CN108726368A - A kind of crane fixing device and its construction method - Google Patents

A kind of crane fixing device and its construction method Download PDF

Info

Publication number
CN108726368A
CN108726368A CN201810561773.5A CN201810561773A CN108726368A CN 108726368 A CN108726368 A CN 108726368A CN 201810561773 A CN201810561773 A CN 201810561773A CN 108726368 A CN108726368 A CN 108726368A
Authority
CN
China
Prior art keywords
embedded bar
crane
track
steel
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810561773.5A
Other languages
Chinese (zh)
Inventor
吴周平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Gang Source Electronic Technology Co Ltd
Original Assignee
Henan Gang Source Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Gang Source Electronic Technology Co Ltd filed Critical Henan Gang Source Electronic Technology Co Ltd
Priority to CN201810561773.5A priority Critical patent/CN108726368A/en
Publication of CN108726368A publication Critical patent/CN108726368A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • B66C5/04Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods with runways or tracks supported for movements relative to bridge or gantry
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C17/00Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
    • B66C17/04Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports with lifting beams, e.g. slewable beams, carrying load-engaging elements, e.g. magnets, hooks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of crane fixing device of present invention offer and construction method, vertical embedded bar, horizontal embedded bar are respectively set on bracket and framed bent, and it is made to be fixedly connected with track beam steel, to form firm framework of steel reinforcement structure, track girder becomes fixed end structure, forms fixed constraint, and vertical embedded bar passes through backing plate, I-steel lower flange, track, backing plate, track girder and bracket are connected to become entirety, improve the whole fixed performance of structure.

Description

A kind of crane fixing device and its construction method
Technical field
The present invention relates to factory building fields, and in particular to a kind of crane fixing device and its construction method.
Background technology
In factory building, in the hall space for especially needing lifting large-sized object, such as Bridge Erector workshop, Hydroelectric Plant Room etc. generally requires to lift by crane mobile large-sized object, such as the parts of Bridge Erector, turbine-generator units from facility floor, these Often volume weight is very big for object, and needs the compound actions such as swivel, by manpower, mobile handling can not be carried out, therefore, big It generally requires to build crane fixing device according to requirements in type industrial building, realizes the movement of parts.
It for crane, needs to move, therefore sets up and set crane moving track and the track girder of cooperation, this is stress Key area, since bearing load is larger, and working condition sometimes be simply-supported state, the loss of stability work of structure can be caused Make, then influences the whole of structure and use.
How crane girder, track are fixed, are that crane builds the important process used, present common measure is all External reinforcing mode, reinforcement performance is limited, does not make structure that the structure of fixing end be integrally formed, therefore, when with using Between growth, still will produce certain destruction.
Invention content
The present invention is directed to problem of the prior art, provides a kind of crane fixing device and its construction method.
The present invention provides a kind of crane fixing device, including framed bent, bracket, crane, crane girder and track, the bracket position In the framed bent top, crane girder is located on bracket, and track is arranged on crane girder, and crane moves in orbit, and feature exists In:Be provided with vertical embedded bar on the bracket, be provided with horizontal embedded bar on framed bent, the crane beam steel with it is described Horizontal embedded bar and the vertical embedded bar are fixedly connected, to improve crane girder fixed performance, the track with hang Resilient sleeper-bearing is set between bicycle beam, the track is i-beam structure, the vertical embedded bar pass through the resilient sleeper-bearing with And it is fixed behind the lower flange of the i-beam structure, to realize the fixation of crane beam orbit.
Preferably, the yield strength of the horizontal embedded bar and the vertical embedded bar is not less than 325MP.
Preferably, the vertical embedded bar is behind the lower flange of the resilient sleeper-bearing and the i-beam structure Fixed concrete mode is:Nut is arranged in the part that the I-steel lower flange is stretched out in the vertical embedded bar, and makes spiral shell It is female to be welded and fixed with vertical embedded bar.
The present invention also provides a kind of construction methods of crane fixing device, it is characterised in that includes the following steps:
S1:Framed bent reinforcing bar and bracket reinforcing bar are bound, the framework of steel reinforcement of framed bent and bracket is formed, the bracket reinforcing bar includes vertical pre- Reinforcing bar is buried, the framed bent reinforcing bar includes horizontal embedded bar;
S2:Track beam steel is bound on the horizontal embedded bar and the vertical embedded bar, and forms track beam steel Skeleton;
S3:Erected support template, bracket template and track beam form respectively, casting concrete are simultaneously conserved to design strength, it Form removal afterwards;
S4:Resilient sleeper-bearing is set on the track girder, the hole passed through for vertical embedded bar is offered on the resilient sleeper-bearing;
S4:The track of I-steel is lifted by crane, the lower flange of the I-steel offers the hole to match with vertical embedded bar, by work The lower flange of word steel is placed on the resilient sleeper-bearing, and vertical embedded bar is made to pass through the hole being arranged on the lower flange;
S5:The nut is set on the vertical embedded bar, so that nut is close to the upper surface of I-steel lower flange, and weld The fixed nut and vertical embedded bar, build completion.
The advantage of the invention is that:
Vertical embedded bar, horizontal embedded bar are respectively set on bracket and framed bent, and so that it is fixed with track beam steel and connects It connects, to form firm framework of steel reinforcement structure, track girder becomes fixed end structure, forms fixed constraint, vertical embedded bar Across backing plate, I-steel lower flange, track, backing plate, track girder and bracket are connected to become entirety, the entirety for improving structure is solid Qualitative energy.
Description of the drawings:
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the fixation schematic diagram of track girder;
Fig. 3 is that track is fixedly connected with schematic diagram.
Specific implementation mode:The structure that the present invention limits specifically is explained below for Figure of description content Explanation.
The present invention provides a kind of crane fixing device, including framed bent 1, bracket 2, crane 3, crane girder 4 and track 5, described Bracket 2 is located at 1 top of the framed bent, and crane girder 4 is located on bracket 2, and track 5 is arranged on crane girder 4, and crane 3 is on the rail 5 It is mobile, it is characterised in that:It is provided with vertical embedded bar 6 on the bracket 2, horizontal embedded bar 7, institute are provided on framed bent 1 It states 4 reinforcing bar of crane girder to be fixedly connected with the horizontal embedded bar 7 and the vertical embedded bar 6, to improve crane girder 4 Resilient sleeper-bearing 8 is arranged in fixed performance between the track 5 and crane girder 4, the track 5 is i-beam structure, described vertical pre- It is fixed behind the lower flange of the resilient sleeper-bearing 8 and the i-beam structure to bury reinforcing bar 6, to realize 4 track of crane girder Fixation.
Preferably, the yield strength of the horizontal embedded bar 7 and the vertical embedded bar 6 is not less than 325MP.
Preferably, the vertical embedded bar 6 passes through the lower flange of the resilient sleeper-bearing 8 and the i-beam structure Fixed concrete mode is afterwards:Nut 9 is arranged in the part that the I-steel lower flange is stretched out in the vertical embedded bar 6, and Nut 9 is set to be welded and fixed with vertical embedded bar 6.
The present invention also provides a kind of construction methods of crane fixing device, it is characterised in that includes the following steps:
S1:1 reinforcing bar of framed bent and 2 reinforcing bar of bracket are bound, the framework of steel reinforcement of framed bent 1 and bracket 2 is formed, 2 reinforcing bar of the bracket includes Vertical embedded bar 6,1 reinforcing bar of the framed bent includes horizontal embedded bar 7;
S2:4 reinforcing bar of crane girder is bound on the horizontal embedded bar 7 and the vertical embedded bar 6, and forms crane girder 4 Framework of steel reinforcement;
S3:1 template of erected support, 4 template of 2 template of bracket and crane girder respectively, casting concrete are simultaneously conserved to design strength, Form removal later;
S4:Resilient sleeper-bearing 8 is set on the crane girder 4, offers on the resilient sleeper-bearing 8 and is passed through for vertical embedded bar 6 Hole;
S4:The track 5 of I-steel is lifted by crane, the lower flange of the I-steel offers the hole to match with vertical embedded bar 6, will The lower flange of I-steel is placed on the resilient sleeper-bearing 8, and vertical embedded bar 6 is made to be arranged on the lower flange Hole;
S5:The nut 9 is set on the vertical embedded bar 6, nut 9 is made to be close to the upper surface of I-steel lower flange, and It is welded and fixed the nut 9 and vertical embedded bar 6, builds completion.
The above embodiment is only the preferred embodiment of the present invention, and protection scope of the present invention is not construed as only limiting In the concrete form that embodiment is stated, protection scope of the present invention also includes those skilled in the art according to present inventive concept institute It is conceivable that equivalent technologies mean.

Claims (4)

1. a kind of crane fixing device, including framed bent, bracket, crane, crane girder and track, the bracket is located on the framed bent Portion, crane girder are located on bracket, and track is arranged on crane girder, and crane moves in orbit, it is characterised in that:On the bracket It is provided with vertical embedded bar, horizontal embedded bar, the crane beam steel and the horizontal embedded bar are provided on framed bent And the vertical embedded bar is fixedly connected, and to improve crane girder fixed performance, is arranged between the track and crane girder Resilient sleeper-bearing, the track are i-beam structure, and the vertical embedded bar passes through the resilient sleeper-bearing and the I-steel It is fixed behind the lower flange of structure, to realize the fixation of crane beam orbit.
2. crane fixing device as described in claim 1, it is characterised in that:The horizontal embedded bar and described vertical pre-buried The yield strength of reinforcing bar is not less than 325MP.
3. crane fixing device as described in claim 1, it is characterised in that:The vertical embedded bar passes through the cushion Fixed concrete mode is behind the lower flange of plate and the i-beam structure:The I-shaped is stretched out in the vertical embedded bar Nut is arranged in the part of steel lower flange, and nut is made to be welded and fixed with vertical embedded bar.
4. a kind of construction method of crane fixing device as described in any one of claims 1-3, it is characterised in that including as follows Step:
S1:Framed bent reinforcing bar and bracket reinforcing bar are bound, the framework of steel reinforcement of framed bent and bracket is formed, the bracket reinforcing bar includes vertical pre- Reinforcing bar is buried, the framed bent reinforcing bar includes horizontal embedded bar;
S2:Track beam steel is bound on the horizontal embedded bar and the vertical embedded bar, and forms track beam steel Skeleton;
S3:Erected support template, bracket template and track beam form respectively, casting concrete are simultaneously conserved to design strength, it Form removal afterwards;
S4:Resilient sleeper-bearing is set on the track girder, the hole passed through for vertical embedded bar is offered on the resilient sleeper-bearing;
S4:The track of I-steel is lifted by crane, the lower flange of the I-steel offers the hole to match with vertical embedded bar, by work The lower flange of word steel is placed on the resilient sleeper-bearing, and vertical embedded bar is made to pass through the hole being arranged on the lower flange;
S5:The nut is set on the vertical embedded bar, so that nut is close to the upper surface of I-steel lower flange, and weld The fixed nut and vertical embedded bar, build completion.
CN201810561773.5A 2018-06-04 2018-06-04 A kind of crane fixing device and its construction method Pending CN108726368A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810561773.5A CN108726368A (en) 2018-06-04 2018-06-04 A kind of crane fixing device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810561773.5A CN108726368A (en) 2018-06-04 2018-06-04 A kind of crane fixing device and its construction method

Publications (1)

Publication Number Publication Date
CN108726368A true CN108726368A (en) 2018-11-02

Family

ID=63931658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810561773.5A Pending CN108726368A (en) 2018-06-04 2018-06-04 A kind of crane fixing device and its construction method

Country Status (1)

Country Link
CN (1) CN108726368A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2876039Y (en) * 2006-01-26 2007-03-07 贵阳铝镁设计研究院 Crane beam location layout structure of single layer multi overhead row beam column
EP2218825A2 (en) * 2009-02-13 2010-08-18 SSF Ingenieure GmbH Bridge for railways and girders and method for its manufacture
CN103572973A (en) * 2013-11-11 2014-02-12 江苏翔森建设工程有限公司 Construction method for arranging steel corbel on concrete frame column
CN204938757U (en) * 2015-08-18 2016-01-06 中国电建集团贵阳勘测设计研究院有限公司 The connection structure of a kind of crane girder and bracket
CN208561457U (en) * 2018-06-04 2019-03-01 河南罡源电子科技有限公司 A kind of fixed device of crane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2876039Y (en) * 2006-01-26 2007-03-07 贵阳铝镁设计研究院 Crane beam location layout structure of single layer multi overhead row beam column
EP2218825A2 (en) * 2009-02-13 2010-08-18 SSF Ingenieure GmbH Bridge for railways and girders and method for its manufacture
CN103572973A (en) * 2013-11-11 2014-02-12 江苏翔森建设工程有限公司 Construction method for arranging steel corbel on concrete frame column
CN204938757U (en) * 2015-08-18 2016-01-06 中国电建集团贵阳勘测设计研究院有限公司 The connection structure of a kind of crane girder and bracket
CN208561457U (en) * 2018-06-04 2019-03-01 河南罡源电子科技有限公司 A kind of fixed device of crane

Similar Documents

Publication Publication Date Title
CN103243654B (en) Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN107090975B (en) Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN102587286A (en) Simply supported-continuous construction method for bridge superstructure
CN103352428A (en) Suspension bridge cable bent tower beam non-support construction method
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN108842954A (en) A kind of huge different section Honeycomb Beam structural system construction method of installation of aerofoil profile roofing
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
JP2020002778A (en) Bridge pier construction method
CN202430994U (en) Template limiting clamp
CN103470036A (en) Overhanging structure construction method
CN108978478A (en) Bridge cast-in-situ box-beam deck-type bearing frame system and its construction method
CN212129839U (en) Steel pipe reinforcing column structure
CN102155095B (en) Arranging method of concrete reinforcements of steel rib of large-scale metallurgical workshop
CN111809654A (en) Assembled tower crane foundation structure
CN104499706A (en) Elevator well template platform and construction method thereof
CN208561457U (en) A kind of fixed device of crane
CN108086695B (en) Auxiliary sleeve type lifting tool and construction method
CN208830171U (en) Bridge cast-in-situ box-beam deck-type bearing frame system
CN108726368A (en) A kind of crane fixing device and its construction method
CN105464215A (en) Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support
CN202899639U (en) Concrete column structure
CN102817467B (en) Operating platform for high-altitude installation of steel structure
CN114876209A (en) Steel reinforced beam sectional construction method for limited hoisting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181102