric energy meter needs to adopt a RS485 line as the data transmission channel. The low-voltage resident centralized meter reading management system of the invention overcomes the above defects, thus having the following advantages of high meter reading efficiency, strong system operation reliability, strong anti-interference ability and accurate zero data storage and the like.

Description

Low pressure resident's collection is copied management system
Technical field
The present invention relates to a kind of kilowatt meter reading-out system, particularly a kind of low pressure resident's collection is copied management system.
Background technology
Current, the data collection task of ammeter is still adopted by the person of exceeding standard and is finished by the building classic method of entering the room of knocking at the door from door to door, occurred a lot of drawbacks like this, at first, needed to drop into great amount of manpower and go the work of checking meter, and, check meter owing to need enter the room, also reduced security of users, simultaneously, the inaccuracy that also has some manual meterings, thus the leak of corrupting produced.Along with the understanding of people to these drawbacks, the super table of some self-actions system has appearred, for example adopt the automatic card-scanning type of watt-hour meter, yet adopt aforesaid way need more renew table, and the electric energy meter of this card-scanning type costs an arm and a leg usually, to some older sub-districts, or the city that development level falls behind relatively can't be effectively universal.Simultaneously, along with China enlarges day by day the needs of electric energy and to the reasonable utilization of electric energy, the modes of the different valuation of high low peak occurred, still be that electronic electric energy meter all can't accurate measurement and adopt old-fashioned mechanical electric energy meter
Summary of the invention
Low pressure resident of the present invention collection is copied management system and has been overcome above-mentioned scarce limit, thereby has following advantage: copy that rate height, system's operational reliability are strong, antijamming capability by force, advantage such as zero data preservation accurately
Native system is made up of electric energy meter, collector, concentrator, computing machine four parts of checking meter, and the concrete standard-required of each several part is as follows:
1. the electric energy meter data transmission channel requires:
User's electric energy meter requires to adopt single-phase, the three-phase and four-line electronic electric energy meter that has the RS485 interface;
The user examines the electric energy meter requirement to adopt the three-phase and four-line electronic electric energy meter that has the RS485 interface;
Various electric energy meter 485 transmission protocols must satisfy the additional stipulations that 645 stipulations promulgated by the ministries or commissions of the Central Government and my company provide;
2. collector data transmission channel standard:
Collector up with concentrator between communicate by letter and must adopt low-voltage power line as data transmission channel; Communicating by letter between descending and the electric energy meter must adopt the RS485 line as data transmission channel;
3. concentrator data transmission channel standard:
Concentrator is up to adopt PSDN (talking path, city) as data transmission channel with the compunication requirement of checking meter, communicate by letter between descending and the collector must the employing low-voltage power line as data transmission channel.
Description of drawings
Fig. 1 is that this low pressure resident collection is copied the topological diagram of management system
Embodiment
Native system is made up of electric energy meter, collector, concentrator, computing machine four parts of checking meter, and the concrete standard-required of each several part is as follows:
2, data transmission channel requirement
1. the electric energy meter data transmission channel requires:
User's electric energy meter requires to adopt single-phase, the three-phase and four-line electronic electric energy meter that has the RS485 interface;
The user examines the electric energy meter requirement to adopt the three-phase and four-line electronic electric energy meter that has the RS485 interface;
Various electric energy meter 485 transmission protocols must satisfy the additional stipulations that 645 stipulations promulgated by the ministries or commissions of the Central Government and my company provide.
2. collector data transmission channel standard:
Collector up with concentrator between communicate by letter and must adopt low-voltage power line as data transmission channel, communicating by letter between descending and the electric energy meter must adopt the RS485 line as data transmission channel.
Concentrator data transmission channel standard:
Concentrator is up to adopt PSDN (talking path, city) as data transmission channel with the compunication requirement of checking meter, communicate by letter between descending and the collector must the employing low-voltage power line as data transmission channel.
System of the present invention has following advantage:
The high native system of the rate of copying guarantees that once the rate of copying reaches 95% in 500 meters radius of electricity supply scopes.Concentrator can guarantee to realize that by carrier wave on average every electric energy meter is copied 8 times every day at least.
The strong present most of carrier wave centralized meter-reading system of system's operational reliability is because the distance of checking meter is as one wishes not to the utmost, the route meter reading methods that adopt more, electric energy meter was copied equipment as commentaries on classics in the middle of both having used for the distant electric energy meter of relative concentrator, changeed by the one-level level and copied and could copy electric energy meter.In the practical application, some system uses nearly 5 grades of routes.This mode is brought two fatal problems, and the one, increased the time of checking meter greatly, the checking meter the time of 10 times of 5 grades of minimum needs of route, this still can both guarantee under the case of successful in each route; The 2nd, greatly reduce reliability of system operation, because, certainly will influence normally making a copy of of a sheet of electric energy meter once the electric energy meter that commentaries on classics is copied as route breaks down.System checks meter and all adopts directly point-to-point mode of making a copy of electric energy meter of concentrator, does not need any route relaying.Therefore system a certain intermediate link fault can not occur and causes system's affected situation of large tracts of land of checking meter, and yet fast relatively many of the speed of checking meter.
Antijamming capability is strong
Carrier wave centralized meter-reading system antijamming capability is by force to be based upon on following three bases:
1. the carrier wave data that transmit an electric energy meter comprise synchronously, verification etc., by encoding compression 5 bytes of need only.Data packet length is short more, and the degree that is interfered is just low more.
2. the system carrier frequency of operation is 15KHz, therefore has superpower signal penetration power, and the signal to noise ratio (S/N ratio) of terminal signal is improved greatly.
3. carrier wave only transmits data " 0 ", makes the content of data transmission reduce half, and disturbed probability also reduces half thereupon.
Automatically seek table function
What is called is sought table automatically, is exactly that concentrator adopts a kind of specific way of search by carrier channel, all electric energy meters under automatically platform being become fast one by one search inquiry arrive, and office is indexed in the concentrator by carrier channel with electric energy meter information such as numbering, addresses.Generally speaking, be example with 200 electric energy meters, 80% electric energy meter can be found in 30 minutes.Automatically seeking table is an important function, and it greatly reduces Installation and Debugging personnel's the workload and the debugging cycle of system, and has avoided the error of slipping up and causing because of artificial Information Monitoring.
The foundation of news file is a very loaded down with trivial details job in the carrier system debugging work, and installation personnel at first needs to add up one by one the office of all electric energy meters of installation with electric energy meter information such as numbering, address, installation sites, and manual entry is in computing machine then.After realizing looking for table function automatically, installation personnel send after finishing the installation of collector, concentrator, system can automatic office with electric energy meter preserve with electric energy meter information such as numbering, address, the table truth of a matter, and host computer gets final product by " electric energy meter data upload " order all information are imported computing machine.Can finish the work of setting up of news file after the importing middle database information, time saving and energy saving.The commissioning staff can very easily finish system debug work according to these news files.
The obstacle of realizing this function maximum is that carrier system must guarantee to have the high rate of copying.
Change table information automatic recording function
Before not having this function, after changing the table handling personnel and finishing electric energy meter and change, at first to write down the old electric energy meter table truth of a matter, will change the table work ticket then and deliver the power consuming administrative system operator according to, new electric energy meter table truth of a matter certificate.Operator's new, old electric energy meter information input power consuming administrative system of will being correlated with again carries out information translation.
After realizing this function, system's regulation when design per hour starts new table query function once automatically.After changing the table handling personnel and finishing electric energy meter and change, system can retrieve automatically in one hour at most and newly change electric energy meter, and write down old electric energy meter automatically and finally show the truth of a matter and begin to show truth of a matter certificate according to, new electric energy meter, all information stores such as automatic simultaneously table office newly numbering, address are in concentrator, when host computer is checked meter, according to user account number relevant information is imported in the host computer database automatically, need not manually carry out any typing work of changing table information system.
The realization of this function must have the height of the carrier wave rate of copying to be the basis.
Long-range arrearage notice
Most of resident's arrearages are not malice, rely on manpower to notify the resident of arrearage one by one, and finishing and calling the work of taking a lot of work as a very loaded down with trivial details thing.Do you how the automatic accurate errorless notice of arrearage information be arrived each defaulting subscriber? this is the problem that the carrier wave centralized meter-reading system need solve.System can realize long-range arrearage informing function at present.Operating personnel can be glimmered by the very convenient Long-distance Control defaulting subscriber electric energy meter arrearage pilot lamp of finishing of computing machine, and also remote controlled time of fire alarming section and time of fire alarming length free the meter reading personnel from loaded down with trivial details work.
Realize that this function carrier system not only will have the very high rate of copying, and also must have very high data transmission credibility.
Long-range notics of charge (enhanced functional I needs to increase the demonstration annex)
In the sub-district of realizing carrier meter reading system, by installing the demonstration annex additional, the menology truth of a matter in the long-range transmission, this menology truth of a matter, this month power consumption, this month should the pay dues amount of money etc. call the microform display device of charge information to each building, thereby realize long-range notics of charge.User's paying information roll display, the user is by the button fast query paying information separately of display screen.
Zero data is preserved accurately
System adopts the mode of freezing to realize what zero data was preserved.All have clock in the collector, the table truth of a matter that collector will connect electric energy meter down by 485 channels during zero point every day is saved in the internal memory (storage chip can guarantee that collector outage do not lose data in 10 years) according to making a copy of, concentrator was copied back each electric energy meter zero data one by one by carrier channel after zero point.Because system can guarantee that the minimum height of copying 8 times of every electric energy meter every day copies rate, zero data can not occur and gather and untimelyly cause the phenomenon that the date covers dislocation, and guarantee that each electric energy meter zero data makes a copy of the error of time less than 20s.Therefore be right-on as the line loss analyzing data source.
Although the present invention here specifically describes in conjunction with the specific embodiments, but be understandable that this is illustration rather than restriction, under the prerequisite of the spirit of the present invention that does not break away from accessory claim and limited, in the scope of and accompanying drawing disclosed at preamble, it all is possible reasonably changing and revising.

Claims (1)

1. a low pressure resident collection is copied management system, and native system is made up of electric energy meter, collector, concentrator, computing machine four parts of checking meter, and the concrete standard-required of each several part is as follows:
1. the electric energy meter data transmission channel requires:
User's electric energy meter requires to adopt single-phase, the three-phase and four-line electronic electric energy meter that has the RS485 interface;
The user examines the electric energy meter requirement to adopt the three-phase and four-line electronic electric energy meter that has the RS485 interface;
Various electric energy meter 485 transmission protocols must satisfy the additional stipulations that 645 stipulations promulgated by the ministries or commissions of the Central Government and my company provide;
2. collector data transmission channel standard:
Collector up with concentrator between communicate by letter and must adopt low-voltage power line as data transmission channel; Communicating by letter between descending and the electric energy meter must adopt the RS485 line as data transmission channel;
3. concentrator data transmission channel standard:
Concentrator is up to adopt PSDN (talking path, city) as data transmission channel with the compunication requirement of checking meter, communicate by letter between descending and the collector must the employing low-voltage power line as data transmission channel.
CN2010102883947A 2010-09-21 2010-09-21 Low voltage resident centralized meter reading management system Pending CN101944284A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102883947A CN101944284A (en) 2010-09-21 2010-09-21 Low voltage resident centralized meter reading management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102883947A CN101944284A (en) 2010-09-21 2010-09-21 Low voltage resident centralized meter reading management system

Publications (1)

Publication Number Publication Date
CN101944284A true CN101944284A (en) 2011-01-12

Family

ID=43436262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102883947A Pending CN101944284A (en) 2010-09-21 2010-09-21 Low voltage resident centralized meter reading management system

Country Status (1)

Country Link
CN (1) CN101944284A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102142863A (en) * 2011-01-30 2011-08-03 重庆电力科学试验研究院 Data reporting method and system
CN102495315A (en) * 2011-12-08 2012-06-13 重庆市电力公司电力科学研究院 Method and system for split-phase line loss measurement
CN102637352A (en) * 2012-02-23 2012-08-15 国网信息通信有限公司 Remote meter reading method and system, primary electric energy meter and secondary electric energy meter
CN102855743A (en) * 2011-06-30 2013-01-02 北京新媒传信科技有限公司 Meter reading system and method
CN105632156A (en) * 2015-12-30 2016-06-01 宁波三星医疗电气股份有限公司 Data transmission method for four-meter centralized reading system
CN108732977A (en) * 2018-08-30 2018-11-02 四川中电启明星信息技术有限公司 A kind of collecting method and system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102142863A (en) * 2011-01-30 2011-08-03 重庆电力科学试验研究院 Data reporting method and system
CN102855743A (en) * 2011-06-30 2013-01-02 北京新媒传信科技有限公司 Meter reading system and method
CN102495315A (en) * 2011-12-08 2012-06-13 重庆市电力公司电力科学研究院 Method and system for split-phase line loss measurement
CN102637352A (en) * 2012-02-23 2012-08-15 国网信息通信有限公司 Remote meter reading method and system, primary electric energy meter and secondary electric energy meter
CN102637352B (en) * 2012-02-23 2014-07-30 国网信息通信有限公司 Remote meter reading method and system, primary electric energy meter and secondary electric energy meter
CN105632156A (en) * 2015-12-30 2016-06-01 宁波三星医疗电气股份有限公司 Data transmission method for four-meter centralized reading system
CN105632156B (en) * 2015-12-30 2019-01-29 宁波三星医疗电气股份有限公司 A kind of data transmission method for four table centralized meter-reading systems
CN108732977A (en) * 2018-08-30 2018-11-02 四川中电启明星信息技术有限公司 A kind of collecting method and system

Similar Documents

Publication Publication Date Title
CN101944284A (en) Low voltage resident centralized meter reading management system
CN101231780A (en) Remote meter reading system based on RF and GPRS radio network
CN203192219U (en) Electric energy meter collector with rapid reading function
CN105490722A (en) General packet radio service (GPRS) network communication repeater
CN208766825U (en) A kind of LoRa meeting southern network mark standard and carrier wave dual mode communication module
CN103646524B (en) A kind of communication means of double-mode local communication module device of electric energy meter
CN108074387A (en) Kilowatt meter reading-out system
CN203910000U (en) Concentrator electricity meter reading on-site communication failure analysis system based on mobile phone Bluetooth
CN105427569A (en) Intelligent meter reading system and meter reading method thereof
CN103280085A (en) Intelligent remote metering control system for cities and towns
CN102185747A (en) Automatic remote meter reading system
CN102708624B (en) Prepayment electricity utilization management terminal
CN204904026U (en) Environmental protection data acquisition device
CN104181386A (en) Single-phase fee charged intelligent ammeter
CN206097452U (en) GPRS signal conversion equipment
CN104678167A (en) Intelligent electric energy meter and public utility meter reading system
CN202120433U (en) Meter reading system
CN102830281B (en) A kind of intelligent electric energy meter and utility meter kilowatt meter reading-out system
CN106647582A (en) Energy control and management device, method and system
CN203242151U (en) Ultra-low power consumption GPRS (general packet radio service) remote water meter device
CN104680769A (en) Bluetooth-to-infrared meter reading system of intelligent mobile phone
CN208207193U (en) A kind of family table examination device
CN207637292U (en) A kind of kilowatt meter reading-out system
CN207895495U (en) A kind of intelligent property water, electricity and gas kilowatt meter reading-out system
CN106056885A (en) Internet of things and ZigBee-based intelligent water meter reading system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110112